CN202864658U - Hanging tool of master-control room steel structure module - Google Patents

Hanging tool of master-control room steel structure module Download PDF

Info

Publication number
CN202864658U
CN202864658U CN201220444028.0U CN201220444028U CN202864658U CN 202864658 U CN202864658 U CN 202864658U CN 201220444028 U CN201220444028 U CN 201220444028U CN 202864658 U CN202864658 U CN 202864658U
Authority
CN
China
Prior art keywords
beams
control room
balancing
equalizing bar
steel structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201220444028.0U
Other languages
Chinese (zh)
Inventor
陈明国
于喜年
许开勋
刘苏楠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Nuclear Industry Huaxing Construction Co Ltd
Original Assignee
China Nuclear Industry Huaxing Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Nuclear Industry Huaxing Construction Co Ltd filed Critical China Nuclear Industry Huaxing Construction Co Ltd
Priority to CN201220444028.0U priority Critical patent/CN202864658U/en
Application granted granted Critical
Publication of CN202864658U publication Critical patent/CN202864658U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a hanging tool of a master-control room steel structure module, and belongs to the technical field of hoisting auxiliary equipment. The tool comprises a primary balancing beam, secondary balancing beams and a bottom bracket, wherein the two ends of the primary balancing beam are respectively connected with the middle parts of the two secondary balancing beams through upper hangers; the secondary balancing beams are perpendicular to the primary balancing beam; the bottom bracket is formed by fixedly connecting two cross beams which are parallel to the secondary balancing beams and two longitudinal beams which are perpendicular to the cross beams; the distance between the two cross beams is larger than the length of the primary balancing beam; the distance between the two longitudinal beams is larger than the lengths of the two secondary balancing beams; hanging lugs are respectively installed in the positions corresponding to the end parts of the secondary balancing beams on the upper surface of the two longitudinal beams; and the hanging lugs are respectively connected with the end parts of the secondary balancing beams through hangers. By utilizing the hanging tool, the problem of on-site hanging of the master-control room steel structure module in a nuclear power station is well solved, so that conditions for the on-site installation of prefabricated assembled modules are provided.

Description

Master control room steel structure module hoisting frock
Technical field
The utility model relates to a kind of hoisting fixture, and especially a kind of master control room steel structure module hoisting frock belongs to lifting accessory equipment technical field.
Background technology
Master control room is the place that operation exercises supervision, controls, operates to nuclear station, and its main body is steel-frame structure, and master control room of nuclear power station was finished the prefabricated of member in the workshop in the past, then carried out at the scene assembly unit.Because the master control room member is scattered, quantity is many, its on-site consolidation duration needs 3 months at least.In order to improve master control room assembling construction quality, to shorten the site operation duration, the applicant creates and will precast the master control room assembling module, and field erected construction method needs the on-the-spot hoisting tool of design specialized for this reason afterwards.
Summary of the invention
The purpose of this utility model is: propose a kind of master control room steel structure module hoisting frock that is, thereby be that the scene installation that realizes the master control room module lays the foundation.
In order to reach above purpose, master control room steel structure module hoisting frock of the present utility model, comprise an one-level equalizing bar, two secondary equalizing bars and a underframe, the two ends of described one-level equalizing bar are connected with the middle part of two secondary equalizing bars respectively by upper suspender, and described secondary equalizing bar is vertical with the one-level equalizing bar; Described underframe is formed by fixedly connecting by two crossbeams that are parallel to the secondary equalizing bar with perpendicular to two longerons of crossbeam; Hanger is equipped with respectively in the position of the corresponding secondary equalizing bar of the upper surface of described two longerons termination, and described each hanger is connected by lower suspender with the secondary equalizing bar termination of vicinity respectively.
Further, the spacing of described two crossbeams is greater than the length of described one-level equalizing bar, and the spacing of described two longerons is greater than the length of described secondary equalizing bar.
During use, lifting machinery is hung on the one-level equalizing bar, and master control room steel structure module is hung under the underframe.By the beam action of firsts and seconds balance, can make the vertical and horizontal of suspended object all be in state of equilibrium, and large-area master control room steel structure module steadily can be sling by the underframe of expansion.Therefore, behind employing the utility model, can properly settle the on-site hoisting problem of master control room of nuclear power station steel structure module, thereby for the scene of precast assembly module being installed by the condition of having created.
Description of drawings
Below in conjunction with accompanying drawing the utility model is further described.
Fig. 1 is the structural representation (suspender does not show) of an embodiment of the utility model.
Fig. 2 is the assembled state structural representation of Fig. 1 embodiment.
Fig. 3 is the lateral plan of Fig. 2.
The specific embodiment
Embodiment one
Master control room steel structure module hoisting frock basic structure such as Fig. 1, Fig. 2, shown in Figure 3 of present embodiment, comprise an one-level equalizing bar 1, two secondary equalizing bars 2 and a underframe 3, the two ends of one-level equalizing bar 1 are connected with the middle part of two secondary equalizing bars 2 respectively by upper suspender 4, secondary equalizing bar 2 is vertical with the one-level equalizing bar, and projection is I-shape.Underframe 3 is formed by fixedly connecting by two crossbeam 3-1 that are parallel to the secondary equalizing bar with perpendicular to two longeron 3-2 of crossbeam 3-1.The spacing of two crossbeam 3-1 is greater than the length of one-level equalizing bar 1, the spacing of two longeron 3-2 is greater than the length of secondary equalizing bar 2, and hanger 6 is equipped with respectively in the position of the corresponding secondary equalizing bar of upper surface termination, and each hanger is connected by lower suspender 6 with secondary equalizing bar 2 terminations of vicinity respectively.
During construction, the assembly unit of master control room can be moved to ground from factory building inside and finish, after assembly unit finishes, by this frock the master control room module whole be lifted installation in position.Thereby success civil engineering and installation are separated, not only do not affect master control room periphery body of wall reinforcing bar binding, concrete pouring construction, for the master control room assembly unit provides wide construction surface and good construction environment, properly settled master control room and taken the long and interior bad problem of assembly unit welding quality of factory building of factory building critical path again.

Claims (2)

1. master control room steel structure module hoisting frock, it is characterized in that: comprise an one-level equalizing bar, two secondary equalizing bars and a underframe, the two ends of described one-level equalizing bar are connected with the middle part of two secondary equalizing bars respectively by upper suspender, and described secondary equalizing bar is vertical with the one-level equalizing bar; Described underframe is formed by fixedly connecting by two crossbeams that are parallel to the secondary equalizing bar with perpendicular to two longerons of crossbeam; Hanger is equipped with respectively in the position of the corresponding secondary equalizing bar of the upper surface of described two longerons termination, and described each hanger is connected by lower suspender with the secondary equalizing bar termination of vicinity respectively.
2. master control room steel structure module hoisting frock according to claim 1, it is characterized in that: the spacing of described two crossbeams is greater than the length of described one-level equalizing bar, and the spacing of described two longerons is greater than the length of described secondary equalizing bar.
CN201220444028.0U 2012-09-03 2012-09-03 Hanging tool of master-control room steel structure module Expired - Lifetime CN202864658U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201220444028.0U CN202864658U (en) 2012-09-03 2012-09-03 Hanging tool of master-control room steel structure module

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201220444028.0U CN202864658U (en) 2012-09-03 2012-09-03 Hanging tool of master-control room steel structure module

Publications (1)

Publication Number Publication Date
CN202864658U true CN202864658U (en) 2013-04-10

Family

ID=48031398

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201220444028.0U Expired - Lifetime CN202864658U (en) 2012-09-03 2012-09-03 Hanging tool of master-control room steel structure module

Country Status (1)

Country Link
CN (1) CN202864658U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105000461A (en) * 2015-08-12 2015-10-28 上海核工程研究设计院 Lifting device commonly used for hoisting nuclear power equipment and modules

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105000461A (en) * 2015-08-12 2015-10-28 上海核工程研究设计院 Lifting device commonly used for hoisting nuclear power equipment and modules

Similar Documents

Publication Publication Date Title
CN201417657Y (en) Installation device of indoor transformer
CN103195256A (en) Hanging column type steel structure jig frame construction method
CN102587286A (en) Simply supported-continuous construction method for bridge superstructure
CN106836475B (en) Modular more high-rise assembling type steel structure systems
CN202627506U (en) Formwork for cast-in-place concrete connecting beams
CN103243649B (en) The system and method for a kind of cable saddle Fast Installation, location
CN107476583A (en) A kind of concrete assembled building builds construction method
CN204626411U (en) A kind of pile foundation steel bar cage erecting device
CN202787926U (en) Overhanging scaffold simple and convenient to disassemble and assemble
CN201962608U (en) Adjustable viaduct concrete anti-collision guardrail template supporting device
CN202864658U (en) Hanging tool of master-control room steel structure module
CN104018680B (en) Lifting method of large-span solid-web type arc beam
CN106150105A (en) A kind of stiffened column installation method
CN202865996U (en) Room modular structure for nuclear power plant
CN201511439U (en) System for integrally binding and hoisting box girder steel reinforcement framework
CN103291042B (en) A kind of can the curtain wall pendant of three-dimensional regulation
CN104863259A (en) Upside-down construction method for large-span ultra-high signal-layer cylindrical architectural steel structure
CN203361596U (en) Auxiliary support of integrated lifting operation platform
CN105625732A (en) Supporting-free construction method of ultrahigh overhung steel-structure truss
CN103469892B (en) The primary and secondary modular unit combining structure in high-rise building module space and method of attachment
CN203129322U (en) Concrete cavity type assembled house
CN204960324U (en) Suspension type floor formwork support device
CN102400507B (en) Decoration line system for back-bolt curtain wall
CN205777531U (en) Floor slab construction beam string shuttering supporting equipment
CN104818675A (en) Assembling method of rebar segments

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20130410

CX01 Expiry of patent term