CN103243691A - 大坝消力池预制廊道顶拱钢模板 - Google Patents

大坝消力池预制廊道顶拱钢模板 Download PDF

Info

Publication number
CN103243691A
CN103243691A CN2013101446797A CN201310144679A CN103243691A CN 103243691 A CN103243691 A CN 103243691A CN 2013101446797 A CN2013101446797 A CN 2013101446797A CN 201310144679 A CN201310144679 A CN 201310144679A CN 103243691 A CN103243691 A CN 103243691A
Authority
CN
China
Prior art keywords
absorption basin
steel form
internal mold
dam
external mold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013101446797A
Other languages
English (en)
Inventor
张建花
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group No 5 Engineering Co Ltd
Original Assignee
China Gezhouba Group No 5 Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group No 5 Engineering Co Ltd filed Critical China Gezhouba Group No 5 Engineering Co Ltd
Priority to CN2013101446797A priority Critical patent/CN103243691A/zh
Publication of CN103243691A publication Critical patent/CN103243691A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

一种大坝消力池预制廊道顶拱钢模板,由外模板内模板和二块封头板组成,所述的外模板和内模板通过螺栓与封头板连接固定。本发明经实践检测,预制模板的承载能力、抗强度、刚度及整体稳定均满足设计要求。本发明具有提高工效,缩短工期,减少交叉施工的相互干扰等优点,非常适用于大坝消力池廊道顶拱的预制。

Description

大坝消力池预制廊道顶拱钢模板
技术领域
本发明涉及水电站施工中的大坝消力池廊道顶拱预制技术领域,具体涉及一种大坝消力池预制廊道顶拱钢模板。 
背景技术
在水利水电混凝土施工建筑领域,大坝消力池廊道顶拱的混凝土浇筑传统的施工方法一般采用搭设满堂脚手支撑架立模的方式,进行现场混凝土浇筑。这种立模方式具有如下缺陷:一是费工费时;二是要材料消耗大,不利于施工环境;三是由于廊道的顶拱模板为承重模板,其自身整体性较差,在混凝土浇筑过程中模板受压变形较大,难以保证混凝土的质量;四是因顶拱架底部要设置大量支撑杆件,不利于廊道内的交通,给标段间的交叉施工带来了较大的干扰。 
发明内容
本发明所要解决的技术问题是提供一种结构简单、制作方便的大坝消力池廊道预制顶拱钢模板装置,克服了模架容易变形、周转材料的投入和占压大,施工难度高的缺点。本发明全部部件采用钢材制成,装拆方便快捷,可反复周转使用,降低了成本,对廊道内的交通影响较小,减少了交叉施工标段间的相互干扰。
为解决上述技术问题,本发明所采用的技术方案是:一种大坝消力池预制廊道顶拱钢模板,由外模板内模板和二块封头板组成,所述的外模板和内模板通过螺栓与封头板连接固定。
所述的外模板由外模钢模板和外模钢拱架通过焊接连接而成。
所述的外模钢模板由外模钢板、第一外模拱圈和外模连接板焊接而成;外模拱架由第二外模拱圈与横向连接杆和支撑杆通过焊接连接而成。
所述的内模板由内模钢模板和内模钢拱架焊接连接而成。
所述的内模钢模板由内模钢板、内模拱圈和内模连接板焊接而成;内模钢拱架由内模支撑杆和内模连接杆通过焊接连接而成。 
本发明具有以下的有益效果:本发明提供的大坝消力池预制廊道顶拱钢模板,每榀钢模板装置的外模板和内模板通过螺栓与封头板连接固定,有效确保了钢钢模板装置的整体性和稳定性。只需提供一块面积约500m2左右的场地,就可以在现场进行钢模板装置制作,并批量浇筑预制顶拱,每次浇筑以四榀为一批次,提高了工效。本发明经实践检测,预制模板的承载能力、抗强度、刚度及整体稳定均满足设计要求。本发明具有提高工效,缩短工期,减少周转材料的投入和占压;减少交叉施工的相互干扰等优点,并且提高工程质量、确保施工安全、改善工作环境。
附图说明
下面结合附图和实施例对本发明作进一步说明。
图1是本发明的外模结构示意图。
图2是本发明的内模结构示意图。
图3是本发明封头板的结构示意图。
图4是图1的A-A剖视图。
图5是图2是B-B剖视图。
具体实施方式
下面结合附图对本发明作进一步说明。
本发明的结构如图1-5所示,一种大坝消力池预制廊道顶拱钢模板,由外模板7内模板8和二块封头板16组成,所述的外模板7和内模板8通过螺栓与封头板16连接固定,组成一榀完整的顶拱钢模板,封头板16为两块。
所述的外模板7由外模钢模板1和外模钢拱架2通过焊接连接而成。
所述的外模钢模板1由外模钢板3、第一外模拱圈5和外模连接板4焊接而成;外模拱架2由第二外模拱圈5'与横向连接杆6和支撑杆6'通过焊接连接而成,每块模板布置三道。
所述的内模板8由内模钢模板9和内模钢拱架13焊接连接而成。
所述的内模钢模板9由内模钢板10、内模拱圈12和内模连接板11焊接而成;内模钢拱架13由内模支撑杆14和内模连接杆15通过焊接连接而成,每块模板布置三道。
本发明的结构尺寸大小可以根据廊道顶拱内径的实际尺寸确定。
本发明的施工过程如下:1)根据消力池廊道顶拱的实际尺寸确定预制顶拱钢模板装置的内外径;2)提供预制场地;3)进行钢模板装置的制作;4)预制模板混凝土浇筑;5)拆模、养护。
通过上述步骤实现大坝消力池廊道顶拱预制混凝土模板的施工。 

Claims (5)

1.一种大坝消力池预制廊道顶拱钢模板,其特征在于:由外模板(7)内模板(8)和二块封头板(16)组成,所述的外模板(7)和内模板(8)通过螺栓与封头板(16)连接固定。
2.根据权利要求1所述的一种大坝消力池预制廊道顶拱钢模板,其特征在于:所述的外模板(7)由外模钢模板(1)和外模钢拱架(2)通过焊接连接而成。
3.根据权利要求2所述的一种大坝消力池预制廊道顶拱钢模板,其特征在于:所述的外模钢模板(1)由外模钢板(3)、第一外模拱圈(5)和外模连接板(4)焊接而成;外模拱架(2)由第二外模拱圈(5')与横向连接杆(6)和支撑杆(6')通过焊接连接而成。
4.根据权利要求1所述的一种大坝消力池预制廊道顶拱钢模板,其特征在于:所述的内模板(8)由内模钢模板(9)和内模钢拱架(13)焊接连接而成。
5.根据权利要求4所述的一种大坝消力池预制廊道顶拱钢模板,其特征在于:所述的内模钢模板(9)由内模钢板(10)、内模拱圈(12)和内模连接板(11)焊接而成;内模钢拱架(13)由内模支撑杆(14)和内模连接杆(15)通过焊接连接而成。
CN2013101446797A 2013-04-24 2013-04-24 大坝消力池预制廊道顶拱钢模板 Pending CN103243691A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013101446797A CN103243691A (zh) 2013-04-24 2013-04-24 大坝消力池预制廊道顶拱钢模板

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013101446797A CN103243691A (zh) 2013-04-24 2013-04-24 大坝消力池预制廊道顶拱钢模板

Publications (1)

Publication Number Publication Date
CN103243691A true CN103243691A (zh) 2013-08-14

Family

ID=48923543

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013101446797A Pending CN103243691A (zh) 2013-04-24 2013-04-24 大坝消力池预制廊道顶拱钢模板

Country Status (1)

Country Link
CN (1) CN103243691A (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105298111A (zh) * 2015-10-19 2016-02-03 中交第一公路工程局有限公司 明洞隧道衬砌施工模板及其施工装置、方法
CN105735128A (zh) * 2014-12-09 2016-07-06 济南黄河路桥工程公司 主拱圈施工线形控制模具
CN111364422A (zh) * 2020-04-24 2020-07-03 海南省水利水电勘测设计研究院 一种预制廊道的现场施工方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20080004971U (ko) * 2007-04-24 2008-10-29 주식회사 서진기계 개착터널 자주식 외부철재거푸집
CN201738250U (zh) * 2010-08-21 2011-02-09 中铁六局集团有限公司 拱涵拱圈钢模台车
CN202001022U (zh) * 2011-03-28 2011-10-05 中铁十六局集团有限公司 移动衬砌拱架模板
CN202055263U (zh) * 2011-04-21 2011-11-30 中国水利水电第五工程局有限公司 钢筋混凝土廊道
CN202707072U (zh) * 2012-07-27 2013-01-30 福建中天建工机械有限公司 一种隧道洞门的帽檐模板
CN202731936U (zh) * 2012-08-15 2013-02-13 中铁十九局集团第二工程有限公司 隧道仰拱端模
CN203420261U (zh) * 2013-04-24 2014-02-05 葛洲坝集团第五工程有限公司 大坝消力池预制廊道顶拱钢模板

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20080004971U (ko) * 2007-04-24 2008-10-29 주식회사 서진기계 개착터널 자주식 외부철재거푸집
CN201738250U (zh) * 2010-08-21 2011-02-09 中铁六局集团有限公司 拱涵拱圈钢模台车
CN202001022U (zh) * 2011-03-28 2011-10-05 中铁十六局集团有限公司 移动衬砌拱架模板
CN202055263U (zh) * 2011-04-21 2011-11-30 中国水利水电第五工程局有限公司 钢筋混凝土廊道
CN202707072U (zh) * 2012-07-27 2013-01-30 福建中天建工机械有限公司 一种隧道洞门的帽檐模板
CN202731936U (zh) * 2012-08-15 2013-02-13 中铁十九局集团第二工程有限公司 隧道仰拱端模
CN203420261U (zh) * 2013-04-24 2014-02-05 葛洲坝集团第五工程有限公司 大坝消力池预制廊道顶拱钢模板

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
水力发电部第八工程局: "《乌江渡施工技术 上》", 31 January 1987, 水利电力出版社 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105735128A (zh) * 2014-12-09 2016-07-06 济南黄河路桥工程公司 主拱圈施工线形控制模具
CN105735128B (zh) * 2014-12-09 2017-07-07 济南黄河路桥建设集团有限公司 主拱圈施工线形控制模具
CN105298111A (zh) * 2015-10-19 2016-02-03 中交第一公路工程局有限公司 明洞隧道衬砌施工模板及其施工装置、方法
CN105298111B (zh) * 2015-10-19 2017-10-27 中交第一公路工程局有限公司 明洞隧道衬砌施工模板及其施工装置、方法
CN111364422A (zh) * 2020-04-24 2020-07-03 海南省水利水电勘测设计研究院 一种预制廊道的现场施工方法

Similar Documents

Publication Publication Date Title
CN207003479U (zh) 一种现浇城市综合管廊整体模架体系
CN109837831A (zh) 一种离心预制装配式混凝土桥墩及施工方法
CN105926775A (zh) 新型钢管混凝土梁柱节点
CN103452350A (zh) 装配式电子厂房及其施工方法
CN103243691A (zh) 大坝消力池预制廊道顶拱钢模板
CN104131700A (zh) 一种门窗现浇梁浇筑方法及模具
CN204097864U (zh) 一种桥梁预制空心墩柱后浇连接结构
CN206428805U (zh) 一种装配式钢‑混凝土预制阳台
CN206513015U (zh) 基于bim技术用于建筑物楼板施工的铝合金模板机构
CN203284735U (zh) 现浇连续梁竖向预应力筋金属波纹管防堵注浆装置
CN207919737U (zh) 一种装配式钢-混凝土组合框架结构
CN110424438A (zh) 一种适用于低层房屋的装配式小型桩基础
CN203420261U (zh) 大坝消力池预制廊道顶拱钢模板
CN202658765U (zh) 龙骨构架混凝土抗裂填充墙体
CN205712565U (zh) 一种预制双面墙
CN104060757B (zh) 预制混凝土框撑剪力墙墙板
CN103056957A (zh) 钢筋砼预制柱立式预制法
CN203684664U (zh) 一种门窗现浇梁模具
CN103072194B (zh) 一种预制钢筋混凝土防撞护栏模具
CN202850017U (zh) 改良型预应力高强混凝土空心方桩
CN205969435U (zh) 一种卧式多仓拼装管廊模具
CN205205847U (zh) 桩柱承台的框架结构
CN213347892U (zh) 一种预制装配式穿孔配水花墙
CN212404878U (zh) 一种拱圈施工结构
CN211250565U (zh) 一种梁的浇筑模具

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20130814

RJ01 Rejection of invention patent application after publication