CN203034656U - 半预制钢筋混凝土楼板 - Google Patents

半预制钢筋混凝土楼板 Download PDF

Info

Publication number
CN203034656U
CN203034656U CN 201220746257 CN201220746257U CN203034656U CN 203034656 U CN203034656 U CN 203034656U CN 201220746257 CN201220746257 CN 201220746257 CN 201220746257 U CN201220746257 U CN 201220746257U CN 203034656 U CN203034656 U CN 203034656U
Authority
CN
China
Prior art keywords
reinforced concrete
concrete floor
floor slab
prefabricated reinforced
steel bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220746257
Other languages
English (en)
Inventor
罗龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Peng Peng building industrial materials Co., Ltd.
Original Assignee
PENGCHENG RESIDENTIAL INDUSTRIALIZATION MATERIAL (JAINGSU) CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PENGCHENG RESIDENTIAL INDUSTRIALIZATION MATERIAL (JAINGSU) CO Ltd filed Critical PENGCHENG RESIDENTIAL INDUSTRIALIZATION MATERIAL (JAINGSU) CO Ltd
Priority to CN 201220746257 priority Critical patent/CN203034656U/zh
Application granted granted Critical
Publication of CN203034656U publication Critical patent/CN203034656U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

本实用新型的一种半预制钢筋混凝土楼板,包括混凝土层和多排钢筋桁架,所述的混凝土层的厚度为5-8厘米,所述的钢筋桁架的高度为10-15厘米,多排钢筋桁架之间的间距为15-25厘米,所述的钢筋桁架下半部分埋设在混凝土层中。本实用新型的半预制钢筋混凝土楼板为半预制式,克服了现浇钢筋混凝土楼板和预制钢筋混凝土楼板的缺点,又具有两者的优点,易于制造又便于现场施工,运输相比预制钢筋混凝土楼板成本低,现场浇筑时更方便,能通过后续的混凝土浇筑解决预制钢筋混凝土楼板存在的防水性能差的问题,整体生产工序少,效率大大提高,养护所需时间少,综合成本大大降低。

Description

半预制钢筋混凝土楼板
技术领域
本实用新型涉及钢筋混凝土楼板,尤其是一种半预制钢筋混凝土楼板。
背景技术
现有技术中钢筋混凝土楼板包括现浇钢筋混凝土楼板和预制钢筋混凝土楼板两种,现浇钢筋混凝土楼板是指在现场依照设计位置,进行支模、绑扎钢筋、浇筑混凝土,经养护、拆模板而制作的楼板。预制钢筋混凝土楼板系指在构件预制加工厂或施工现场外预先制作,然后运到工地现场进行安装的钢筋混凝土楼板。
现浇钢筋混凝土楼板施工复杂,程序多养护时间长,效率低,且现场施工受天气影响较大,工期安排紧的时候常常来不及等待养护时间。预制钢筋混凝土楼板在工厂预先制造,运输成本大,且可能出现与现场尺寸不完全匹配的情况,有些预制空心楼板已经是淘汰产品。
实用新型内容
本实用新型要解决的技术问题是:克服现有技术中现浇钢筋混凝土楼板和预制钢筋混凝土楼板的不足,提供一种半预制钢筋混凝土楼板,克服了上述两种楼板的区别,即便于现场施工,又降低运输难度,综合成本,生产效率高。
本实用新型解决其技术问题所采用的技术方案是:一种半预制钢筋混凝土楼板,包括混凝土层和多排钢筋桁架,所述的混凝土层的厚度为5-8厘米,所述的钢筋桁架的高度为10-15厘米,多排钢筋桁架之间的间距为15-25厘米,所述的钢筋桁架下半部分埋设在混凝土层中。
进一步的作为优选,所述的混凝土层的厚度为6厘米,所述的钢筋桁架的高度为12厘米。
进一步的作为优选,所述的钢筋桁架下部高度的6厘米埋设在混凝土层中。
本实用新型的有益效果是,本实用新型的半预制钢筋混凝土楼板为半预制式,克服了现浇钢筋混凝土楼板和预制钢筋混凝土楼板的缺点,又具有两者的优点,易于制造又便于现场施工,运输相比预制钢筋混凝土楼板成本低,现场浇筑时更方便,能通过后续的混凝土浇筑解决预制钢筋混凝土楼板存在的防水性能差的问题,整体生产工序少,效率大大提高,养护所需时间少,综合成本大大降低。
附图说明
下面结合附图和实施例对本实用新型进一步说明。
图1是本实用新型的半预制钢筋混凝土楼板最佳实施例的结构示意图;
图中:1.混凝土层,2.钢筋桁架。
具体实施方式
现在结合附图对本实用新型作进一步详细的说明。这些附图均为简化的示意图,仅以示意方式说明本实用新型的基本结构,因此其仅显示与本实用新型有关的构成。
如图1所示的本实用新型的最佳实施例,一种半预制钢筋混凝土楼板,包括混凝土层1和多排钢筋桁架2,混凝土层1的厚度为5-8厘米,钢筋桁架2的高度为10-15厘米,多排钢筋桁架2之间的间距为15-25厘米,钢筋桁架2下半部分埋设在混凝土层1中。
进一步的作为优选,混凝土层1的厚度为6厘米,钢筋桁架2的高度为12厘米。钢筋桁架2下部高度的6厘米埋设在混凝土层1中。
一种生产上述半预制钢筋混凝土楼板的方法,具有如下步骤:
①根据现场尺寸准备浇筑模板;
②在浇筑模板上涂抹一层脱模油;
③在浇筑模板上放置多排钢筋桁架2,相邻两个钢筋桁架2之间间距15-25里面;
④浇筑混凝土,在浇筑的过程中进行搅拌、振荡,去除混凝土中的气泡,平整混凝土使钢筋桁架2的下半部分埋设在混凝土中;
⑤浇筑完成后进行高温养护;
⑥高温养护至少3小时后脱模。
进一步的,步骤⑤是在180-250℃下进行高温蒸汽养护。
一种将上述半预制钢筋混凝土楼板现场浇筑楼板的方法,具有如下步骤:
①将半预制钢筋混凝土楼板吊装到位;
②在半预制钢筋混凝土楼板上现场浇筑一层5-8厘米厚的混凝土,对混凝土进行振荡并进行平整,去除混凝土中的气泡后静置等待现场浇筑的混凝土凝固;
③待凝固后在混凝土上现场浇筑一层3-5厘米厚的发泡混凝土,并进行平整;
④等待发泡混凝土凝固后进行养护。
以上述依据本实用新型的理想实施例为启示,通过上述的说明内容,相关工作人员完全可以在不偏离本项实用新型技术思想的范围内,进行多样的变更以及修改。本项实用新型的技术性范围并不局限于说明书上的内容,必须要根据权利要求范围来确定其技术性范围。

Claims (3)

1.一种半预制钢筋混凝土楼板,其特征是:包括混凝土层(1)和多排钢筋桁架(2),所述的混凝土层(1)的厚度为5-8厘米,所述的钢筋桁架(2)的高度为10-15厘米,多排钢筋桁架(2)之间的间距为15-25厘米,所述的钢筋桁架(2)下半部分埋设在混凝土层(1)中。
2.如权利要求1所述的半预制钢筋混凝土楼板,其特征是:所述的混凝土层(1)的厚度为6厘米,所述的钢筋桁架(2)的高度为12厘米。
3.如权利要求1所述的半预制钢筋混凝土楼板,其特征是:所述的钢筋桁架(2)下部高度的6厘米埋设在混凝土层(1)中。
CN 201220746257 2012-12-31 2012-12-31 半预制钢筋混凝土楼板 Expired - Fee Related CN203034656U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220746257 CN203034656U (zh) 2012-12-31 2012-12-31 半预制钢筋混凝土楼板

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220746257 CN203034656U (zh) 2012-12-31 2012-12-31 半预制钢筋混凝土楼板

Publications (1)

Publication Number Publication Date
CN203034656U true CN203034656U (zh) 2013-07-03

Family

ID=48686790

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220746257 Expired - Fee Related CN203034656U (zh) 2012-12-31 2012-12-31 半预制钢筋混凝土楼板

Country Status (1)

Country Link
CN (1) CN203034656U (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103074952A (zh) * 2012-12-31 2013-05-01 鹏程住宅工业化材料江苏有限公司 半预制钢筋混凝土楼板及其生产方法和现场浇筑方法
CN104453045A (zh) * 2014-12-03 2015-03-25 中铁城建集团北京工程有限公司 一种分离式预制桁架楼承板及其施工方法

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103074952A (zh) * 2012-12-31 2013-05-01 鹏程住宅工业化材料江苏有限公司 半预制钢筋混凝土楼板及其生产方法和现场浇筑方法
CN104453045A (zh) * 2014-12-03 2015-03-25 中铁城建集团北京工程有限公司 一种分离式预制桁架楼承板及其施工方法
CN104453045B (zh) * 2014-12-03 2017-02-22 中铁城建集团北京工程有限公司 一种分离式预制桁架楼承板及其施工方法

Similar Documents

Publication Publication Date Title
CN101858119B (zh) 一种钢筋混凝土空心楼板及施工方法
CN105317137A (zh) 预制墙体、墙板及其施工方法以及预制墙板生产方法
CN201738443U (zh) 一种预制混凝土双叠合梁
CN109025017A (zh) 钢筋混凝土空心叠合双向密肋楼盖及其建造方法
CN101649656A (zh) 一种部分预制与部分现浇的叠合剪力墙及其制作方法
CN106638313A (zh) 一种大型盖梁半预制施工技术方法
CN109723140A (zh) 一种预制楼梯间的施工方法
CN103031952A (zh) 装配式免支撑预制带肋轻质叠合楼板的制作方法
CN103452350B (zh) 装配式电子厂房及其施工方法
CN103568109A (zh) 一种预制混凝土空心构件成孔方法
CN105297893A (zh) 榫卯式混凝土叠合梁交叉连接结构及其施工方法
CN203034656U (zh) 半预制钢筋混凝土楼板
CN104972550A (zh) 一种现场预制混凝土桩的多边型模具及制作方法
CN102409848A (zh) 一种轻质密肋楼板和轻质密肋楼盖的施工成型方法
CN205224332U (zh) 预制墙体和预制墙板
CN101748893B (zh) 一种高层建筑阳台板的制作方法
CN206220297U (zh) 预制剪力墙
CN103074952A (zh) 半预制钢筋混凝土楼板及其生产方法和现场浇筑方法
CN210421568U (zh) 一种装配式梁、板结构
CN203947493U (zh) 拼装式检查井
CN104164882A (zh) 在边坡上构建支护结构梁基础的施工方法及结构
CN207647033U (zh) 一种预制钢筋笼结构
CN203603542U (zh) 装配式电子厂房
CN106914984B (zh) 一种预制复合结构板的施工方法
CN112012473B (zh) 污水池扶臂肋梁型墙身一体成型钢模板

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: JIANGSU BAOPENG BUILDING INDUSTRIAL MATERIAL CO.,

Free format text: FORMER OWNER: PENGCHENG RESIDENTIAL INDUSTRIALIZED MATERIALS JIANGSU CO., LTD.

Effective date: 20141020

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Shi Tao

Inventor before: Luo Long

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: LUO LONG TO: SHI TAO

TR01 Transfer of patent right

Effective date of registration: 20141020

Address after: 213311 Jiangsu city of Changzhou province Liyang City Daitou Industrial Zone Baopeng Road No. 1

Patentee after: Jiangsu Peng Peng building industrial materials Co., Ltd.

Address before: 213311 Jiangsu city of Changzhou province Liyang City Daitou Industrial Zone Xin Friends Road No. 2

Patentee before: Pengcheng Residential Industrialization Material (Jaingsu) Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130703

Termination date: 20201231

CF01 Termination of patent right due to non-payment of annual fee