CN203034769U - Scaffold for building construction - Google Patents
Scaffold for building construction Download PDFInfo
- Publication number
- CN203034769U CN203034769U CN 201220712728 CN201220712728U CN203034769U CN 203034769 U CN203034769 U CN 203034769U CN 201220712728 CN201220712728 CN 201220712728 CN 201220712728 U CN201220712728 U CN 201220712728U CN 203034769 U CN203034769 U CN 203034769U
- Authority
- CN
- China
- Prior art keywords
- scaffold
- vertical
- pipes
- tube
- steel pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model discloses a scaffold for building construction. The scaffold for building construction is provided with an arc steel pipe frame, vertical pipes are arranged on two sides of the arc steel pipe frame, the upper portions of the vertical pipes are welded with transverse pipes and arc support pipes, pedal plates are arranged in the middles of the outer sides of the vertical pipes, connection pipes are arranged at the top ends of the vertical pipes, holes are formed at the tops of the connection pipes and the bottoms of the vertical pipes, and foot blocking rods are additionally arranged among holes below the two vertical pipes on the outer side of the scaffold. The scaffold for building construction has the advantages of being simple in structure, convenient to install, attractive in modeling, good in strength, safe, reliable, capable of saving materials and the like.
Description
Technical field
The utility model belongs to the building operations scaffold, especially a kind of novel steel tube scaffold.
Background technology
Existing all kinds of scaffolds have been widely used in the realm of building construction, and old job practices and instrument progressively are eliminated, and are substituted continual renovation, constantly perfect by more advanced technical equipment.The scaffold of using with regard to building operations also is the same, and is through repeatedly improving, progressively perfect.But in use still there are some problems, complex structure, cost is higher, and the construction safety performance is poor, and spare and accessory parts are more, and management is inconvenient, and installs and waste time and energy, and old shape steel tube shelf structure is unreasonable, intensity is low.
Summary of the invention
The utility model provides a kind of simple in structure, easy for installation, safe and reliable novel building construction scaffold at above deficiency.
The technical scheme that the utility model adopts is:
A kind of novel steel tube scaffold is provided with the camber steel pipe frame, and its camber steel pipe frame both sides are vertical tube, riser upper portions and transverse tube and circular arc stay pipe weld together, the outer middle side part of vertical tube is provided with foot rest, and the top of vertical tube is provided with tube connector, and tube connector top and vertical tube bottom are provided with the hole; Between the Kong Yukong below two vertical tubes of the scaffold outside, set up the retaining foot lever; Be welded with crossbar on two vertical tubes of the described scaffold outside; Described scaffold bottom camber steel pipe frame is equipped with adjustable base.
The beneficial effects of the utility model are:
Simple in structure, easy for installation, handsome in appearance, save advantages such as material, intensity are good, safe and reliable.
Description of drawings
Fig. 1 is structural representation of the present utility model.
Among the figure, 1. vertical tube, 2. foot rest; 3. crossbar; 4. scaffold floor; 5. retaining foot lever; 6. adjustable base.
The specific embodiment
As shown in drawings, a kind of novel steel tube scaffold, be provided with the camber steel pipe frame, its camber steel pipe frame both sides are vertical tube 1, vertical tube 1 top and transverse tube and circular arc stay pipe weld together, vertical tube 1 outer middle side part is provided with foot rest 2, and the top of vertical tube 1 is provided with tube connector, and tube connector top and vertical tube 1 bottom are provided with the hole; Between the Kong Yukong below two vertical tubes of scaffold 2 outsides, set up retaining foot lever 5; Be welded with crossbar 3 on two vertical tubes 1 of the described scaffold outside; Described scaffold bottom camber steel pipe frame is equipped with adjustable base 6.
Insert on the tube connector of lower floor camber steel pipe frame vertical tube 1 upper end upper strata camber steel pipe frame vertical tube 1 lower end during installation, inserts retaining foot lever 5 again and get final product; Scaffold floor 4 is placed on the transverse tube top, makes things convenient for personnel to walk about.
Claims (3)
1. building operations scaffold, it is characterized in that: be provided with the camber steel pipe frame, its camber steel pipe frame both sides are vertical tube, riser upper portions and transverse tube and circular arc stay pipe weld together, the outer middle side part of vertical tube is provided with foot rest, the top of vertical tube is provided with tube connector, and tube connector top and vertical tube bottom are provided with the hole; Between the Kong Yukong below two vertical tubes of the scaffold outside, set up the retaining foot lever.
2. a kind of building operations scaffold according to claim 1 is characterized in that: be welded with crossbar on two vertical tubes of the scaffold outside.
3. a kind of building operations scaffold according to claim 1, it is characterized in that: scaffold bottom camber steel pipe frame is equipped with adjustable base.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220712728 CN203034769U (en) | 2012-12-21 | 2012-12-21 | Scaffold for building construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220712728 CN203034769U (en) | 2012-12-21 | 2012-12-21 | Scaffold for building construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203034769U true CN203034769U (en) | 2013-07-03 |
Family
ID=48686903
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220712728 Expired - Fee Related CN203034769U (en) | 2012-12-21 | 2012-12-21 | Scaffold for building construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203034769U (en) |
-
2012
- 2012-12-21 CN CN 201220712728 patent/CN203034769U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203008398U (en) | Telescopic protection handrail for temporary use | |
CN202785338U (en) | Large plate girder overturning seat | |
CN202596150U (en) | Scaffold pedal | |
CN202441042U (en) | Novel steel pipe scaffold | |
CN205801953U (en) | A kind of concrete pipe sheet bracket | |
CN203034769U (en) | Scaffold for building construction | |
CN203846780U (en) | Semi-automatic lifting type operating platform device | |
CN204059924U (en) | A kind of scaffolding structure for building | |
CN204023417U (en) | For building the bearing pin bracket of high pier 0# block concrete | |
CN202672687U (en) | Three-point lifting scaffolding | |
CN202544399U (en) | Supporting frame for overhang floor slab with steel structure | |
CN102943615A (en) | Horizontal-buckling support insulating ladder | |
CN202055509U (en) | Upright rod installation structure of directly-inserted scaffold | |
CN211007061U (en) | Connecting device for jacking frame and ball joint of welding ball net rack | |
CN209129335U (en) | A kind of construction carrier | |
CN204174915U (en) | Scaffold | |
CN202731261U (en) | Movable scaffold with adjustable height | |
CN2563238Y (en) | Door type steel pipe scaffold for building constructure | |
CN203666706U (en) | Simple two-wheel lever transportation tool | |
CN202509750U (en) | Height-adjustable type scaffold | |
CN203769634U (en) | Adjustable engineering climbing ladder | |
CN202731730U (en) | Assembled type safety stair constructed in foundation pit for building construction | |
CN201991203U (en) | Scaffold | |
CN204152019U (en) | A kind of integral wall module | |
CN204324806U (en) | High-low voltage electric power distribution cabinet installs special cart |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130703 Termination date: 20151221 |
|
EXPY | Termination of patent right or utility model |