CN202731936U - 隧道仰拱端模 - Google Patents

隧道仰拱端模 Download PDF

Info

Publication number
CN202731936U
CN202731936U CN 201220403524 CN201220403524U CN202731936U CN 202731936 U CN202731936 U CN 202731936U CN 201220403524 CN201220403524 CN 201220403524 CN 201220403524 U CN201220403524 U CN 201220403524U CN 202731936 U CN202731936 U CN 202731936U
Authority
CN
China
Prior art keywords
end mold
inverted arch
mould
concrete
tunnel inverted
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220403524
Other languages
English (en)
Inventor
徐英伦
王常辉
张玉
张洪杰
曹树强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Original Assignee
Second Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd filed Critical Second Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority to CN 201220403524 priority Critical patent/CN202731936U/zh
Application granted granted Critical
Publication of CN202731936U publication Critical patent/CN202731936U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

本实用新型具体为一种隧道仰拱端模,解决了现有仰拱端模采用拼装成整体的木质结构模板存在止水带位置不精确、资源浪费且影响混凝土强度和质量的问题。隧道仰拱端模,包括弧状结构的上端模和下端模,上端模和下端模均是由若干钢制的端模本体螺栓连接而成,端模本体的面板上开有预留孔,上端模和下端模之间通过固定卡固定。本实用新型结构设计合理可靠,采用钢制端模本体,杜绝了混凝土配比发生变化的现象,而且仰拱高度容易控制,保证了混凝土的强度和质量,同时止水带的安装位置更加精确,彻底杜绝了仰拱施工缝处渗漏水的问题,具有结构简单、安装方便、可重复利用及降低施工成本的优点。

Description

隧道仰拱端模
技术领域
本实用新型涉及隧道施工用端模,具体为一种隧道仰拱端模。
背景技术
现有隧道仰拱端模多采用木板及背肋整体固定而成,存在如下不足之处:木板端模具有吸水性能,影响混凝土的浆液配比,进而影响混凝土的强度;止水带的位置固定不够精确,影响其止水效果,仰拱施工缝处易出现渗水现象;仰拱浇筑厚度不易控制,影响仰拱及仰拱填充验收;木模不易周转使用,资源浪费严重。
发明内容
本实用新型为了解决现有仰拱端模采用拼装成整体的木质结构模板存在止水带位置不精确、资源浪费且影响混凝土强度和质量的问题,提供了一种隧道仰拱端模。
本实用新型是采用如下技术方案实现的:隧道仰拱端模,包括弧状结构的上端模和下端模,上端模和下端模均是由若干钢制的端模本体螺栓连接而成,端模本体的面板上开有预留孔,上端模和下端模之间通过固定卡固定。
隧道仰拱端模安装时,根据放样位置先安装下端模中部的端模本体,之后安装两侧的端模本体;随后在下端模顶面安装中埋式橡胶止水带,之后依次进行上端模中部及两侧端模本体的安装,克服了现有仰拱端模存在止水带位置不精确且影响混凝土强度和质量的问题。
本实用新型结构设计合理可靠,采用钢制端模本体,杜绝了混凝土配比发生变化的现象,而且仰拱高度容易控制,保证了混凝土的强度和质量,同时止水带的安装位置更加精确,彻底杜绝了仰拱施工缝处渗漏水的问题,具有结构简单、安装方便、可重复利用及降低施工成本的优点。
附图说明
图1为本实用新型的结构示意图。
图中:1-上端模,2-下端模,3-端模本体,4-预留孔,5-固定卡。
具体实施方式
隧道仰拱端模,包括弧状结构的上端模1和下端模2,上端模1和下端模2均是由若干钢制的端模本体3螺栓连接而成,端模本体3的面板上开有预留孔4,上端模1和下端模2之间通过固定卡5固定。
具体实施过程中,端模本体3采用钢模,面板为12mm厚钢板,加劲肋板为4mm厚钢板,预留孔4的间距为25cm。固定卡5采用14mm的U形厚钢板及穿在厚钢板一侧的螺栓组成。
隧道仰拱端模安装前,先进行测量定位,端模平面位置定位以隧道中心与端模中点重合为标准进行控制;为保证仰拱的厚度和设计标高,下端模2安装时,要根据放样标高用C25混凝土垫块调整模板高度。
在安装隧道仰拱端模时,注意将纵向钢筋通过预留孔4穿出,端模拼装成型后,进行端模斜支撑的加固作业。斜支撑采用直径40mm的钢管,布设间距为1-1.2m,钢管一头固定于上端模1或下端模2上,一头利用地锚固定于基岩面上。
仰拱混凝土由搅拌站集中拌制,混凝土输送车运至施工现场,溜槽下料,插入式振捣器振捣的施工方式;浇筑仰拱砼时应从中间向两侧分别进行,浇筑边墙砼时,应注意浇筑砼的数量,避免掩埋钢边止水带,施工中加强振捣,确保仰拱砼密实,完成后及时收面;砼初凝前,用10mm×15mm方钢条进行压槽,压槽位置设置于内层钢筋靠钢边止水带侧12cm处,约1h后取出方钢条,以免时间过长不易取出。

Claims (1)

1.一种隧道仰拱端模,其特征在于:包括弧状结构的上端模(1)和下端模(2),上端模(1)和下端模(2)均是由若干钢制的端模本体(3)螺栓连接而成,端模本体(3)的面板上开有预留孔(4),上端模(1)和下端模(2)之间通过固定卡(5)固定。
CN 201220403524 2012-08-15 2012-08-15 隧道仰拱端模 Expired - Fee Related CN202731936U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220403524 CN202731936U (zh) 2012-08-15 2012-08-15 隧道仰拱端模

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220403524 CN202731936U (zh) 2012-08-15 2012-08-15 隧道仰拱端模

Publications (1)

Publication Number Publication Date
CN202731936U true CN202731936U (zh) 2013-02-13

Family

ID=47657648

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220403524 Expired - Fee Related CN202731936U (zh) 2012-08-15 2012-08-15 隧道仰拱端模

Country Status (1)

Country Link
CN (1) CN202731936U (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103243691A (zh) * 2013-04-24 2013-08-14 葛洲坝集团第五工程有限公司 大坝消力池预制廊道顶拱钢模板
CN105134253A (zh) * 2015-07-09 2015-12-09 中铁十二局集团有限公司 隧道仰拱组合整体模板及浇筑施工方法
CN106437763A (zh) * 2016-08-26 2017-02-22 中铁十局集团第四工程有限公司 一种仰拱钢端模及其施工方法
CN106979023A (zh) * 2017-05-22 2017-07-25 中铁二局集团有限公司 隧道二次衬砌宽度可调节式混凝土端模及其调节方法
CN114075984A (zh) * 2021-11-01 2022-02-22 中建五局土木工程有限公司 隧道仰拱端头外露钢筋的定位端头模板及施工方法

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103243691A (zh) * 2013-04-24 2013-08-14 葛洲坝集团第五工程有限公司 大坝消力池预制廊道顶拱钢模板
CN105134253A (zh) * 2015-07-09 2015-12-09 中铁十二局集团有限公司 隧道仰拱组合整体模板及浇筑施工方法
CN105134253B (zh) * 2015-07-09 2017-12-01 中铁十二局集团有限公司 隧道仰拱组合整体模板及浇筑施工方法
CN106437763A (zh) * 2016-08-26 2017-02-22 中铁十局集团第四工程有限公司 一种仰拱钢端模及其施工方法
CN106979023A (zh) * 2017-05-22 2017-07-25 中铁二局集团有限公司 隧道二次衬砌宽度可调节式混凝土端模及其调节方法
CN114075984A (zh) * 2021-11-01 2022-02-22 中建五局土木工程有限公司 隧道仰拱端头外露钢筋的定位端头模板及施工方法

Similar Documents

Publication Publication Date Title
CN202731936U (zh) 隧道仰拱端模
CN202000380U (zh) 地下室外墙后浇带回填保护板
CN201679014U (zh) 一种新型桩板式挡土墙
CN202945622U (zh) 一种地下室钢筋混凝土底板裂缝的复合修补结构
CN102653946A (zh) 钢筋混凝土筏板基础底部设置橡胶止水带防水施工方法
CN208534081U (zh) 一种老建筑构造柱的改造结构
CN208777557U (zh) 外露倒置钢筋灌浆套筒预制混凝土柱
CN204311628U (zh) 防坠落预制预应力楼板结构
CN206888264U (zh) 一种全预制的剪刀梯梯段板间分隔墙
CN207525755U (zh) 一种复合材料桩锚支护装置
CN204001699U (zh) 建筑外墙保温一体化模板支撑结构
CN103835303A (zh) 一种现浇式钢筋混凝土抗剪方法及结构
CN206070731U (zh) 带干字型连接件预制剪力墙板的连接构造
CN104911999A (zh) 深埋锚施工方法
CN209353381U (zh) 一种后注浆止水钢板结构
CN201400959Y (zh) 滑模施工筒仓混凝土保护层定位件
CN204418691U (zh) 一种用于现浇竖向构件与水平构件连接处混凝土拦截装置
CN204401377U (zh) 可调式无碴轨道自密实混凝土灌注组合模板
CN203594050U (zh) 一种新型内支撑墙体
CN105275198B (zh) 一种剪力墙加固模板结构及其施工方法
CN103243913B (zh) 装配式剪力墙建筑上下层连接处灌浆层的封堵方法
CN103437349B (zh) 钢筋混凝土灌注异形桩的施工方法
CN202970006U (zh) 一种l形预制清水看台板安装施工结构
CN103938759A (zh) 钢筋砼剪力墙预埋件安装限位装置
CN207794321U (zh) 整体式填充墙砌体拉结筋预埋件

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130213