CN202866154U - Awning pull rod installation structure for outer wall plant house - Google Patents

Awning pull rod installation structure for outer wall plant house Download PDF

Info

Publication number
CN202866154U
CN202866154U CN 201220496821 CN201220496821U CN202866154U CN 202866154 U CN202866154 U CN 202866154U CN 201220496821 CN201220496821 CN 201220496821 CN 201220496821 U CN201220496821 U CN 201220496821U CN 202866154 U CN202866154 U CN 202866154U
Authority
CN
China
Prior art keywords
otic placode
fixedly connected
shaped steel
pull rod
pull bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220496821
Other languages
Chinese (zh)
Inventor
路江龙
胡君
向红
李刚
刘名
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongheng Design Group Co ltd
Original Assignee
Suzhou Industrial Park Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Industrial Park Design and Research Institute Co Ltd filed Critical Suzhou Industrial Park Design and Research Institute Co Ltd
Priority to CN 201220496821 priority Critical patent/CN202866154U/en
Application granted granted Critical
Publication of CN202866154U publication Critical patent/CN202866154U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

Provided is an awning pull rod installation structure for an outer wall plant house. The awning pull rod installation structure for the outer wall plant house comprises a profile steel and a connecting otic placode, wherein the inner lateral of the profile steel is fixedly connected with the main structure of a plant house, the outer lateral of the profile steel is fixedly connected with the connecting otic placode and the connecting otic placode is fixedly connected with an awning pull rod. The awning pull rod installation structure for the outer wall plant house is good in reliability, not easy in water leakage and good in safety.

Description

Exterior wall factory building canopy pull bar mounting structure
Technical field
When the utility model relates to factory building and office building exterior wall and is steel plate or aluminium sheet, the structure of canopy pull bar and factory building main structure junction.
Background technology
With pull bar canopy ubiquity in the factory building of steel plate aluminium sheet exterior wall and office building, for being connected of canopy pull bar and main structure, mainly be the connection otic placode to be set be bolted at present.Because there is certain altitude in the metope purlin, mainly contains two kinds of forms at pass through wall surface plate place, the one, pull bar pass through wall surface plate, the 2nd, otic placode pass through wall surface plate.But this dual mode has shortcoming.The shortcoming of the first is that shingle nail is installed difficulty.Because bolt connection node is inner at shingle nail, pull bar must be installed first shingle nail is installed again, shingle nail also need arrange hole, pull bar cross section, constructional difficulties, and the hole is generally circle, and the otch out-of-flatness is not attractive in appearance, and easily leaks.The shortcoming of the second is that connection otic placode cross section is large, and stable being difficult to guarantees outside the plane, has potential safety hazard.
Summary of the invention
Relatively poor for the reliability that overcomes existing exterior wall factory building canopy pull bar mounting structure, as easily to leak, exist potential safety hazard deficiency, the utility model provide that a kind of reliability is good, antileaking, the good exterior wall factory building canopy pull bar mounting structure of safety.
The technical scheme that its technical problem that solves the utility model adopts is:
A kind of exterior wall factory building canopy pull bar mounting structure, described mounting structure comprises shaped steel and is connected otic placode, the inboard of described shaped steel is fixedly connected with the factory building main structure, and the outside of described shaped steel is fixedly connected with the described otic placode that is connected, and described connection otic placode is fixedly connected with the canopy pull bar.
Further, shingle nail is laid in the described shaped steel outside, has the installing hole that passes for described connection otic placode on the described shingle nail, and the metope purlin is installed in the described shaped steel, and described connection otic placode is fixedly connected with described metope purlin.
The beneficial effects of the utility model are mainly manifested in:
(1) is connected safe and reliable the connection with rain cover structure with main structure.
(2) on-the-spot installation is simple, the place's accurate positioning that punches, finished surface neat appearance.
(3) buildings waterproof easy construction, antileaking.
(4) application surface is extensive.No matter steel work, concrete structure, wall purlin height, wallboard model all can be used.
Description of drawings
Fig. 1 is plan view of the present utility model;
Fig. 2 is sectional drawing of the present utility model.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is further described.
See figures.1.and.2, a kind of exterior wall factory building canopy pull bar mounting structure comprises shaped steel 3 and is connected otic placode 4 that the inboard of described shaped steel 3 is fixedly connected with factory building main structure 1, the outside of described shaped steel 3 is fixedly connected with the described otic placode 4 that is connected, and described connection otic placode 4 is fixedly connected with canopy pull bar 6.
Further, shingle nail 7 is laid in described shaped steel 3 outsides, has the installing hole that passes for described connection otic placode 4 on the described shingle nail 7, described shaped steel 3 interior installation metope purlins 2, and described connection otic placode 4 is fixedly connected with described metope purlin 2.
In the present embodiment, shaped steel 3 be connected otic placode 4 and weld together, and can be when factory process and steel work agent structure 1 be welded into integral body, or reliably be connected with the concrete main body member by embedded part.
Pass after shingle nail 7 punches and connect otic placode 4 and metope purlin 2 and be connected by self-tapping screw.Canopy pull bar 6 passes through bolt 5 and is connected otic placode 4 connections.

Claims (2)

1. exterior wall factory building canopy pull bar mounting structure, it is characterized in that: described mounting structure comprises shaped steel and is connected otic placode, the inboard of described shaped steel is fixedly connected with the factory building main structure, and the outside of described shaped steel is fixedly connected with the described otic placode that is connected, and described connection otic placode is fixedly connected with the canopy pull bar.
2. exterior wall factory building canopy pull bar mounting structure as claimed in claim 1, it is characterized in that: shingle nail is laid in the described shaped steel outside, have the installing hole that passes for described connection otic placode on the described shingle nail, the metope purlin is installed in the described shaped steel, and described connection otic placode is fixedly connected with described metope purlin.
CN 201220496821 2012-09-26 2012-09-26 Awning pull rod installation structure for outer wall plant house Expired - Lifetime CN202866154U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220496821 CN202866154U (en) 2012-09-26 2012-09-26 Awning pull rod installation structure for outer wall plant house

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220496821 CN202866154U (en) 2012-09-26 2012-09-26 Awning pull rod installation structure for outer wall plant house

Publications (1)

Publication Number Publication Date
CN202866154U true CN202866154U (en) 2013-04-10

Family

ID=48032881

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220496821 Expired - Lifetime CN202866154U (en) 2012-09-26 2012-09-26 Awning pull rod installation structure for outer wall plant house

Country Status (1)

Country Link
CN (1) CN202866154U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019179111A1 (en) * 2018-03-23 2019-09-26 中建钢构有限公司 Fabricated purlin structure for use on flexible cable structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019179111A1 (en) * 2018-03-23 2019-09-26 中建钢构有限公司 Fabricated purlin structure for use on flexible cable structure

Similar Documents

Publication Publication Date Title
CN106801473B (en) Aluminum alloy structure house
CN106930413B (en) Buckling structure of aluminum alloy wallboard, roof panel and corner connecting material
CN102635248B (en) Modularized quickly-assembled house
CN202644862U (en) Combined roof water-falling system
CN203590127U (en) Drainage type roof photovoltaic component waterproof installation structure
CN216405887U (en) Furred ceiling waterproof construction
CN202899346U (en) Light composite wallboard sliding connection structure
CN202866154U (en) Awning pull rod installation structure for outer wall plant house
CN209854922U (en) Prefabricated assembled reinforced concrete prefabricated house
CN205617425U (en) Prefabricated structure of assembling of utility tunnel
CN111535701A (en) Low-energy-consumption building external window structure and installation method
CN203834749U (en) Composite wallboard and foundation ground connection structure
CN204002293U (en) Steel-structure factory building brick wall and color steel wall junction waterproof are received limit
CN203213321U (en) Construction structure of outer wall deformation joint of building
CN205077748U (en) There is parapet post gable node construction system
CN201087491Y (en) Floor structure
CN205134514U (en) Residence community basement intermediate layer spatial structure
CN204475683U (en) A kind of novel ridge tiles
CN204959980U (en) Simple to operate's floor connection structure
CN204357018U (en) A kind of colored steel room rain pipe structure
CN210127490U (en) Water receiving box structure
CN205296419U (en) Embedded steel construction assembly house outer column waterproof construction
CN110258798A (en) A kind of novel fabricated heel join node and its installation method
CN204174961U (en) Ecological residence room building block
CN203856350U (en) Bay window of steel structure factory building

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP03 Change of name, title or address

Address after: Suzhou City, Jiangsu province 215028 Industrial Park Suzhou Bada Street No. 111

Patentee after: Zhongheng Design Group Co.,Ltd.

Address before: Suzhou Industrial Park Suzhou City, Jiangsu province 215126 Sheng Pu Zhen Jin Sheng Lu No. 12

Patentee before: SUZHOU INDUSTRIAL PARK DESIGN & RESEARCH INSTITUTE Co.,Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20130410