CN204573326U - A kind of central air-conditioning pipe installation clip - Google Patents
A kind of central air-conditioning pipe installation clip Download PDFInfo
- Publication number
- CN204573326U CN204573326U CN201520295470.5U CN201520295470U CN204573326U CN 204573326 U CN204573326 U CN 204573326U CN 201520295470 U CN201520295470 U CN 201520295470U CN 204573326 U CN204573326 U CN 204573326U
- Authority
- CN
- China
- Prior art keywords
- clip body
- clip
- fixed
- hole
- screw rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model discloses a kind of central air-conditioning pipe installation clip, comprise clip body, the fixed end of described clip body is provided with fixed hole, fixed hole is arranged on punching press stiffening rib one, the movable end of clip body is provided with at least one hangers hole, and the sidewall in described hangers hole is provided with diagonal cut joint, the surrounding in described hangers hole is provided with punching press stiffening rib two.Further, the fixed end of described clip body is set on screw rod by fixed hole, and along the clip body that pipeline outer wall is bending, be set on screw rod by the diagonal cut joint in hangers hole by movable end, clip body is fixed by nut outside two ends.Further, clip body is provided with moving casing to the inside with the phase of screw rod.The utility model structure is simple, and easy to operate, working efficiency is high, destroys when decreasing installation to the boring of building wall end face.
Description
Technical field
The utility model belongs to pipeline clamp field, particularly relates to the clip that a kind of central air-conditioning pipe is installed.
Background technique
The installation of current central air-conditioning pipe generally adopts holes to building wall end face, by mounting hole, supporting element is fixed, by supporting element, pipeline is hung and supported on building wall top again, when pipeline is more, boring destroys comparatively serious to building wall end face, complex procedures, inefficiency, a kind of securing supports of current exigence, reduce the destruction to body of wall, and installation is simple, convenient, working efficiency is high.
Model utility content
The purpose of this utility model is: for overcoming the deficiencies in the prior art, provides a kind of structure simple, and the clip of the central air-conditioning pipe installation of easy installation and removal, decreases and destroy the boring of building wall end face, improve working efficiency.
For achieving the above object, the technical solution of the utility model is:
A kind of central air-conditioning pipe installation clip, comprise clip body, the fixed end of described clip body is provided with fixed hole, fixed hole is arranged on punching press stiffening rib one, the movable end of clip body is provided with at least one hangers hole, and the sidewall in described hangers hole is provided with diagonal cut joint, the surrounding in described hangers hole is provided with punching press stiffening rib two.
Further, the fixed end of described clip body is set on screw rod by fixed hole, and along the clip body that pipeline outer wall is bending, be set on screw rod by the diagonal cut joint in hangers hole by movable end, clip body is fixed by nut outside two ends.
Further, clip body is provided with moving casing to the inside with the phase of screw rod.
Further, described clip body is stainless steel.
Further, described clip body is rectangle, and right angle strikes out circular arc.
Owing to have employed such scheme, the beneficial effects of the utility model are: solve the deficiencies in the prior art, this yoke configurations is simple, easy-to-operat, same screw rod can wear multiple clip and moving casing, fixes load-bearing many pipelines simultaneously, the usage quantity not only reducing screw rod destroys the boring of building wall end face with decreasing, and decrease drilling process, improve working efficiency, prevent pipeline be extruded distortion or damage by pressure; Adopt GB nut check during locking, ensure that clip registration and quick mounting; Pipeline for different tube diameters can select length to differ or the clip in multiple hangers hole; The fixed end of clip and movable end all increase punching press stiffening rib, ensure that pipeline construction support performance, is convenient to control antenna height; The right angle of clip all strikes out circular arc, avoids staff and in use scratches.
Accompanying drawing explanation
Fig. 1 is clip plan view.
Fig. 2 is the clip plan view in two hangers hole
Fig. 3 is the using state figure that one-pipe is fixed.
Fig. 4 is the using state figure that three pipelines are fixed.
Reference character: 1-clip body, 2-fixed hole, 3-punching press stiffening rib one, 4-punching press stiffening rib two, 5-hangers hole, 6-diagonal cut joint, 7-nut, 8-screw rod, 9-pipeline, 10-sleeve pipe, 101-fixed end, 102-movable end.
Embodiment
Embodiment 1: composition graphs 1, and a kind of central air-conditioning pipe installation clip, comprise rectangle stainless steel lathe dog body 1, and right angle strikes out circular arc, in order to avoid hold wound when installing, have employed stainless steel, has the advantages such as ageing-resistant, corrosion-resistant, high strength.The fixed end 101 of described clip body 1 is provided with fixed hole 2, fixed hole 2 is arranged on punching press stiffening rib 1, the movable end 102 of clip body 1 is provided with hangers hole 5, and the sidewall in described hangers hole 5 is provided with diagonal cut joint 6, the surrounding in described hangers hole 5 is provided with punching press stiffening rib 24, punching press stiffening rib 1 and punching press stiffening rib 24, increased the intensity of clip, rigidity and support performance, avoids clip distortion.The clip of different length can be set as according to the pipe diameter size of fixing tube.
Embodiment 2: composition graphs 2, in order to the pipeline of fixing different tube diameters, clip body 1 movable end 102 arranges two hangers holes 5, two hangers holes 5 are at a distance of 2cm, and the sidewall in two hangers holes 5 is all provided with diagonal cut joint 6, the surrounding in described hangers hole 5 is provided with punching press stiffening rib 24, the fixed end 101 of clip body 1 is provided with fixed hole 2, fixed hole 2 is arranged on punching press stiffening rib 1, other is identical with embodiment 1, the length of clip body 1 can be arranged as requested, the hangers hole 5 of clip movable end 102 also can increase as required, the pipeline meeting a multiple different tube diameters of clip uses.
Embodiment 3: composition graphs 3, a kind of central air-conditioning pipe installation clip, comprise rectangle stainless steel lathe dog body 1, the screw rod 8 matched and the nut 7 supporting with screw rod 8, the fixed end 101 of described clip body 1 is set on screw rod 8 by fixed hole 2, clip body 1 is provided with moving casing 10 to the inside with the phase of screw rod 8, movable end 102 bends along the outer wall of fixed sleeving 10, the movable end 102 of clip body 1 is set on screw rod 8 by diagonal cut joint 6 by hangers hole 5, the pipeline 9 then matched is through moving casing 10, be set in moving casing 10, clip body 1 is fixed by nut 7 outside two ends.Adopt sleeve pipe 10 can effectively avoid pipeline 9 to be squeezed be out of shape or squeeze bad, described nut 7 is GB nut 7, and ensure that clip registration, efficiency of construction is high.The clip of appropriate length can be selected according to the size of pipe diameter.
Embodiment 4: composition graphs 4, three pipelines are parallel to each other, two up one in below, the profile of clip is identical with embodiment 1 or embodiment 2, a described screw rod 8 is arranged with three clip bodies 1 by the fixed hole 2 of fixed end 101, pipeline 9 is fixed by sleeve pipe 10 by clip body 1, movable end 102 bends along fixing sleeve pipe 10 outer wall respectively, the movable end 102 of clip body 1 is set on screw rod 8 by diagonal cut joint 6 by hangers hole 5, the pipeline 9 then matched is arranged on the inner side of clip body 1, screw on the outermost clip body 1 in two ends nut 7 of parallel two pipelines 9 needs is fixed, be fixed by nut 7 outside clip body 1 two ends of below.Many pipelines can be fixed as required on same screw rod, not only save the usage quantity of screw rod, and decrease the boring of building wall end face is destroyed.
Claims (5)
1. a central air-conditioning pipe installation clip, it is characterized in that: comprise clip body (1), the fixed end (101) of described clip body (1) is provided with fixed hole (2), fixed hole (2) is arranged on punching press stiffening rib one (3), the movable end (102) of clip body (1) is provided with at least one hangers hole (5), and the sidewall of described hangers hole (5) is provided with diagonal cut joint (6), the surrounding of described hangers hole (5) is provided with punching press stiffening rib two (4).
2. central air-conditioning pipe installation clip according to claim 1, it is characterized in that: the fixed end (101) of described clip body (1) is set on screw rod (8) by fixed hole (2), along the clip body (1) that pipeline (9) outer wall is bending, by the diagonal cut joint (6) of hangers hole (5), movable end (102) is set on screw rod (8), is fixed by nut (7) outside clip body (1) two ends.
3. central air-conditioning pipe installation clip according to claim 2, is characterized in that: clip body (1) is provided with moving casing (10) to the inside with the phase of screw rod (8).
4. according to central air-conditioning pipe installation clip described in any one in claims 1 to 3, it is characterized in that: described clip body (1) is stainless steel.
5. central air-conditioning pipe installation clip according to claim 4, is characterized in that: described clip body (1) is rectangle, and right angle strikes out circular arc.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520295470.5U CN204573326U (en) | 2015-05-08 | 2015-05-08 | A kind of central air-conditioning pipe installation clip |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520295470.5U CN204573326U (en) | 2015-05-08 | 2015-05-08 | A kind of central air-conditioning pipe installation clip |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204573326U true CN204573326U (en) | 2015-08-19 |
Family
ID=53865962
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520295470.5U Active CN204573326U (en) | 2015-05-08 | 2015-05-08 | A kind of central air-conditioning pipe installation clip |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204573326U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105673937A (en) * | 2016-04-15 | 2016-06-15 | 中煤科工集团武汉设计研究院有限公司 | Pipeline hanger |
CN105864522A (en) * | 2016-06-06 | 2016-08-17 | 无锡市翱宇特新科技发展有限公司 | Multi-pipeline fixing device |
CN107725897A (en) * | 2017-11-08 | 2018-02-23 | 山东同其智能科技有限公司 | A kind of installation of central air-conditioning is with hanging code |
-
2015
- 2015-05-08 CN CN201520295470.5U patent/CN204573326U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105673937A (en) * | 2016-04-15 | 2016-06-15 | 中煤科工集团武汉设计研究院有限公司 | Pipeline hanger |
CN105864522A (en) * | 2016-06-06 | 2016-08-17 | 无锡市翱宇特新科技发展有限公司 | Multi-pipeline fixing device |
CN107725897A (en) * | 2017-11-08 | 2018-02-23 | 山东同其智能科技有限公司 | A kind of installation of central air-conditioning is with hanging code |
CN107725897B (en) * | 2017-11-08 | 2023-09-12 | 山东同其智能科技有限公司 | Hanging bracket for installing central air conditioner |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204573326U (en) | A kind of central air-conditioning pipe installation clip | |
CN201915461U (en) | Water pipe clamp | |
CN103243905B (en) | A kind of reducing arc formwork | |
CN106239020A (en) | A kind of novel pipe fitting welder | |
CN205020664U (en) | Be used for simple and easy flaring specialized tool of steel pipe | |
CN202812485U (en) | Hydraulic pipeline clamp | |
CN202273401U (en) | Extension pipe connecting piece | |
CN202791874U (en) | Adjustable lamp hoop | |
CN202645025U (en) | Installation tool special for suspender | |
CN204944276U (en) | The structure that a kind of collector tube is connected with its annex | |
CN205278555U (en) | But expansion card hoop | |
CN204901066U (en) | Section bar hoist and mount support frame | |
CN202349390U (en) | Fixing clip capable of quickly installing pipe | |
CN201988890U (en) | Large butt welding flange installing device for piping system processing | |
CN204940829U (en) | A kind of wall connecting mechanism of exterior scaffold | |
CN204554194U (en) | A kind of reinforced bend pipe | |
CN103148544B (en) | A kind of air conditioner connecting pipe | |
CN204611127U (en) | A kind of compressor copper-plated tube assembly | |
CN201858460U (en) | Metal tube connecting device | |
CN103353251B (en) | Fixed connection structure during pressure testing between tube sheet and shell-side cylinder | |
CN207195831U (en) | A kind of support bracket for Pipe installing | |
CN203585574U (en) | Adjustable rack | |
CN203484499U (en) | U-shaped bent-tube mold device with short straight segment | |
CN203273077U (en) | Pipe joint | |
CN207319948U (en) | One kind switch magazine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20200407 Address after: 621050 No.3, floor 1, building 6, Kaitai oucheng, No.36, north section of Huayuan East Street, Mianyang City, Sichuan Province Patentee after: Sichuan Sihe smart home Co., Ltd Address before: 621050 Mianyang city of Sichuan Province Branch Garden Street No. 29. Jossinfo long ridge 7 Building 1 layer 10 Patentee before: SICHUAN SIHE HEATING VENTILATION EQUIPMENT Co.,Ltd. |
|
TR01 | Transfer of patent right |