CN102400507B - Decoration line system for back-bolt curtain wall - Google Patents

Decoration line system for back-bolt curtain wall Download PDF

Info

Publication number
CN102400507B
CN102400507B CN 201110361568 CN201110361568A CN102400507B CN 102400507 B CN102400507 B CN 102400507B CN 201110361568 CN201110361568 CN 201110361568 CN 201110361568 A CN201110361568 A CN 201110361568A CN 102400507 B CN102400507 B CN 102400507B
Authority
CN
China
Prior art keywords
suspension member
curtain wall
bolt
base plate
curtain
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 201110361568
Other languages
Chinese (zh)
Other versions
CN102400507A (en
Inventor
王何青
王生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GOLDEN CURTAIN WALL GROUP CO., LTD.
Original Assignee
GUANGDONG JINGANG CURTAIN WALL ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGDONG JINGANG CURTAIN WALL ENGINEERING Co Ltd filed Critical GUANGDONG JINGANG CURTAIN WALL ENGINEERING Co Ltd
Priority to CN 201110361568 priority Critical patent/CN102400507B/en
Publication of CN102400507A publication Critical patent/CN102400507A/en
Application granted granted Critical
Publication of CN102400507B publication Critical patent/CN102400507B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Curtains And Furnishings For Windows Or Doors (AREA)

Abstract

The invention discloses a decoration line system for a back-bolt curtain wall. In the decoration line system for the back-bolt curtain wall, two decoration panels which are erected outside a curtain wall body and used for installing decoration lines are connected through a first hanging piece and a second hanging piece which are arranged between the two decoration panels, the decoration line system is arranged on a curtain wall keel through a third hanging piece which is connected with the two hanging pieces, and the decoration panels can be pre-assembled to achieve an accurate installation size by erecting a model structure of the decoration line system, so that the decoration line system is integrally installed, and the installation speed of the decoration line system is improved. The decoration line system is used for the field of building curtain walls.

Description

A kind of moulding system of carrying on the back the bolt curtain wall
Technical field
The present invention relates to a kind of building curtain wall system, particularly relate to a kind of moulding system of carrying on the back the bolt curtain wall.
Background technology
Traditional back of the body bolt stone curtain wall is by the back of the body bolt aluminium alloys suspension member and stone material to be connected together, and cooperatively interacts by the suspension member on this aluminium alloys suspension member and the curtain skeleton then, transmits wind load and gravity load.
Traditional back of the body bolt stone curtain wall, every stone panel is independent installation, and the aluminium alloys suspension member on the stone material cooperates direction and wind load direction in the same way with the suspension member on the curtain skeleton, and other both directions all are mobilizable, regulate or spacing by screw.When this type of back of the body bolt stone curtain wall is applied in the stone decoration lines that protrude on the unit plate, the direction that the cooperation direction of suspension member and stone decoration line protrude in the same way, other both directions are movable, but since plate when shop assembled, decoration panel is parallel to ground, therefore, can not realize that stone panel assembles in the workshop, stone panel can only be gone up wall and install, and installation difficulty is bigger, precision is difficult to control, cost manually more.
Summary of the invention
For addressing the above problem, the invention provides a kind of moulding system that carries out the back of the body bolt curtain wall of integrated installation in the workshop.
The technical solution adopted for the present invention to solve the technical problems is:
A kind of moulding system of carrying on the back the bolt curtain wall, comprise the curtain wall body and perpendicular to the curtain wall body and stretch out in this external curtain skeleton of curtain wall, the both sides of curtain skeleton are provided with the two packaged facing plates that are mutually symmetrical, between decoration panel nearer from the curtain wall body and away from a side be respectively equipped with first suspension member and second suspension member for connection fixed to one another, be installed with the 3rd suspension member that connects with first suspension member or second suspension member on the curtain skeleton.
Be further used as the improvement of technical solution of the present invention, the 3rd suspension member comprises the suspension member base plate that is parallel to curtain skeleton, the suspension member base plate is provided with the suspension member web perpendicular to the suspension member base plate, the top of suspension member web is provided with the suspension member block that is parallel to the suspension member base plate, be equipped with chute on first suspension member and second suspension member, the suspension member web is installed in the chute.
Be further used as the improvement of technical solution of the present invention, the suspension member baffle plate of first suspension member is provided with the elevator bolt that is parallel to the suspension member web, one end of elevator bolt is fastening to be connected on the 3rd suspension member that promotes the baffle plate downside, the top of suspension member baffle plate is provided with the clamp nut with the elevator bolt thread connection, is provided with packing ring between clamp nut and suspension member baffle plate.
Be further used as the improvement of technical solution of the present invention, be equipped with four connecting holes between the suspension member base plate of first suspension member and curtain skeleton, two connecting holes in the connecting hole of suspension member base plate on a diagonal are two straight trough holes parallel to each other, the connecting hole that cooperates with it on the curtain skeleton is vertical with this straight trough hole, two other connecting hole is screw hole, be provided with the attachment bolt that connects curtain skeleton and suspension member base plate between two straight trough holes, be provided with the trip bolt for connection fixed to one another between two screw holes.
Be further used as the improvement of technical solution of the present invention, the top of attachment bolt is provided with coupling nut, is provided with Improved mat between coupling nut and suspension member base plate.
Be further used as the improvement of technical solution of the present invention, be provided with the back of the body bolt that connects for fixed to one another between two packaged facing plates and first suspension member and second suspension member.
Be further used as the improvement of technical solution of the present invention, between two decoration panels in the distance of the first suspension member side greater than the distance in the second suspension member side.
Beneficial effect of the present invention: the moulding system of this back of the body bolt curtain wall will be set up in the curtain wall body exterior and be used for the two packaged facing plates that moulding is installed, connect by first suspension member and second suspension member that is arranged between two decoration panels, and by the 3rd suspension member that is connected with two suspension members this moulding system is installed on the curtain skeleton, this moulding system can carry out assembled in advance with decoration panel by setting up model structure, to reach accurate installation dimension, thereby realize the integrated installation of moulding system, improve the installation rate of moulding system.
Description of drawings
The invention will be further described below in conjunction with accompanying drawing:
Fig. 1 is embodiment of the invention overall structure schematic diagram;
Fig. 2 is the embodiment of the invention first suspension member mounting structure side schematic view;
Fig. 3 is the embodiment of the invention second suspension member mounting structure side schematic view.
The specific embodiment
With reference to Fig. 1~Fig. 3, the present invention is a kind of moulding system of carrying on the back the bolt curtain wall, comprise curtain wall body 1 and perpendicular to curtain wall body 1 and stretch out in the outer curtain skeleton 2 of curtain wall body 1, the both sides of curtain skeleton 2 are provided with the two packaged facing plates 3 that are mutually symmetrical, 3 of decoration panels nearer from curtain wall body 1 and away from a side be respectively equipped with first suspension member 4 and second suspension member 5 for connection fixed to one another, be installed with the 3rd suspension member 6 that connects with first suspension member 4 or second suspension member 5 on the curtain skeleton 2.
The moulding system of this back of the body bolt curtain wall will be set up in the curtain wall body 1 outside two packaged facing plates 3 that are used for the moulding installation, connect by first suspension member 4 and second suspension member 5 that is arranged at 3 of two decoration panels, and by the 3rd suspension member that is connected with two suspension members 6 these moulding systems are installed on the curtain skeleton 2, this moulding system can carry out assembled in advance with decoration panel 3 by setting up model structure, to reach accurate installation dimension, thereby realize the integrated installation of moulding system, improve the installation rate of moulding system.
This moulding is in the process of installing in advance, can earlier two decoration panels that are mutually symmetrical 3 be positioned by the mould that has set up, mould is for pressing the bracing frame that the required angle of decoration panel 3 installations arranges, and be arranged at the aluminum alloy beams that is lower than two suspension member setting height(from bottom)s between two bracing frames and form, the bracing frame bottom of mould both sides is provided with holddown groove, can prevent that decoration panel 3 slides in the installation process, 3 of two decoration panels are installed after finish decoration panel 3 location are used for first suspension member 4 and second suspension member 5 that two decoration panels 3 connect.
After treating all stone material lines installations in this decorative system, the aluminium alloys square tube can be installed decorative system is carried out last consolidation process, the aluminium alloys square tube need be fixing with the curtain skeleton 2 that the galvanizing square tube is formed, also need to be connected with second suspension member 5, the aluminium alloys square tube should the same segment processing with the stone material lattice, stone material can independently change, and be independent of each other mutually, whole erection process at decorative system does not need to do any unwrapping wire processing, plate precision height, the installation progress piece, economic, practical.
Because decoration panel 3 and two suspension members that are used for connecting all are to position by installation mold, so can effectively guarantee its installation accuracy.
As the preferred embodiment of the present invention, the 3rd suspension member 6 comprises the suspension member base plate 61 that is parallel to curtain skeleton 2, suspension member base plate 61 is provided with the suspension member web 62 perpendicular to suspension member base plate 61, the top of suspension member web 62 is provided with the suspension member block 63 that is parallel to suspension member base plate 61, be equipped with chute on first suspension member 4 and second suspension member 5, suspension member web 62 is installed in the chute.
As the preferred embodiment of the present invention, the suspension member baffle plate 63 of first suspension member 4 is provided with the elevator bolt 41 that is parallel to suspension member web 62, one end of elevator bolt 41 is fastening to be connected on the 3rd suspension member 6 that promotes baffle plate 63 downsides, the top of suspension member baffle plate 63 is provided with the clamp nut 42 with elevator bolt 41 thread connection, and 63 on clamp nut 42 and suspension member baffle plate are provided with packing ring 43.
Two packaged facing plate 3 two ends, first suspension members 4 and second suspension member 5 are all realized and the connecting of curtain skeleton 2 by the 3rd suspension member 6, be equipped with chute on first suspension member 4 and second suspension member 5, by this chute win suspension member 4 and second suspension member 5 slided up and down along the suspension member web 62 on the 3rd suspension member 6.
This moulding system carries out needing in the installation process to carry out accurate localization, and first suspension member, 4 places are higher to the requirement of positioning accuracy, so be provided with elevator bolt 41 at this place, and second suspension member, 5 places realize second suspension member 5 and the 3rd suspension member 6 to be fixedly connected by screw, first suspension member, 4 places are by the clamp nut 42 on rotary lifting bolt 41 tops, the 3rd suspension member 6 that can drive herein slides along the hanger web 62 of first suspension member 4, thereby carries out the position adjustments of above-below direction.
As the preferred embodiment of the present invention, 2 of the suspension member base plate 61 of first suspension member 4 and curtain skeletons are equipped with four connecting holes, two connecting holes in the connecting hole of suspension member base plate 61 on a diagonal are two straight trough holes parallel to each other, the connecting hole that cooperates with it on the curtain skeleton 2 is vertical with this straight trough hole, two other connecting hole is screw hole, be provided with the trip bolt 66 that is provided with between attachment bolt 65, two screw holes that connect curtain skeleton 2 and suspension member base plate 61 for connection fixed to one another between two straight trough holes.
As the preferred embodiment of the present invention, the top of attachment bolt 65 is provided with coupling nut 67, and 61 of coupling nut 67 and suspension member base plates are provided with Improved mat 68.
First suspension member, 4 places are owing to need carry out accurate localization, so be provided with vertical each other connecting hole 2 of first suspension member 4 and curtain skeletons, by these two connecting holes that become the straight trough hole that arrange at a diagonal, can regulate first location of suspension member 4 on curtain skeleton 2 accurately, attachment bolt 65 after finishing, the location is installed, realize the fastening of first suspension member 4 by trip bolt 66 at last, to guarantee its accurate installation.
As the preferred embodiment of the present invention, two packaged facing plates 3 are provided with the back of the body bolt 7 that connects for fixed to one another with first suspension member 4 and 5 of second suspension members.
As the preferred embodiment of the present invention, 3 of two decoration panels in the distance of first suspension member, 4 sides greater than the distance in second suspension member, 5 sides.
Used decoration panel 3 is stone panel in this invention, and first suspension member 4, second suspension member 5 and the 3rd suspension member 6 used among the present invention are the aluminium alloys suspension member.
The invention solves the shortcoming that the stone decoration lines can not be assembled in the workshop, about two packaged facing plates 3 be linked to be integral body by the aluminium alloys suspension member, form whole lines, by the cooperating each other of the 3rd suspension member 6 on first suspension member 4 on the stone material and second suspension member 5 and the curtain skeleton 2, can realize the spacing of direction that the stone decoration line protrudes and stone decoration lines weather side, thereby reach the purpose that to assemble in the workshop.
This invention has realized the integral installation of stone decoration lines two packaged facing plates 3, and utilization ready-made stone material jig is in advance installed, and precision is controlled well, and processing progress is fast; The stone decoration lines can directly be installed in the workshop, and do not need plate is gone up the secondary installing of wall, and are both economical, can save the duration again.
Certainly, the invention is not limited to above-mentioned embodiment, those of ordinary skill in the art also can make equivalent variations or replacement under the prerequisite of spirit of the present invention, the modification that these are equal to or replacement all are included in the application's claim institute restricted portion.

Claims (7)

1. moulding system of carrying on the back the bolt curtain wall, it is characterized in that: comprise curtain wall body (1) and perpendicular to curtain wall body (1) and stretch out in the outer curtain skeleton (2) of curtain wall body (1), the both sides of described curtain skeleton (2) are provided with the two packaged facing plates (3) that are mutually symmetrical, between described decoration panel (3) nearer from curtain wall body (1) and away from a side be respectively equipped with first suspension member (4) and second suspension member (5) for connection fixed to one another, be installed with the 3rd suspension member (6) that connects with first suspension member (4) or second suspension member (5) on the described curtain skeleton (2).
2. the moulding system of back of the body bolt curtain wall according to claim 1, it is characterized in that: described the 3rd suspension member (6) comprises the suspension member base plate (61) that is parallel to curtain skeleton (2), described suspension member base plate (61) is provided with the suspension member web (62) perpendicular to suspension member base plate (61), the top of described suspension member web (62) is provided with the suspension member block (63) that is parallel to suspension member base plate (61), be equipped with chute on described first suspension member (4) and second suspension member (5), described suspension member web (62) is installed in the chute.
3. the moulding system of back of the body bolt curtain wall according to claim 2, it is characterized in that: the suspension member baffle plate (63) of described first suspension member (4) is provided with the elevator bolt (41) that is parallel to suspension member web (62), one end of described elevator bolt (41) is fastening to be connected on the 3rd suspension member (6) that promotes baffle plate (63) downside, the top of described suspension member baffle plate (63) is provided with the clamp nut (42) with elevator bolt (41) thread connection, is provided with packing ring (43) between described clamp nut (42) and suspension member baffle plate (63).
4. the moulding system of back of the body bolt curtain wall according to claim 3, it is characterized in that: be equipped with four connecting holes between the suspension member base plate (61) of described first suspension member (4) and curtain skeleton (2), two connecting holes in the connecting hole of described suspension member base plate (61) on a diagonal are two straight trough holes parallel to each other, the connecting hole that cooperates with it on the described curtain skeleton (2) is vertical with this straight trough hole, described two other connecting hole is screw hole, be provided with the attachment bolt (65) that connects curtain skeleton (2) and suspension member base plate (61) between described two straight trough holes, be provided with the trip bolt (66) for connection fixed to one another between described two screw holes.
5. the moulding system of back of the body bolt curtain wall according to claim 4, it is characterized in that: the top of described attachment bolt (65) is provided with coupling nut (67), is provided with Improved mat (68) between described coupling nut (67) and suspension member base plate (61).
6. the moulding system of back of the body bolt curtain wall according to claim 1 and 2 is characterized in that: be provided with the back of the body bolt (7) that connects for fixed to one another between described two packaged facing plates (3) and first suspension member (4) and second suspension member (5).
7. the moulding system of back of the body bolt curtain wall according to claim 1 and 2 is characterized in that: between described two decoration panels (3) in the distance of first suspension member (4) side greater than the distance in second suspension member (5) side.
CN 201110361568 2011-11-16 2011-11-16 Decoration line system for back-bolt curtain wall Active CN102400507B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110361568 CN102400507B (en) 2011-11-16 2011-11-16 Decoration line system for back-bolt curtain wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110361568 CN102400507B (en) 2011-11-16 2011-11-16 Decoration line system for back-bolt curtain wall

Publications (2)

Publication Number Publication Date
CN102400507A CN102400507A (en) 2012-04-04
CN102400507B true CN102400507B (en) 2013-08-14

Family

ID=45883117

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110361568 Active CN102400507B (en) 2011-11-16 2011-11-16 Decoration line system for back-bolt curtain wall

Country Status (1)

Country Link
CN (1) CN102400507B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108222339B (en) * 2017-12-29 2024-03-26 苏州苏明装饰股份有限公司 High-precision unit system easy to construct
CN110185178A (en) * 2019-06-11 2019-08-30 北京港源幕墙有限公司 Glass curtain wall and its construction method with stone panel shade structures
CN113802806B (en) * 2021-10-08 2022-10-28 泰源工程集团股份有限公司 Building curtain wall outdoor decoration lines precision governing system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5189858A (en) * 1990-04-30 1993-03-02 Daniel Jouanet Decorative panel, in particular for ceilings
CN201406781Y (en) * 2009-05-14 2010-02-17 北京嘉寓门窗幕墙股份有限公司 Adjustable connecting piece used for installation of unit curtain wall
CN101769010A (en) * 2008-12-30 2010-07-07 徐友才 Connecting piece aluminum alloy profile between main material and decorative strip of building curtain wall
CN201649373U (en) * 2010-01-05 2010-11-24 深圳市方大装饰工程有限公司 Hanging structure of inter-storey unit type curtain wall board
CN202359708U (en) * 2011-11-16 2012-08-01 广东金刚幕墙工程有限公司 Decorative moulding system of back-bolt curtain wall

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0260171A (en) * 1988-08-26 1990-02-28 Mitsubishi Electric Corp Solar cell

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5189858A (en) * 1990-04-30 1993-03-02 Daniel Jouanet Decorative panel, in particular for ceilings
CN101769010A (en) * 2008-12-30 2010-07-07 徐友才 Connecting piece aluminum alloy profile between main material and decorative strip of building curtain wall
CN201406781Y (en) * 2009-05-14 2010-02-17 北京嘉寓门窗幕墙股份有限公司 Adjustable connecting piece used for installation of unit curtain wall
CN201649373U (en) * 2010-01-05 2010-11-24 深圳市方大装饰工程有限公司 Hanging structure of inter-storey unit type curtain wall board
CN202359708U (en) * 2011-11-16 2012-08-01 广东金刚幕墙工程有限公司 Decorative moulding system of back-bolt curtain wall

Also Published As

Publication number Publication date
CN102400507A (en) 2012-04-04

Similar Documents

Publication Publication Date Title
CN207160349U (en) A kind of dot point rotatably plug-in PC wallboard connecting mechanisms and device
CN102979312B (en) Indoor aluminum honeycomb board suspended ceiling reverse installation technology
CN206737222U (en) Cell cube section curtain wall installing device
CN201801987U (en) High aseismic combination stone curtain wall with replaceable aluminium suspension member
CN102400507B (en) Decoration line system for back-bolt curtain wall
CN205742671U (en) One can paramodulant aluminium sheet attachment structure
CN104120811B (en) A kind of metal decking unit curtain wall system
CN205171782U (en) Frame curtain system between stone material edge list
CN201835410U (en) Three-dimension adjustable curtain wall hanger
CN202359708U (en) Decorative moulding system of back-bolt curtain wall
CN211523693U (en) Vertical lines curtain system of cell cube aluminum plate
CN207794379U (en) Type unitized curtain wall system with cantilevered structure
CN104318860B (en) A kind of modularity fast-assembling finished door head and mounting process thereof
CN110965684A (en) Small cell body aluminum plate vertical line curtain wall system and installation method thereof
CN103967178B (en) A kind of non-upright post curtain wall corner structure
CN203296310U (en) Curtain wall pendant capable of being adjusted in three-dimensional mode
CN103291042B (en) A kind of can the curtain wall pendant of three-dimensional regulation
CN102230332B (en) Unit-type curtain wall mounting suspender
CN107035144B (en) It is a kind of conducive to the locating rack for improving electrical box position positioning accuracy in space
CN102587549B (en) Three-dimensional adjustment hanger for curtain wall back-bolted stone
CN211523694U (en) Vertical lines curtain steelframe system of cell cube aluminum plate
CN204983519U (en) Novel soft and hard package installation metal pendant
CN204315919U (en) A kind of novel 45 degree of wing angle G section bar switch cubicles
CN102493582A (en) Three-dimension adjustable connection assembly for curtain walls
CN103290955A (en) Fixing support capable of quickly mounting integrated building external wall panel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: GOLDEN CURTAIN WALL GROUP CO., LTD.

Free format text: FORMER NAME: GUANGDONG JINGANG CURTAIN WALL ENGINEERING CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: Tianhe District Tianrun road Guangzhou City, Guangdong province 510635 445-459 Building No. 5

Patentee after: GOLDEN CURTAIN WALL GROUP CO., LTD.

Address before: Tianhe District Tianrun road Guangzhou City, Guangdong province 510635 445-459 Building No. 5

Patentee before: Guangdong Jingang Curtain Wall Engineering Co., Ltd.