CN207348571U - Multistage linking pylon - Google Patents
Multistage linking pylon Download PDFInfo
- Publication number
- CN207348571U CN207348571U CN201721283691.6U CN201721283691U CN207348571U CN 207348571 U CN207348571 U CN 207348571U CN 201721283691 U CN201721283691 U CN 201721283691U CN 207348571 U CN207348571 U CN 207348571U
- Authority
- CN
- China
- Prior art keywords
- tower body
- level
- multistage
- side roller
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Electric Cable Installation (AREA)
Abstract
Multistage linking pylon is related to steel tower field, which includes:Multistage tower body, motor, roll, rope and pulley;There is fixed pulley on every layer of tower body of multistage tower body, rope one end of level-one tower body and the roll of motor are fixed, and pulley, two level tower body lower-left side roller, the two level tower body bottom right side roller for the upper left side for passing through level-one tower body, the upper right side of the other end and level-one tower body is fixed;Rope one end of two level tower body and the lower left side of level-one tower body are fixed, and by two level tower body upper left side roller, three-level tower body lower-left side roller, three-level tower body bottom right side roller, two level tower body upper right side roller, the lower right side of the other end and level-one tower body is fixed;Tower body component is together in series;The utility model reduces the loss of tower body entirety, easy to use, positive effect.The construction volume at the scene of can reducing, shortens construction period, ensures construction speed and construction quality, reduces the rent of the heavy suspender in scene, reduces construction cost.
Description
Technical field
It the utility model is related to steel tower field, and in particular to a kind of multistage linking pylon.
Background technology
At present, communicating, broadcast, TV signal lamp field carry out the transmission of wireless signal, tower extensively using communications tower
Frame be usually by metallic plate in layer be welded into high-rise pylon, form multiple tower bodies, finally again tower top installation signal receive
Transmitting apparatus.Need to use large-scale crane if gradually installed, in installation process, aerial work platform and others are big
Type equipment aids in, and construction trouble, heavy workload, there are certain danger by operating personnel.Pylon generally use weldering common in the past
The mode connect, it is necessary to install at the scene, site welding.Yet with the influence of environment, the rigidity and intensity of pad are difficult to protect
Card, it is difficult to make more than hundred meters of brandreth, that is, enables and produces more than hundred meters of brandreth, is also difficult to guarantee the security of brandreth, and
And the bad environments of site operation, construction quality are difficult to control, construction speed is influenced, also easily the safety belt of construction personnel is come
Hidden danger, is prone to accidents.
Utility model content
In order to solve the problems in the existing technology, the utility model provides a kind of multistage linking pylon, solves existing
There are the constructional difficulties in technology, there are the problem of certain security risk.
The utility model technical scheme applied to solve the technical problem is as follows:
Multistage linking pylon, the pylon include:Multistage tower body, motor, roll, rope and pulley;Multistage tower body it is every
There is fixed pulley on layer tower body, rope one end of level-one tower body and the roll of motor are fixed, and pass through a left side for level-one tower body
Pulley, two level tower body lower-left side roller, the two level tower body bottom right side roller of upside, the upper right side of the other end and level-one tower body is consolidated
It is fixed;Rope one end of two level tower body and the lower left side of level-one tower body are fixed, and pass through two level tower body upper left side roller, three-level tower body
Lower-left side roller, three-level tower body bottom right side roller, two level tower body upper right side roller, the lower right side of the other end and level-one tower body is consolidated
It is fixed;And so on, so that tower body component be together in series;During expansion, motor drives roll to rotate, and collapses rope, so that will
Multistage tower body mechanism expansion.
The beneficial effects of the utility model are:The utility model is by way of multistage linking by multistage tower body to set
Speed or time expansion, install multistage tower body under tower, are being not required the time of work simply to pack up, are reducing tower
The loss of body entirety, easy to use, positive effect.Can reduce scene construction volume, shorten construction period, ensure construction speed and
Construction quality, reduces the rent of the heavy suspender in scene, reduces construction cost.
Brief description of the drawings
Fig. 1 the utility model multistage linking pylon principle schematics.
The structure diagram of Fig. 2 the utility model pylons.
In figure:1st, motor, 2, roll, 3, rope, 4, pulley, 5, level-one tower body, 6, two level tower body, 7, three-level tower body,
8th, level Four tower body, 9, Pyatyi tower body, 10, six grades of tower bodies, 11, batter post, 12, principal post and 13, base for post.
Embodiment
The utility model is described in further details with reference to the accompanying drawings and examples.
In the present embodiment, multistage linking pylon is as shown in Figure 1, by motor 1, roll 2, rope 3, pulley 4, level-one tower body
5th, 9, six grades of two level tower body 6, three-level tower body 7, level Four tower body 8, Pyatyi tower body tower bodies 10 are formed;On every grade of tower body of multistage tower body
There is fixed pulley 4,3 one end of rope of level-one tower body 5 and the roll of motor 1 are fixed, and pass through the upper left side of level-one tower body 5
Pulley 4,6 lower-left side roller of two level tower body, 6 bottom right side roller of two level tower body, the upper right side of the other end and level-one tower body 5 is consolidated
It is fixed;Rope one end of two level tower body 6 and the lower left side of level-one tower body are fixed, and pass through 6 upper left side roller of two level tower body, three-level tower
7 lower-left side roller of body, 7 bottom right side roller of three-level tower body, 6 upper right side roller of two level tower body, the bottom right of the other end and level-one tower body 5
Side is fixed;And so on, so that tower body component be together in series;During expansion, motor 1 drives roll 2 to rotate, and collapses rope 3,
So as to which six grades of tower body mechanisms be unfolded., for multistage tower body mechanism (level-one~six grade) during being unfolded step by step, drive is corresponding
Pylon realizes axial expansion.
The pylon includes batter post 11 and principal post 12;Some batter posts 11 are connected with each other with principal post 12, collectively form pylon master
Body, the connection of its overall structure use triangle, and hyperbolic configuration design, i.e., the interconnection between brandreth is all with this two kinds of geometric forms
Based on shape.The base for post 13 that the principal post 12 is located at ground includes:Double-deck pilum plate, anchor bolt casing and reinforcing rib.It has
There is good anti seismic efficiency, and further strengthen the fixation to principal post 12.The base for post 13 of pylon structure principal post 12 uses
Double-deck base plated construction:Upper end base plate, lower base plate and the reinforcing rib positioned at upper end base plate and lower base plate.Pedestal
Surrounding arrangement anchor bolt, anchor bolt set double nut, make connection more constant.Bolt outer layer sets anchor bolt casing, institute
State bolt and dried using complex acid salt epithelium and cover processing, greatly strengthen resistance to corrosion, the service life is much higher than galvanized bolt.
Brandreth junction is connected using flange bolt or clamp plate type, i.e., the joint of described brandreth all uses flange bolt
Connect, connected at interconnection using clamp plate type, the connection between batter post 11 and principal post 12 is connected using clamp plate type;Principal post
Dock between principal post, docked between batter post and batter post, all connected using flange bolt formula.Flange face and batter post 11 it
Between be evenly arranged with some reinforcing ribs, it can regard the combination that centerbody and some cross sections are hollow rectangle as, save material
While material, the rigidity and intensity of junction are greatly enhanced, makes pylon overall more firm, it is safer.
Claims (4)
1. multistage linking pylon, it is characterised in that the pylon includes:Multistage tower body, motor, roll, rope and pulley;It is multistage
There is fixed pulley on every layer of tower body of tower body, rope one end of level-one tower body and the roll of motor are fixed, and pass through level-one
Pulley, two level tower body lower-left side roller, the two level tower body bottom right side roller of the upper left side of tower body, the right side of the other end and level-one tower body
Upside is fixed;Rope one end of two level tower body and the lower left side of level-one tower body are fixed, and pass through two level tower body upper left side roller, three
Level tower body lower-left side roller, three-level tower body bottom right side roller, two level tower body upper right side roller, the bottom right of the other end and level-one tower body
Side is fixed;And so on, so that tower body component be together in series;During expansion, motor drives roll to rotate, and collapses rope, from
And multistage tower body mechanism is unfolded.
2. multistage linking pylon according to claim 1, it is characterised in that the tower body is made of brandreth;Brandreth docks
Place is connected using flange bolt;Flat connection is used at brandreth interconnection.
3. multistage linking pylon according to claim 2, it is characterised in that the brandreth includes:Principal post and batter post;It is described
The pedestal of principal post includes:Double-deck pilum plate, anchor bolt casing and reinforcing rib.
4. multistage linking pylon according to claim 1, it is characterised in that the series of the multistage tower body is 2-10.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721283691.6U CN207348571U (en) | 2017-09-30 | 2017-09-30 | Multistage linking pylon |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721283691.6U CN207348571U (en) | 2017-09-30 | 2017-09-30 | Multistage linking pylon |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207348571U true CN207348571U (en) | 2018-05-11 |
Family
ID=62357294
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721283691.6U Expired - Fee Related CN207348571U (en) | 2017-09-30 | 2017-09-30 | Multistage linking pylon |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207348571U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107762230A (en) * | 2017-09-30 | 2018-03-06 | 中国铁塔股份有限公司长春市分公司 | Multistage linking pylon |
-
2017
- 2017-09-30 CN CN201721283691.6U patent/CN207348571U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107762230A (en) * | 2017-09-30 | 2018-03-06 | 中国铁塔股份有限公司长春市分公司 | Multistage linking pylon |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206203692U (en) | For the equipment boom hoisting in waterwheel room of pumped storage power station | |
CN203128000U (en) | Hoisting device for direct-driven wind power generator set | |
CN207348571U (en) | Multistage linking pylon | |
CN108560510A (en) | Surface low road movable overhaul platform in a kind of power station | |
CN202785351U (en) | Tower cranes attached operating platform | |
CN107720542A (en) | A kind of ceiling mounted tracks composite beam | |
CN202100392U (en) | Portable wind and photovoltaic hybrid power supply device with perpendicular shaft | |
CN110005250A (en) | Friction plate girdle ring device | |
CN208308241U (en) | Power station indirect air cooling tower cooler triangle tool special for hoisting and Special lifting device | |
CN207581213U (en) | A kind of ceiling mounted tracks composite beam | |
CN203022328U (en) | Climbing operation platform | |
CN207061793U (en) | Anchor crimping platform is faced in a kind of high-altitude | |
CN108341331A (en) | A kind of overlength light-weight metal roof boarding lifting attachment device and its vertical transporting method | |
CN206957175U (en) | A kind of planar dimension and adjustable for height operating platform | |
CN107762230A (en) | Multistage linking pylon | |
CN215717449U (en) | Novel hoisting hole plugging structure | |
CN205743215U (en) | A kind of communication iron tower of high stable performance | |
CN210780634U (en) | Component for connecting photovoltaic module and cable structure | |
CN201896016U (en) | Lifting basket device for storage tank maintenance | |
CN202299523U (en) | Portable lifting polygonal movable base station | |
CN207069447U (en) | A kind of novel double-layer cable mounting platform | |
CN208472681U (en) | Surface low road movable overhaul platform in a kind of power station | |
CN202865370U (en) | Workpiece power-on transmission device for electrophoretic coating assembly line | |
CN207277373U (en) | A kind of riding track being used in foundation pit construction | |
CN205716244U (en) | A kind of ship launching is with rolling dolly |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180511 Termination date: 20190930 |
|
CF01 | Termination of patent right due to non-payment of annual fee |