CN202787293U - 沉井施工装置 - Google Patents

沉井施工装置 Download PDF

Info

Publication number
CN202787293U
CN202787293U CN 201220432565 CN201220432565U CN202787293U CN 202787293 U CN202787293 U CN 202787293U CN 201220432565 CN201220432565 CN 201220432565 CN 201220432565 U CN201220432565 U CN 201220432565U CN 202787293 U CN202787293 U CN 202787293U
Authority
CN
China
Prior art keywords
open caisson
construction
construction device
utility
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220432565
Other languages
English (en)
Inventor
吴全科
伍田生
林旭东
郑育东
林益东
伍国斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinzhongtian Group Co ltd
Jinzhongtian Water Conservancy Construction Co ltd
Zhongyuan Landscaping Co ltd
Original Assignee
Jinzhongtian Group Harbor Shipping Co Ltd
Zhong Yuan Gardens Ltd Co
JINZHONGTIAN BUILDING GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinzhongtian Group Harbor Shipping Co Ltd, Zhong Yuan Gardens Ltd Co, JINZHONGTIAN BUILDING GROUP CO Ltd filed Critical Jinzhongtian Group Harbor Shipping Co Ltd
Priority to CN 201220432565 priority Critical patent/CN202787293U/zh
Application granted granted Critical
Publication of CN202787293U publication Critical patent/CN202787293U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

本实用新型公开了一种沉井施工装置。沉井施工装置,包括沉井本体(1),沉井本体(1)的外围设置有混凝土搅拌桩帷幕,沉井本体(1)的刃脚下均匀预设有石砌垫脚(2)。所述的沉井本体(1)的底板分为上、下两层,下层底板(3)上设有暗沟(4)及集水坑(5)。本实用新型可对沉井下沉及封底施工进行有效控制,既可保证施工质量,又可节约大量的施工成本,同时有利于加快施工进度。

Description

沉井施工装置
技术领域
本实用新型属于建筑的技术领域,具体是指一种沉井施工装置。
背景技术
目前,国内有沉井在流塑状淤泥中的应用及其关键技术作专门的研究,但其中均忽视了在淤泥土中进行沉井施工时地下水位、淤泥中土方开挖的特殊处理,未能有效处理沉井下沉过程中地下水位过高、土方开挖困难、沉井下沉容易产生突沉、偏沉、下沉偏差难以控制,下沉最后阶段容易出现超沉,封底后易出现地下水渗漏等质量通病现象。
由于沉井下沉过程中出现过大下沉偏差将造成后续施工难度加大,不但费时费工,而且加大了施工成本,其次,如果沉井封底未做好,将使封底之后出现地下水渗漏现象,并将影响底板的施工,大量的地下水积压在底板下面,将使底板钢筋产生锈蚀,长期作用严重影响底板结构性能,危及结构安全。
上述论述内容目的在于向读者介绍可能与下面将被描述和/或主张的本实用新型的各个方面相关的技术的各个方面,相信该论述内容有助于为读者提供背景信息,以有利于更好地理解本实用新型的各个方面,因此,应了解是以这个角度来阅读这些论述,而不是承认现有技术。
实用新型内容
本实用新型的目的在于避免现有技术中的不足而提供一种沉井施工装置,以对沉井下沉及封底施工进行有效控制,既可保证施工质量,又可节约大量的施工成本,同时有利于加快施工进度。
本实用新型的目的通过以下技术方案实现:
提供一种沉井施工装置,包括沉井本体,沉井本体的外围设置有混凝土搅拌桩帷幕,沉井本体的的刃脚下均匀预设有石砌垫脚。
其中, 所述的沉井本体的底板分为上、下两层,下层底板上设有暗沟。
其中, 所述的沉井本体的底板分为上、下两层,下层底板上设有集水坑。
本实用新型的有益效果:由于采用了上述的结构,本实用新型通过沿沉井周边及刃脚下打设混凝土搅拌桩帷幕、下沉最后阶段通过计算分析设置石砌垫脚以及“二次封底”等一列技术方法成功解决了流塑状淤泥中大型沉井施工所遇到的由于地下淤泥土层较厚、地下水位较高、局部还存在有地下土层分布不均等现象而带来的沉井下沉土方开挖、纠偏以及沉井封底困难等一系列问题,形成了完整的流塑状淤泥中沉井施工技术。其可对沉井下沉及封底施工进行有效控制,既可保证施工质量,又可节约大量的施工成本,同时有利于加快施工进度。
附图说明
利用附图对本实用新型作进一步说明,但附图中的实施例不构成对本实用新型的任何限制,对于本领域的普通技术人员,在不付出创造性劳动的前提下,还可以根据以下附图获得其它的附图。
图1是沉井施工装置的沉井本体和石砌垫脚的结构示意图。
图2是沉井施工装置的沉井本体、暗沟、下层底板的结构示意图。
图3是沉井施工装置的沉井本体、集水坑、下层底板的结构示意图。
具体实施方式
为了使本领域的技术人员更好地理解本实用新型的技术方案,下面结合附图和具体实施例对本实用新型作进一步详细的描述,需要说明的是,在不冲突的情况下,本申请的实施例及实施例中的特征可以相互组合。
本实用新型的核心在于提供一种沉井施工装置,其对沉井下沉及封底施工进行有效控制,既可保证施工质量,又可节约大量的施工成本,同时有利于加快施工进度。
如图1至图3所示,本实用新型所述的沉井施工装置,包括沉井本体1,沉井本体1的外围设置有混凝土搅拌桩帷幕,沉井本体1的的刃脚下均匀预设有石砌垫脚2。其中, 所述的沉井本体1的底板分为上、下两层,下层底板3上设有暗沟4及集水坑5。
本实用新型具体施工时,针对流塑状淤泥中大型沉井施工,通过沿沉井周边打设混凝土搅拌桩帷幕以控制沉井下沉施工时地下水位,通过沿沉井刃脚下打设混凝土搅拌桩以保证下沉阻力及沉井制作高度,中间下沉阶段通过计算沉井下沉系数并结合实际所观测的下沉数据,采取沿沉井外侧“灌砂法”、不均衡挖土法、不均衡灌水法等技术方法纠偏沉井的不均衡、不匀速下沉,采用设置钢垫板配合挖机在淤泥中行走作业以有效的解决淤泥土中施工作业难的问题,采用先沿沉井刃脚挖起再挖中间的施工流向以确保在淤泥地质环境下沉井下沉偏差得到有效控制。在临近下沉最后阶段进通过计算分析,在沉井刃脚下均匀预设足够数量石砌垫脚,以确保沉井下沉的足够阻力,防止沉井发生超沉现象;采用“二次封底”,通过计算分析,在第一次封底后设置相应的暗沟及集水坑的施工技术,以确保沉井封底结束后不发生渗漏水的质量通病现象。
上面的描述中阐述了很多具体细节以便于充分理解本实用新型,但是,本实用新型还可以采用其他不同于在此描述的其他方式来实施,因此,不能理解为对本实用新型保护范围的限制。
总之,本实用新型虽然例举了上述优选实施方式,但是应该说明,虽然本领域的技术人员可以进行各种变化和改型,除非这样的变化和改型偏离了本实用新型的范围,否则都应该包括在本实用新型的保护范围内。

Claims (3)

1.一种沉井施工装置,其特征在于:包括沉井本体(1),沉井本体(1)的外围设置有混凝土搅拌桩帷幕,沉井本体(1)的的刃脚下均匀预设有石砌垫脚(2)。
2.根据权利要求1所述的沉井施工装置,其特征在于:所述的沉井本体(1)的底板分为上、下两层,下层底板(3)上设有暗沟(4)。
3.根据权利要求1所述的沉井施工装置,其特征在于:所述的沉井本体(1)的底板分为上、下两层,下层底板(3)上设有集水坑(5)。
CN 201220432565 2012-08-29 2012-08-29 沉井施工装置 Expired - Fee Related CN202787293U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220432565 CN202787293U (zh) 2012-08-29 2012-08-29 沉井施工装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220432565 CN202787293U (zh) 2012-08-29 2012-08-29 沉井施工装置

Publications (1)

Publication Number Publication Date
CN202787293U true CN202787293U (zh) 2013-03-13

Family

ID=47814575

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220432565 Expired - Fee Related CN202787293U (zh) 2012-08-29 2012-08-29 沉井施工装置

Country Status (1)

Country Link
CN (1) CN202787293U (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104005419A (zh) * 2014-06-23 2014-08-27 洛阳城市建设勘察设计院有限公司 下沉法施工的箱涵构造及施工方法
CN104563146A (zh) * 2014-12-31 2015-04-29 浙江杭州湾建筑集团有限公司 定直埋式雨污水泵站沉井工程施工方法

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104005419A (zh) * 2014-06-23 2014-08-27 洛阳城市建设勘察设计院有限公司 下沉法施工的箱涵构造及施工方法
CN104005419B (zh) * 2014-06-23 2016-04-20 洛阳城市建设勘察设计院有限公司 下沉法施工的箱涵构造及施工方法
CN104563146A (zh) * 2014-12-31 2015-04-29 浙江杭州湾建筑集团有限公司 定直埋式雨污水泵站沉井工程施工方法

Similar Documents

Publication Publication Date Title
CN104563128B (zh) 软土地区非对称深大基坑同步开挖的支护体系及实施方法
CN103422511B (zh) 一种复合式软土地基下输电杆塔浅埋基础地基加固方法
CN103758113B (zh) 一种格栅围箍抗液化地基加固方法
CN206308569U (zh) 一种加固处治下伏溶洞的路基结构
CN104612179B (zh) 贯穿超厚粉砂层的地下连续墙的施工方法
CN205134193U (zh) 缓坡河床基岩上的桥梁主墩承台基坑支护结构
CN103437340A (zh) 一种高压旋喷注浆加固软土地基的方法
CN109594575A (zh) 一种沉井周边注浆加固土体施工方法
CN203463016U (zh) 一种适用于穿透圆砾层土质的三轴搅拌机钻头
CN202787293U (zh) 沉井施工装置
CN106884427A (zh) 水下沉管隧道以及沉管隧道过渡段软土地基加固方法
CN109469066A (zh) 土方机械与水力机械全断面立体组合开挖施工方法及系统
CN204456058U (zh) 一种降低建筑基础沉降速率的施工结构
CN207277344U (zh) 用于狭窄深基坑土方回填的引导工具
CN107190709B (zh) 新近疏浚土吹填成陆围区内建设河道的方法
CN203007961U (zh) 石笼围堰结构
CN207211176U (zh) 一种超高大沉井
CN110144871A (zh) 一种暗浜处理施工方法
CN111139854A (zh) 采用引流注浆法处理基坑勘探孔管涌施工方法
CN105350544A (zh) 用于含有块石区域的止水帷幕及其施工方法
CN103556641A (zh) 一种既有地下室坑内地下连续墙成槽辅助方法
CN204875807U (zh) 河道陡坡基岩上的桥梁主墩承台基坑支护结构
CN103437712A (zh) 一种适用于穿透圆砾层土质的三轴搅拌机钻头
CN106013198A (zh) 基坑围护结构缝隙预处理施工方法
CN206887984U (zh) 一种光伏发电支架用钢筋混凝土加固钢管桩基础

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP03 Change of name, title or address

Address after: 510627 Guangdong, Guangzhou, Haian, No. 13 Tianhe District Road, fortune Century Square, building A1, floor 25

Co-patentee after: JINZHONGTIAN WATER CONSERVANCY CONSTRUCTION CO.,LTD.

Patentee after: JINZHONGTIAN GROUP CO.,LTD.

Co-patentee after: ZHONGYUAN LANDSCAPING CO.,LTD.

Address before: 510100 Yuexiu District, Guangzhou, Baiyun Road, Guangzhou, Baiyun Building, No. twelve, building 111-113

Co-patentee before: Jinzhongtian Group Ganghang Co.,Ltd.

Patentee before: JINZHONGTIAN BUILDING GROUP Co.,Ltd.

Co-patentee before: ZHONGYUAN LANDSCAPING CO.,LTD.

TR01 Transfer of patent right

Effective date of registration: 20170418

Address after: 510627 Guangdong, Guangzhou, Haian, No. 13 Tianhe District Road, fortune Century Square, building A1, floor 25

Patentee after: JINZHONGTIAN WATER CONSERVANCY CONSTRUCTION CO.,LTD.

Address before: 510627 Guangdong, Guangzhou, Haian, No. 13 Tianhe District Road, fortune Century Square, building A1, floor 25

Co-patentee before: JINZHONGTIAN WATER CONSERVANCY CONSTRUCTION CO.,LTD.

Patentee before: JINZHONGTIAN GROUP CO.,LTD.

Co-patentee before: ZHONGYUAN LANDSCAPING CO.,LTD.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130313

Termination date: 20190829

CF01 Termination of patent right due to non-payment of annual fee