CN109555348A - A kind of transmission tower and the molding construction method of the transmission tower - Google Patents

A kind of transmission tower and the molding construction method of the transmission tower Download PDF

Info

Publication number
CN109555348A
CN109555348A CN201811229403.8A CN201811229403A CN109555348A CN 109555348 A CN109555348 A CN 109555348A CN 201811229403 A CN201811229403 A CN 201811229403A CN 109555348 A CN109555348 A CN 109555348A
Authority
CN
China
Prior art keywords
inner sleeve
sleeve
outer sleeve
footstock
pedestal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811229403.8A
Other languages
Chinese (zh)
Inventor
张津沛
张馨月
龚长英
邓云博
牛学雨
吴黎明
周作静
马伟刚
马倩
袁芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Jinghai Power Supply Co of State Grid Tianjin Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Jinghai Power Supply Co of State Grid Tianjin Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Jinghai Power Supply Co of State Grid Tianjin Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201811229403.8A priority Critical patent/CN109555348A/en
Publication of CN109555348A publication Critical patent/CN109555348A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/02Structures made of specified materials
    • E04H12/12Structures made of specified materials of concrete or other stone-like material, with or without internal or external reinforcements, e.g. with metal coverings, with permanent form elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/34Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
    • E04H12/341Arrangements for casting in situ concrete towers or the like

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Materials Engineering (AREA)
  • Wood Science & Technology (AREA)
  • Foundations (AREA)

Abstract

The present invention relates to a kind of transmission towers, it is characterized by: being made of pedestal, middle base, footstock, cement layer and concrete core, several section middle bases are welded on the pedestal, footstock is welded at the top of middle base, pouring hole is provided through among the pedestal, middle base and footstock, concrete has been poured in the pouring hole, has been provided with cement layer outside the tower body that pedestal, middle base, footstock are constituted.The invention further relates to a kind of molding construction methods of transmission tower, it is characterised in that: Specific construction step includes: the pretreatment on the preceding ground of (1) construction;(2) the first one-step forming of shaft tower;(3) molding of shaft tower;(4) landfill operation.The design of the invention is scientific and reasonable, has light-weight, convenient transportation, carrying and installation, reduces construction cost, improves the advantages of construction efficiency, is a kind of with the transmission tower of higher innovation and the molding construction method of the transmission tower.

Description

A kind of transmission tower and the molding construction method of the transmission tower
Technical field
The invention belongs to power domains, are related to a kind of transmission tower, especially a kind of transmission tower and the transmission tower at The construction method of type.
Background technique
Shaft tower is one of the basic equipment in overhead distribution, is the supporter for supporting power transmission line, by material used Matter can be divided into rod, cement pole and three kinds of metallic rod.Cement pole has many advantages, such as long service life, and maintenance workload is small, uses It is relatively broad.Most commonly used in cement pole is to dial tip bar, and taper is generally 1/75, is divided into regular reinforcement mixed mud bar and pre- Stress type reinforced concrete bar.
But no matter which kind of cement pole, weight is all larger, be unfavorable for transport, carry and installation, increase transport, remove Fortune and the cost of installation, reduce construction efficiency.
By the retrieval to patent document, patent document identical with present patent application is not found.
Summary of the invention
It is an object of the invention to overcome the deficiencies of the prior art and provide one kind, design is scientific and reasonable, light-weight, facilitates fortune Defeated, carrying and installation, the transmission tower and the molding construction method of the transmission tower for reducing construction cost, improving construction efficiency.
The present invention solves its technical problem and adopts the following technical solutions to achieve:
A kind of transmission tower, it is characterised in that: be made of pedestal, middle base, footstock, cement layer and concrete core, in institute It is welded with several section middle bases on the pedestal stated, footstock, the pedestal, middle base and footstock are welded at the top of middle base Centre is provided through pouring hole, has poured concrete in the pouring hole, outside the tower body that pedestal, middle base, footstock are constituted Portion is provided with cement layer.
Moreover, the pedestal is made of bottom plate, outer sleeve, inner sleeve and reinforcing rib, then it is provided on the bottom plate Outer sleeve is equipped with inner sleeve in the inside coaxial sleeve of the outer sleeve, is connected with uniformly at intervals between inner sleeve and outer sleeve Reinforcing rib is provided with inserting groove in the top end surface of the inner sleeve.
Moreover, the middle base is made of outer sleeve, inner sleeve and reinforcing rib, in the inside coaxial sleeve of the outer sleeve Equipped with inner sleeve, reinforcing rib uniformly at intervals is connected between inner sleeve and outer sleeve, in the top end surface of the inner sleeve On be provided with inserting groove, compatible with inserting groove inserting protrusion is provided on the bottom end face of the inner sleeve, it is each described Middle base by inserting groove and inserting protrusion cooperation realize be located by connecting.
Moreover, the footstock is made of outer sleeve, inner sleeve, top cover and reinforcing rib, it is same in the inside of the outer sleeve Axle sleeve is equipped with inner sleeve, reinforcing rib uniformly at intervals is connected between inner sleeve and outer sleeve, at the top of the inner sleeve It is provided with inserting groove on end face, inserting protrusion compatible with inserting groove, institute are provided on the bottom end face of the inner sleeve The top cover lid stated is mounted in the gap between inner sleeve and outer sleeve.
A kind of molding construction method of transmission tower, it is characterised in that: Specific construction step includes:
(1) pretreatment on the preceding ground of construction: the installation pit for digging at the position of shaft tower and requiring depth to be installed on the ground, so Mounting plate is set in the bottom of installation pit afterwards, is provided with the screw rod being pierced by from bottom to top on a mounting board;
(2) the first one-step forming of shaft tower: completing the installation of pedestal on it by the cooperation of screw rod and nut on a mounting board, Then the middle base according to the height selection respective numbers that build shaft tower carries out grafting successively, finally pushes up in the inserting of top Seat, during each seat grafting, one layer of every grafting needs to complete the welding of outer sleeve on seat up and down by soldering appliance, most The top cover of corresponding bore is welded between the inner sleeve and outer sleeve at the top of footstock afterwards;
(3) molding of shaft tower: casting concrete or cement in pouring hole inside the preliminary molding shaft tower, in first one-step forming Shaft tower outer surface be arranged cement layer;
(4) landfill operation: the earth filling tamping into installation pit keeps the block ground concordant with the ground of surrounding.
Moreover, the mounting plate is the mounting plate of concreting.
Moreover, the fitting depth be want mounting rod tower height degree ten/again and again plus 0.5m-1m depth.
The advantages and positive effects of the present invention are:
1. transmission tower and the molding construction method of the transmission tower, sectional forming and the structure and method constructed, greatly Reduce the difficulty of transport and lifting greatly, and it significantly reduces own wt while not reducing stability, saved at This.The strong flexibility of this transmission tower assembling, can realize the peace of different joint number pedestals according to the requirement for specifically building route Dress, selects the size of pedestal according to specific height, pedestal and footstock be all improved on the basis of middle base, thus Reduce the inventory of unit in charge of construction.Bolt fixation is filled with the mounting means buried, so that the installation of this shaft tower is more firm.
2. transmission tower and the molding construction method of the transmission tower pass through the setting of inserting groove and inserting protrusion, side Positioning between upper and lower pieces, consequently facilitating the welding of outer sleeve, accelerates construction efficiency.
3. the design of the invention is scientific and reasonable, there is light-weight, convenient transportation, carrying and installation, reduce construction cost, improve The advantages of construction efficiency is a kind of with the transmission tower of higher innovation and the molding construction method of the transmission tower.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is partial sectional view of the invention.
Specific embodiment
The embodiment of the present invention is further described below in conjunction with attached drawing:
A kind of transmission tower, innovation are: by pedestal, middle base 6,2 structure of footstock 1, cement layer 9 and concrete core At being welded with several section middle bases on the pedestal, footstock, the pedestal, centre be welded at the top of middle base It is provided through pouring hole among seat and footstock, has poured concrete in the pouring hole, is constituted in pedestal, middle base, footstock Tower body outside be provided with cement layer.
The pedestal is made of bottom plate 7, outer sleeve 5, inner sleeve 3 and reinforcing rib 4, then is provided on the bottom plate outer Sleeve, the outer sleeve inside coaxial sleeve be equipped with inner sleeve, be connected between inner sleeve and outer sleeve uniformly at intervals plus Strengthening tendons are provided with inserting groove in the top end surface of the inner sleeve.
The middle base is made of outer sleeve, inner sleeve and reinforcing rib, is equipped in the inside coaxial sleeve of the outer sleeve Inner sleeve is connected with reinforcing rib uniformly at intervals between inner sleeve and outer sleeve, sets in the top end surface of the inner sleeve Be equipped with inserting groove, be provided with compatible with inserting groove inserting protrusion 8 on the bottom end face of the inner sleeve, it is each it is described in Between seat by inserting groove and inserting protrusion cooperation realize be located by connecting.
The footstock is made of outer sleeve, inner sleeve, top cover and reinforcing rib, in the inside coaxial package of the outer sleeve There is inner sleeve, reinforcing rib uniformly at intervals is connected between inner sleeve and outer sleeve, in the top end surface of the inner sleeve It is provided with inserting groove, inserting protrusion compatible with inserting groove, the top are provided on the bottom end face of the inner sleeve Lid lid is mounted in the gap between inner sleeve and outer sleeve.
A kind of molding construction method of transmission tower, innovation are: Specific construction step includes:
(1) pretreatment on the preceding ground of construction: the installation pit for digging at the position of shaft tower and requiring depth to be installed on the ground, so Mounting plate is set in the bottom of installation pit afterwards, is provided with the screw rod being pierced by from bottom to top on a mounting board;
(2) the first one-step forming of shaft tower: completing the installation of pedestal on it by the cooperation of screw rod and nut on a mounting board, Then the middle base according to the height selection respective numbers that build shaft tower carries out grafting successively, finally pushes up in the inserting of top Seat, during each seat grafting, one layer of every grafting needs to complete the welding of outer sleeve on seat up and down by soldering appliance, most The top cover of corresponding bore is welded between the inner sleeve and outer sleeve at the top of footstock afterwards;
(3) molding of shaft tower: casting concrete or cement in pouring hole inside the preliminary molding shaft tower, in first one-step forming Shaft tower outer surface be arranged cement layer;
(4) landfill operation: the earth filling tamping into installation pit keeps the block ground concordant with the ground of surrounding.
The mounting plate is the mounting plate of concreting.
The fitting depth be want mounting rod tower height degree ten/again and again plus 0.5m-1m depth.
Although disclosing the embodiment of the present invention and attached drawing for the purpose of illustration, those skilled in the art can be managed Solution, do not departing from the present invention and spirit and scope of the appended claims in, various substitutions, changes and modifications be all it is possible, Therefore, the scope of the present invention is not limited to the embodiment and attached drawing disclosure of that.

Claims (7)

1. a kind of transmission tower, it is characterised in that: be made of pedestal, middle base, footstock, cement layer and concrete core, described Pedestal on be welded with several section middle bases, footstock is welded at the top of middle base, in the pedestal, middle base and footstock Between be provided through pouring hole, poured concrete in the pouring hole, pedestal, middle base, footstock constitute tower body outside It is provided with cement layer.
2. a kind of transmission tower according to claim 1, it is characterised in that: the pedestal is by bottom plate, outer sleeve, inner sleeve Cylinder and reinforcing rib are constituted, then are provided with outer sleeve on the bottom plate, and inner sleeve is housed in the inside coaxial sleeve of the outer sleeve, It is connected with reinforcing rib uniformly at intervals between inner sleeve and outer sleeve, inserting is provided in the top end surface of the inner sleeve Slot.
3. a kind of transmission tower according to claim 1, it is characterised in that: the middle base is by outer sleeve, inner sleeve And reinforcing rib is constituted, and inner sleeve is housed in the inside coaxial sleeve of the outer sleeve, between being connected between inner sleeve and outer sleeve Every uniformly distributed reinforcing rib, it is provided with inserting groove in the top end surface of the inner sleeve, on the bottom end face of the inner sleeve It is provided with inserting protrusion compatible with inserting groove, it is fixed that each middle base is realized by the cooperation of inserting groove and inserting protrusion Position connection.
4. a kind of transmission tower according to claim 1, it is characterised in that: the footstock is by outer sleeve, inner sleeve, top Lid and reinforcing rib are constituted, and inner sleeve is housed in the inside coaxial sleeve of the outer sleeve, is connected between inner sleeve and outer sleeve Reinforcing rib uniformly at intervals is provided with inserting groove in the top end surface of the inner sleeve, in the bottom end face of the inner sleeve On be provided with compatible with inserting groove inserting protrusion, the top cover lid is mounted in the gap between inner sleeve and outer sleeve.
5. a kind of molding construction method of transmission tower according to claim 1, it is characterised in that: Specific construction step packet It includes:
(1) pretreatment on the preceding ground of construction: the installation pit for digging at the position of shaft tower and requiring depth to be installed on the ground, is then existed Mounting plate is arranged in the bottom of installation pit, is provided with the screw rod being pierced by from bottom to top on a mounting board;
(2) the first one-step forming of shaft tower: the installation of pedestal on it is completed by the cooperation of screw rod and nut on a mounting board, then Middle base according to the height selection respective numbers that build shaft tower carries out grafting successively, finally inserts upper footstock at top, During each seat grafting, one layer of every grafting needs to complete the welding of outer sleeve on seat up and down by soldering appliance, finally will The top cover of corresponding bore is welded between the inner sleeve and outer sleeve at the top of footstock;
(3) molding of shaft tower: casting concrete or cement in pouring hole inside the preliminary molding shaft tower, in preliminary molding bar Cement layer is arranged in tower outer surface;
(4) landfill operation: the earth filling tamping into installation pit keeps the block ground concordant with the ground of surrounding.
6. the molding construction method of a kind of transmission tower according to claim 5, it is characterised in that: the mounting plate is The mounting plate of concreting.
7. the molding construction method of a kind of transmission tower according to claim 5, it is characterised in that: the fitting depth For want mounting rod tower height degree ten/again and again plus 0.5m-1m depth.
CN201811229403.8A 2018-10-22 2018-10-22 A kind of transmission tower and the molding construction method of the transmission tower Pending CN109555348A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811229403.8A CN109555348A (en) 2018-10-22 2018-10-22 A kind of transmission tower and the molding construction method of the transmission tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811229403.8A CN109555348A (en) 2018-10-22 2018-10-22 A kind of transmission tower and the molding construction method of the transmission tower

Publications (1)

Publication Number Publication Date
CN109555348A true CN109555348A (en) 2019-04-02

Family

ID=65865137

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811229403.8A Pending CN109555348A (en) 2018-10-22 2018-10-22 A kind of transmission tower and the molding construction method of the transmission tower

Country Status (1)

Country Link
CN (1) CN109555348A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202658946U (en) * 2012-04-16 2013-01-09 浙江省电力设计院 Double-skin concrete-filled steel tube rod of power transmission line
CN202945741U (en) * 2012-12-19 2013-05-22 黑龙江工程学院 Non-vibrating concrete column of steel tube
EP2647782A1 (en) * 2012-04-05 2013-10-09 SAG GmbH Mast for an overhead line device and method for producing a mast for an overhead line device
CN203430129U (en) * 2013-07-09 2014-02-12 中材建设有限公司 Steel shell concrete tower barrel
CN104278876A (en) * 2014-10-27 2015-01-14 国家电网公司 Splicing method of concrete tower pole
CN207700819U (en) * 2017-12-30 2018-08-07 惠州电力勘察设计院有限公司 Compound electric pole support device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2647782A1 (en) * 2012-04-05 2013-10-09 SAG GmbH Mast for an overhead line device and method for producing a mast for an overhead line device
CN202658946U (en) * 2012-04-16 2013-01-09 浙江省电力设计院 Double-skin concrete-filled steel tube rod of power transmission line
CN202945741U (en) * 2012-12-19 2013-05-22 黑龙江工程学院 Non-vibrating concrete column of steel tube
CN203430129U (en) * 2013-07-09 2014-02-12 中材建设有限公司 Steel shell concrete tower barrel
CN104278876A (en) * 2014-10-27 2015-01-14 国家电网公司 Splicing method of concrete tower pole
CN207700819U (en) * 2017-12-30 2018-08-07 惠州电力勘察设计院有限公司 Compound electric pole support device

Similar Documents

Publication Publication Date Title
AU2006224942B2 (en) Tower foundation system and method for providing such system
US9032674B2 (en) Wind turbine tower arrangement
CN105002924A (en) Hollow ground anchor cage base
CN110387826A (en) A kind of precast segment assembly bridge pier steel member and construction method and application
CN106958259B (en) A kind of concrete towers column foundation and its construction method
CN105970996B (en) For the raw fly ash and its construction method of transmission line of electricity
CN109555348A (en) A kind of transmission tower and the molding construction method of the transmission tower
CN206859250U (en) Combined tower seat
CN216201659U (en) Floor pours cloth machine location prefabricated section
CN108277817B (en) Construction method of high-pile bearing platform tower crane foundation reinforcing structure
CN110080391A (en) Assembled detachable steel tube concrete column reinforcing joint construction method
CN109056779A (en) A kind of key variable cross-section mat foundation
CN213741194U (en) Gravity type concrete retaining wall template
CN108457294B (en) Composite material foundation capable of preventing pole tower from overturning and implementation method thereof
CN113216019A (en) Pier stud reinforcing and support replacing device
CN207062981U (en) A kind of Retaining Wall
CN210714041U (en) Electric power communication tower strutting arrangement
CN220365388U (en) Anti-toppling power tower base
CN219909033U (en) Concrete rigid pile composite foundation
CN212896439U (en) Precast pile type traffic rod piece foundation and traffic rod piece assembly
CN221052654U (en) Step-shaped traffic rod piece equipment foundation and traffic rod piece assembly
CN203654276U (en) Pre-stressed concrete square pile
CN212837045U (en) Electric power tower pole supports mound
CN209114462U (en) Composite foundation hollow type pile cover
CN217631464U (en) Be used for damaged cement wire pole to restore and use reinforcing mold

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190402