CN202746763U - 大口径长距离钢筋混凝土管泥水平衡顶管施工装置 - Google Patents

大口径长距离钢筋混凝土管泥水平衡顶管施工装置 Download PDF

Info

Publication number
CN202746763U
CN202746763U CN 201220432562 CN201220432562U CN202746763U CN 202746763 U CN202746763 U CN 202746763U CN 201220432562 CN201220432562 CN 201220432562 CN 201220432562 U CN201220432562 U CN 201220432562U CN 202746763 U CN202746763 U CN 202746763U
Authority
CN
China
Prior art keywords
reinforced concrete
pipe
jacking construction
construction device
sliding material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220432562
Other languages
English (en)
Inventor
吴全科
林超
林旭东
郑育东
林益东
陈江波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Jinxin Road And Bridge Co ltd
Jinzhongtian Group Co ltd
Jinzhongtian Water Conservancy Construction Co ltd
Original Assignee
Guangdong Province Jinxin Road & Bridge Co Ltd
Jinzhongtian Group Harbor Shipping Co Ltd
JINZHONGTIAN BUILDING GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Province Jinxin Road & Bridge Co Ltd, Jinzhongtian Group Harbor Shipping Co Ltd, JINZHONGTIAN BUILDING GROUP CO Ltd filed Critical Guangdong Province Jinxin Road & Bridge Co Ltd
Priority to CN 201220432562 priority Critical patent/CN202746763U/zh
Application granted granted Critical
Publication of CN202746763U publication Critical patent/CN202746763U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Underground Or Underwater Handling Of Building Materials (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

本实用新型公开了一种大口径长距离钢筋混凝土管泥水平衡顶管施工装置。大口径长距离钢筋混凝土管泥水平衡顶管施工装置,包括圆筒状的机体(1),机体(1)的头端设有刀组(2)及刀组驱动装置(3),所述机体(1)的侧壁上开设有注浆滑材注入口(4),注浆滑材注入口(4)的内端接有注浆滑材注入管(5)。本实用新型用于大口径长距离泥水平衡顶管施工的偏差一般可控制在5mm以内,且操作简便、要求低;此外,还大大降低了顶进过程的摩擦阻力,摩擦系数可降至0.06-0.1,顶进距离可增大30%-80%,效果非常明显。

Description

大口径长距离钢筋混凝土管泥水平衡顶管施工装置
技术领域
本实用新型属于建筑施工的技术领域,具体是指一种大口径长距离钢筋混凝土管泥水平衡顶管施工装置。
背景技术
目前,国内顶管工程虽然应用越来越广泛,但积累的关于泥水平衡顶管的工程数据和经验比较有限。在减少总顶力,增加一次性顶进距离的环节上,通常是通过一般的膨润土进行注浆减阻,效果很一般,降低摩擦力的改进空间很大;另外,常规的纠偏对于方向控制的精度不容易保证,有经验的操作人员能把偏差控制在50mm之内已属不易。
上述论述内容目的在于向读者介绍可能与下面将被描述和/或主张的本实用新型的各个方面相关的技术的各个方面,相信该论述内容有助于为读者提供背景信息,以有利于更好地理解本实用新型的各个方面,因此,应了解是以这个角度来阅读这些论述,而不是承认现有技术。
实用新型内容
本实用新型的目的在于避免现有技术中的不足而提供一种大口径长距离钢筋混凝土管泥水平衡顶管施工装置,其可以大大降低顶管阻力,同时也方便进行纠偏。
本实用新型的目的通过以下技术方案实现:
提供一种大口径长距离钢筋混凝土管泥水平衡顶管施工装置,包括圆筒状的机体,机体的头端设有刀组及刀组驱动装置,所述机体的侧壁上开设有注浆滑材注入口,注浆滑材注入口的内端接有注浆滑材注入管。
其中,所述机体的侧壁上开设有多个注浆滑材注入口,多个注浆滑材注入口均匀地设置在所述机体的侧壁上。
其中,所述机体中设置有红外跟踪纠偏定位装置。
本实用新型的有益效果:由于采用了上述的结构,本实用新型与现有技术相比具有以下优点:
(1)、采用流体输送切削入泥仓的土体,由排泥泵经排泥管道将泥水送至地面泥浆池,残渣外运,操作方便,作业环境好,安全又环保。
(2)、运用红外线跟踪定位技术,自动测量定位,通过偏差趋势图辅助判断偏差趋势,可及时为预先纠偏提供参考,纠偏精度高。
(3)、改良注浆工艺,采用性能良好的膨润土和新型高效滑材,结合具体地层特点配制泥浆,可大大降低管壁摩擦力和总顶力。
(4)、顶进过程不间断,施工速度快。
(5)、可保持挖掘面的相对稳定,无需土质改良或降水处理,对周围土层的影响较小,工后地面沉降极小。
附图说明
利用附图对本实用新型作进一步说明,但附图中的实施例不构成对本实用新型的任何限制,对于本领域的普通技术人员,在不付出创造性劳动的前提下,还可以根据以下附图获得其它的附图。
图1是大口径长距离钢筋混凝土管泥水平衡顶管施工装置的结构示意图。
具体实施方式
为了使本领域的技术人员更好地理解本实用新型的技术方案,下面结合附图和具体实施例对本实用新型作进一步详细的描述,需要说明的是,在不冲突的情况下,本申请的实施例及实施例中的特征可以相互组合。
本实用新型的核心在于提供一种大口径长距离钢筋混凝土管泥水平衡顶管施工装置,其可以大大降低顶管阻力,方便进行纠偏。
如图1所示,本实用新型所述的大口径长距离钢筋混凝土管泥水平衡顶管施工装置,包括圆筒状的机体1,机体1的头端设有刀组2及刀组驱动装置3,其特征在于:所述机体1的侧壁上开设有注浆滑材注入口4,注浆滑材注入口4的内端接有注浆滑材注入管5。其中,所述机体1的侧壁上开设有多个注浆滑材注入口4,多个注浆滑材注入口4均匀地设置在所述机体1的侧壁上。采用新型注浆滑材,并结合具体地层特点配制泥浆,新型滑材经调配后可膨胀为直径3-5mm的小球,起到使滑动摩擦变为滚动摩擦的效果,降低管壁摩擦力和总顶力,减少了中继间的使用,节省了软弱土质大口径长距离钢筋混凝土管泥水平衡顶管施工成本。其中,所述机体1中设置有红外跟踪纠偏定位装置。红外跟踪纠偏定位装置利用红外线跟踪定位,自动测量定位,防止机体走偏。
本实用新型用于大口径长距离泥水平衡顶管施工的偏差一般可控制在5mm以内,且操作简便、要求低;此外,还大大降低了顶进过程的摩擦阻力,摩擦系数可降至0.06-0.1,顶进距离可增大30%-80%,效果非常明显。
上面的描述中阐述了很多具体细节以便于充分理解本实用新型,但是,本实用新型还可以采用其他不同于在此描述的其他方式来实施,因此,不能理解为对本实用新型保护范围的限制。
总之,本实用新型虽然例举了上述优选实施方式,但是应该说明,虽然本领域的技术人员可以进行各种变化和改型,除非这样的变化和改型偏离了本实用新型的范围,否则都应该包括在本实用新型的保护范围内。

Claims (3)

1.一种大口径长距离钢筋混凝土管泥水平衡顶管施工装置,包括圆筒状的机体(1),机体(1)的头端设有刀组(2)及刀组驱动装置(3),其特征在于:所述机体(1)的侧壁上开设有注浆滑材注入口(4),注浆滑材注入口(4)的内端接有注浆滑材注入管(5)。
2.根据权利要求1所述的大口径长距离钢筋混凝土管泥水平衡顶管施工装置,其特征在于:所述机体(1)的侧壁上开设有多个注浆滑材注入口(4),多个注浆滑材注入口(4)均匀地设置在所述机体(1)的侧壁上。
3.根据权利要求1或2所述的大口径长距离钢筋混凝土管泥水平衡顶管施工装置,其特征在于:所述机体(1)中设置有红外跟踪纠偏定位装置。
CN 201220432562 2012-08-29 2012-08-29 大口径长距离钢筋混凝土管泥水平衡顶管施工装置 Expired - Fee Related CN202746763U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220432562 CN202746763U (zh) 2012-08-29 2012-08-29 大口径长距离钢筋混凝土管泥水平衡顶管施工装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220432562 CN202746763U (zh) 2012-08-29 2012-08-29 大口径长距离钢筋混凝土管泥水平衡顶管施工装置

Publications (1)

Publication Number Publication Date
CN202746763U true CN202746763U (zh) 2013-02-20

Family

ID=47706162

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220432562 Expired - Fee Related CN202746763U (zh) 2012-08-29 2012-08-29 大口径长距离钢筋混凝土管泥水平衡顶管施工装置

Country Status (1)

Country Link
CN (1) CN202746763U (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104100273A (zh) * 2014-07-16 2014-10-15 同济大学 一种减少箱涵顶进时土体纵向变形的反拖曳装置
CN109162726A (zh) * 2018-08-22 2019-01-08 广州众粤市政园林设计工程有限公司 一种纠偏工具头以及工具头纠偏方法
CN110145322A (zh) * 2018-07-09 2019-08-20 中国水利水电第七工程局有限公司 注浆尾套及小口径泥水平衡顶管设备
CN110359540A (zh) * 2019-08-02 2019-10-22 中铁建设集团北京工程有限公司 一种浅覆土大管径高水位穿既有道路人工顶管施工工法
CN110899416A (zh) * 2019-12-23 2020-03-24 徐雨 一种小曲率曲线顶进用的大口径钢筋混凝土电力顶管结构

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104100273A (zh) * 2014-07-16 2014-10-15 同济大学 一种减少箱涵顶进时土体纵向变形的反拖曳装置
CN110145322A (zh) * 2018-07-09 2019-08-20 中国水利水电第七工程局有限公司 注浆尾套及小口径泥水平衡顶管设备
CN109162726A (zh) * 2018-08-22 2019-01-08 广州众粤市政园林设计工程有限公司 一种纠偏工具头以及工具头纠偏方法
CN110359540A (zh) * 2019-08-02 2019-10-22 中铁建设集团北京工程有限公司 一种浅覆土大管径高水位穿既有道路人工顶管施工工法
CN110359540B (zh) * 2019-08-02 2024-04-19 中铁建设集团北京工程有限公司 一种浅覆土大管径高水位穿既有道路人工顶管施工工法
CN110899416A (zh) * 2019-12-23 2020-03-24 徐雨 一种小曲率曲线顶进用的大口径钢筋混凝土电力顶管结构
CN110899416B (zh) * 2019-12-23 2021-07-02 上海矩顶工程科技有限公司 一种小曲率曲线顶进用的大口径钢筋混凝土电力顶管结构

Similar Documents

Publication Publication Date Title
CN202746763U (zh) 大口径长距离钢筋混凝土管泥水平衡顶管施工装置
CN101982688B (zh) 一种大口径长距离钢顶管施工系统
CN105240019A (zh) 一种顶管施工方法
CN102889428A (zh) 顶管施工后管道中心线偏差的非开挖纠正方法及设备
CN210562572U (zh) 管道清淤机器人
CN202852197U (zh) 顶管施工后管道中心线偏差的非开挖纠正设备
CN204060702U (zh) 一种地下管廊盾构施工用盾构机头
CN201152143Y (zh) 导管立式水平定向钻机
CN102748033B (zh) 超长顶管减阻浆分仓填充机构
CN202228785U (zh) 长输管线千斤顶式顶管机头
CN203783470U (zh) 一种新型石油勘探pdc钻头
CN204300506U (zh) 海底电缆、光缆、软管敷设机
CN201560769U (zh) 改进的三臂凿岩台车
CN208441848U (zh) 联络通道施工用类矩形顶管机
CN204530815U (zh) 碎石基床清淤设备
CN109538222A (zh) 盾构机掘进稳定装置
CN107091053B (zh) 地下工程桩基础成孔用左右位移式低净空钻机
CN205438877U (zh) 泥水搅拌装置
CN206220872U (zh) 拔锚索施工套管跟管钻进装置
CN205355694U (zh) 一种非开挖电缆顶管
CN204532359U (zh) 矩形顶管机的多刀盘组合式切削系统
CN203394532U (zh) 一种大口径手掘式顶管掘进机
CN203822360U (zh) 煤层瓦斯预抽采孔径向钻进导向装置
CN109989710A (zh) 高精度大口径水平孔钻进方法
CN202690066U (zh) 超长顶管减阻浆分仓填充机构

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address

Address after: 510627 Guangdong, Guangzhou, Haian, No. 13 Tianhe District Road, fortune Century Square, building A1, floor 25

Co-patentee after: JINZHONGTIAN WATER CONSERVANCY CONSTRUCTION CO.,LTD.

Patentee after: JINZHONGTIAN GROUP CO.,LTD.

Co-patentee after: GUANGDONG JINXIN ROAD AND BRIDGE CO.,LTD.

Address before: 510100 Yuexiu District Baiyun Road, Guangdong, Baiyun Building, building 111-113, floor twelve

Co-patentee before: Jinzhongtian Group Ganghang Co.,Ltd.

Patentee before: JINZHONGTIAN BUILDING GROUP Co.,Ltd.

Co-patentee before: GUANGDONG JINXIN ROAD AND BRIDGE CO.,LTD.

CP03 Change of name, title or address
TR01 Transfer of patent right

Effective date of registration: 20170411

Address after: 510627 Guangdong, Guangzhou, Haian, No. 13 Tianhe District Road, fortune Century Square, building A1, floor 25

Patentee after: JINZHONGTIAN WATER CONSERVANCY CONSTRUCTION CO.,LTD.

Address before: 510627 Guangdong, Guangzhou, Haian, No. 13 Tianhe District Road, fortune Century Square, building A1, floor 25

Co-patentee before: JINZHONGTIAN WATER CONSERVANCY CONSTRUCTION CO.,LTD.

Patentee before: JINZHONGTIAN GROUP CO.,LTD.

Co-patentee before: GUANGDONG JINXIN ROAD AND BRIDGE CO.,LTD.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130220

Termination date: 20190829

CF01 Termination of patent right due to non-payment of annual fee