CN102748033B - 超长顶管减阻浆分仓填充机构 - Google Patents

超长顶管减阻浆分仓填充机构 Download PDF

Info

Publication number
CN102748033B
CN102748033B CN201210256580.1A CN201210256580A CN102748033B CN 102748033 B CN102748033 B CN 102748033B CN 201210256580 A CN201210256580 A CN 201210256580A CN 102748033 B CN102748033 B CN 102748033B
Authority
CN
China
Prior art keywords
pipe
steel pipe
curtain steel
injected hole
place
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210256580.1A
Other languages
English (en)
Other versions
CN102748033A (zh
Inventor
张晓峰
陈佑新
孙国著
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Engineering Co Ltd of China Railway Urban Construction Group Co Ltd
Original Assignee
Beijing Engineering Co Ltd of China Railway Urban Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Engineering Co Ltd of China Railway Urban Construction Group Co Ltd filed Critical Beijing Engineering Co Ltd of China Railway Urban Construction Group Co Ltd
Priority to CN201210256580.1A priority Critical patent/CN102748033B/zh
Publication of CN102748033A publication Critical patent/CN102748033A/zh
Application granted granted Critical
Publication of CN102748033B publication Critical patent/CN102748033B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

本发明涉及一种超长顶管减阻浆分仓填充机构,包括管幕钢管,所述管幕钢管的前端通过纠偏铰接装置连接有掘进机,掘进机的前端安装有刀盘,刀盘上连接有进泥水管和出泥水管,所述管幕钢管的后端安装有千斤顶顶镐,千斤顶顶镐通过分配梁与外部的后背墙固定连接,所述管幕钢管的顶端中部靠近管幕钢管前端2.5m处设有第一注浆孔,第一注浆孔的前侧0.05m处设有第一分仓隔断环,第一注浆孔的后侧每间隔5m处和每间隔30m处分别设有第二注浆孔和第二分仓隔断环。本发明的有益效果为:本发明采用单体减阻浆套环,避免了减阻浆出现局部压力过大或抱管的现象发生,且提高了工作效率,改善了工作质量,同时也使得操作和控制更便捷。

Description

超长顶管减阻浆分仓填充机构
技术领域
本发明涉及一种超长顶管减阻技术,尤其是涉及一种超长顶管减阻浆分仓填充机构。
背景技术
顶管技术运用至今已有近一百年的历史,特别在城市基础设施全面兴起后,顶管工法被越来越广泛地运用到地下工程中去,顶管施工技术已日趋成熟,顶管施工工艺也日益先进,从原先的短顶管施工变为现在的超长顶管施工,无时不在进步着,然而目前在超长顶管施工时,为减小顶进阻力,主要采用的是管外壁注减阻浆减小顶力技术,但这种管外减阻技术一般在顶进长度小于10米以内效果比较好,超长后会出现减阻浆分布不均,造成局部压力过大,甚至出现抱管现象(即:由于顶管周围泥浆或土体阻力过大,导致顶管无法继续顶进),导致顶管失败,故现有的管外减阻技术还需进一步改进。
发明内容
本发明的目的是提供一种超长顶管减阻浆分仓填充机构,以克服目前管外减阻技术超长后会出现减阻浆分布不均,造成局部压力过大;甚至出现抱管现象而导致顶管失败的不足。
本发明的目的是通过以下技术方案来实现:
一种超长顶管减阻浆分仓填充机构,包括管幕钢管,所述管幕钢管的前端通过纠偏铰接装置连接有掘进机,掘进机的前端安装有刀盘,刀盘上连接有进泥水管和出泥水管,进泥水管和出泥水管的另一端均穿过管幕钢管延伸至管幕钢管后端的外侧,所述管幕钢管的后端安装有千斤顶顶镐,千斤顶顶镐通过分配梁与外部的后背墙固定连接,所述管幕钢管的顶端中部靠近管幕钢管前端2.5m处设有第一注浆孔,第一注浆孔的前侧0.05m处设有第一分仓隔断环,第一注浆孔的后侧每间隔5m处和每间隔30m处分别设有第二注浆孔和第二分仓隔断环,所述第一注浆孔和第二注浆孔均与安装在管幕钢管内部的注润滑泥浆管相连通;所述注润滑泥浆管上每间隔3m处设有钢管内快速接头;所述进泥水管和出泥水管分别通过进泥水泵和排泥水泵与循环水池相连通;所述注润滑泥浆管通过恒压罐与压浆泵连接。
本发明的有益效果为:本发明采用单体减阻浆套环,避免了减阻浆出现局部压力过大或抱管的现象发生,且提高了工作效率,改善了工作质量,同时也使得操作和控制更便捷。
附图说明
下面根据附图对本发明作进一步详细说明。
图1是本发明实施例所述的超长顶管减阻浆分仓填充机构的结构示意图之一;
图2是本发明实施例所述的超长顶管减阻浆分仓填充机构的结构示意图之二。
图中:
1、管幕钢管;2、纠偏铰接装置;3、掘进机;4、刀盘;5、进泥水管;6、出泥水管;7、千斤顶顶镐;8、分配梁;9、后背墙;10、第一注浆孔;11、第一分仓隔断环;12、第二注浆孔;13、第二分仓隔断环;14、注润滑泥浆管;15、钢管内快速接头。
具体实施方式
如图1-2所示,本发明实施例所述的一种超长顶管减阻浆分仓填充机构,包括管幕钢管1,所述管幕钢管1的前端通过纠偏铰接装置2连接有掘进机3,掘进机3的前端安装有刀盘4,刀盘4上连接有进泥水管5和出泥水管6,进泥水管5和出泥水管6的另一端均穿过管幕钢管1延伸至管幕钢管1后端的外侧,所述管幕钢管1的后端安装有千斤顶顶镐7,千斤顶顶镐7通过分配梁8与外部的后背墙9固定连接,所述管幕钢管1的顶端中部靠近管幕钢管1前端2.5m处设有第一注浆孔10,第一注浆孔10的前侧0.05m处设有第一分仓隔断环11,第一注浆孔10的后侧每间隔5m处和每间隔30m处分别设有第二注浆孔12和第二分仓隔断环13,所述第一注浆孔10和第二注浆孔12均与安装在管幕钢管1内部的注润滑泥浆管14相连通,所述注润滑泥浆管14上每间隔3m处设有钢管内快速接头15。
所述进泥水管5和出泥水管6分别通过进泥水泵和排泥水泵与循环水池相连通;所述注润滑泥浆管14通过恒压罐与压浆泵连接。
具体使用时,通过在第一注浆孔10前侧0.05m处和后侧每隔30m处设有分仓隔断环,使得整个管幕钢管1在土体里形成N个单体减阻浆套环,起到整体减阻浆均衡减阻的作用。而顶进时,掘进机3尾部及管幕钢管1上的注浆孔要及时有效地跟踪压浆,始终保持顶进过程中环状间隙泥浆压力大于土压力与水压力之和,对周围土体起到支撑作用,确保形成完整有效的泥浆套。同时顶进施工时,还需要经常检测水位线以便及时对压力值进行修正。
本发明中,管幕钢管1的顶进速度主要取决于盾构机前进速度,而盾构机的前进速度主要受刀盘4力矩及进排泥系统的限制。当进排出土体大于顶进时盾构机吃土时,易形成超挖造成的土体坍塌,应提高顶进速度;当进排出土体小于顶进时盾构机吃土时,易造成刀盘过载,应降低顶进速度,确定顶进速度能有效控制高效率,提高顶管质量;在推进过程中通过监视器观察位于掘进机3尾部光靶上的激光点,光靶中心即是掘进机中心,激光点是管道设计中心。在产生偏差时通过控制台调节掘进机3内的4个控制方向千斤顶,使掘进机3能改变其姿态,向设计方向靠拢,能快捷、简单的控制好顶进精度。
本发明不局限于上述最佳实施方式,任何人在本发明的启示下都可得出其他各种形式的产品,但不论在其形状或结构上作任何变化,凡是具有与本申请相同或相近似的技术方案,均落在本发明的保护范围之内。

Claims (3)

1.一种超长顶管减阻浆分仓填充机构,包括管幕钢管(1),所述管幕钢管(1)的前端通过纠偏铰接装置(2)连接有掘进机(3),掘进机(3)的前端安装有刀盘(4),刀盘(4)上连接有进泥水管(5)和出泥水管(6),进泥水管(5)和出泥水管(6)的另一端均穿过管幕钢管(1)延伸至管幕钢管(1)后端的外侧,所述管幕钢管(1)的后端安装有千斤顶顶镐(7),千斤顶顶镐(7)通过分配梁(8)与外部的后背墙(9)固定连接,其特征在于:所述管幕钢管(1)的顶端中部靠近管幕钢管(1)前端2.5m处设有第一注浆孔(10),第一注浆孔(10)的前侧0.05m处设有第一分仓隔断环(11),第一注浆孔(10)的后侧每间隔5m处和每间隔30m处分别设有第二注浆孔(12)和第二分仓隔断环(13),所述第一注浆孔(10)和第二注浆孔(12)均与安装在管幕钢管(1)内部的注润滑泥浆管(14)相连通,所述注润滑泥浆管(14)上每间隔3m处设有钢管内快速接头(15)。
2.根据权利要求1所述的超长顶管减阻浆分仓填充机构,其特征在于:所述进泥水管(5)和出泥水管(6)分别通过进泥水泵和排泥水泵与循环水池相连通。
3.根据权利要求1或2所述的超长顶管减阻浆分仓填充机构,其特征在于:所述注润滑泥浆管(14)通过恒压罐与压浆泵连接。
CN201210256580.1A 2012-07-23 2012-07-23 超长顶管减阻浆分仓填充机构 Active CN102748033B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210256580.1A CN102748033B (zh) 2012-07-23 2012-07-23 超长顶管减阻浆分仓填充机构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210256580.1A CN102748033B (zh) 2012-07-23 2012-07-23 超长顶管减阻浆分仓填充机构

Publications (2)

Publication Number Publication Date
CN102748033A CN102748033A (zh) 2012-10-24
CN102748033B true CN102748033B (zh) 2016-03-02

Family

ID=47028487

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210256580.1A Active CN102748033B (zh) 2012-07-23 2012-07-23 超长顶管减阻浆分仓填充机构

Country Status (1)

Country Link
CN (1) CN102748033B (zh)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104594909B (zh) * 2014-12-19 2016-10-19 中建六局土木工程有限公司 一种超长管幕的后背装置的安装施工方法
CN106015733B (zh) * 2016-08-03 2018-05-04 北京政平建设投资集团有限公司 一种直顶钢管管道顶进施工方法
CN108868783B (zh) * 2018-06-05 2020-04-03 中船重型装备有限公司 一种用于顶管机纠偏的挤泥装置及其纠偏方法
CN114321496B (zh) * 2021-12-22 2023-09-26 深圳市市政工程总公司 工具管反向顶进施工方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11107686A (ja) * 1996-02-22 1999-04-20 Toyo Technos:Kk セミシールド工法における長距離推進工法
JP2000257387A (ja) * 1999-03-04 2000-09-19 Shin Gijutsu Koei Kk 小口径トンネル掘進機
CN102032393A (zh) * 2010-11-10 2011-04-27 博大建设有限公司 小口径超长距离曲线顶管工法
CN102278117A (zh) * 2011-04-29 2011-12-14 上海交通大学 平行顶管顶进施工模拟装置
CN202690066U (zh) * 2012-07-23 2013-01-23 中铁十六局集团北京工程有限公司 超长顶管减阻浆分仓填充机构

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11107686A (ja) * 1996-02-22 1999-04-20 Toyo Technos:Kk セミシールド工法における長距離推進工法
JP2000257387A (ja) * 1999-03-04 2000-09-19 Shin Gijutsu Koei Kk 小口径トンネル掘進機
CN102032393A (zh) * 2010-11-10 2011-04-27 博大建设有限公司 小口径超长距离曲线顶管工法
CN102278117A (zh) * 2011-04-29 2011-12-14 上海交通大学 平行顶管顶进施工模拟装置
CN202690066U (zh) * 2012-07-23 2013-01-23 中铁十六局集团北京工程有限公司 超长顶管减阻浆分仓填充机构

Also Published As

Publication number Publication date
CN102748033A (zh) 2012-10-24

Similar Documents

Publication Publication Date Title
CN102748033B (zh) 超长顶管减阻浆分仓填充机构
CN102155237B (zh) 盾构掘进过程中更换尾刷的装置及其施工方法
CN109403995B (zh) 一种顶管机的纠偏装置
CN205578016U (zh) 一种盾构机管片吊运系统
CN109779651B (zh) 一种砂姜黏土地层近距泥水平衡顶管施工方法
CN205036382U (zh) 一种复合式刀盘超挖刀
CN204963871U (zh) 应用于双护盾隧道掘进机的导向系统
CN202673297U (zh) 一种改进的盾构机盾尾密封油脂注入系统
CN205805558U (zh) 一种新型护盾式tbm主驱动
CN202690066U (zh) 超长顶管减阻浆分仓填充机构
CN204060702U (zh) 一种地下管廊盾构施工用盾构机头
CN103628898B (zh) 一种用于防止巷道底鼓的连续墙支护方法
CN205577998U (zh) 一种盾构机的推进系统
CN204167849U (zh) 电缆沟及其盖板
CN202746763U (zh) 大口径长距离钢筋混凝土管泥水平衡顶管施工装置
CN212202060U (zh) 一种顶管纠偏装置
CN105065011A (zh) 软土盾构切削桩基的施工方法
CN205355694U (zh) 一种非开挖电缆顶管
CN109538222A (zh) 盾构机掘进稳定装置
CN104018474B (zh) 施工支洞回填改建检修支洞的方法
CN208441848U (zh) 联络通道施工用类矩形顶管机
CN103233765A (zh) 一种注氮装置及其实现注氮的方法
CN209483350U (zh) 盾构机掘进稳定装置
CN105221163A (zh) 一种用于隧道管片衬砌的机架及盾构机
CN204941571U (zh) 一种改进的铁路隧道支护结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent for invention or patent application
CB02 Change of applicant information

Address after: 100018, No. 2, building 2, North Court, North Korean pine garden, Beijing, Chaoyang District 8

Applicant after: BEIJING ENGINEERING COMPANY LIMITED OF CHINA RAILWAY URBAN CONSTRUCTION GROUP

Address before: 100018 sixteen China Railway Bureau Group Co., Ltd., 2 North Korean pine garden, Beijing, Chaoyang District

Applicant before: China Railway 16th Bureau Group Beijing Engineering Co., Ltd.

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: CHINA RAIWAY 16TH BUREAU GROUP BEIJING ENGINEERING CO., LTD. TO: BEIJING ENGINEERING COMPANY LIMITED OF CHINA RAILWAY URBAN CONSTRUCTION GROUP

C14 Grant of patent or utility model
GR01 Patent grant