CN204112378U - 一种具有仿真隔离作用的桩基检测双护筒装置 - Google Patents
一种具有仿真隔离作用的桩基检测双护筒装置 Download PDFInfo
- Publication number
- CN204112378U CN204112378U CN201420474639.9U CN201420474639U CN204112378U CN 204112378 U CN204112378 U CN 204112378U CN 201420474639 U CN201420474639 U CN 201420474639U CN 204112378 U CN204112378 U CN 204112378U
- Authority
- CN
- China
- Prior art keywords
- casing
- interior casing
- ribs
- interior
- pile measurement
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
- Piles And Underground Anchors (AREA)
Abstract
本实用新型公开了一种具有仿真隔离作用的桩基检测双护筒装置,包括:外护筒、内护筒、环形封口顶板、支撑肋,其特征在于:在内护筒外侧沿长度方向均有布置若干道支撑肋,每道沿内护筒圆周方向均匀布置四个支撑肋;将内护筒套于外护筒中;在外护筒顶部焊接一个环形封口顶板并与内护筒相连。本实用新型的桩基检测装置,可以消除非有效桩长段的土体摩擦力、缩短桩基检测时间、减少检测费用和基坑安全隐患的问题。
Description
技术领域
本实用新型涉及一种建筑工程中的桩基检测装置,尤其是此装置可以完全消除桩顶标高以上的非有效桩长段的土体摩擦力。
背景技术
现代建筑地下空间得到更大的利用,桩基深度更深,有效桩长顶标高距自然地面距离更大,桩基承载力检测难度加大,传统的桩基承载力检测方法已不能满足施工要求。
传统的桩基承载力检测方法有两种:
一是在基坑土方开挖后进行桩基承载力检测施工,此方法需待桩基检测完成后才能进行后续工程的施工,增加了桩基检测的等待时间,除此外,由于土方已开挖,桩基检测时还需增加机械设备及配重的吊入吊上基坑的费用,同时增加基坑的暴露时间,从而延长工期、增大安全隐患。
二是在基坑土方开挖前进行桩基承载力检测施工,此方法是在桩基桩顶标高处及以上的钢筋笼上焊三道应力计,通过应力计的数值和检测装置的数值估算桩基承载力,得出的最终承载力包含估算的非有效桩长段的土体摩擦力,由于估算与实际或多或少存在一定偏差,故得出的桩基承载力并不是桩基的实际准确承载力值。
发明内容
本实用新型为了解决上述两个缺点,提出新的桩基检测装置,消除了桩顶标高以上的非有效桩长段的土体摩擦力,很好地解决了桩基检测的精确性、工期、费用、基坑安全隐患等问题。
本实用新型解决其技术问题所采用的技术方案是:
一种具有仿真隔离作用的桩基检测双护筒装置,包括:外护筒、内护筒、环形封口顶板、支撑肋,其特征在于:在内护筒外侧沿长度方向均有布置若干道支撑肋,每道沿内护筒圆周方向均匀布置四个支撑肋;将内护筒套于外护筒中;在外护筒顶部焊接一个环形封口顶板并与内护筒相连。
本实用新型还包括四个型钢牛腿,四个型钢牛分别焊接在内护筒顶部,作为整个装置的支承。
本实用新型还包括若干干海带、密封胶,在外护筒、内护筒底部之间的空隙用若干干海带塞实,末端用密封胶封牢。
所述的装置的各部件除海带、密封胶外,均采用钢材制作而成。
在桩基有效桩长顶至自然地面预先埋入设计好的本实用新型的双护筒装置,然后进行桩基施工,待桩身混凝土达到设计要求后进行承载力检测,通过双护筒可以消除非有效桩长段桩身与土体的摩擦力,从而得出准确的桩基实际承载力。
所述装置的外护筒长度为自然地面至有效桩顶标高,桩基混凝土浇筑完成并达到一定强度后,进行桩基承载力检测,检测前将环形封闭顶板割除,使外护筒与内护筒分离,从而消除了桩顶标高以上的非有效桩长段的土体摩擦力,可以得到精确的承载力检测值。
附图说明
图1是双护筒装置平面图。
图2是双护筒装置水平剖面图。
图3是双护筒装置垂直剖面图。
具体实施方式
下面结合附图和实施例对本实用新型进一步说明。
如图1、图2、图3所示,本实用新型包括一个外护筒1、一个内护筒2、四个型钢牛腿3、一个环形封口顶板4、若干支撑肋5、若干干海带6、若干密封胶7,其特征在于:在内护筒2的外侧沿长度方向均有布置若干道支撑肋5,每道沿内护筒2的圆周方向均匀布置四个支撑肋5;将内护筒2套于外护筒1中;在外护筒1的顶部焊接一个环形封口顶板4与内护筒2相连,在内护筒2的顶部焊接四个型钢牛腿3作为整个装置的支承;两个护筒底部之间的空隙用若干干海带6塞实,末端用密封胶7封牢。所述装置的外护筒1长度为自然地面至有效桩顶标高,桩基混凝土浇筑完成并达到一定强度后,进行桩基承载力检测,检测前将环形封闭顶板4割除,使外护筒1与内护筒2分离,由于外护筒1与内护筒2底部的空隙用海带6及密封胶7封闭,不会有泥浆进入,故桩基受到检测静载力后,外护筒1嵌固于土层中,由于外护筒1与内护筒2为分离状态,故外护筒1不会移动,内护筒2与筒内的非有效桩长段混凝土粘结牢固,在检测静载力作用下产生向下位移,很好的消除了非有效桩长段与土体的摩擦力,可以得到准确的有效桩长段桩基承载力数据。
所述的装置的各部件除海带6、密封胶7外,均采用钢材制作而成。
在桩基有效桩长顶至自然地面预先埋入设计好的本实用新型的双护筒装置,然后进行桩基施工,待桩身混凝土达到设计要求后进行承载力检测,通过双护筒可以消除非有效桩长段桩身与土体的摩擦力,从而得出准确的桩基实际承载力。
本实用新型的有益效果是,很好的消除了非有效桩长段与土体的摩擦力,可以得到准确的有效桩长段桩基承载力数据,很好地解决了桩基检测的精确性、工期、费用、基坑安全隐患等问题。
Claims (4)
1.一种具有仿真隔离作用的桩基检测双护筒装置,包括:外护筒、内护筒、环形封口顶板、支撑肋,其特征在于:在内护筒外侧沿长度方向均有布置若干道支撑肋,每道沿内护筒圆周方向均匀布置四个支撑肋;将内护筒套于外护筒中;在外护筒顶部焊接一个环形封口顶板并与内护筒相连。
2.根据权利要求1所述的具有仿真隔离作用的桩基检测双护筒装置,其特征在于:还包括四个型钢牛腿,四个型钢牛分别焊接在内护筒顶部,作为整个装置的支承。
3.根据权利要求1所述的具有仿真隔离作用的桩基检测双护筒装置,其特征在于:还包括若干干海带、密封胶,在外护筒、内护筒底部之间的空隙用若干干海带塞实,末端用密封胶封牢。
4.根据权利要求1所述的具有仿真隔离作用的桩基检测双护筒装置,其特征在于:所述外护筒、内护筒、环形封口顶板、支撑肋均采用钢材制作而成。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420474639.9U CN204112378U (zh) | 2014-08-21 | 2014-08-21 | 一种具有仿真隔离作用的桩基检测双护筒装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420474639.9U CN204112378U (zh) | 2014-08-21 | 2014-08-21 | 一种具有仿真隔离作用的桩基检测双护筒装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204112378U true CN204112378U (zh) | 2015-01-21 |
Family
ID=52329706
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420474639.9U Active CN204112378U (zh) | 2014-08-21 | 2014-08-21 | 一种具有仿真隔离作用的桩基检测双护筒装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204112378U (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106948390A (zh) * | 2017-05-24 | 2017-07-14 | 深圳宏业基岩土科技股份有限公司 | 用于试验桩检测的双护筒结构 |
CN106988353A (zh) * | 2017-05-24 | 2017-07-28 | 深圳宏业基岩土科技股份有限公司 | 基坑试验桩施工检测方法 |
CN108425383A (zh) * | 2018-03-23 | 2018-08-21 | 深圳市工勘岩土集团有限公司 | 试桩隔离侧摩阻力的施工方法 |
CN109403394A (zh) * | 2018-12-13 | 2019-03-01 | 深圳宏业基岩土科技股份有限公司 | 便于试桩试验的双护筒结构 |
CN113513019A (zh) * | 2021-09-02 | 2021-10-19 | 中建八局第二建设有限公司 | 一种桩基检测使用的双护筒及其使用方法 |
-
2014
- 2014-08-21 CN CN201420474639.9U patent/CN204112378U/zh active Active
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106948390A (zh) * | 2017-05-24 | 2017-07-14 | 深圳宏业基岩土科技股份有限公司 | 用于试验桩检测的双护筒结构 |
CN106988353A (zh) * | 2017-05-24 | 2017-07-28 | 深圳宏业基岩土科技股份有限公司 | 基坑试验桩施工检测方法 |
CN108425383A (zh) * | 2018-03-23 | 2018-08-21 | 深圳市工勘岩土集团有限公司 | 试桩隔离侧摩阻力的施工方法 |
CN109403394A (zh) * | 2018-12-13 | 2019-03-01 | 深圳宏业基岩土科技股份有限公司 | 便于试桩试验的双护筒结构 |
CN113513019A (zh) * | 2021-09-02 | 2021-10-19 | 中建八局第二建设有限公司 | 一种桩基检测使用的双护筒及其使用方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204112378U (zh) | 一种具有仿真隔离作用的桩基检测双护筒装置 | |
CN106950070B (zh) | 用于矩形顶管顶进施工全过程模拟的试验装置 | |
CN104563164B (zh) | 一种地连墙接缝渗漏检测及注浆堵漏方法 | |
CN202899174U (zh) | 管桩光纤光栅传感器测试系统 | |
CN104929133B (zh) | 一种深基坑拉森钢板桩桩底放坡支护的施工方法 | |
CN106198890A (zh) | 一种室内注浆模拟试验装置及其使用方法 | |
CN103149091A (zh) | 建筑桩抗拔竖向拉力加载试验装置 | |
CHEN et al. | Three-dimensional centrifuge modeling of influence of nearby excavations on existing tunnels and effects of cut-off walls | |
CN103604698A (zh) | 煤矿老采空区冒落带破碎岩体二次变形压实模拟实验方法 | |
CN109975117A (zh) | 顶管实验箱及实验方法 | |
CN107179391B (zh) | 一种用于超浅埋下穿隧道浅层注浆的试验装置 | |
CN103343534A (zh) | 基坑施工封闭降水方法 | |
CN101858074A (zh) | 现场注水试验施工方法及装置 | |
CN103835319B (zh) | 混凝土扩盘半面桩受压状态下现场可观测实桩试验方法 | |
CN204356820U (zh) | 用于高应变法桩基检测的自由落锤锤击装置 | |
CN108532650B (zh) | 一种原位测定地下结构所受水浮力的方法 | |
CN206114063U (zh) | 一种地下水位监测装置 | |
CN103088847B (zh) | 一种地基加固离心模型试验砂桩制作装置及制作方法 | |
CN103276706B (zh) | 引水隧洞斜井段防渗结构的施工方法 | |
CN209841650U (zh) | 顶管实验箱的顶管 | |
CN204510292U (zh) | 一种桩土模型模拟实验桩 | |
CN203891045U (zh) | 深基坑围护桩间的堵漏注浆装置 | |
CN201713803U (zh) | 现场注水试验装置 | |
CN204000819U (zh) | 一种横向受荷体顶部驱动式土压力测模装置 | |
CN106836320A (zh) | 预留管底激振旁孔接收波速测试桩底注浆测试装置及方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |