CN203019354U - Sequencing material frame - Google Patents

Sequencing material frame Download PDF

Info

Publication number
CN203019354U
CN203019354U CN 201220691975 CN201220691975U CN203019354U CN 203019354 U CN203019354 U CN 203019354U CN 201220691975 CN201220691975 CN 201220691975 CN 201220691975 U CN201220691975 U CN 201220691975U CN 203019354 U CN203019354 U CN 203019354U
Authority
CN
China
Prior art keywords
track
suspension member
rail
guide
block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220691975
Other languages
Chinese (zh)
Inventor
张利伟
谢德峰
崔永广
王娜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHENGZHOU EAST INDUSTRY Co Ltd
Original Assignee
ZHENGZHOU EAST INDUSTRY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHENGZHOU EAST INDUSTRY Co Ltd filed Critical ZHENGZHOU EAST INDUSTRY Co Ltd
Priority to CN 201220691975 priority Critical patent/CN203019354U/en
Application granted granted Critical
Publication of CN203019354U publication Critical patent/CN203019354U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a sequencing material frame which comprises a hanging frame and hanging pieces. A rail is arranged on the hanging frame and extends along the guiding direction. An installing ends and a taking end are sequentially distributed on the rail in the guiding direction, wherein the installing end is used for installing the hanging pieces and the taking end is used for taking off the hanging pieces. Guiding pieces which are used for being movably matched with the rail in a guiding mode are arranged on the tops of the hanging pieces. The rail is provided with a rail surface, wherein the rail surface is used for supporting the guiding pieces so that the hanging pieces are hung on the rail surface of the rail when the guiding pieces are matched with the rail in the guiding mode. A check block is arranged at the position, close to the taking end, of the rail, wherein the check block is matched with the guiding piece in a stop-check mode in the guiding direction to prevent the guiding piece from leaving away the rail from the taking end. The check block is arranged above the rail surface. A derail space is reserved above the check block on the rail, wherein the derail space enables the guiding piece to pass over the check block through the space and leave the rail from the taking end. According to the sequencing material frame, hanging and taking can be conveniently achieved in sequence, labor intensity can be reduced, and working efficiency can be improved.

Description

The sequence bin
Technical field
The utility model relate to be used to pick and place, the sequence bin of transporting work pieces.
Background technology
of the prior artly comprise hanger and hang over the suspension member that being used on hanger mounts workpiece for the production of the bin on line, suspension member has hook according to the difference of the mode that mounts of extension workpiece, hanging scroll or pallet, the suspension member of existing bin is to be mounted on hanger by the hanging hole on hanger, because the workpiece of taking by the work step order can be increased work efficiency, therefore hanging hole is generally along arranged in a straight line and require the workman to mount sequentially workpiece after workpiece machines, so that subsequent handling can be taken off workpiece in order, but look in order comparatively trouble and can hang wrong situation of hole for arbitrarily hanging up, thereby existing bin sequence mounts use inconvenience, do not have actually increase work efficiency and reduce labour intensity yet.
The utility model content
The purpose of this utility model is to provide a kind of sequence to mount the workpiece bin that sorts easily.
the technical solution of the utility model is: a kind of sequence bin, comprise hanger and suspension member, described hanger is provided with track, track extends and has on guide direction to distribute successively along its guide direction and is used for loading onto the charging end of suspension member, be used for taking off the flowing end of suspension member, the top of described suspension member is provided with the guide that coordinates for described rail-guided movement, described track has and is used for support guide spare suspension member is hung orbital plane in orbit when guiding movement coordinates, coordinate to stop guide from the block of flowing end disorbit with described guide block on the guide direction that is provided with near its flowing end position at track on track, described block is located at above orbital plane, leave for guide from crossing block from the derailing space of flowing end disorbit above block on described track.
The guide direction of described track is extended along straight line.
Described track is tilted to downward-extension from charging end to flowing end.
Described track is that the cross section is the square tube of rectangle, offer the groove for a guide function of walking in the middle part of suspension member that extends along the track bearing of trend on the bottom side tube wall of square tube, the opening at square tube two ends forms charging end and flowing end, the upper surface of the bottom side tube wall that is distributed in groove both sides of square tube forms described orbital plane, the guide of suspension member is specially and rotates the road wheel that is assemblied in the suspension member top, described block is fixed on orbital plane, and described derailing space is located between the top side tube wall of block and square tube.
Described suspension member bottom is provided be used to the hook that mounts with porose workpiece.
Suspension member of the present utility model can be easily from the charging end of track along the rail-guided flowing end that moves to, thereby can hang over one by one on hanger workpiece in order along rail-guided direction according to need of work, due to the two ends that take, put workpiece and be limited in track, so just can realize easily first hanging first get with rear extension after get, and saved time and the amount of labour of recognition sequence and capturing position, thereby can reduce labour intensity and increase work efficiency.
Description of drawings
Fig. 1 is the structural representation of the embodiment of the utility model sequence bin.
The specific embodiment
As shown in Figure 1, the embodiment of sequence bin of the present utility model, comprise hanger 1, be fixed with the track 2 and the track 6 that extend along the straight-line guidance direction by after forward direction on hanger 1, track 2 hangs with a plurality of suspension members 3, hangs with a plurality of suspension members 7 on track 6, because the structure of track 2 and track 6 is identical, the structure of suspension member 3 and suspension member 7 is identical, the below only to track 2 and on the suspension member 3 that mounts be introduced.
The front and back ends of track 2 is respectively be used to the charging end of loading onto suspension member, for the flowing end that takes off suspension member, and track 2 is tilted to downward-extension from charging end to flowing end.The top of suspension member 3 is provided with the guide 4 that coordinates for described track 2 guiding movements, described track 2 has and is used for support guide spare 4 suspension member 3 is hung over the orbital plane on track 2 when guiding movement coordinates, coordinate to stop guide from the block 5 of flowing end disorbit with described guide 4 blocks on the guide direction that is provided with near its flowing end position at track on track 2, described block 5 is located at orbital plane top, leaves for guide from crossing block 5 from the derailing space of flowing end disorbit in block 5 tops on described track 2.track 2 in the present embodiment is specially the square tube that the cross section is rectangle, offer the groove that plays guide function of walking along the middle part for suspension member 3 that the track bearing of trend extends on the bottom side tube wall of square tube, the opening at square tube two ends forms charging end and flowing end, the upper surface of the bottom side tube wall that is distributed in groove both sides of square tube forms described orbital plane, and in the present embodiment, suspension member 3 bottoms are provided be used to the hook that mounts with porose workpiece, the guide 4 of suspension member 3 is specially and rotates the road wheel that is assemblied in suspension member 3 tops, road wheel can coordinate with the orbital plane rolling support of square tube bottom side tube wall and can hanging in square tube suspension member 3 Anti-falls, block 5 is fixed on the orbital plane of square tube and can stops that road wheel rolls out from the lower end of square tube, and the space of derailing is located between the top side tube wall of block 5 and square tube, can be from crossing block 5 can take out from the opening of the flowing end of square tube at upper suspension member 3 rear walking wheels that move like this.
when above-described embodiment uses, when knocking off part, hook on the part that hanger 3 can pass from the groove of square tube can first hang up workpiece, then the road wheel of suspension member 3 is packed into and relied on gravity automatically to move down along the orbital plane of square tube from the opening of the charging end of square tube, first suspension member 3 is by block 5 blocks, the suspension member of back can not come off from track 2 by the suspension member of front block successively, workpiece according to successively sequence just can sequentially hang on track 2 like this, the charging end that each extension workpiece only need to be firmly believed track gets final product, when getting workpiece, suspension member 3 can be taken off from track 2 from the move up guide 4 of suspension member 3 of the flowing end of track 2, suspension member 3 by the Action of Gravity Field back is automatically moved to charging end and becomes first workpiece to be removed.
In other embodiment of the present utility model, track 2 also can adopt other conventional track forms, and such as adopting guide groove or guide pillar, the guide on suspension member 3 can change the common structures such as slide block or sliding sleeve into accordingly.Similar with prior art in addition, also can have hanging scroll or pallet according to the difference of the mode that mounts of extension workpiece on suspension member 3, and not necessarily have hook.Track also can adopt arc or annular to extend and not necessarily must extend along straight line in addition, and can adopt the form that charging end and flowing end height equate and not necessarily must be tilted to from charging end to flowing end downward-extension, at this moment need artificial or promote suspension member by drive unit to walk, this belongs to technological means well known to those skilled in the art.Above-described embodiment middle orbit is two that distribute up and down in addition, in other embodiment of the present utility model, also can only have more than one or three according to the requirements of one's work track.

Claims (5)

  1. one kind the sequence bin, comprise hanger and suspension member, it is characterized in that: described hanger is provided with track, track extends and has on guide direction to distribute successively along its guide direction and is used for loading onto the charging end of suspension member, be used for taking off the flowing end of suspension member, the top of described suspension member is provided with the guide that coordinates for described rail-guided movement, described track has and is used for support guide spare suspension member is hung orbital plane in orbit when guiding movement coordinates, coordinate to stop guide from the block of flowing end disorbit with described guide block on the guide direction that is provided with near its flowing end position at track on track, described block is located at above orbital plane, leave for guide from crossing block from the derailing space of flowing end disorbit above block on described track.
  2. 2. sequence bin according to claim 1, it is characterized in that: the guide direction of described track is extended along straight line.
  3. 3. sequence bin according to claim 1, it is characterized in that: described track is tilted to downward-extension from charging end to flowing end.
  4. 4. according to claim 1 and 2 or 3 described sequence bins, it is characterized in that: described track is that the cross section is the square tube of rectangle, offer the groove that plays guide function that supplies suspension member to walk that extends along the track bearing of trend on the bottom side tube wall of square tube, the opening at square tube two ends forms charging end and flowing end, the upper surface of the bottom side tube wall that is distributed in groove both sides of square tube forms described orbital plane, the guide of suspension member is for rotating the road wheel that is assemblied in the suspension member top, block is fixed on orbital plane, and described derailing space is located between the top side tube wall of block and square tube.
  5. 5. sequence bin according to claim 4, is characterized in that: be provided be used to the hook that mounts with porose workpiece bottom described suspension member.
CN 201220691975 2012-12-14 2012-12-14 Sequencing material frame Expired - Fee Related CN203019354U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220691975 CN203019354U (en) 2012-12-14 2012-12-14 Sequencing material frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220691975 CN203019354U (en) 2012-12-14 2012-12-14 Sequencing material frame

Publications (1)

Publication Number Publication Date
CN203019354U true CN203019354U (en) 2013-06-26

Family

ID=48643366

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220691975 Expired - Fee Related CN203019354U (en) 2012-12-14 2012-12-14 Sequencing material frame

Country Status (1)

Country Link
CN (1) CN203019354U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103736615A (en) * 2013-12-28 2014-04-23 湖南衡山汽车制造有限公司 Paint spraying rack
CN103802084A (en) * 2014-02-24 2014-05-21 珠海格力电器股份有限公司 Pipe hanging tool trolley
CN104723308A (en) * 2013-12-19 2015-06-24 孙黎明 Air pipe support
DK178733B1 (en) * 2014-09-01 2016-12-12 Søren Kaastrup Equipment rack

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104723308A (en) * 2013-12-19 2015-06-24 孙黎明 Air pipe support
CN103736615A (en) * 2013-12-28 2014-04-23 湖南衡山汽车制造有限公司 Paint spraying rack
CN103736615B (en) * 2013-12-28 2016-08-17 湖南衡山汽车制造有限公司 One is sprayed paint and is used hanger
CN103802084A (en) * 2014-02-24 2014-05-21 珠海格力电器股份有限公司 Pipe hanging tool trolley
CN103802084B (en) * 2014-02-24 2016-07-06 珠海格力电器股份有限公司 Hanging tube fixture vehicle
DK178733B1 (en) * 2014-09-01 2016-12-12 Søren Kaastrup Equipment rack

Similar Documents

Publication Publication Date Title
CN203019354U (en) Sequencing material frame
CN202570853U (en) Loading trolley
CN102922207A (en) Device used for lengthening and welding barrel
CN101850932B (en) Door conveying apparatus
CN104070088B (en) Veneer reeling machine fast
CN104355027B (en) Special-specification vertical goods storing warehouse
CN201071400Y (en) Electrophoresis program controlled travelling device
CN105365864A (en) Novel transportation trolley
CN103510146A (en) Composite planting production line for long aluminum part and normal part
CN205500140U (en) Long -pending formula of putting of optional route hangs conveying system
CN204339213U (en) A kind of binder clip automatically to wear sandwiched standby
CN203546191U (en) Aluminum long piece and common piece composite electroplating production line
CN210084750U (en) Hanging rail suitable for heavy-load monorail transportation
CN204197787U (en) Special requirement article storage vertical library
CN107826653B (en) Flexible conveying device for corner conveying
CN203637873U (en) High-station transfer trolley
CN203767441U (en) Carrying trolley, trolley set, hanging chain conveyor and conveying system
CN202369275U (en) Improved suspension type double-rail overhead travelling crane structure
CN206305732U (en) Suspension type motor -cycle frame assembly assembles device
CN211029659U (en) Automatic feeding and discharging mechanism with double tracks for shot blasting machine
CN203295053U (en) Door-shaped hanging frame with load-bearing wheels
CN202346284U (en) Transport device for clothing storage
CN207142087U (en) A kind of vertical elevator
CN207548036U (en) blanking conveying mechanism
CN207810394U (en) A kind of the wheel module and walking dolly of walking dolly

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130626

Termination date: 20151214

EXPY Termination of patent right or utility model