CN202689007U - Lift type protective railing - Google Patents

Lift type protective railing Download PDF

Info

Publication number
CN202689007U
CN202689007U CN 201220317274 CN201220317274U CN202689007U CN 202689007 U CN202689007 U CN 202689007U CN 201220317274 CN201220317274 CN 201220317274 CN 201220317274 U CN201220317274 U CN 201220317274U CN 202689007 U CN202689007 U CN 202689007U
Authority
CN
China
Prior art keywords
frame
gauze wire
wire cloth
decending
ascending
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220317274
Other languages
Chinese (zh)
Inventor
龚剑
许铭
朱毅敏
周虹
陈康
谢麟
凌旭辉
张常庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction Group Co Ltd
Shanghai Construction No 1 Group Co Ltd
Original Assignee
Shanghai Construction Group Co Ltd
Shanghai Construction No 1 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction Group Co Ltd, Shanghai Construction No 1 Group Co Ltd filed Critical Shanghai Construction Group Co Ltd
Priority to CN 201220317274 priority Critical patent/CN202689007U/en
Application granted granted Critical
Publication of CN202689007U publication Critical patent/CN202689007U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model discloses a lift type protective railing comprising a steel wire gauze and an outer frame, wherein the steel wire gauze is arranged in the outer frame and comprises upper and lower parts; the upper-part steel wire gauze and the lower-part steel wire gauze are connected through hinges; the outer frame comprises a top frame an two side frames; the two side frames are respectively formed by sleeving an upper-part casing pipe in a lower-part casing pipe; the upper-part casing pipes and the lower-part casing pipes are fixed through plug pins; and the upper-part steel wire gauze and the top frame are detachably and fixedly connected. In the top-down construction, the lift type protective railing provided by the utility model is arranged at a position in which the earth borrowing layer is, so that the requirements of the rotation operation of digging machines or grab buckets in the earth cutting stage are satisfied and the protection requirements of opening edges in the structural construction stage are satisfied.

Description

The ascending/decending guard rail
Technical field
The utility model belongs to building underground construction technical field, relates to a kind of guard rail, and is particularly a kind of for the fetch earth ascending/decending guard rail on mouthful limit of the contrary sequence method first floor.
Background technology
In the reverse construction, digging machine or grab bucket are all fetched earth at the first floor, about digging machine or the liftoff 0.9m of grab bucket operating room, radius of gyration is larger, adopting fixed railing to be hit when rotated by digging machine touches off, and cut the earth and carry out stage by stage, when cutting the earth end, begins structure construction in a stage, the limit is faced at the hole during structure construction must guard rail, the place, limit is faced at the conventional construction hole must install the guard rail that is not less than 1.2m, in the soil excavation process, because of the requirement of excavator rotary work, fixed protective guard of shoveling stage needs to remove, the at once recovery of formula protective guard that is standing of cutting the earth, the repetitive operation amount is large in the work progress, precarious position swiftly occurs easily.
The utility model content
Technical problem to be solved in the utility model is that existing fixed guard rail is improved, a kind of ascending/decending guard rail is provided, make it satisfy simultaneously mouthful requirement of facing the limit isolating and protecting of fetching earth of excavation and construction stage and structure construction stage, the defects that exists to overcome prior art.
The technical scheme of the utility model technical solution problem is as follows:
A kind of ascending/decending guard rail, comprise gauze wire cloth and outer rim, described gauze wire cloth is arranged in the outer rim, it is characterized in that described gauze wire cloth comprises up and down two parts, upper steel silk screen and bottom gauze wire cloth are connected through the hinge, described outer rim comprises top frame and two side frames, two side frames are set in the lower parts casing pipe by upper sleeve respectively and consist of, and fix by latch between upper sleeve and the lower parts casing pipe, and described upper steel silk screen is fixedly connected with the top frame is detachable.
By above disclosed technical scheme as can be known, the utility model beneficial effect is as follows: when excavation and construction soil, only need latch is extracted and the connection disassembling of top frame and gauze wire cloth junction can be finished lifting, adjustable height descends from original height, satisfied the requirement of cut the earth stage digging machine or grab bucket rotary manipulation, and excavation and construction is finished when changing structure construction over to railing is recovered to rise to original calibrated altitude, thereby satisfies the requirement of shelter that the limit is faced at structure construction stage hole.The utility model integral arrangement is exquisite, convenient, the easy accessibility of installation, be difficult for being damaged by digging machine, but Reusability.
Description of drawings
Fig. 1 is the utility model lifting railing structural representation;
Fig. 2 is the utility model lifting railing decline status architecture schematic diagram;
Fig. 3 is Fig. 2 side view of the state that descends;
Reference numeral is as follows:
1, upper steel silk screen 2, bottom gauze wire cloth 3, hinge
4, top frame 5, lower frame 6, side frame
7, latch 601, upper sleeve 602, lower parts casing pipe
8, bolt 9, angle frame
The specific embodiment
The utility model is described in further detail below in conjunction with drawings and Examples.
As shown in Figure 1, 2, the utility model ascending/decending guard rail, comprise gauze wire cloth and outer rim, described gauze wire cloth is arranged in the outer rim, described gauze wire cloth comprises up and down two parts, upper steel silk screen 1 is connected by hinge 3 with bottom gauze wire cloth 2, described outer rim comprises top frame 4, lower frame 5 and two side frames 6, two side frames are set in by upper sleeve 601 respectively that lower parts casing pipe 602 is interior to be consisted of, fixing by latch 7 between upper sleeve 601 and the lower parts casing pipe 602, described upper steel silk screen 1 and top frame 4 detachable being fixedly connected with.Upper steel silk screen and upper side frame are fixed by bolts and nuts.
Described top frame 4 is the steel pipe of a horizontally set.
Described upper steel silk screen 1 and bottom gauze wire cloth 2 are fixedly installed on respectively in the angle frame 8, link to each other with outer rim respectively by angle frame 8.
Specific embodiment: the high 1.2m of ascending/decending guard rail, long 1.8m, lower frame 5 liftoff 200mm, the hole that can satisfy the non-shoveling stage is faced frontier defense and is protected requirement.When considering the digging machine rotation, the top organism bottom is liftoff to be not less than 1m, so in manufacturing process, lower frame 5 top gauze wire cloths are divided into two upper steel silk screen 1 high 500mm, bottom gauze wire cloth 2 high 300mm, fixing with hinge 3 two gauze wire cloth junctions, upper steel silk screen 1 is then fixed with bolts and nuts with steel pipe junction, top, and the both sides frame all adopts the method for " big steel pipe overlaps little steel pipe ", and steel pipe high 650mm in bottom adopts
Figure BDA00001842395900031
Steel pipe, steel pipe high 650mm in top adopts
Figure BDA00001842395900032
Steel pipe, make respectively latch 7 in the top cross steel pipe inboard of both sides.Height after the turnover of ascending/decending railing is 0.7m, can satisfy the rotary manipulation requirement of shoveling stage digging machine or grab bucket.
The above is preferred embodiments of the present utility model only, is not to limit protection domain of the present utility model, and every equal conversion of doing according to the utility model claim is all within protection domain of the present utility model.

Claims (5)

1. ascending/decending guard rail, comprise gauze wire cloth and outer rim, described gauze wire cloth is arranged in the outer rim, it is characterized in that described gauze wire cloth comprises up and down two parts, upper steel silk screen and bottom gauze wire cloth are connected through the hinge, described outer rim comprises top frame and two side frames, two side frames are set in the lower parts casing pipe by upper sleeve respectively and consist of, and fix by latch between upper sleeve and the lower parts casing pipe, and described upper steel silk screen is fixedly connected with the top frame is detachable.
2. ascending/decending guard rail according to claim 1 is characterized in that, upper steel silk screen and upper side frame are fixed by bolts and nuts.
3. ascending/decending guard rail according to claim 1 is characterized in that, described top frame is the steel pipe of a horizontally set.
4. ascending/decending guard rail according to claim 1 is characterized in that, described upper steel silk screen and bottom gauze wire cloth are fixedly installed on respectively in the angle frame, link to each other with outer rim respectively by angle frame.
5. ascending/decending guard rail according to claim 1 is characterized in that, described outer rim also comprises lower frame.
CN 201220317274 2012-07-02 2012-07-02 Lift type protective railing Expired - Lifetime CN202689007U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220317274 CN202689007U (en) 2012-07-02 2012-07-02 Lift type protective railing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220317274 CN202689007U (en) 2012-07-02 2012-07-02 Lift type protective railing

Publications (1)

Publication Number Publication Date
CN202689007U true CN202689007U (en) 2013-01-23

Family

ID=47544647

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220317274 Expired - Lifetime CN202689007U (en) 2012-07-02 2012-07-02 Lift type protective railing

Country Status (1)

Country Link
CN (1) CN202689007U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106564839A (en) * 2016-10-27 2017-04-19 浙江大丰实业股份有限公司 Gear drive lifting rail structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106564839A (en) * 2016-10-27 2017-04-19 浙江大丰实业股份有限公司 Gear drive lifting rail structure

Similar Documents

Publication Publication Date Title
CN205654349U (en) Device based on interconnection removes shield zone cataract or glaucoma impenetrability foreign matter
CN204715366U (en) A kind of large-area deep foundation pit subregion is along the support system under inverse operating mode
CN204571384U (en) A kind of sizing chemoprevention pounds switchbox protection canopy
CN202689002U (en) Concrete pouring rotary chute material distribution system
CN202689007U (en) Lift type protective railing
CN103850377B (en) Water proof type hanging object blind patch and guard bar device
CN102912989B (en) Installation method for steel reticulated shell and cable dome combined structure
CN110409378A (en) Repair method of not cutting off the water for large channel
CN211229458U (en) A operation platform for cylinder mound concrete placement construction
CN103422499B (en) Casing construction method inside and outside a kind of permafrost region pile foundation
CN204703740U (en) The underground chamber To Construction of Silo cat ladder of quickly dismantled reusable edible
CN206972266U (en) A kind of tunnel arch heavy in section junction steel plate structure with ribbing
CN107012872B (en) Mud construction method of deep foundation ditch
CN206359272U (en) A kind of air lift equipment
CN202023375U (en) Construction site processing room
CN112482396A (en) Mounting method of deep foundation pit assembled steel supporting structure
CN206889316U (en) A kind of safety-type Coal Mine Electromechanical Equipment for coal mining
CN219862958U (en) Cable well
CN214196377U (en) Coal mine operation ventilation unit
CN204676555U (en) Excavation of foundation pit protection handling canopy
CN205527386U (en) A detachable electric room for port crane
CN204940342U (en) Double protection anti-settling manhole cover
CN205502045U (en) Drainage of assembled foundation ditch and protective system suitable for industrial production
CN205471168U (en) Take cable duct and scraper conveyor of rotatable cell body
CN210684700U (en) Device for recycling steel casing with integrated vibration and pressure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20130123

CX01 Expiry of patent term