CN202940470U CN2012206208813U CN201220620881U CN202940470U CN 202940470 U CN202940470 U CN 202940470U CN 2012206208813 U CN2012206208813 U CN 2012206208813U CN 201220620881 U CN201220620881 U CN 201220620881U CN 202940470 U CN202940470 U CN 202940470U
Authority
CN
China
Prior art keywords
bus
bus bar
circuit breaker
double
breaker
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2012206208813U
Other languages
Chinese (zh)
Inventor
孙恒
郭晨光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiuwu Electric Co
State Grid Corp of China SGCC
Original Assignee
Xiuwu Electric Co
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xiuwu Electric Co, State Grid Corp of China SGCC filed Critical Xiuwu Electric Co
Priority to CN2012206208813U priority Critical patent/CN202940470U/en
Application granted granted Critical
Publication of CN202940470U publication Critical patent/CN202940470U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems

Landscapes

  • Gas-Insulated Switchgears (AREA)

Abstract

The utility model discloses a double-bus wiring system, comprising a first operating bus, a standby operating bus, a breaker connected between the first operating bus and the standby operating bus, two disconnecting switches respectively disposed on two sides of the breaker, and power utilization units which are connected with the first operating bus and the standby operating bus. Each disconnecting switch is connected with the first operating bus and the standby operating bus. The technical scheme has the following advantages: (1) reliable power supply, power is continuously supplied to users when any bus is being maintained; (2) flexible operation control, forming different operation methods through switching operation; (3) easy extension, expanding towards left and right sides of the double-bus, and free combination of power supplies and loads would not be influenced.

Description

The double bus scheme system
Technical field
The utility model relates to the distribution network technical field, is specifically related to a kind of double bus scheme system.
Background technology
The line voltage grade: the following electric pressure of 60kV level is called distribution voltage; The 110kV-220kV electric pressure is called high pressure;
The 330kV-750kV electric pressure is called superhigh pressure; 1000kV level above is called ultra high voltage.The definition of power transmission and distribution is, between the backbone network that numerous power supply points and supply terminals are coupled together and different electrical network mutually the networking rack of power transmission power be called power transmission network; Within service area, be power distribution network with distributing electric power to the electrical network that the user also directly serves for the user.
The citation form of primary wiring of transformer substation: the electrical main connecting wire of electric substation by electric equipments such as transformer, circuit breaker, isolating switch, instrument transformer, bus and cables, connects, in certain sequence in order to represent the circuit of Matter production and allocation electric energy.Be called again primary connection.
Existing supply power mode comprises, single-trunk segmental wiring (single bus with twosections), and advantage: sectional overhauls bus and bus isolating switch, reduces the coverage of busbar fault; Shortcoming: during the wire-outgoing breaker maintenance, this outlet has a power failure.Operational mode: when normally moving, section breaker DQF disconnects (1).Automatic throw-in equipment of emergency power supply also is housed on DQF, and when arbitrary power supply dead electricity, after power circuit breaker disconnected, DQF connected automatically, guaranteed the continuation power supply of whole circuits; When (2) normally moving, DQF connects, arbitrary busbar fault, and DQF disconnects, and guarantees that non-faulty section bus can work.
The utility model content
The utility model has overcome the deficiencies in the prior art, and the double bus scheme system is provided, and when solving the arbitrary bus of maintenance, can not stop the technical problem of power supply continuously to the user.
Consider the problems referred to above of prior art, according to an aspect of the present utility model, for solving above-mentioned technical problem, the utility model by the following technical solutions:
A kind of double bus scheme system comprises:
The first working bus bar;
Standby working bus bar is connected with circuit breaker between described the first working bus bar and standby working bus bar;
Isolating switch, described isolating switch is two, is separately positioned on the both sides of described circuit breaker, each isolating switch and the first working bus bar be connected working bus bar and be connected;
Power unit, this power unit and described the first working bus bar be connected working bus bar and be connected.
In order to realize better the utility model, further technical scheme is:
In one of them embodiment of the present utility model, described circuit breaker is bus-tie circuit breaker.
The utility model can also be:
In one of them embodiment of the present utility model, described circuit breaker is a kind of in oil circuit breaker, sulfur hexafluoride breaker, vacuum circuit-breaker, compressed-air circuit breaker.
Compared with prior art, one of the beneficial effects of the utility model are:
In the technical solution of the utility model:
(1) power supply is reliable;
When a. overhauling arbitrary bus, can not stop the user being powered continuously.
For example, the service work bus can be with all power and line switching to auxiliary bus-bar.
Operating procedure:
1. the isolating switch of bus both sides that first closes, then the bus that closes, to the auxiliary bus-bar charging, this moment two groups of bus equipotentials.
2. then according to ' make-before-break ' operating sequence, first connect the isolating switch on auxiliary bus-bar, then disconnect the isolating switch on working bus bar.
3. after completing the bus switching, last cut-off breaker and its both sides isolating switch can overhaul the first working bus bar.
B. overhaul arbitrary group of isolating switch, only need to disconnect loop under this isolating switch and this group bus of being connected of isolating switch therewith, other circuit all can be organized bus continuation by another and move.
C. overhaul arbitrary wire-outgoing breaker, only need to have a power failure in short-term.
(2) traffic control is flexible.
Can form different running method by grid switching operation.
A. sectionalized single busbar connection operation;
Bus is closed, and two groups of buses move simultaneously, and line is connected on respectively on two groups of buses.
B. be equivalent to single bus-bar operation;
Bus disconnects, one group of bus operation, and another group bus is standby, and all line is connected on the operation bus.
(3) be easy to enlarging;
To double-bus left and right sides enlarging, all can not affect the independent assortment of two groups of bus power sources and load.
Description of drawings
For clearer explanation present specification embodiment or technical scheme of the prior art, the below will do simple the introduction to the accompanying drawing of required use in the description of embodiment or prior art, apparently, the accompanying drawing that the following describes is only the reference to some embodiment in present specification, for those skilled in the art, in the situation that do not pay creative work, can also obtain according to these accompanying drawings other accompanying drawing.
Fig. 1 shows the principle schematic according to the double bus scheme system of an embodiment of the utility model.
Embodiment
Below in conjunction with embodiment, the utility model is described in further detail, but execution mode of the present utility model is not limited to this.
Fig. 1 shows the principle schematic according to the double bus scheme system of an embodiment of the utility model.An embodiment with reference to a kind of double bus scheme shown in Figure 1 system comprises:
The first working bus bar 1;
Standby working bus bar 2 is connected with circuit breaker CQF between described the first working bus bar 1 and standby working bus bar 2;
Isolating switch 3, described isolating switch 3 is two, is separately positioned on the both sides of described circuit breaker CQF, each isolating switch 3 and the first working bus bar 1 be connected working bus bar 2 and be connected;
Power unit 4, this power unit 4 and described the first working bus bar 1 be connected working bus bar 2 and be connected.
Described circuit breaker CQF is bus-tie circuit breaker.
Described circuit breaker CQF also can select a kind of in oil circuit breaker, sulfur hexafluoride breaker, vacuum circuit-breaker, compressed-air circuit breaker in other embodiments.
In this specification, each embodiment adopts the mode of going forward one by one to describe, and what each embodiment stressed is and the difference of other embodiment that between each embodiment, identical similar part cross-references gets final product.
" embodiment " who speaks of in this manual, " another embodiment ", " embodiment ", etc., refer to specific features, structure or the characteristics described in conjunction with this embodiment and be included at least one embodiment that the application's generality describes.A plurality of local appearance statement of the same race is not necessarily to refer to same embodiment in specification.Furthermore, when describing a specific features, structure or characteristics in conjunction with arbitrary embodiment, what advocate is to realize that in conjunction with other embodiment this feature, structure or characteristics also drop in scope of the present utility model.
Although with reference to a plurality of explanatory embodiment of the present utility model, the utility model is described here, but, should be appreciated that, those skilled in the art can design a lot of other modification and execution modes, and these are revised and within execution mode will drop on the disclosed principle scope and spirit of the application.More particularly, in the scope of, accompanying drawing open in the application and claim, can carry out multiple modification and improvement to building block and/or the layout of subject combination layout.Except modification that building block and/or layout are carried out with improving, to those skilled in the art, other purposes will be also obvious.

Claims (3)

1. a double bus scheme system, is characterized in that, comprising:
The first working bus bar;
Standby working bus bar is connected with circuit breaker between described the first working bus bar and standby working bus bar;
Isolating switch, described isolating switch is two, is separately positioned on the both sides of described circuit breaker, each isolating switch and the first working bus bar be connected working bus bar and be connected;
Power unit, this power unit and described the first working bus bar be connected working bus bar and be connected.
2. double bus scheme according to claim 1 system, is characterized in that, described circuit breaker is bus-tie circuit breaker.
3. double bus scheme according to claim 1 and 2 system, is characterized in that, described circuit breaker is a kind of in oil circuit breaker, sulfur hexafluoride breaker, vacuum circuit-breaker, compressed-air circuit breaker.
CN2012206208813U 2012-11-22 2012-11-22 Double-bus wiring system Expired - Lifetime CN202940470U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012206208813U CN202940470U (en) 2012-11-22 2012-11-22 Double-bus wiring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012206208813U CN202940470U (en) 2012-11-22 2012-11-22 Double-bus wiring system

Publications (1)

Publication Number Publication Date
CN202940470U true CN202940470U (en) 2013-05-15

Family

ID=48324693

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012206208813U Expired - Lifetime CN202940470U (en) 2012-11-22 2012-11-22 Double-bus wiring system

Country Status (1)

Country Link
CN (1) CN202940470U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106463916A (en) * 2014-04-25 2017-02-22 金美来 Household distribution box for forcible power interruption and forcible power interruption system
CN106451087A (en) * 2016-07-12 2017-02-22 四川电器集团股份有限公司 12kV double bus switchgear control system and switching control method
CN108667021A (en) * 2018-08-02 2018-10-16 南方电网科学研究院有限责任公司 Wiring system based on regular graph
CN110148933A (en) * 2019-04-30 2019-08-20 国网河北省电力有限公司邢台供电分公司 The more bus DC micro-electric planar network architectures of multiple-unit and Sub-region and hierarchical intelligence control system

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106463916A (en) * 2014-04-25 2017-02-22 金美来 Household distribution box for forcible power interruption and forcible power interruption system
CN106463916B (en) * 2014-04-25 2018-10-26 金美来 It forces power-off Domestic distributing box and forces power-off system
CN106451087A (en) * 2016-07-12 2017-02-22 四川电器集团股份有限公司 12kV double bus switchgear control system and switching control method
CN108667021A (en) * 2018-08-02 2018-10-16 南方电网科学研究院有限责任公司 Wiring system based on regular graph
CN108667021B (en) * 2018-08-02 2024-04-16 南方电网科学研究院有限责任公司 Wiring system based on regular graph
CN110148933A (en) * 2019-04-30 2019-08-20 国网河北省电力有限公司邢台供电分公司 The more bus DC micro-electric planar network architectures of multiple-unit and Sub-region and hierarchical intelligence control system

Similar Documents

Publication Publication Date Title
CN202940470U (en) Double-bus wiring system
CN205178525U (en) Asynchronous conversion device of high-voltage direct-current two-end power grid
CN105305431A (en) Snowflake grid type grid construction method suitable for urban medium voltage distribution networks
RU2596046C1 (en) Alternate current traction substation for supply of traction loads 25 kv
CN208078653U (en) Double-bus and single busbar mixing wiring high voltage distribution installation
CN204577857U (en) A kind of 110kV transformer station adopting novel wire connecting way
CN107482523B (en) Double bus scheme GIS device and its repair method, pressure resistant test method
CN105024329A (en) Medium-voltage overhead trunk power distribution network construction structure and building method thereof
CN113904326A (en) Urban distribution network wiring mode
CN203932698U (en) A kind of single busbar connection dual-breaker sectional wiring structure
CN203787789U (en) T and pi mixed net rack wiring structure applied to high voltage distribution
CN205864047U (en) A kind of outdoor 10kV Switching Station four supplies two for electric power system
CN207490512U (en) A kind of three end DC transmission systems
CN100401611C (en) Four-way power supply equalization switched transformer station wiring method
CN106059050B (en) Outdoor 10kV Switching Stations four supply two available electric systems
CN102593826B (en) Wiring structure of high voltage distribution network
CN205211625U (en) Prevent switch mistake and close circuit system
CN205029331U (en) Few big ring of subregion cluster structure of urban rail transit 35kV middling pressure network
CN202435033U (en) High voltage distribution network connecting wire structure
CN203850641U (en) Optimized 110kV cable wiring structure capable of realizing fault fast isolation
CN210404746U (en) Bus-tie interval capable of realizing interconnection of three buses
CN216056337U (en) Power distribution interlocking system based on limited power supply capacity
CN204258428U (en) A kind of mobile wheelbarrow switch type power supply vehicle of meet an emergency switch cubicle
CN203607729U (en) Compact 35kv transformer substation
CN203071643U (en) Power supply switching loop for 10KV switching station control

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20130515