CN202945741U - Non-vibrating concrete column of steel tube - Google Patents

Non-vibrating concrete column of steel tube Download PDF

Info

Publication number
CN202945741U
CN202945741U CN 201220706219 CN201220706219U CN202945741U CN 202945741 U CN202945741 U CN 202945741U CN 201220706219 CN201220706219 CN 201220706219 CN 201220706219 U CN201220706219 U CN 201220706219U CN 202945741 U CN202945741 U CN 202945741U
Authority
CN
China
Prior art keywords
section
steel column
funnel
column
cross
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220706219
Other languages
Chinese (zh)
Inventor
房树田
李琦
陈茜
牛哲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Heilongjiang Institute of Technology
Original Assignee
Heilongjiang Institute of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Heilongjiang Institute of Technology filed Critical Heilongjiang Institute of Technology
Priority to CN 201220706219 priority Critical patent/CN202945741U/en
Application granted granted Critical
Publication of CN202945741U publication Critical patent/CN202945741U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a non-vibrating concrete column of a steel tube. The non-vibrating concrete column is used for solving the problems that the vibrating is time-wasting and labor-wasting, the construction time is long and the project benefits are low during the casting process of the existing concrete column. The non-vibrating concrete column comprises a steel column with a rectangular cross section; the non-vibrating concrete column further comprises a steel column with a circular cross section, a funnel, a partition plate, a lifting lug and a plurality of reinforcing bars, wherein a charging hole is formed on the partition plate; the steel column with the circular cross section is vertically arranged on the ground; the steel column with the rectangular cross section is vertically sleeved on the steel column with the circular cross section; the center of the steel column with the rectangular cross section is superposed with the axis of the steel column with the circular cross section; the partition plate is arranged at the upper end of the steel column with the rectangular cross section; the funnel is provided with a guide tube; the funnel is fixedly arranged on the charging hole of the partition plate by the plurality of the reinforcing bars; the guide tube at the lower end of the funnel is connected with the upper end of the steel column with the circular cross section; and the lifting lug is arranged on the upper part of the funnel. According to the non-vibrating concrete column disclosed by the utility model, the funnel is provided with the guide tube, so that holes are effectively avoided due to insufficient overflowing of the gas below the partition plate. The non-vibrating concrete column is suitable for various buildings.

Description

A kind of steel pipe is exempted from the vibration concrete post
Technical field
The utility model relates to a kind of concrete column, is specifically related to a kind of steel pipe and exempts from the vibration concrete post.
Background technology
Concrete column is the most basic supporting member in the various engineering structuress such as house, bridge, water conservancy project, is commonly used for the depression bar of pillar, bridge pier, foundation columns, pylon and the truss of superstructure.Concrete column need to vibrate in casting process, to guarantee pouring quality, wastes time and energy but vibrate, and the engineering time is long, and project benefit is low.
The utility model content
The purpose of this utility model is in order to solve existing concrete column in casting process, and vibrating wastes time and energy, and the engineering time is long, the problem that project benefit is low, and then provide a kind of steel pipe to exempt from the vibration concrete post.
the technical solution of the utility model is: a kind of steel pipe is exempted from the vibration concrete post and is comprised that cross section is the steel column of rectangle, described concrete column comprises that also cross section is circular steel column, funnel, dividing plate, hanger and Duo Gen reinforcing bar, dividing plate is provided with charging aperture, cross section is vertically set on ground for circular steel column, cross section is that the steel column of rectangle vertically is sleeved on cross section on circular steel column, and cross section is that center and the cross section of the steel column of rectangle is the dead in line of the steel column of circle, dividing plate is arranged on the upper end that cross section is the steel column of rectangle, funnel is the funnel with guide pipe, funnel is fixedly installed on charging aperture on dividing plate by many reinforcing bars, and the guide pipe of funnel lower end is connected with the upper end that cross section is the steel column of circle, hanger is arranged on the top of funnel.
The utility model compared with prior art has following effect:
1. funnel of the present utility model is the funnel with guide pipe, effectively avoids gas under dividing plate fully to overflow and forms the cavity.
2. the utility model directly gets final product concreting by funnel in steel rectangle column and circular steel column, the high self-compacting concrete requirement concrete of exempting to shake of throwing itself has the works fine performance of upper flow regime, protect plasticity, education resistance, slow setting and microdilatancy, take the high position of " controlled orderly " to leave mode when building, need not to vibrate, reach the effect of concrete self-compaction.
3. steel core concrete column of the present utility model is compared with common steel column, and component are few, weld seam is few, particularly because steel pipe is relatively thin, has alleviated workload and the welding difficulty of Site Welding; Compare with reinforced concrete post, saved the time of reinforcing bar binding, formwork form removal and concrete curing, shortened the construction period.
4. the utility model as the steel core concrete column of compressed member,, improves concrete compressive strength, and becomes plastic material by fragile material concrete lock ring effect due to steel pipe, and key property has played the variation of matter.Due to fill concrete in steel pipe column, improved the local stability of thin-wall steel tube simultaneously, the yield strength of steel pipe can be taken full advantage of.Therefore in steel core concrete column, bi-material can make up weakness separately mutually, brings out one's strong points, thereby has greatly improved bearing capacity.
5., there are not the phenomenons such as the quick-fried mould of spillage in steel pipe column encased steel plate good seal performance of the present utility model during concreting; To exempt from vibration concrete be the self-compacting concrete that need not to vibrate because height is thrown in addition, can not produce the noise pollution environment that vibrates and send because of vibrating head.
Description of drawings
Fig. 1 is front view of the present utility model; Fig. 2 is the top view of Fig. 1.
The specific embodiment
the specific embodiment one: present embodiment is described in conjunction with Fig. 1 and Fig. 2, a kind of steel pipe of present embodiment is exempted from the vibration concrete post and is comprised that cross section is the steel column 1 of rectangle, described concrete column comprises that also cross section is circular steel column 2, funnel 3, dividing plate 5, hanger 6 and Duo Gen reinforcing bar 4, dividing plate 5 is provided with charging aperture 7, cross section is vertically set on ground for circular steel column 2, cross section is that the steel column 1 of rectangle vertically is sleeved on cross section on circular steel column 2, and cross section is that center and the cross section of the steel column 1 of rectangle is the dead in line of the steel column 2 of circle, dividing plate 5 is arranged on the upper end that cross section is the steel column 1 of rectangle, funnel 3 is the funnel with guide pipe, funnel 3 is fixedly installed on charging aperture 7 on dividing plate 5 by many reinforcing bars 4, and the guide pipe of funnel 3 lower ends is connected with the upper end that cross section is the steel column 2 of circle, hanger 6 is arranged on the top of funnel 3.
The specific embodiment two: in conjunction with Fig. 1 and Fig. 2, present embodiment is described, the diameter of the reinforcing bar 4 of present embodiment is 25mm.So arrange, effectively accept funnel 3 and weight of cement.Other composition and annexation are identical with the specific embodiment one.
The specific embodiment three: in conjunction with Fig. 1 and Fig. 2, present embodiment is described, the quantity of the reinforcing bar 4 of present embodiment is 2-4.Construction safety so is set.Other composition and annexation are identical with the specific embodiment one or two.
The utility model is to use like this,
1, namely add a cover cover sheet at the steel rectangle column column cap before the steel column hoisted in position, fall into rainwater-proof, oil, foreign matter.The interline link of going forward side by side is checked and accepted, and guarantees that steel column position error and welding quality satisfy code requirement.The inspection concrete placing installation is intact, installs firmly, organizes concrete to march into the arena.
2, erection construction operating platform before concreting, perform and face the limit security protection.
3, after self-compacting concrete was shown up, the reply concrete slump divergence of per car and T500 performance detected totally.
4, the self-compacting concrete field sampling is made test block, and any vibrating do not done in test block; Divide two layers and fill with concrete column; First floor is built cross section and is circular steel column 2, has built cross section and has taken off dividing plate 5 and funnel 3 after for circular steel column 2, then built the steel column 2 of circle of the second layer and the chamber between steel column 1 that cross section is rectangle.The surface troweling, press polish after final set.
5, molding temperature should be controlled at 10~25 ℃ of scopes, according to the difference of seasonal temperature, adjusts the concrete casting time.
6, because height is thrown the characteristics such as self-compacting concrete intensity is high, cohesiveness is large, pumping resistance is large, easy plugging when building, so in casting process, the pump line elbow will reduce as far as possible, prevents that pump line from blocking, the continuity that should keep solidifying soil to build.When building as interruption, must not surpass the concrete initial setting time break time of building.Rectangle steel tubing string concreting face should be below column joint about 30cm place.
If 7, laitance is arranged before concrete initial set, need laitance is scooped out to clean out.
8, clear up constuction joint after concrete final set, eliminating impurities in post is clean, cover cover plate and prevent that foreign matter from entering.
9, last segmented column concrete casting is to capital, and the employing cement mortar is floating with concrete surface after final set three days, concrete shrinkage are completed substantially.Complete building of concrete column.

Claims (3)

1. a steel pipe is exempted from the vibration concrete post, it comprises that cross section is the steel column (1) of rectangle, it is characterized in that: described concrete column comprises that also cross section is circular steel column (2), funnel (3), dividing plate (5), hanger (6) and many reinforcing bars (4), dividing plate (5) is provided with charging aperture (7), cross section is vertically set on ground for circular steel column (2), cross section is that the steel column (1) of rectangle vertically is sleeved on cross section on circular steel column (2), and cross section is that center and the cross section of the steel column (1) of rectangle is the dead in line of the steel column (2) of circle, dividing plate (5) is arranged on the upper end of the steel column that cross section is rectangle (1), funnel (3) is the funnel with guide pipe, funnel (3) is fixedly installed on charging aperture (7) on dividing plate (5) by many reinforcing bars (4), and the guide pipe of funnel (3) lower end is connected with the upper end that cross section is the steel column (2) of circle, hanger (6) is arranged on the top of funnel (3).
2. a kind of steel pipe is exempted from the vibration concrete post according to claim 1, it is characterized in that: the diameter of described reinforcing bar (4) is 25mm.
3. a kind of steel pipe is exempted from the vibration concrete post according to claim 2, it is characterized in that: the quantity of described reinforcing bar (4) is 2-4.
CN 201220706219 2012-12-19 2012-12-19 Non-vibrating concrete column of steel tube Expired - Fee Related CN202945741U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220706219 CN202945741U (en) 2012-12-19 2012-12-19 Non-vibrating concrete column of steel tube

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220706219 CN202945741U (en) 2012-12-19 2012-12-19 Non-vibrating concrete column of steel tube

Publications (1)

Publication Number Publication Date
CN202945741U true CN202945741U (en) 2013-05-22

Family

ID=48421449

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220706219 Expired - Fee Related CN202945741U (en) 2012-12-19 2012-12-19 Non-vibrating concrete column of steel tube

Country Status (1)

Country Link
CN (1) CN202945741U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104074360A (en) * 2014-06-26 2014-10-01 重庆建工住宅建设有限公司 High-throwing self-compacting concrete construction forming method
CN104441203A (en) * 2013-09-17 2015-03-25 中广核工程有限公司 Self-compacting concrete specimen production method and self-compacting concrete specimen production device
CN109555348A (en) * 2018-10-22 2019-04-02 国网天津静海供电有限公司 A kind of transmission tower and the molding construction method of the transmission tower
CN110080531A (en) * 2019-05-08 2019-08-02 中国二十冶集团有限公司 A kind of self-compacting concrete casting method and its pour tool

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104441203A (en) * 2013-09-17 2015-03-25 中广核工程有限公司 Self-compacting concrete specimen production method and self-compacting concrete specimen production device
CN104441203B (en) * 2013-09-17 2018-04-03 中广核工程有限公司 The preparation method and producing device of self-compacting concrete test specimen
CN104074360A (en) * 2014-06-26 2014-10-01 重庆建工住宅建设有限公司 High-throwing self-compacting concrete construction forming method
CN109555348A (en) * 2018-10-22 2019-04-02 国网天津静海供电有限公司 A kind of transmission tower and the molding construction method of the transmission tower
CN110080531A (en) * 2019-05-08 2019-08-02 中国二十冶集团有限公司 A kind of self-compacting concrete casting method and its pour tool

Similar Documents

Publication Publication Date Title
JP5373979B2 (en) Construction Method of Steel Composite Girder Bridge {ConstructionMethod SteelCompositeGirderBridge}
CN104746422A (en) Bridge prefabricated hollow pier column post-poured connecting structure and construction method
CN106284044A (en) A kind of Novel steel concrete composite bridge and construction method thereof
CN110439137A (en) Prefabricated panel, wall and prefabricated panel production method, precast wall body construction method
CN108343148B (en) A kind of frame structure system and its construction method
CN102828468B (en) Construction method for controlling prefabricated crack of high-strength thin-walled box girder under high-temperature dry condition
CN202945741U (en) Non-vibrating concrete column of steel tube
CN103938767B (en) Trough type energy-saving bearing wall externally wrapped by steel wire mesh mortar plates and foamed concrete
CN106836262A (en) A kind of construction method of packaged type bridges substructure
CN104295003A (en) Structural column construction method
CN104790436A (en) High-rise building basement roof settlement post-pouring joint advanced water stop construction method
CN204097864U (en) A kind of bridge prefabrication hollow pier stud delay-pour joint structure
CN103835440A (en) Wire-mesh-coated cement mortar plate-concrete combined bearing rectangular column and preparation method thereof
CN105839851B (en) Using the construction method for the prefabricated frame trestle that segmentation connection is formed
CN101806112B (en) Preparation method of cast-in-situ concrete hollow slab
CN209585431U (en) Frame column formwork and exempt from template reinforced column
CN207920139U (en) A kind of Axial-compression Column of Reinforced Concrete with ruggedized construction
WO1996033311A1 (en) Hinged section construction for a gerber bridge
CN104234432B (en) Shed deckhead construction method
CN204571286U (en) Cast-in-place bracket column concrete construction formwork
CN111945577A (en) Ultra-high-toughness concrete simply-supported-rotating continuous beam bridge structure and manufacturing method thereof
CN205894492U (en) Post ultra high performance concrete's permanent template
CN104294917A (en) Safe and convenient connection structure for precast reinforced concrete beam and steel pipe column
CN103835439A (en) Wire-mesh-coated cement mortar plate-concrete combined bearing T-shaped column and preparation method thereof
CN203891193U (en) Reinforced building block framework structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130522

Termination date: 20151219

EXPY Termination of patent right or utility model