CN202703862U - Position-fixing automatic lifting float mat on water - Google Patents

Position-fixing automatic lifting float mat on water Download PDF

Info

Publication number
CN202703862U
CN202703862U CN 201220338384 CN201220338384U CN202703862U CN 202703862 U CN202703862 U CN 202703862U CN 201220338384 CN201220338384 CN 201220338384 CN 201220338384 U CN201220338384 U CN 201220338384U CN 202703862 U CN202703862 U CN 202703862U
Authority
CN
China
Prior art keywords
mat
road
automatic lifting
floating mat
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220338384
Other languages
Chinese (zh)
Inventor
寇国斌
丁立娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 201220338384 priority Critical patent/CN202703862U/en
Application granted granted Critical
Publication of CN202703862U publication Critical patent/CN202703862U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model relates to a position-fixing automatic lifting float mat on water. The position-fixing automatic lifting float mat comprises a plurality of position-fixing piles which are arranged at equal intervals, a float mat channel formed by longitudinal channels and horizontal channels in a stagger mode, a contraction building production area provide with a mat net and a float production area. The middles of the position-fixing piles are connected with the horizontal channels of the float mat channel, and the front side, the rear side, the left side and the right side of the float mat channel are respectively connected with the contraction building production area and the float production area. The position-fixing automatic lifting float mat on water can replace land, and ecological industrial parks, convalescent hospitals, entertainment centers, houses and the like can be constructed on the position-fixing automatic lifting float mat, water areas and resource advantages in water can be utilized to perform multielement development to develop a low-carbon environmental-protection economical industrial chain on water. Simultaneously, compared with platforms, the position-fixing automatic lifting float mat is little in invest, quick in effect, light in weight, large in bearing amount, capable of lifting automatically, wide in application, capable of extending towards the periphery according to water area and production requirements, and the like.

Description

Maintenance automatic lifting floating mat waterborne
Technical field
The utility model relates to the aquatic building field, relates in particular to maintenance automatic lifting floating mat waterborne.
Background technology
Along with China's economic development, population increases, the raising of living standards of the people, and town site, building site, the land used of founding the factory, land use for greening and other every lands used continue to increase, and make that can to plough land used fewer and feweri, and the contradiction in contention soil strengthens everywhere.In order to alleviate and fundamentally dissolve this contradiction, keep national sustained economic development, guarantee agricultural land and other land used, the human development water area resource replaces the soil with the waters, builds on the water factory, son and even build city etc. builds a house, Devoting Major Efforts To Developing industry waterborne, making that resource becomes wealth in the water, must be trend and the emphasis of Future Development, has long-range strategic importance.
China waters is vast, sea, rivers, lake, reservoir, wetland etc. are arranged, gather in length and breadth, its area is the several times on land, rich and varied resource is arranged again in the water, and potentiality to be exploited is huge, and country has determined in development strategy that the blue economy of development is economy waterborne, for from now on exploitation waterborne has indicated direction, worked out blueprint.
China's floating mat on water has two kinds, how in the southern region of rivers and lakes.Floating mat the earliest is to make of bamboo pole, China fir, is used for floating manned or fishing shrimp etc., and with the appearance of plastics airbag, people are filled with air with plastic bag again and form floating mat and be used for cultivation and fish for fishes and shrimps etc.These two kinds of floating mats all can not be fixed, and the automatic lifting load carrying ability is again little, so the purposes scope is little, more can not found the factory in the above etc.Along with qualifications and record of service source such as submarine oil etc. in China's economic development and the exploitation water, need carrying main equipment etc., with construction such as steel cement in addition, above water platform is in common name, can not automatic lifting be fixed, the high general enterprises of cost can not invested, and also is not suitable for other exploitation waterborne.
Summary of the invention
Technical problem to be solved in the utility model provides a kind of maintenance automatic lifting floating mat waterborne little, that supporting power is large of investing.
For addressing the above problem, maintenance automatic lifting floating mat waterborne described in the utility model is characterized in that: it comprises the maintenance stake of several equidistant settings, undertakes the construction of producing tract and floating producing tract by what vertical road and the staggered floating mat road that consists of of lateral road, the row of being provided with netted; The middle part of described maintenance stake is connected with the lateral road in described floating mat road; All around the undertaking the construction of the producing tract and be connected floating producing tract and be connected with described respectively of described floating mat road.
Described maintenance stake is divided into waterborne pile body and two parts under water by the row of piles spacing; The top of described pile body waterborne is provided with wind turbine; One side of described pile body under water is provided with the stake shoulder, and opposite side then is provided with strides arch, and this is takeed on and stride arch and is provided with described floating mat road.
In described several maintenance stakes each all is provided with the gap with the junction in described floating mat road.
Describedly undertake the construction of that the producing tract is the oblique angle symmetry with described floating producing tract and area equates.
The described producing tract of undertaking the construction of is connected with the lateral road in described floating mat road.
Described floating producing tract is connected with the vertical road in described floating mat road.
The utility model compared with prior art has the following advantages:
1, owing to being provided with the maintenance stake that arch was takeed on and striden in the band stake in the utility model, therefore, can fix and bear floating mat weight; Be provided with the row of piles spacing in the maintenance stake simultaneously, made things convenient for again the lifting of floating mat.
2, owing to being provided with in the utility model by vertical road and the staggered floating mat road that consists of of lateral road, therefore, can be used for pedestrian and transportation.
3, owing to being provided with the producing tract of undertaking the construction of of band row net in the utility model, therefore, can carrying lay-up and equipment, thereby make it be used to build a house, build canopy and production etc.
4, owing to being provided with floating producing tract in the utility model, therefore, can cultivate under water in this gap, zone and production etc.
5, the producing tract is the oblique angle symmetry with floating producing tract and area equates owing to undertaking the construction of in the utility model, therefore, can balanced share the weight on the floating mat.
6, since in the utility model each in several maintenance stakes all be provided with the gap with the junction in floating mat road, therefore, can make things convenient for the floating mat lifting.
7, the utility model replaces the soil with maintenance automatic lifting floating mat, can build ecoindustrial park, sanatorium, entertainment city, room etc. in the above, and utilizes in waters and the water resources advantage to carry out polynary exploitation, low-carbon environment-friendly economic industry chain on the developing water.Simultaneously, the utility model is compared small investment with platform, and instant effect is lightweight, supporting power is large, can automatic lifting, optimum range is wide etc., can according to water surface area and need of production to around extend expansion.
Description of drawings
Below in conjunction with accompanying drawing the specific embodiment of the present utility model is described in further detail.
Fig. 1 is structural representation of the present utility model.
Among the figure: 1-maintenance stake, 11-row of piles spacing, 14-wind turbine 12-stake shoulder 13-stride arch 21-vertical 22-lateral road, 2-floating mat road, road 31-row's net 3-undertake the construction of producing tract 4-floating producing tract.
The specific embodiment
As shown in Figure 1, maintenance automatic lifting floating mat waterborne, it comprises the maintenance stake 1 of several equidistant settings, undertakes the construction of producing tract 3 and floating producing tract 4 by vertical road 21 and the lateral road 22 staggered floating mat roads 2 that consist of, the row's of being provided with net 31.The middle part of maintenance stake 1 is connected with the lateral road 22 in floating mat road 2; Floating mat road 2 all around respectively with undertake the construction of producing tract 3 and be connected producing tract 4 and be connected.
Wherein: maintenance stake 1 is divided into waterborne pile body and two parts under water by row of piles spacing 11; The top of pile body waterborne is provided with wind turbine 14; A side of pile body is provided with stake shoulder 12 under water, and opposite side then is provided with strides arch 13, this shoulder 12 and stride arch 13 and be provided with floating mat road 2.
In several maintenance stakes 1 each all is provided with the gap with the junction in floating mat road 2.
Undertake the construction of that producing tract 3 is the oblique angle symmetry with floating producing tract 4 and area equates.
Undertaking the construction of producing tract 3 is connected with the lateral road 22 in floating mat road 2.
Floating producing tract 4 is connected with the vertical road 21 in floating mat road 2.

Claims (6)

1. maintenance automatic lifting floating mat waterborne is characterized in that: it comprises the maintenance stake (1) of several equidistant settings, undertakes the construction of producing tract (3) and floating producing tract (4) by the floating mat road (2) of vertical road (21) and the staggered formation of lateral road (22), the row's of being provided with net (31); The middle part of described maintenance stake (1) is connected with the lateral road (22) in described floating mat road (2); All around the undertaking the construction of producing tract (3) and be connected floating producing tract (4) and be connected with described respectively of described floating mat road (2).
2. maintenance automatic lifting floating mat waterborne as claimed in claim 1 is characterized in that: described maintenance stake (1) is divided into waterborne pile body and two parts under water by row of piles spacing (11); The top of described pile body waterborne is provided with wind turbine (14); One side of described pile body under water is provided with stake shoulder (12), and opposite side then is provided with strides arch (13), and this stake is takeed on (12) and striden arch (13) and is provided with described floating mat road (2).
3. maintenance automatic lifting floating mat waterborne as claimed in claim 1 is characterized in that: each in described several maintenance stakes (1) all is provided with the gap with the junction in described floating mat road (2).
4. maintenance automatic lifting floating mat waterborne as claimed in claim 1 is characterized in that: describedly undertake the construction of that producing tract (3) is the oblique angle symmetry with described floating producing tract (4) and area equates.
5. maintenance automatic lifting floating mat waterborne as claimed in claim 1, it is characterized in that: the described producing tract (3) of undertaking the construction of is connected with the lateral road (22) in described floating mat road (2).
6. maintenance automatic lifting floating mat waterborne as claimed in claim 1, it is characterized in that: described floating producing tract (4) is connected with the vertical road (21) in described floating mat road (2).
CN 201220338384 2012-07-13 2012-07-13 Position-fixing automatic lifting float mat on water Expired - Fee Related CN202703862U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220338384 CN202703862U (en) 2012-07-13 2012-07-13 Position-fixing automatic lifting float mat on water

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220338384 CN202703862U (en) 2012-07-13 2012-07-13 Position-fixing automatic lifting float mat on water

Publications (1)

Publication Number Publication Date
CN202703862U true CN202703862U (en) 2013-01-30

Family

ID=47584189

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220338384 Expired - Fee Related CN202703862U (en) 2012-07-13 2012-07-13 Position-fixing automatic lifting float mat on water

Country Status (1)

Country Link
CN (1) CN202703862U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106945795A (en) * 2017-05-04 2017-07-14 广州粤科工程建设监理咨询有限公司 A kind of Novel work floating mat in harbour restricted clearance

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106945795A (en) * 2017-05-04 2017-07-14 广州粤科工程建设监理咨询有限公司 A kind of Novel work floating mat in harbour restricted clearance

Similar Documents

Publication Publication Date Title
CN103787507B (en) Multifunctional stereo formula ecological floating island
CN201794056U (en) Ecological slope protection block
CN105256766B (en) Ecology-simulated water bank protection slope structure
CN203884433U (en) Triangular-prism-shaped artificial fish shelter
CN102660934A (en) Novel ecological landscape type bank revetment system
CN106542639A (en) Suitable for the artificial ecology Bird Island in Urban Parks lake
CN109349165A (en) A kind of aquafarm development model
CN101545253A (en) Method for protecting revetment banket ecological environment
CN203523548U (en) Anti-subsidence triangular mesh shell artificial reef
CN202925514U (en) Layered platform type hydrophilic landscape bank protection system
CN202703862U (en) Position-fixing automatic lifting float mat on water
CN210658206U (en) Multifunctional riverbank biodiversity maintaining structure
CN205023947U (en) Ecological floating bed
CN204662553U (en) A kind of cavernous body multifunctional ecological governing system
CN108308079B (en) Four-hole circular truncated cone type beach combined construction reef and construction method thereof
CN103250664B (en) A kind of fish reef structure
CN203492588U (en) Artificial fish reef
CN216664002U (en) Ecological revetment based on biological habitat
CN202907629U (en) Multifunctional nature-imitated ecological breeding submerging and floating disc in sea farming
CN201962124U (en) Artificial floating wetland
CN105692911B (en) Water body purification chinampa structure
CN209162751U (en) Slope type ecological revetment structure
CN203968781U (en) A kind of leakproof combined grow basin
KR200418963Y1 (en) Habitation Structure for Marsh Living Things
CN205116109U (en) Building block of ecological fish nido

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130130

Termination date: 20140713

EXPY Termination of patent right or utility model