CN203008003U - 用于抗拔钻孔灌注桩试桩非摩擦段的双层套筒 - Google Patents
用于抗拔钻孔灌注桩试桩非摩擦段的双层套筒 Download PDFInfo
- Publication number
- CN203008003U CN203008003U CN 201220700012 CN201220700012U CN203008003U CN 203008003 U CN203008003 U CN 203008003U CN 201220700012 CN201220700012 CN 201220700012 CN 201220700012 U CN201220700012 U CN 201220700012U CN 203008003 U CN203008003 U CN 203008003U
- Authority
- CN
- China
- Prior art keywords
- layer sleeve
- pile
- sleeve
- double
- inner layer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
本实用新型公开一种用于抗拔钻孔灌注桩试桩非摩擦段的双层套筒,包括内层套筒、外层套筒,若干限定内层套筒和外层套筒间相对位置的限位钢板,该限位钢板与内层套筒焊接一体,在外层套筒底部焊接有一圈底座,并在底座上设置有垫圈,在该内、外层套筒接口部位采用密封物密封。本实用新型结构简单,在进行试桩的桩基测试时,非摩擦段内所产生的摩擦力可忽略不计,可以客观模拟日后工程桩的实际受力状态,提供最接近真实的实验数据。
Description
技术领域:
本实用新型涉及一种用于抗拔钻孔灌注桩试桩非摩擦段的双层套筒。
背景技术:
传统的抗拔钻孔灌注桩试桩在非摩擦段内是不采取任何措施的,所以在试桩的过程中,由于地下室土体尚未开挖,土体和试桩之间会产生摩阻力,直接影响到试桩的真实数据,只能提供一个大概的参考数据。
发明内容:
为解决现有技术存在的上述问题,本实用新型的目的是提出一种用于抗拔钻孔灌注桩试桩非摩擦段的双层套筒,在进行试桩的桩基测试时,非摩擦段内所产生的摩擦力可忽略不计,可以客观模拟日后工程桩的实际受力状态,提供最接近真实的实验数据。
为解决以上目的,本实用新型可通过以下技术方案予以实现:
一种用于抗拔钻孔灌注桩试桩非摩擦段的双层套筒,包括内层套筒、外层套筒,若干限定内层套筒和外层套筒间相对位置的限位钢板,该限位钢板与内层套筒焊接一体,在外层套筒底部焊接有一圈底座,并在底座上设置有垫圈,在该内、外层套筒接口部位采用密封物密封。
作为本实用新型的进一步特征,所述内层套筒内径为试桩的直径,套筒壁厚不小于5mm。
作为本实用新型的进一步特征,所述外层套筒与内层套筒之间留有不小于5cm的间隙,套筒壁厚不小于5mm。
作为本实用新型的进一步特征,所述限位钢板有三道,分别设在所述内、外层套筒的顶部、中部和底部。
作为本实用新型的进一步特征,所述密封物为硅胶。
由于采用以上技术方案,本实用新型的用于抗拔钻孔灌注桩试桩非摩擦段的双层套筒,将与地下室深度相同双层钢套筒安装在灌注桩试桩外侧,在试桩进行单桩抗拔实验的时候,套筒将非摩擦段的土体与试桩桩身隔离,双层套筒之间产生滑动,真实模拟了工程桩的工作状态,为桩基设计提供有效依据,本实用新型适用于各类工程及不同地质环境的试桩工程。
附图说明
图1为本实用新型的结构俯视图;
图2为本实用新型的结构剖视图;
图3为本实用新型在具体实施时的状态图;
图4为图3中A部分的放大图。
图中1,外层套筒;2,内层套筒;3,限位钢板;4,橡胶垫圈;5,钻孔灌注桩;a,非摩擦段土体
具体实施方式
下面结合具体实施例,对本实用新型作进一步说明:
如图1-4所示,本实用新型的用于抗拔钻孔灌注桩试桩非摩擦段的双层套筒,其可做到将抗拔钻孔灌注桩试桩非摩擦段土体a与试桩桩身的有效隔离,其主要构造如下:
1)内层套筒1:内层钢套筒内径为试桩的直径,钢套筒壁厚不宜小于5mm,长度根据建筑地下室的埋置深度来确定。
2)外层套筒2:与内筒之间留有不小于5cm的间隙,钢套筒壁厚不宜小于5mm,长度根据建筑地下室的埋置深度来确定。
3)限位钢板3:用于限定内外层套筒之间的相对位置,分别在套筒的顶部、中部、底部设置三道限位钢板(可视埋置深度适当增加限位钢板的道数),限位钢板与内层套筒1之间采用电焊连接;
4)内、外层套筒在组装的时候,抗拔桩的外层套筒底部需进行构造处理,为防止施工过程中有混凝土或水泥浆进入到双层套筒的间隙中,在外层套筒底部焊接一圈底座,并在底座上设置橡胶垫圈,组装完成后,在内外筒接口部位采用硅胶密封;
5)双层套筒组装完成后,采用钢板在套筒顶部将其临时焊接牢固。
6)双层套筒沉入桩孔后,将其进行临时固定,待试桩养护到期开始进行检测前,将套筒上口连接固定设施拆除,使内外层套筒脱离开来。然后再进行相应的试桩检测。
但是,上述的具体实施方式只是示例性的,是为了更好的使本领域技术人员能够理解本专利,不能理解为是对本专利包括范围的限制;只要是根据本专利所揭示精神的所作的任何等同变更或修饰,均落入本专利包括的范围。
Claims (5)
1.一种用于抗拔钻孔灌注桩试桩非摩擦段的双层套筒,其特征在于:包括内层套筒、外层套筒,若干限定内层套筒和外层套筒间相对位置的限位钢板,该限位钢板与内层套筒焊接一体,在外层套筒底部焊接有一圈底座,并在底座上设置有垫圈,在该内、外层套筒接口部位采用密封物密封。
2.根据权利要求1所述的双层套筒,其特征在于:所述内层套筒内径为试桩的直径,套筒壁厚不小于5mm。
3.根据权利要求2所述的双层套筒,其特征在于:所述外层套筒与内层套筒之间留有不小于5cm的间隙,套筒壁厚不小于5mm。
4.根据权利要求2或3所述的双层套筒,其特征在于:所述限位钢板有三道,分别设在所述内、外层套筒的顶部、中部和底部。
5.根据权利要求4所述的双层套筒,其特征在于:所述密封物为硅胶。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220700012 CN203008003U (zh) | 2012-12-18 | 2012-12-18 | 用于抗拔钻孔灌注桩试桩非摩擦段的双层套筒 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220700012 CN203008003U (zh) | 2012-12-18 | 2012-12-18 | 用于抗拔钻孔灌注桩试桩非摩擦段的双层套筒 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203008003U true CN203008003U (zh) | 2013-06-19 |
Family
ID=48599612
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220700012 Expired - Fee Related CN203008003U (zh) | 2012-12-18 | 2012-12-18 | 用于抗拔钻孔灌注桩试桩非摩擦段的双层套筒 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203008003U (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109056857A (zh) * | 2018-09-11 | 2018-12-21 | 上海建科工程咨询有限公司 | 试验桩侧摩阻力消除装置及方法 |
CN114482155A (zh) * | 2022-03-20 | 2022-05-13 | 云南建投第一勘察设计有限公司 | 一种超长试桩空桩段桩土隔离的施工方法 |
-
2012
- 2012-12-18 CN CN 201220700012 patent/CN203008003U/zh not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109056857A (zh) * | 2018-09-11 | 2018-12-21 | 上海建科工程咨询有限公司 | 试验桩侧摩阻力消除装置及方法 |
CN114482155A (zh) * | 2022-03-20 | 2022-05-13 | 云南建投第一勘察设计有限公司 | 一种超长试桩空桩段桩土隔离的施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201843152U (zh) | 深基坑工程施工和监测模拟试验装置 | |
CN104060634B (zh) | 顶管工井预留孔洞的止水方法及结构 | |
CN204257101U (zh) | 一种隧道教学实验模型 | |
CN203008003U (zh) | 用于抗拔钻孔灌注桩试桩非摩擦段的双层套筒 | |
CN103514786B (zh) | 基于位移控制法的隧道施工对环境影响的模型试验方法 | |
CN104264721A (zh) | 围岩损伤区分区的测试方法 | |
CN103149091A (zh) | 建筑桩抗拔竖向拉力加载试验装置 | |
CN204112378U (zh) | 一种具有仿真隔离作用的桩基检测双护筒装置 | |
CN204000963U (zh) | 顶管工井预留孔洞的止水结构 | |
CN203008002U (zh) | 用于抗压钻孔灌注桩试桩非摩擦段的双层套筒 | |
CN107179391B (zh) | 一种用于超浅埋下穿隧道浅层注浆的试验装置 | |
CN103696757A (zh) | 一种用于测量模拟钻井中钻头侧向力及轴向力的装置 | |
CN203462462U (zh) | 一种便于取芯检测的钻孔灌注桩钢筋笼 | |
CN104091516A (zh) | 一种地下结构外防内贴法施工教学模型 | |
CN204002741U (zh) | 一种填砂模型管 | |
CN207779618U (zh) | 一种模拟地下结构防水测试系统 | |
CN215669726U (zh) | 一种原位测量桶式基础的沉贯阻力的装置 | |
CN102607910B (zh) | 一种土与结构物接触三轴试样制备装置及其使用方法 | |
CN204326121U (zh) | 用于输电线路基础试验的试验装置 | |
CN104819700A (zh) | 一种填筑体沉降监测用沉降磁环的埋设方法 | |
CN204356795U (zh) | 一种带有长垂直接地极的变电站管桩 | |
CN104452835B (zh) | 用于输电线路基础试验的试验装置及其设置方法 | |
CN209841650U (zh) | 顶管实验箱的顶管 | |
CN203908538U (zh) | 一种复合型地层形变测量装置 | |
CN106940233A (zh) | 一种地下结构防水测试综合试验平台及其试验方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130619 Termination date: 20211218 |