CN104925665A - Hoisting device special for test run and beam mechanism of hoisting device - Google Patents

Hoisting device special for test run and beam mechanism of hoisting device Download PDF

Info

Publication number
CN104925665A
CN104925665A CN201510386818.6A CN201510386818A CN104925665A CN 104925665 A CN104925665 A CN 104925665A CN 201510386818 A CN201510386818 A CN 201510386818A CN 104925665 A CN104925665 A CN 104925665A
Authority
CN
China
Prior art keywords
beam body
cross
armed lever
hanger
hanging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510386818.6A
Other languages
Chinese (zh)
Other versions
CN104925665B (en
Inventor
郝建光
范江波
郭上峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taiyuan Heavy Industry Co Ltd
Original Assignee
Taiyuan Heavy Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taiyuan Heavy Industry Co Ltd filed Critical Taiyuan Heavy Industry Co Ltd
Priority to CN201510386818.6A priority Critical patent/CN104925665B/en
Publication of CN104925665A publication Critical patent/CN104925665A/en
Application granted granted Critical
Publication of CN104925665B publication Critical patent/CN104925665B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C6/00Girders, or track-supporting structures, specially adapted for cranes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M99/00Subject matter not provided for in other groups of this subclass

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Load-Engaging Elements For Cranes (AREA)

Abstract

The invention provides a hoisting device special for the test run and a beam mechanism of the hoisting device. The hoisting device special for the test run comprises the beam mechanism, an arm lever mechanism and hanging basket mechanisms. The beam mechanism comprises a beam body, first lifting lugs, second lifting lugs, a first connecting part and a second connecting part, the first lifting lugs and the second lifting lugs are fixed to the top of the beam body, and one set of the first lifting lugs and two sets of the second lifting lugs are arranged. The arm lever mechanism comprises a pair of first arm levers and two pairs of second arm levers, and the pair of first arm levers is connected with the beam body through the set of first lifting lugs and used for being connected with a lifting hook of a crane. The two pairs of the second arm levers are connected with the beam body through the two sets of second lifting lugs and used for being connected with two lifting hooks of the crane respectively. The beam body can be selectively connected with the first arm levers or the second arm levers, the number of the hanging basket mechanisms connected with the beam body when the beam body is connected with the first arm levers is smaller than or equal to the number of the hanging basket mechanisms connected with the beam body when the beam body is connected with the second arm levers.

Description

A kind of special chain sling of test run and beam mechanism thereof
Technical field
The present invention relates to crane field, particularly relate to a kind of chain sling for hoisting crane test run.
Background technology
The specification of current crane has multiple, such as, and the crawler crane series of 150t to 2000t, the All-terrain telescopic arm crane of three specifications and all-pavement truss arm crane.Need before dispatching from the factory to do type test to each kind, every chassis has multiple combination form, needs the lift heavy test run doing respective loads.Existing lift heavy test run method is to sling hanging basket with the suspension hook of hoisting crane, according to different size, places the configuration of Different Weight in hanging basket.Current hanging basket kind is two kinds of different lift heavy specification, the specification of these two kinds of hanging baskets is little, be suitable in the test run of small dimension hoisting crane, but large gauge hoisting crane test run requirement cannot be met, if continue to use small dimension hanging basket, need the hanging basket quantity manufactured significantly to increase, cause the problems such as manufacturing cost increases, degree of utilization is low, also cannot realize the block combiner of existing hanging basket and make full use of.If for the hoisting crane of often kind of specification customizes a hanging basket, then will significantly raise the cost.
Therefore, need a kind of hanging apparatus, to meet the test run requirement of different size hoisting crane, solve at lower cost needed for current production, reach reduction cost of goods manifactured, improve the object of product competitiveness.
Summary of the invention
Based on the problems referred to above, the invention provides the special chain sling of a kind of test run and beam mechanism thereof, solve at lower cost needed for current production, meet the test run requirement of different size hoisting crane, reach the object reducing cost of goods manifactured.
For reaching above-mentioned purpose, the invention provides the special chain sling of a kind of test run, use for hoisting crane test run, comprise: beam mechanism, comprise: cross-beam body, the first hanger, the second hanger, the first connecting portion and the second connecting portion, first hanger and the second hanger are all fixed on the top of cross-beam body, and the quantity of the first hanger is one group, and the quantity of the second hanger is two groups; Armed lever mechanism, comprises a pair first armed levers and two to the second armed lever, and this is connected with cross-beam body, for being connected with a suspension hook of hoisting crane by this group first hanger the first armed lever; This two couple second armed lever is connected with cross-beam body respectively by this two group of second hanger, for being connected with two suspension hooks of hoisting crane respectively; And hanging basket mechanism, comprising: the first hanging basket and the second hanging basket, the first hanging basket is connected with cross-beam body by the first connecting portion, and the second hanging basket is connected with cross-beam body by the second connecting portion; Wherein, cross-beam body can optionally be connected with the first armed lever or the second armed lever, and the quantity that when cross-beam body is connected with the first armed lever, cross-beam body connects hanging basket mechanism is less than or equal to cross-beam body when cross-beam body is connected with the second armed lever and connects the quantity of hanging basket mechanism.
The present invention also provides a kind of beam mechanism, comprise: cross-beam body, the first hanger, the second hanger, the first connecting portion and the second connecting portion, first hanger and the second hanger are all fixed on the top of cross-beam body, and the quantity of the first hanger is one group, and the quantity of the second hanger is two groups.
The present invention is compared to the beneficial effect of prior art: the special chain sling of test run of the present invention optionally coordinates with two kinds of armed levers with a beam mechanism, one of them armed lever is connected with two suspension hooks of hoisting crane, the pallet of larger load can be carried, the hoisting crane test run lift heavy requirement of multiple large gauge can be met thus.In commissioning process, only need to select different armed lever and pallet according to specification requirement, hanging basket can use existing hanging basket, without the need to custom-made.Therefore, the special chain sling of test run of the present invention is combined by the suspension of multiple hanging basket, realizes the covering on a large scale of test run lift heavy, reaches the object meeting the requirement of multiple large gauge hoisting crane test mass, and can reduce cost of goods manifactured, easy to operate.
Accompanying drawing explanation
Fig. 1 is the front view that beam mechanism of the present invention is connected with the first armed lever.
Fig. 2 is the birds-eye view that beam mechanism of the present invention is connected with the first armed lever.
Fig. 3 is the cutaway view along AA line in Fig. 1.
Fig. 4 is the B direction view in Fig. 1.
Fig. 5 is that beam mechanism of the present invention is sling the schematic diagram of the first hanging basket.
Fig. 6 is that beam mechanism of the present invention is sling the schematic diagram of the second hanging basket.
Fig. 7 is schematic diagram hoisting crane being installed a double-hook hanger.
Fig. 8 is the schematic diagram that the special chain sling of test run of the present invention is connected with a double-hook hanger.
Fig. 9 is the front view that beam mechanism of the present invention is connected with the second armed lever.
Figure 10 is the cutaway view along CC line in Fig. 9, and wherein the second armed lever is in open mode.
Figure 11 is the cutaway view along CC line in Fig. 9, and wherein the second armed lever is in closure state.
Figure 12 is that beam mechanism of the present invention is sling the schematic diagram of the second hanging basket.
Figure 13 is front view hoisting crane being installed two double-hook hangers.
Figure 14 is lateral plan hoisting crane being installed two double-hook hangers.
Figure 15 is the schematic diagram that the special chain sling of test run of the present invention is connected with two double-hook hangers, and wherein the second armed lever is in open mode.
Figure 16 is the schematic diagram that the special chain sling of test run of the present invention is connected with two double-hook hangers, and wherein the second armed lever is in closure state.
Figure 17 is that beam mechanism of the present invention is sling the schematic diagram of two the first hanging baskets and two the second hanging baskets.
Figure 18 is the D direction view in Figure 17.
Detailed description of the invention
More fully example embodiment is described referring now to accompanying drawing.But example embodiment can be implemented in a variety of forms, and should not be understood to be limited to embodiment set forth herein; On the contrary, provide these embodiments to make the present invention more comprehensively with complete, and the design of example embodiment is conveyed to those skilled in the art all sidedly.In the drawings, in order to clear, may be exaggerated the thickness of region and layer.Reference numeral identical in the drawings represents same or similar structure, thus will omit their detailed description.
In addition, described feature, structure or characteristic can be combined in one or more embodiment in any suitable manner.In the following description, provide many details thus provide fully understanding embodiments of the invention.But, one of skill in the art will appreciate that and can put into practice technical scheme of the present invention and not have in described specific detail one or more, or other method, constituent element, material etc. can be adopted.In other cases, known features, material or operation is not shown specifically or describes to avoid fuzzy major technique intention of the present invention.
With reference to shown in Fig. 1,2,5,6,17, the invention provides the special chain sling of a kind of test run, use for hoisting crane test run, comprise beam mechanism 10, armed lever mechanism and hanging basket mechanism.Beam mechanism 10 comprises: cross-beam body 11, first hanger 12, second hanger 13, first connecting portion 14 and the second connecting portion 15, first hanger 12 and the second hanger 13 are all fixed on the top of cross-beam body 11, the quantity of the first hanger 12 is one group, and the quantity of the second hanger 13 is two groups.Armed lever mechanism comprises a pair first armed levers 21 and two to the second armed lever 22, this is connected with cross-beam body 11 by this group first hanger 12 the first armed lever 21, for being connected with a suspension hook 100 of hoisting crane, this two couple second armed lever 22 is connected with cross-beam body 11 respectively by this two group of second hanger 13, for being connected with two suspension hooks 100 of hoisting crane respectively.Hanging basket mechanism comprises the first hanging basket 31 and the second hanging basket 32, first hanging basket 31 is connected with cross-beam body 11 by the first connecting portion 14, and the second hanging basket 32 is connected with cross-beam body 11 by the second connecting portion 15.
Wherein, as shown in Fig. 5 and 17, cross-beam body 11 can optionally be connected with the first armed lever 21 or the second armed lever 22, and the quantity that when cross-beam body 11 is connected with the first armed lever 21, cross-beam body 11 connects hanging basket mechanism is less than or equal to cross-beam body 11 when cross-beam body 11 is connected with the second armed lever 22 and connects the quantity of hanging basket mechanism.The size of lift heavy meets by the test mass number of blocks on adjustment first hanging basket 31 and the second hanging basket 32, and in the present embodiment, the lift heavy specification of the second hanging basket 32 is larger than the lift heavy specification of the first hanging basket 31.When the first hanging basket 31 or the second hanging basket 32 all cannot meet lift heavy requirement, can to sling the first hanging basket 31 and the second hanging basket 32 by the second armed lever simultaneously.
That is, the special chain sling of test run of the present invention optionally coordinates with two kinds of armed levers with a beam mechanism, one of them armed lever is connected with two suspension hooks of hoisting crane, can carry the pallet of larger load, can meet the hoisting crane test run lift heavy requirement of multiple large gauge thus.In commissioning process, only need to select different armed lever and pallet according to specification requirement, hanging basket can use existing hanging basket, without the need to custom-made.Therefore, the special chain sling of test run of the present invention is combined by the suspension of multiple hanging basket, realizes the covering on a large scale of test run lift heavy, reaches the object meeting the requirement of multiple large gauge hoisting crane test mass, and can reduce cost of goods manifactured, easy to operate.
As shown in Figure 1, 2, in the present embodiment, first hanger 12 comprises the first limiting section 121, support portion 122 and a pair the first hanging part 123, this is to the longitudinally symmetrical setting of the first hanging part 123 along cross-beam body 11, and with one end pivot joint of the first armed lever 21, make this to the first armed lever 21 can around the first hanging part 123 in the plane of the longitudinal direction of cross-beam body 11 pivotable.First limiting section 121 is connected to the two ends of the first hanging part 123, as shown in Figure 1, when contacting with the first limiting section 121 in the first armed lever 21 pivotable process, the first armed lever 21 stop pivotable and be in mutually away from open mode.The expansion that first limiting section 121 can limit the first armed lever closes angle, ensures realize hook by suspension hook deadweight, manpower householder method and break off relations.Support portion 122 perpendicular to cross-beam body 11, and is connected between the first limiting section 121, and as shown in Figure 15,16, when two suspension hooks 100 of hoisting crane fall, suspension hook 100 contacts with the end face of support portion 122, thus is supported.
As shown in Figure 8, in the present embodiment, this is provided with locking part 211 to the first armed lever 21, when this is switched to the first armed lever 21 plumbness be parallel to each other, this is connected with a suspension hook 100 of hoisting crane the first armed lever 21, and by locking part 211, this is locked in this plumbness to the first armed lever 21.The form of locking part 211 can be one of them first armed lever 21 arranges one rotatable, be with reeded plate, another first armed lever 21 is arranged one protruding, when plate rotate to groove and projection in conjunction with time realize locking.During practical operation, first, first armed lever 21 is in open mode as shown in Figure 1 due to the backstop of the first limiting section 121, along with falling of suspension hook 100, the deadweight of suspension hook 100 makes this to the rotation close to each other of the first armed lever 21 to the plumbness be parallel to each other, suspension hook 100 engages with the first armed lever 21 automatically, and by locking part 211, first armed lever 21 is locked in this state, and then suspension hook 100 rises.As shown in Figure 5,6, when cross-beam body 11 is connected with the first armed lever 21, cross-beam body 11 connects two the first pallets 31 or two the second pallets 32, and cross-beam body 11 is lifted by crane by a suspension hook, is applicable to the test run lift heavy requirement that specification is less.
As shown in Figure 1, 2, this two group of second hanger 13 is along the longitudinally symmetrical setting of cross-beam body 11, each is organized the second hanger 13 and has a pair second hanging parts 131, this is to the setting of second hanging part 131 along the lateral symmetry of cross-beam body 11, and be positioned at the both sides of the first hanger 21, as shown in figs. 9-11, every a pair second hanging parts 131 and a pair second armed lever 22 pivot joints, make the second armed lever 22 can around second hanging part 131 pivotable in the plane of the transverse direction of cross-beam body 11.
As shown in Fig. 2,10,11, in the present embodiment, beam mechanism 10 also comprises the second limiting section 16, it is fixed on cross-beam body 11, when contacting with the second limiting section 16 in the second armed lever 22 pivotable process, the second armed lever 22 stop pivotable and be in mutually away from open mode or closure state close to each other.In the present embodiment, two the second limiting sections 16 are provided with corresponding to each second armed lever 22, when the second armed lever 22 mutually away from be switched to when wherein one second limiting section 16 contacts by this second limiting section 16 spacing (as shown in Figure 10), when the second armed lever 22 close to each other be switched to when wherein another second limiting section 16 contacts by this another the second limiting section 16 spacing (as shown in figure 11).Second limiting section 16 ensures that the first armed lever 22 launches the state be in Figure 15, ensures that suspension hook 100 can fall and fall after on the first hanger 12 and stops.As shown in Figure 9, in the present embodiment, the second armed lever 22 also establishes handle 221, for promoting the second armed lever 22 to closure state close to each other.Suspension hook is risen after second armed lever 22 is closed.Four the second armed levers 22 coordinate with two suspension hooks 100 can be suitable for sling 2 the first hanging baskets 31 and 2 the second hanging baskets 32, thus meets the test run lift heavy requirement compared with large gauge.
As shown in Figure 1, in the present embodiment, the bottom being installed on cross-beam body 11 of the first connecting portion 14 symmetry and near the two ends of cross-beam body 11, the bottom being installed on cross-beam body 11 of the second connecting portion 15 symmetry.
As shown in Figure 6, the first hanging basket 31 comprises entablatrance 311, arm-tie 312 and the first lower tray 313, and entablatrance 311 is connected with the first connecting portion 14, and in the present embodiment, the first connecting portion 14 comprises bearing pin, to be connected with entablatrance 311.What arm-tie 312 was vertical is connected between entablatrance 311 and the first lower tray 313.
As shown in Figure 5, second hanging basket 32 comprises link span 321, platform 322, wears axle portion 323, ladder 324 and the second lower tray 325, what link span 321 was vertical is connected between cross-beam body 11 and the second lower tray 325, wear the position that axle portion 323 is arranged at the close top of link span 321, for wearing a bearing pin between link span 321 and cross-beam body 11, platform 322 is arranged at the close position of wearing axle portion 323 of link span 321, and what ladder 324 was vertical is arranged between link span 321 and the second pallet 325.Before test run, staff climbs up platform 322 by ladder 324, to may stand on platform 322 operation and wears axle portion 323 and realize wearing axle.
Therefore, the connection of cross-beam body and first, second hanging basket existing is easy to realize.Can be connected with arm-tie by the entablatrance of the first hanging basket in advance, interfering with each other does not appear in the initial position (position in Figure 12) that arm-tie is in close to level.Second hanging basket has platform on top, realizes wearing axle by wearing axle portion, convenient and safe.
In sum, the special chain sling of test run of the present invention optionally coordinates with two kinds of armed levers with a beam mechanism.For the test mass requirement that specification is less, a beam mechanism and a pair first armed levers can be adopted, form that two hanging baskets coordinate meets; For the test mass requirement that specification is larger, a beam mechanism can be adopted to meet the form that the second armed lever, four hanging baskets coordinate with two, finally reach and meet the requirement of all specification hoisting crane test run lift heavys with a special crossbeam of test run and existing test mass hanging basket.Therefore, the special chain sling of test run of the present invention is combined by the suspension of multiple hanging basket, realizes the covering on a large scale of test run lift heavy, reaches the object meeting the requirement of multiple large gauge hoisting crane test mass, and can reduce cost of goods manifactured, easy to operate.
Although exemplary embodiment describe the present invention with reference to several, should be appreciated that term used illustrates and exemplary and nonrestrictive term.Spirit or the essence of invention is not departed from because the present invention can specifically implement in a variety of forms, so be to be understood that, above-described embodiment is not limited to any aforesaid details, and explain widely in the spirit and scope that should limit in claim of enclosing, therefore fall into whole change in claim or its equivalent scope and remodeling and all should be claim of enclosing and contained.

Claims (10)

1. the special chain sling of test run, uses for hoisting crane test run, comprising:
Beam mechanism, comprising: cross-beam body, the first hanger, the second hanger, the first connecting portion and the second connecting portion, and the first hanger and the second hanger are all fixed on the top of cross-beam body, and the quantity of the first hanger is one group, and the quantity of the second hanger is two groups;
Armed lever mechanism, comprises a pair first armed levers and two to the second armed lever, and this is connected with cross-beam body, for being connected with a suspension hook of hoisting crane by this group first hanger the first armed lever; This two couple second armed lever is connected with cross-beam body respectively by this two group of second hanger, for being connected with two suspension hooks of hoisting crane respectively; And
Hanging basket mechanism, comprising: the first hanging basket and the second hanging basket, and the first hanging basket is connected with cross-beam body by the first connecting portion, and the second hanging basket is connected with cross-beam body by the second connecting portion;
Wherein, cross-beam body can optionally be connected with the first armed lever or the second armed lever, and the quantity that when cross-beam body is connected with the first armed lever, cross-beam body connects hanging basket mechanism is less than or equal to cross-beam body when cross-beam body is connected with the second armed lever and connects the quantity of hanging basket mechanism.
2. the special chain sling of test run as claimed in claim 1, wherein, first hanger comprises the first limiting section, support portion and a pair the first hanging part, this is to the longitudinally symmetrical setting of the first hanging part along cross-beam body, and with one end pivot joint of the first armed lever, make this to the first armed lever can around the first hanging part in the plane of the longitudinal direction of cross-beam body pivotable, first limiting section is connected to the two ends of the first hanging part, when contacting with the first limiting section in the first armed lever pivotable process, the first armed lever stop pivotable and be in mutually away from open mode; Support portion perpendicular to cross-beam body, and is connected between the first limiting section, when two suspension hooks of hoisting crane fall, can support this two suspension hooks.
3. the special chain sling of test run as claimed in claim 2, wherein, this is provided with locking part to the first armed lever, when this is switched to the first armed lever the plumbness be parallel to each other, this is connected with a suspension hook of hoisting crane the first armed lever, and by locking part, this is locked in this plumbness to the first armed lever.
4. the special chain sling of test run as claimed in claim 1, wherein, this two group of second hanger is along the longitudinally symmetrical setting of cross-beam body, each is organized the second hanger and has a pair second hanging parts, this is to the setting of second hanging part along the lateral symmetry of cross-beam body, and be positioned at the both sides of the first hanger, every a pair second hanging parts and a pair second armed lever pivot joints, make the second armed lever can around second hanging part pivotable in the plane of the transverse direction of cross-beam body.
5. the special chain sling of test run as claimed in claim 4, wherein, beam mechanism also comprises the second limiting section, it is fixed on cross-beam body, when contacting with the second limiting section in the second armed lever pivotable process, the second armed lever stop pivotable and be in mutually away from open mode or closure state close to each other.
6. the special chain sling of test run as claimed in claim 4, wherein, the second armed lever establishes handle, for promoting the second armed lever to closure state close to each other.
7. the special chain sling of test run as claimed in claim 1, wherein, the bottom being installed on cross-beam body of the first connecting portion symmetry and near the two ends of cross-beam body, the bottom being installed on cross-beam body of the second connecting portion symmetry.
8. the special chain sling of test run as claimed in claim 7, wherein, the first hanging basket comprises entablatrance, arm-tie and the first lower tray, and entablatrance is connected with the first connecting portion, and what arm-tie was vertical is connected between entablatrance and the first lower tray; Second hanging basket comprises link span, platform, wears axle portion, ladder and the second lower tray, what link span was vertical is connected between cross-beam body and the second lower tray, wear the position that axle portion is arranged at the close top of link span, for wearing a bearing pin between link span and cross-beam body, platform is arranged at the close position of wearing axle portion of link span, and what ladder was vertical is arranged between link span and the second pallet.
9. the special chain sling of test run as claimed in claim 8, wherein, when cross-beam body is connected with the first armed lever, cross-beam body connects two the first hanging baskets or two the second hanging baskets; When cross-beam body is connected with the second armed lever, cross-beam body connects two the first hanging baskets and two the second hanging baskets.
10. a beam mechanism, comprising: cross-beam body, the first hanger, the second hanger, the first connecting portion and the second connecting portion, and the first hanger and the second hanger are all fixed on the top of cross-beam body, and the quantity of the first hanger is one group, and the quantity of the second hanger is two groups.
CN201510386818.6A 2015-07-02 2015-07-02 A kind of special chain sling of test run Active CN104925665B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510386818.6A CN104925665B (en) 2015-07-02 2015-07-02 A kind of special chain sling of test run

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510386818.6A CN104925665B (en) 2015-07-02 2015-07-02 A kind of special chain sling of test run

Publications (2)

Publication Number Publication Date
CN104925665A true CN104925665A (en) 2015-09-23
CN104925665B CN104925665B (en) 2017-07-14

Family

ID=54113144

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510386818.6A Active CN104925665B (en) 2015-07-02 2015-07-02 A kind of special chain sling of test run

Country Status (1)

Country Link
CN (1) CN104925665B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105016190A (en) * 2015-06-30 2015-11-04 沪东中华造船(集团)有限公司 Cross beam lifting tool and method of hoisting pump tower LNG ship
CN105398934A (en) * 2015-12-01 2016-03-16 中核机械工程有限公司 Large test run hanger for container weight counterbalancing
CN106904526A (en) * 2017-05-04 2017-06-30 中国矿业大学 One kind the lifting adjustable General balance beam suspender of span and its application method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11193194A (en) * 1998-01-05 1999-07-21 Mitsubishi Heavy Ind Ltd Suspension device for structure
JP2000327257A (en) * 1999-05-19 2000-11-28 Ishikawajima Harima Heavy Ind Co Ltd Ceiling casing hoisting method for exhaust heat recovery boiler
CN201678360U (en) * 2010-04-15 2010-12-22 中国石油化工集团公司 Hoist for hoisting equipment
CN102009909A (en) * 2010-11-19 2011-04-13 太原重工股份有限公司 Multi-lifting point hanger for lifting nuclear power station module
CN203095387U (en) * 2012-12-14 2013-07-31 北车风电有限公司 Large wind generating set cabin cover side plate hanger
CN203806948U (en) * 2014-01-26 2014-09-03 中山市明阳电器有限公司 Hoisting tool for high-low voltage prefabricated substation equipment

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11193194A (en) * 1998-01-05 1999-07-21 Mitsubishi Heavy Ind Ltd Suspension device for structure
JP2000327257A (en) * 1999-05-19 2000-11-28 Ishikawajima Harima Heavy Ind Co Ltd Ceiling casing hoisting method for exhaust heat recovery boiler
CN201678360U (en) * 2010-04-15 2010-12-22 中国石油化工集团公司 Hoist for hoisting equipment
CN102009909A (en) * 2010-11-19 2011-04-13 太原重工股份有限公司 Multi-lifting point hanger for lifting nuclear power station module
CN203095387U (en) * 2012-12-14 2013-07-31 北车风电有限公司 Large wind generating set cabin cover side plate hanger
CN203806948U (en) * 2014-01-26 2014-09-03 中山市明阳电器有限公司 Hoisting tool for high-low voltage prefabricated substation equipment

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105016190A (en) * 2015-06-30 2015-11-04 沪东中华造船(集团)有限公司 Cross beam lifting tool and method of hoisting pump tower LNG ship
CN105398934A (en) * 2015-12-01 2016-03-16 中核机械工程有限公司 Large test run hanger for container weight counterbalancing
CN105398934B (en) * 2015-12-01 2018-07-31 中核机械工程有限公司 A kind of large-scale test run hanger for container counterweight
CN106904526A (en) * 2017-05-04 2017-06-30 中国矿业大学 One kind the lifting adjustable General balance beam suspender of span and its application method

Also Published As

Publication number Publication date
CN104925665B (en) 2017-07-14

Similar Documents

Publication Publication Date Title
CN203959640U (en) Oblique pull suspension cable type frame lifting appliance
CN104925665A (en) Hoisting device special for test run and beam mechanism of hoisting device
CN205061477U (en) Goods device is got to over -and -under type
CN105197804A (en) Stable type gantry crane
CN105197779A (en) Lighting type gantry crane
CN110294067A (en) The hoisting method of bulk freighter cabin block
CN202390076U (en) Special lifting device for electrode
CN205275005U (en) Flat suspender is woven to chain wire rope complex
CN105752816A (en) Large gantry crane and height-increasing lifting beam capable of increasing the lifting height of large gantry crane
CN208979603U (en) A kind of stacking adapter placed for floor layering
CN104150346B (en) A kind of hoisting device with two kinds of lifting forms
CN104261320B (en) A kind of high-altitude lift work platform with handling apparatus
RU2397136C1 (en) Load handling frame
CN206538090U (en) One kind lifting steel plate steel shoulder pole
CN203419665U (en) Support beam device for hoisting heavy equipment
US8833574B2 (en) Gantry with suspending links
CN202481905U (en) Auxiliary lifting device ofsintering machine trolley
CN204980869U (en) Hoist compensating beam
CN204281030U (en) A kind of special hanger lifting section bar
CN208979331U (en) It is a kind of not only can four-way into fork but also can two to sidesway picking automatic loading and unloading pallet
CN207276024U (en) Large-scale reactor special hanger
CN104760838B (en) Using the method for well hole car railway transportation overrunning product
CN205294744U (en) Fork arm and fork truck
CN204588437U (en) A kind of hoisting spreader device of cast tube
CN205222365U (en) Fluctuation freight elevator for transporting fodder is used

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant