CN202969988U - Inner structure of building - Google Patents

Inner structure of building Download PDF

Info

Publication number
CN202969988U
CN202969988U CN 201220733754 CN201220733754U CN202969988U CN 202969988 U CN202969988 U CN 202969988U CN 201220733754 CN201220733754 CN 201220733754 CN 201220733754 U CN201220733754 U CN 201220733754U CN 202969988 U CN202969988 U CN 202969988U
Authority
CN
China
Prior art keywords
building
corridor
fire escape
communicated
internal construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220733754
Other languages
Chinese (zh)
Inventor
刘强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 201220733754 priority Critical patent/CN202969988U/en
Application granted granted Critical
Publication of CN202969988U publication Critical patent/CN202969988U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model discloses an inner structure of a building and belongs to the technical field of building design. The problem that personnel in the building are hard to rapidly evacuate in an existing safety passage is solved. The inner structure of the building comprises rooms and corridors. The corridors are located on the peripheries of the rooms, the rooms are communicated with a stair room or an elevator room through the corridors which are further communicated with safety slides, the safety slides are communicated with all storeys of the building, and a person can slide to the first storey of the building from any storey of the building through the safety slides. The inner structure of the building can be applied to a residence, an office building, a factory building and other occasions.

Description

The building internal construction
Technical field
The utility model belongs to the house design field, is specifically related to a kind of building internal construction.
Background technology
During the unsafe conditions such as breaking out of fire in building, gas leakage, the personnel in building need to be by the escape way rapid evacuation.In present building, escape way is the form realization with stair mostly, and is provided with safety insulation door at each layer, is used for blocking-up flame, toxic gas etc.
But the inventor finds in realizing process of the present utility model: existing escape way is all the form realization with stair, and the personnel in building easily cause when evacuating by stair and block up, and therefore is difficult to evacuate fast the personnel in building.
The utility model content
The utility model embodiment provides a kind of building internal construction, has solved the problem that existing escape way is difficult to the personnel in the rapid evacuation building.
For achieving the above object, embodiment of the present utility model adopts following technical scheme:
This building internal construction comprises room and corridor, and described corridor is positioned at described room periphery, and described room is communicated to staircase or escalator by described corridor, and described corridor also is communicated to fire escape, and described fire escape is communicated with described each layer of building;
The people can from any one deck of described building, slide into the first floor of described building by described fire escape.
Preferably, described fire escape twist.
Preferably, described fire escape is arranged at each corner in described corridor.
Further, be provided with cushion pad bottom described fire escape.
Further, also be provided with fire fighting equipment on described corridor.
Further, every one deck of described building is equipped with safety insulation door.
Further, described building internal construction also comprises the ladder that is communicated with described each layer of building.
Compared with prior art, technique scheme provided by the utility model has following advantage: during the unsafe conditions such as breaking out of fire in building, gas leakage, in building, the personnel of each layer can run to fire escape by the corridor, and slide by fire escape from any one deck of building, slide into fast the first floor of building, go to outside building, thereby realized the rapid evacuation of personnel in building, solved the problem that existing escape way is difficult to the personnel in the rapid evacuation building.
Description of drawings
In order to be illustrated more clearly in the technical scheme in the utility model embodiment, during the below will describe embodiment, the accompanying drawing of required use is done to introduce simply, apparently, accompanying drawing in the following describes is only embodiment more of the present utility model, for those of ordinary skills, under the prerequisite of not paying creative work, can also obtain according to these accompanying drawings other accompanying drawing.
The floor map of the building internal construction that Fig. 1 provides for embodiment of the present utility model;
The floor map at the first floor of building of the building internal construction that Fig. 2 provides for embodiment of the present utility model.
The specific embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is clearly and completely described, obviously, described embodiment is only the utility model part embodiment, rather than whole embodiment.Based on the embodiment in the utility model, the every other embodiment that those of ordinary skills obtain under the prerequisite of not paying creative work belongs to the scope that the utility model is protected.
As shown in Figure 1, the building internal construction that the utility model embodiment provides can be applicable to the scenes such as dwelling house, office building, factory building, comprises room 1 and corridor 2.Wherein, room 1 specifically comprises parlor, bedroom, balcony, kitchen and washroom etc.As can be seen from Figure 1, corridor and balcony are enclosed in the periphery in room, and the air at corridor and balcony place just can completely cut off house interior and extraneous exchange heat, so that the temperature of house interior is isolated with the building outside, and cool in summer and warm in winter in the maintenance room.Corridor 2 is positioned at room 1 periphery, and room 1 is communicated to staircase 3 by corridor 2, and further is communicated to escalator 4.
In the utility model embodiment, corridor 2 also is communicated to fire escape 5 with room 1, and fire escape 5 in the vertical directions are communicated with each layer of building; People in building can from any one deck of building, slide into the first floor of building by fire escape 5.
During the unsafe conditions such as breaking out of fire in building, gas leakage, in building, the personnel of each layer can run to fire escape 5 by corridor 2, and slide by fire escape 5 from any one deck of building, slide into fast the first floor of building, go to outside building, thereby realized the rapid evacuation of personnel in building, solved the problem that existing escape way is difficult to the personnel in the rapid evacuation building.
As a preferred version, as shown in Figure 1, fire escape 5 twist.Than linear, fire escape 5 shared space can be effectively saved in spiral design, and can slow down people's gliding speed, avoids because glide the too fast damage that causes.
Further, as shown in Figure 2, fire escape 5 bottoms are provided with cushion pad 6.The people slides from higher floor, and the speed when arriving first floor is just faster, and the momentum of the cushion pad 6 that is arranged on fire escape 5 bottoms can cushion the people and slide the time avoided because glide the too fast damage that causes.
Preferably, as shown in Figure 1, fire escape 5 is arranged at each corner in corridor 2, and is equipped with safety insulation door 7 outside the fire escape 5 of every one deck of building.Safety insulation door 7 is in closed condition at ordinary times, and fire escape 5 is positioned at the corner in corridor 2, can not affect on corridor 2 current normally.When in building, the situation of causing danger need to be used fire escape 5, in building, the personnel of each layer just can open safety insulation door 7, from fire escape sliding 5 to first floor, went to outside building.After the evacuating personnel of this layer was complete, closed safe isolating door 7 was with blocking-up flame, toxic gas etc.
Further, also be provided with the fire fighting equipment (not shown) on the corridor, and building inside can also arrange the ladder that is communicated with each layer of building, the fire fighter can arrive by ladder and fire escape any one deck of building.So just can coordinate fire escape, Yi Bian carry out evacuating personnel, remedy Yi Bian carry out fire-fighting, further reduce personnel and property loss.
The above; it is only the specific embodiment of the present utility model; but protection domain of the present utility model is not limited to this; anyly be familiar with those skilled in the art in the technical scope that the utility model discloses; the variation that can expect easily or replacement are within all should being encompassed in protection domain of the present utility model.Therefore, protection domain of the present utility model should be as the criterion with the protection domain of claim.

Claims (7)

1. building internal construction, comprise room and corridor, described corridor is positioned at described room periphery, and described room is communicated to staircase or escalator by described corridor, it is characterized in that: described corridor also is communicated to fire escape, and described fire escape is communicated with described each layer of building;
The people can from any one deck of described building, slide into the first floor of described building by described fire escape.
2. building internal construction according to claim 1, it is characterized in that: described fire escape twist.
3. building internal construction according to claim 1, it is characterized in that: described fire escape is arranged at each corner in described corridor.
4. building internal construction according to claim 1, is characterized in that: be provided with cushion pad bottom described fire escape.
5. building internal construction according to claim 1, it is characterized in that: every one deck of described building is equipped with safety insulation door.
6. building internal construction according to claim 1, is characterized in that: also be provided with fire fighting equipment on described corridor.
7. building internal construction according to claim 1, is characterized in that: also comprise the ladder that is communicated with described each layer of building.
CN 201220733754 2012-12-27 2012-12-27 Inner structure of building Expired - Fee Related CN202969988U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220733754 CN202969988U (en) 2012-12-27 2012-12-27 Inner structure of building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220733754 CN202969988U (en) 2012-12-27 2012-12-27 Inner structure of building

Publications (1)

Publication Number Publication Date
CN202969988U true CN202969988U (en) 2013-06-05

Family

ID=48511082

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220733754 Expired - Fee Related CN202969988U (en) 2012-12-27 2012-12-27 Inner structure of building

Country Status (1)

Country Link
CN (1) CN202969988U (en)

Similar Documents

Publication Publication Date Title
Ma et al. Discussion on the fire safety design of a high-rise building
CN104740790B (en) A kind of fire of high-rise building device for refuge and escape
CN103386175A (en) Fire disaster slide escape of high-rise building
Xing et al. Simulation of fire and evacuation in high-rise building
CN203790459U (en) High-rise fast escape device
CN205527131U (en) Elevator is evacuated to ward building
Zu-Ming et al. Smoke control–Discussion of switching elevator to evacuation elevator in high-rise building
CN104274918A (en) Rotary table type emergency escape passage with slide bars
CN103663060A (en) High-rise building fire prevention and life-saving system
CN202969988U (en) Inner structure of building
CN203201233U (en) Building with passive self-rescue escape and evacuation system
CN102526912B (en) Fire preventing and controlling method for underground transformer substation
CN202611274U (en) Upper storey duplex type house
CN205677284U (en) One has hedging functional activity house
CN203602186U (en) Fire-proof life-saving system for high-rise buildings
CN209742431U (en) Fireproof separation structure of commercial facilities in public building
CN201997020U (en) Automatic smoke exhausting system for corridor of high-rise
CN204418955U (en) The multifunctional escaping door and window of belt sensor
CN204447019U (en) Escaping slideway
CN206814182U (en) A kind of fire-proof and water-proof evacuation escape elevator
CN204252765U (en) Safety type fire cut door special
CN109545021A (en) Escape system detection device
Pang et al. Fire safety concerns on existing supertall buildings and proposed upgrading in Hong Kong
CN205586369U (en) Multichannel high building prompt drop safety ladder
CN201343876Y (en) House type structure of high-rise building with reduced public sharing area

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130605