CN202672140U CN 201220247995 CN201220247995U CN202672140U CN 202672140 U CN202672140 U CN 202672140U CN 201220247995 CN201220247995 CN 201220247995 CN 201220247995 U CN201220247995 U CN 201220247995U CN 202672140 U CN202672140 U CN 202672140U
Authority
CN
China
Prior art keywords
pile
steel pipe
static pressure
pile body
pipe pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220247995
Other languages
Chinese (zh)
Inventor
郭星宇
顾国荣
陈晖�
瞿成松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Changkai Geotechnical Engineering Co Ltd
Original Assignee
Shanghai Changkai Geotechnical Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Changkai Geotechnical Engineering Co Ltd filed Critical Shanghai Changkai Geotechnical Engineering Co Ltd
Priority to CN 201220247995 priority Critical patent/CN202672140U/en
Application granted granted Critical
Publication of CN202672140U publication Critical patent/CN202672140U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to an anchor rod static pressure anti-pulling steel pipe pile with a lower portion grouted. The anchor rod static pressure anti-pulling steel pipe pile comprises a pile body and a pile end, wherein the pile end is sealed, an annular steel plate is welded on the inner side of a lower portion of the pile body, a circle of rebar is welded on the outer side of the lower portion of the pile body, a hole is reserved in the middle of the annular steel plate, grouting holes are reserved on the pile wall down from the annular steel plate, and iron barbs are arranged on the grouting holes. Since the pile end is sealed, the grouting holes are reserved on the pile body, and the iron barbs are arranged, the grouting holes can be prevented from being blocked by surrounding particles. An expansion head can be formed by grouting the pile body, and anti-pulling bearing capability of a single pile can be effectively improved. The anchor rod static pressure anti-pulling steel pipe pile has the advantages that construction is facilitated, strength of the pile body can be effectively developed, the anti-pulling bearing capability of the single pile is high, and the like.

Description

A kind of bottom grouted anchor bar static pressure resistance to plucking steel pipe pile
Technical field
The utility model relates to a kind of bottom grouted anchor bar static pressure resistance to plucking steel pipe pile, is mainly used in the existing building underpin, solves building anti-floating problem.
Background technology
The building basement uplift pile was lost efficacy or was designed the effect of not considering buoyancy force of underground water fully, and much the situation of the suffered water buoyancy of basement greater than dead load appearred in engineerings, showed as the whole floating of basement, had a strong impact on building safety and normally use.Occur to take effective underpin measure after the problems referred to above, solve basement anti-floating problem by resetting uplift pile, the general mode of anchor jacked pile that adopts is reinforced, but conventional anchor rod static pressure pile anti-pulling capacity is limited, piling quantity can be many, construction costs is high on the one hand, in addition piling perforate on base plate, the number of openings is more, globality and bending resistance impact on basement bottom board are larger, and the construction technology that therefore improves uplift bearing capacity, easy construction remains to be proposed.
The utility model content
But the purpose of this utility model provides the stake bottom grouted anchor bar static pressure resistance to plucking steel pipe pile of a kind of Effective Raise uplift bearing capacity and easy construction.
The purpose of this utility model is achieved in that
A kind of bottom grouted anchor bar static pressure resistance to plucking steel pipe pile, comprise pile body and stake end, described stake end place's sealing, in the bottom of described pile body, the inboard welding of described pile body doughnut-shaped steel plate, outside welding one circle reinforcing bar, the centre of described doughnut-shaped steel plate is a hole, from doughnut-shaped steel plate down, have injected hole at the pile body wall, the angle bar hangnail is set on the described injected hole.
Wherein, described pile body is formed by some joint steel-pipe weldings, and two joint steel pipes weld together by outer steel pipe up and down; Described doughnut-shaped steel plate is arranged on 1.5m place, described stake end top; Described reinforcing bar is arranged on 1.5m place, described stake end top.
Further, described injected hole quantity is six, is respectively arranged with the angle bar hangnail on each injected hole.
The utility model is owing to having adopted technique scheme, compared with prior art have following beneficial effect: a kind of bottom of the utility model grouted anchor bar static pressure resistance to plucking steel pipe pile designs injected hole by the stake end of sealing and at pile body, and the angle bar hangnail is set prevents that injected hole is by surrounding environment Particle Blocking injected hole.By slip casting in pile body, thereby form enlarged footing, but Effective Raise single pile resistance to plucking supporting capacity has easy construction, can effectively bring into play pile strength and uplift bearing capacity high.
Description of drawings
By following embodiments of the invention and description taken together with the accompanying drawings, other advantage of the present invention and feature are shown, this embodiment provides with the form of example, but is not limited to this, wherein:
Fig. 1 is the structural representation of an embodiment of a kind of bottom of the utility model grouted anchor bar static pressure resistance to plucking steel pipe pile;
Fig. 2 is the pile body syndeton schematic diagram of embodiment shown in Fig. 1;
Fig. 3 be a kind of bottom of the utility model grouted anchor bar static pressure resistance to plucking steel pipe pile carry out slip casting the time the work schematic diagram;
Fig. 4 is the effect schematic diagram after a kind of bottom of the utility model grouted anchor bar static pressure resistance to plucking steel pipe pile is finished slip casting.
The specific embodiment
As shown in Figure 1, a kind of bottom grouted anchor bar static pressure resistance to plucking steel pipe pile comprises pile body 1 and stake end 2, the 2 places sealing of stake end, in the bottom of pile body 1, in the present embodiment, for stake end 2 at a distance of the 1.5m place, pile body 1 inboard welding doughnut-shaped steel plate 3, outside welding one circle reinforcing bar 4, the centre of doughnut-shaped steel plate 3 is a hole 31, from doughnut-shaped steel plate 3 down, have six injected holes 5 at pile body 1 wall, angle bar hangnail 6 is set respectively on the injected hole 5.In conjunction with shown in Figure 2, pile body 1 is formed by some joint steel-pipe weldings, and two joint steel pipes weld together by outer steel pipe 7 up and down.
As shown in Figure 3, during work, utilize the anchor rod static pressure steelframe section by section steel pipe pile to be pressed into projected depth, adopt outer steel pipe 7 to be welded to connect when steel pipe pile section and the joint.After putting in place, piling carries out pile end grouting: lower Grouting Pipe 8 in steel pipe pile, Grouting Pipe 8 just in time is stuck in the hole 31, slip casting in the 1.5m scope on 2 is held in slip casting to stake, thereby forms enlarged footing 9(as shown in Figure 4 in the steel pipe pile bottom), but Effective Raise single pile resistance to plucking supporting capacity.
Although the utility model is illustrated hereinbefore according to preferred embodiment of the present utility model; but this does not represent that scope of the present utility model is confined to above-mentioned structure, if by structure that claim of the present utility model covered all within protection domain.Those skilled in the art are reading the equivalent substitution structure that can develop at an easy rate after the above-mentioned explanation, and these equivalent alternative structure also are within the scope that this case requires.

Claims (5)

1. stake bottom grouted anchor bar static pressure resistance to plucking steel pipe pile, comprise pile body and stake end, it is characterized in that: described stake end place's sealing, in the bottom of described pile body, the inboard welding of described pile body doughnut-shaped steel plate, outside welding one circle reinforcing bar, the centre of described doughnut-shaped steel plate is a hole, from doughnut-shaped steel plate down, have injected hole at the pile body wall, the angle bar hangnail is set on the described injected hole.
2. stake as claimed in claim 1 bottom grouted anchor bar static pressure resistance to plucking steel pipe pile, it is characterized in that: described doughnut-shaped steel plate is arranged on 1.5m place, described stake end top.
3. stake as claimed in claim 1 bottom grouted anchor bar static pressure resistance to plucking steel pipe pile, it is characterized in that: described reinforcing bar is arranged on 1.5m place, described stake end top.
4. stake as claimed in claim 1 bottom grouted anchor bar static pressure resistance to plucking steel pipe pile, it is characterized in that: described injected hole quantity is six, is respectively arranged with the angle bar hangnail on each injected hole.
5. stake as claimed in claim 1 bottom grouted anchor bar static pressure resistance to plucking steel pipe pile, it is characterized in that: described pile body is formed by some joint steel-pipe weldings, and two joint steel pipes weld together by outer steel pipe up and down.
CN 201220247995 2012-05-29 2012-05-29 Anchor rod static pressure anti-pulling steel pipe pile with lower portion grouted Expired - Lifetime CN202672140U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220247995 CN202672140U (en) 2012-05-29 2012-05-29 Anchor rod static pressure anti-pulling steel pipe pile with lower portion grouted

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220247995 CN202672140U (en) 2012-05-29 2012-05-29 Anchor rod static pressure anti-pulling steel pipe pile with lower portion grouted

Publications (1)

Publication Number Publication Date
CN202672140U true CN202672140U (en) 2013-01-16

Family

ID=47493050

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220247995 Expired - Lifetime CN202672140U (en) 2012-05-29 2012-05-29 Anchor rod static pressure anti-pulling steel pipe pile with lower portion grouted

Country Status (1)

Country Link
CN (1) CN202672140U (en)

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103437346A (en) * 2013-07-18 2013-12-11 杭州博数土木工程技术有限公司 Steel pipe pile with burrs and construction method
CN103603335A (en) * 2013-11-08 2014-02-26 河海大学 Winged shelter steel-pipe pile capable of reducing influence of soil surface loading to adjacent pile foundations
CN103603346A (en) * 2013-10-15 2014-02-26 中铁三局集团有限公司 Construction method for drawing-resistant thorn-shaped pile
CN103615272A (en) * 2013-11-07 2014-03-05 山东交通学院 Hollow anchor rod with rebar framework and construction method of hollow anchor rod
CN104060610A (en) * 2014-04-30 2014-09-24 上海长凯岩土工程有限公司 Anchor-arm static-pressure pile device with self-sufficient pile pressing counter-force and constructing method of anchor-arm static-pressure pile device
CN104895057A (en) * 2015-05-15 2015-09-09 上海长凯岩土工程有限公司 Big diameter steel pipe protective wall artificial digging-hole bottom expanding pile and building foundation reinforcement method
CN105312315A (en) * 2015-11-27 2016-02-10 上海岩土工程勘察设计研究院有限公司 Injection method applied to in-situ remediation of contaminated sites
CN105344705A (en) * 2015-11-27 2016-02-24 上海岩土工程勘察设计研究院有限公司 Injection device for in-situ remediation of contaminated sites
CN105970921A (en) * 2016-07-08 2016-09-28 上海长凯岩土工程有限公司 Integrated construction method for oblique steel pipe and cemented soil stress body
CN106638592A (en) * 2016-12-29 2017-05-10 青建集团股份公司 Drive anchor rod in complicated geological condition and construction method thereof
CN106759302A (en) * 2017-01-17 2017-05-31 上海智富建设工程有限公司 One kind expansion uplift pile and its construction machinery and construction technology
CN106869106A (en) * 2015-12-14 2017-06-20 中冶天工集团有限公司 A kind of method for welding the steel pipe pile reinforced ground of side wing type
CN107700521A (en) * 2017-10-27 2018-02-16 西安建筑科技大学 One kind is built(Structure)Build thing foundation stabilization and underpin pier and its construction method
CN108179750A (en) * 2017-12-29 2018-06-19 合肥工业大学 A kind of ruggedized construction of dam spillway
CN109356631A (en) * 2018-12-10 2019-02-19 北京交通大学 A kind of self-test anchor pole
CN110172973A (en) * 2019-05-23 2019-08-27 上海长凯岩土工程有限公司 A kind of grouting method of combined steel tube pile structure
CN110172966A (en) * 2019-05-23 2019-08-27 上海长凯岩土工程有限公司 A kind of oblique steel pipe composite structure forms the construction method of beaer
CN110805030A (en) * 2019-11-13 2020-02-18 上海长凯岩土工程有限公司 Anchor rod static pressure pile
CN111455998A (en) * 2020-04-01 2020-07-28 安徽金联地矿科技有限公司 Geogrid positioner is used in mine

Cited By (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103437346A (en) * 2013-07-18 2013-12-11 杭州博数土木工程技术有限公司 Steel pipe pile with burrs and construction method
CN103437346B (en) * 2013-07-18 2016-01-20 浙江中隧桥波形钢腹板有限公司 Steel pipe pile with the burr and construction method
CN103603346A (en) * 2013-10-15 2014-02-26 中铁三局集团有限公司 Construction method for drawing-resistant thorn-shaped pile
CN103603346B (en) * 2013-10-15 2015-06-03 中铁三局集团有限公司 Construction method for drawing-resistant thorn-shaped pile
CN103615272A (en) * 2013-11-07 2014-03-05 山东交通学院 Hollow anchor rod with rebar framework and construction method of hollow anchor rod
CN103603335A (en) * 2013-11-08 2014-02-26 河海大学 Winged shelter steel-pipe pile capable of reducing influence of soil surface loading to adjacent pile foundations
CN104060610B (en) * 2014-04-30 2016-06-01 上海长凯岩土工程有限公司 The anchor jacked pile device of a kind of self-supporting pressure pile reaction and constructional method thereof
CN104060610A (en) * 2014-04-30 2014-09-24 上海长凯岩土工程有限公司 Anchor-arm static-pressure pile device with self-sufficient pile pressing counter-force and constructing method of anchor-arm static-pressure pile device
CN104895057A (en) * 2015-05-15 2015-09-09 上海长凯岩土工程有限公司 Big diameter steel pipe protective wall artificial digging-hole bottom expanding pile and building foundation reinforcement method
CN105344705A (en) * 2015-11-27 2016-02-24 上海岩土工程勘察设计研究院有限公司 Injection device for in-situ remediation of contaminated sites
CN105312315A (en) * 2015-11-27 2016-02-10 上海岩土工程勘察设计研究院有限公司 Injection method applied to in-situ remediation of contaminated sites
CN106869106A (en) * 2015-12-14 2017-06-20 中冶天工集团有限公司 A kind of method for welding the steel pipe pile reinforced ground of side wing type
CN105970921A (en) * 2016-07-08 2016-09-28 上海长凯岩土工程有限公司 Integrated construction method for oblique steel pipe and cemented soil stress body
CN105970921B (en) * 2016-07-08 2018-05-11 上海长凯岩土工程有限公司 A kind of integral construction method of oblique steel pipe soil cement beaer
CN106638592A (en) * 2016-12-29 2017-05-10 青建集团股份公司 Drive anchor rod in complicated geological condition and construction method thereof
CN106759302A (en) * 2017-01-17 2017-05-31 上海智富建设工程有限公司 One kind expansion uplift pile and its construction machinery and construction technology
CN106759302B (en) * 2017-01-17 2023-07-11 上海智富建设工程有限公司 Expansion anti-floating pile, construction machine and construction process thereof
CN107700521A (en) * 2017-10-27 2018-02-16 西安建筑科技大学 One kind is built(Structure)Build thing foundation stabilization and underpin pier and its construction method
CN108179750A (en) * 2017-12-29 2018-06-19 合肥工业大学 A kind of ruggedized construction of dam spillway
CN109356631A (en) * 2018-12-10 2019-02-19 北京交通大学 A kind of self-test anchor pole
CN110172973A (en) * 2019-05-23 2019-08-27 上海长凯岩土工程有限公司 A kind of grouting method of combined steel tube pile structure
CN110172966A (en) * 2019-05-23 2019-08-27 上海长凯岩土工程有限公司 A kind of oblique steel pipe composite structure forms the construction method of beaer
CN110805030A (en) * 2019-11-13 2020-02-18 上海长凯岩土工程有限公司 Anchor rod static pressure pile
CN111455998A (en) * 2020-04-01 2020-07-28 安徽金联地矿科技有限公司 Geogrid positioner is used in mine
CN111455998B (en) * 2020-04-01 2021-08-24 安徽金联地矿科技有限公司 Geogrid positioner is used in mine

Similar Documents

Publication Publication Date Title
CN202672140U (en) Anchor rod static pressure anti-pulling steel pipe pile with lower portion grouted
CN202559361U (en) Precast high strength concrete thin-wall steel pipe pile foundation pit supporting structure
CN108385673B (en) Miniature upper filling ball sleeve pile and construction method thereof
CN203034464U (en) Truss type foundation pit supporting structure
CN102776899B (en) Anti-floating structure of shallow-buried shield tunnel
CN109610874A (en) Increase the basement and its construction process built inside existing workshop
CN202595731U (en) High-bearing-capacity multistage enlarged bore pile convenient to construct
CN210066797U (en) A foundation structure for collapsible loess place
CN205776250U (en) A kind of Double-row-piles Structure system being provided with dilazep anchor pattern
CN103015414A (en) Precast concrete post grouting pile and grouting process
CN204151798U (en) A kind of steel reinforced concrete anti-slide pile structure
CN209323512U (en) The anchor cable structure in flood-discharge energy-dissipating current scour area
CN203403402U (en) Upright pile
CN111719580B (en) Basement anti-floating pile foundation
CN202830936U (en) Supporting structure of foundation pit
CN104234063A (en) Structure of steel-reinforced concrete slide-resistant pile
CN208235562U (en) A kind of static pressure pile structure for Collapsible Loess Stabilized
CN107964975B (en) Construction method of PBL (Poly-p-phenylene benzobisoxazole) shear force key connection structure of steel pipe composite pile and bearing platform
CN202989911U (en) Post-grouting pile of precast concrete
CN202755385U (en) Anti-floating structure of shallow-buried shield tunnel
CN209854711U (en) Tubular pile shoe suitable for deep loose aeolian sand geology
CN204000856U (en) The anti-side changeable ridigity pile of inner support grouting formula level base
CN210529716U (en) Adjacent foundation pit soil body supporting construction
CN201202120Y (en) Mixing pile foundation pit supporting construction
CN204023489U (en) The compound bearing platform type sheet pile structure of a kind of pile foundation-flexible reinforcement bed course

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20130116

CX01 Expiry of patent term