CN202645025U - Installation tool special for suspender - Google Patents

Installation tool special for suspender Download PDF

Info

Publication number
CN202645025U
CN202645025U CN 201220288734 CN201220288734U CN202645025U CN 202645025 U CN202645025 U CN 202645025U CN 201220288734 CN201220288734 CN 201220288734 CN 201220288734 U CN201220288734 U CN 201220288734U CN 202645025 U CN202645025 U CN 202645025U
Authority
CN
China
Prior art keywords
operation rod
action bars
bolt sleeve
suspender
installation tool
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220288734
Other languages
Chinese (zh)
Inventor
徐小钦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN 201220288734 priority Critical patent/CN202645025U/en
Application granted granted Critical
Publication of CN202645025U publication Critical patent/CN202645025U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Treatment Of Fiber Materials (AREA)

Abstract

An installation tool special for a suspender comprises an operation rod (4) with a bolt sleeve and at the upper portion, a detachable operation rod (2) in the middle and an operation rod (3) with a rotatable handle and at the lower portion, wherein the operation rod (4), detachable operation rod (2) and the operation rod (3) are all made of galvanized tubes. A bolt sleeve (1) is arranged at the top end of the operation rod (4), and a screw thread is arranged at a bottom end. A long strip-shaped gap is arranged on a sleeve wall of the bolt sleeve (1), the width (L) of the gap is 2mm larger than the diameter of the suspender, and the inner diameter (r) of the bolt sleeve (1) is equal to the diameter of an expansion bolt. The top end and the bottom end of the detachable operation rod (2) are both provided with screw threads capable of being mutually connected with an upper operation rod and a lower operation rod, a screw thread is arranged at the top end of the operation rod (3) with the rotatable handle, and the lower portion of the operation rod (3) with the rotatable handle is bent to form the L-shaped rotating handle. The installation tool special for the suspender is simple in structure, low in cost and convenient to use, enables an operator to directly install the suspender by standing on the ground, and greatly improves operation efficiency.

Description

The suspension rod special installation tool
Technical field
The utility model relates to a kind of aid that suspension rod, screw rod are installed at floor.
Background technology
In the building decoration and fitment operation, often suspension rod need to be installed at the bottom of floor, generally be that suspension rod is arranged in the expansion bolt, expansion bolt is implanted in the hole of leaving in advance at the bottom of the floor, as furred ceiling, various suspension brackets etc. are installed, because the building floor height is at least 2.7 meters, the normal mounting suspension rod need use the auxiliary installation of double ladder, need mobile double ladder to reinstall the next one behind suspension rod of installation, the efficient that operates is lower again.
Summary of the invention
The purpose of this utility model will overcome the above problems exactly, and a kind of suspension rod special installation tool is provided, and the operating personnel is stood directly on the ground suspension rod can directly be installed, and does not need repeatedly to move, use double ladder, greatly improves operating efficiency.
The objective of the invention is to be achieved like this: a kind of suspension rod special installation tool, be characterized in: it comprises: all adopt the strap bolt sleeve action bars 4 on the top of galvanized pipe making, the detachable action bars 2 at middle part, the band swing handle action bars 3 of bottom; The top of strap bolt sleeve action bars 4 is welded with bolt sleeve 1, and the bottom is with the silk tooth; Have rectangular open-minded seam on the barrel of bolt sleeve 1, the width L of the seam that slits manys 2mm than the suspension rod diameter, and the internal diameter r of bolt sleeve 1 equals the diameter of expansion bolt; Detachable action bars 2 tops and bottom all with can with the interconnective silk of top and the bottom action bars tooth; With the silk tooth, the bottom is bent into " L " shape swing handle with the top of swing handle action bars 3.
The utility model is simple in structure, cost is low, easy to use, the operating personnel is stood directly on the ground suspension rod can directly be installed, greatly improve operating efficiency.
Description of drawings
Fig. 1 is schematic diagram of the present utility model.
Fig. 2 is the top view of bolt sleeve.
Among the figure: 1---bolt sleeve; 2---detachable action bars; 3---band swing handle action bars; 4---strap bolt sleeve action bars.
The specific embodiment
From Fig. 1, Fig. 2 as seen, the utility model comprises: all adopt the strap bolt sleeve action bars 4 on the top of galvanized pipe making, the detachable action bars 2 at middle part, the band swing handle action bars 3 of bottom; The top of strap bolt sleeve action bars 4 is welded with bolt sleeve 1, and the bottom is with the silk tooth; Have rectangular open-minded seam on the barrel of bolt sleeve 1, the width L of the seam that slits manys 2mm than the suspension rod diameter, and the internal diameter r of bolt sleeve 1 equals the diameter of expansion bolt; Detachable action bars 2 tops and bottom all with can with the interconnective silk of top and the bottom action bars tooth; With the silk tooth, the bottom is bent into " L " shape swing handle with the top of swing handle action bars 3.
The utility model is regulated length by the disassembling section bar, action bars can adopt φ 16 galvanized pipes to make, the dismountable blank area of action bars all adopts a tooth to connect, bolt sleeve is in order to the fixed expansion bolt, and the suspension rod of the top band expansion bolt open-minded seam from bolt sleeve is penetrated, and expansion bolt is fixed in the sleeve, by rotating swing handle, fix with regard to may stand in the expansion bolt of finishing suspension rod on the ground, then downward draw out operation bar can carry out next hanger erection.For the diameter of bolt of different size, the bolt sleeve action bars of changing dimension during use gets final product.

Claims (2)

1. suspension rod special installation tool, it is characterized in that: it comprises: all adopt the strap bolt sleeve action bars (4) on the top that galvanized pipe makes, the detachable action bars (2) at middle part, the band swing handle action bars (3) of bottom; The top of strap bolt sleeve action bars (4) is welded with bolt sleeve (1), and the bottom is with the silk tooth; Have rectangular open-minded seam on the barrel of bolt sleeve (1), the width (L) of the seam that slits manys 2mm than the suspension rod diameter, and the internal diameter (r) of bolt sleeve (1) equals the diameter of expansion bolt; The top of detachable action bars (2) and bottom all with can with the interconnective silk of top and the bottom action bars tooth; The top of band swing handle action bars (3) is with the silk tooth, and the bottom is bent into " L " shape swing handle.
2. a kind of suspension rod special installation tool according to claim 1, it is characterized in that: described action bars all adopts φ 16 galvanized pipes to make.
CN 201220288734 2012-06-19 2012-06-19 Installation tool special for suspender Expired - Lifetime CN202645025U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220288734 CN202645025U (en) 2012-06-19 2012-06-19 Installation tool special for suspender

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220288734 CN202645025U (en) 2012-06-19 2012-06-19 Installation tool special for suspender

Publications (1)

Publication Number Publication Date
CN202645025U true CN202645025U (en) 2013-01-02

Family

ID=47414149

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220288734 Expired - Lifetime CN202645025U (en) 2012-06-19 2012-06-19 Installation tool special for suspender

Country Status (1)

Country Link
CN (1) CN202645025U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106760562A (en) * 2016-12-14 2017-05-31 中国十七冶集团有限公司 Hanger erection handheld tool and preparation method, the method for hanger construction
CN110409848A (en) * 2019-06-12 2019-11-05 中国十七冶集团有限公司 One kind adjusting tool for back-bolt type stone curtain wall
CN111206781A (en) * 2018-11-22 2020-05-29 北京韩建集团有限公司 Installation tool for expansion bolt of lifting rod for construction

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106760562A (en) * 2016-12-14 2017-05-31 中国十七冶集团有限公司 Hanger erection handheld tool and preparation method, the method for hanger construction
CN111206781A (en) * 2018-11-22 2020-05-29 北京韩建集团有限公司 Installation tool for expansion bolt of lifting rod for construction
CN110409848A (en) * 2019-06-12 2019-11-05 中国十七冶集团有限公司 One kind adjusting tool for back-bolt type stone curtain wall

Similar Documents

Publication Publication Date Title
CN202645025U (en) Installation tool special for suspender
CN204012466U (en) Concertina type bottle-holding rack
CN205189391U (en) Flexible hanging flower basket of building outer wall construction
CN102704677A (en) Telescopic formwork support beam
CN204609296U (en) A kind of square column template fastener
CN204573326U (en) A kind of central air-conditioning pipe installation clip
CN207553654U (en) A kind of vertical supporting device of assembled architecture
CN205841990U (en) There is the pipe clamp of regulation of mental activities fastening function
CN205875687U (en) A pole setting coupling assembling for coiling detain formula scaffold frame
CN204920249U (en) Simple and easy quick erector for floor suspender installation
CN204826625U (en) Special template for small-diameter circular column
CN204252496U (en) Convenient installation device for constructional engineering suspender
CN203296371U (en) Scaffold steel mesh
CN202509932U (en) Hinge cushioning device
CN202906285U (en) Cable replacement frame
CN202102646U (en) Three-dimensional character-installing component
CN201973023U (en) Extension bar capable of being fast installed and dismounted
CN201794069U (en) Recyclable steel hanger structure of bored pile
CN203743749U (en) Novel television set support elbow and fixing block installation structure
CN201963674U (en) Quick pipe clamp connecting piece
CN204059932U (en) Dish pin steel pipe scaffold node
CN202274557U (en) Air conditioner external unit bracket for board house
CN204876755U (en) Four tubs - single tube of narrow basic steel pipe pole conversion node
CN104300436A (en) Auxiliary pull ring manufactured from power stay wire and method for manufacturing stay wire
CN204851739U (en) Fall to ground improvement structure of fan bracing piece

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20130102