CN203296371U - Scaffold steel mesh - Google Patents

Scaffold steel mesh Download PDF

Info

Publication number
CN203296371U
CN203296371U CN2013202554741U CN201320255474U CN203296371U CN 203296371 U CN203296371 U CN 203296371U CN 2013202554741 U CN2013202554741 U CN 2013202554741U CN 201320255474 U CN201320255474 U CN 201320255474U CN 203296371 U CN203296371 U CN 203296371U
Authority
CN
China
Prior art keywords
steel pipe
hook
steel
scaffold
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2013202554741U
Other languages
Chinese (zh)
Inventor
钱朝香
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2013202554741U priority Critical patent/CN203296371U/en
Application granted granted Critical
Publication of CN203296371U publication Critical patent/CN203296371U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model belongs to the field of building equipment and more specifically relates to a scaffold steel mesh adopted at a construction site, which comprises a steel mesh body. The periphery of the steel mesh body is respectively provided with a steel pipe 1, a steel pipe 2, a steel pipe 3 and a steel pipe 4. The steel pipe 1 and a light pipe 3 are symmetrically arranged. The steel pipe 2 and a light pipe 4 are symmetrically arranged. The end portions of one ends of the steel pipe 1 and the steel pipe 3, positioned opposite to each other, are respectively provided with a hook 1. The end portions of the other ends of the steel pipe 1 and the steel pipe 3, which are not provided with the hook 1, are respectively provided with a hook 2. According to the technical scheme of the utility model, the scaffold steel mesh can be quickly arranged on a scaffold and fixedly connected with the scaffold. Meanwhile, the scaffold steel mesh can also be quickly dismounted and is hardly attacked and damaged by the external environment. In addition, the scaffold steel mesh can be used repeatedly and saves the cost. Simultaneously, the safety factor of the working environment of operators is improved.

Description

A kind of scaffold steel fabric sheet
Technical field
The utility model belongs to the construction equipment field, relates in particular on a kind of building site and uses the scaffold steel fabric sheet.
Technical background
in existing building operations, exterior wall scaffold is one of indispensable relevant equipment, and the operator is in order to stand and to walk on scaffold, often need on scaffold, place bamboo clappers is installed, the time of a general engineering is longer, these bamboo clappers are exposed in air every day, through sunlight, be exposed to the sun, rainwater waters pouring, through expanding with heat and contract with cold, a general engineering finishes, these bamboo clappers just can not reuse, have even in this engineering, just need to repeatedly change bamboo clappers to guarantee operator's safety, will cause the waste of bamboo clappers quantity like this, a large amount of bamboo groves are removed by valve, environment has been caused to irremediable destruction.
The utility model content
The technical problems to be solved in the utility model be to provide a kind of can nonexpondable scaffold steel fabric sheet foot rest.
For solving the problems of the technologies described above, the utility model provides a kind of scaffold steel fabric sheet, comprise steel wire sheet body, steel wire sheet body surrounding is respectively arranged with steel pipe one, steel pipe two, steel pipe three, steel pipe four, steel pipe one and light pipe three symmetries, steel pipe two and steel pipe four symmetries, the end end that steel pipe one is relative with steel pipe three are respectively arranged with hook one, and the end end that steel pipe one and steel pipe three do not arrange hook one is respectively arranged with hook two.
Preferably, hook one and hook two include columniform installing handle and hook, the installing handle of hook one and hook two all be placed in steel pipe one and steel pipe three inner and link up with one and the installing handle external diameter of hook two and the internal diameter of steel pipe one and steel pipe three adapt.
Preferably, hook one the c-shaped shape of hook, the hook of hook two is half of U-shaped, and the hook end of hook two is perpendicular to steel fabric sheet and to the diameter of a steel pipe of downward-extension.
Preferably, the reinforcing bar on steel wire sheet body and steel pipe one, steel pipe two, steel pipe three, steel pipe four welding, hook one and hook two and steel pipe one and steel pipe three welding.
adopt the beneficial effect of technique scheme to be: a kind of scaffold steel fabric sheet, comprise steel wire sheet body, the position that steel wire sheet body is stood for the operator, the end end that steel pipe one is relative with steel pipe three is respectively arranged with hook one, the end end that steel pipe one and steel pipe three do not arrange hook one is respectively arranged with hook two, hook one and hook two actings in conjunction, be used for fixedly steel wire sheet body, by steel fabric sheet, be fixedly on scaffold, make the phenomenon of sliding and coming off can not appearred in steel fabric sheet on scaffold, hook one and hook two include columniform installing handle and hook, described hook one and the installing handle external diameter of hook two and the internal diameter of steel pipe one and steel pipe three adapt, the installing handle of hook one and hook two is placed in to steel pipe one and steel pipe three inside and welds, guarantee that hook one and hook two connect into an integral body with steel fabric sheet, the c-shaped shape of hook of hook one, the hook of hook two is half of U-shaped, hook two hook end is perpendicular to steel fabric sheet and to the diameter of a steel pipe of downward-extension, when steel fabric sheet is installed, at first will link up with one orthodrome is articulated on the crossbeam of scaffold, strain backward steel fabric sheet, hook two cards are hung on another crossbeam of scaffold, make scaffold in use not there will be the phenomenon of digging with landing, reinforcing bar on steel wire sheet body and steel pipe one, steel pipe two, steel pipe three, steel pipe four welding, hook one and hook two and steel pipe one and steel pipe three welding, by the welding operation fast and easy, cost is lower, the size of steel fabric sheet can be set as required.
The accompanying drawing explanation
Fig. 1 is the structural representation of a kind of scaffold steel fabric sheet of the utility model,
Wherein, 1, steel wire sheet body, 2, reinforcing bar, 3, hook one, 4, steel pipe two, 5, steel pipe three, 6-steel pipe four, 7, hook two, 8, installing handle, 9, steel pipe one.
The specific embodiment
Below in conjunction with Figure of description, the technical solution of the utility model and structure are described, so that those skilled in the art understand.
as shown in Figure 1, a kind of scaffold steel fabric sheet, comprise steel wire sheet body 1, steel wire sheet body 1 surrounding is respectively arranged with steel pipe 1, steel pipe 24, steel pipe 35, steel pipe 46, steel pipe 1 and light pipe 35 symmetries, steel pipe 24 and steel pipe 46 symmetries, the end end that steel pipe 1 is relative with steel pipe 35 is respectively arranged with hook 1, the end end that steel pipe 1 and steel pipe 35 do not arrange hook 1 is respectively arranged with hook 27, link up with 1 and include columniform installing handle 8 and hook with hook 27, link up with 1 and hook 27 installing handle 8 all be placed in steel pipe 1 and steel pipe 35 inner and link up with 1 and installing handle 8 external diameters of hook 27 and the internal diameter of steel pipe 1 and steel pipe 35 adapt, hook, the c-shaped shape of 3 hook, link up with 27 hook and be half of U-shaped, link up with 27 hook end perpendicular to steel fabric sheet and to the diameter of a steel pipe of downward-extension, reinforcing bar 2 and steel pipe 1 on steel wire sheet body 1, steel pipe 24, steel pipe 35, steel pipe 46 welding, linking up with 1 welds with hook 27 and steel pipe 1 and steel pipe 35.
adopt the beneficial effect of technique scheme to be: a kind of scaffold steel fabric sheet, comprise steel wire sheet body, the position that steel wire sheet body is stood for the operator, the end end that steel pipe one is relative with steel pipe three is respectively arranged with hook one, the end end that steel pipe one and steel pipe three do not arrange hook one is respectively arranged with hook two, hook one and hook two actings in conjunction, be used for fixedly steel wire sheet body, by steel fabric sheet, be fixedly on scaffold, make the phenomenon of sliding and coming off can not appearred in steel fabric sheet on scaffold, hook one and hook two include columniform installing handle and hook, described hook one and the installing handle external diameter of hook two and the internal diameter of steel pipe one and steel pipe three adapt, the installing handle of hook one and hook two is placed in to steel pipe one and steel pipe three inside and welds, guarantee that hook one and hook two connect into an integral body with steel fabric sheet, the hook of hook one is the great circle arcuation, the hook of hook two is the semicircle arcuation, when steel fabric sheet is installed, at first will link up with one orthodrome is articulated on the crossbeam of scaffold, strain backward steel fabric sheet, hook two cards are hung on another crossbeam of scaffold, make scaffold in use not there will be the phenomenon of digging with landing, reinforcing bar on steel wire sheet body and steel pipe one, steel pipe two, steel pipe three, steel pipe four welding, hook one and hook two and steel pipe one and steel pipe three welding, by the welding operation fast and easy, cost is lower, the size of steel fabric sheet can be set as required.
Adopt a kind of scaffold steel fabric sheet of technical solutions of the utility model, can fast steel fabric sheet be installed and be fixedly connected on scaffold, and can dismantle fast, and steel fabric sheet is difficult for being attacked and destroying by external environment condition, can reuse, provide cost savings, also improved the safety factor of operator's working environment simultaneously.
Above-mentionedly by reference to the accompanying drawings utility model is exemplarily described; obviously the utility model specific implementation is not subject to the restrictions described above; as long as this non-essential improvement that has adopted method design of the present utility model and technical scheme to carry out; or without improving, the design of utility model and technical scheme are directly applied to other occasions, all within protection domain of the present utility model.

Claims (4)

1. scaffold steel fabric sheet, comprise steel wire sheet body, it is characterized in that: described steel wire sheet body surrounding is respectively arranged with steel pipe one, steel pipe two, steel pipe three, steel pipe four, described steel pipe one and steel pipe three symmetries, described steel pipe two and steel pipe four symmetries, the end end that described steel pipe one is relative with steel pipe three is respectively arranged with hook one, and the end end that described steel pipe one and steel pipe three do not arrange hook one is respectively arranged with hook two.
2. a kind of scaffold steel fabric sheet according to claim 1, it is characterized in that: described hook one includes columniform installing handle and hook with hook two, and the installing handle of described hook one and hook two all is placed in steel pipe one and steel pipe three inside and links up with one and adapts with the installing handle external diameter of hook two and the internal diameter of steel pipe one and steel pipe three.
3. a kind of scaffold steel fabric sheet according to claim 1 is characterized in that: the c-shaped shape of the hook of described hook one, and the hook of hook two is half of U-shaped, and the hook end of described hook two is perpendicular to steel fabric sheet and to the diameter of a steel pipe of downward-extension.
4. a kind of scaffold steel fabric sheet according to claim 1, is characterized in that: the reinforcing bar on described steel fabric sheet body and steel pipe one, steel pipe two, steel pipe three, steel pipe four welding, hook one and hook two and steel pipe one and steel pipe three welding.
CN2013202554741U 2013-05-10 2013-05-10 Scaffold steel mesh Expired - Fee Related CN203296371U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013202554741U CN203296371U (en) 2013-05-10 2013-05-10 Scaffold steel mesh

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013202554741U CN203296371U (en) 2013-05-10 2013-05-10 Scaffold steel mesh

Publications (1)

Publication Number Publication Date
CN203296371U true CN203296371U (en) 2013-11-20

Family

ID=49572392

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013202554741U Expired - Fee Related CN203296371U (en) 2013-05-10 2013-05-10 Scaffold steel mesh

Country Status (1)

Country Link
CN (1) CN203296371U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105421750A (en) * 2015-12-03 2016-03-23 无锡市晨源建筑器材有限公司 Highly safe durable pedal for building scaffold
KR102362409B1 (en) * 2020-10-08 2022-02-15 (주)코스텍 A Scaffoling Unit For Ceiling-Installation Of Stage Devices

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105421750A (en) * 2015-12-03 2016-03-23 无锡市晨源建筑器材有限公司 Highly safe durable pedal for building scaffold
KR102362409B1 (en) * 2020-10-08 2022-02-15 (주)코스텍 A Scaffoling Unit For Ceiling-Installation Of Stage Devices

Similar Documents

Publication Publication Date Title
CN204901062U (en) A three -dimensional antidetonation gallows
CN202717501U (en) Pile foundation reinforcement cage lifting ring
CN203296371U (en) Scaffold steel mesh
CN205926710U (en) Hickey device
CN204828960U (en) A a support formula gallows that is used for pipeline classification rationally to arrange
CN204437497U (en) Built-in type under ground piping lifting device
CN204475349U (en) Modular support device
CN204139577U (en) Embedment means formula wall-connecting piece after a kind of
CN203795824U (en) Suspension type fastener scaffold erecting device
CN203143971U (en) Movable pulley block fixing device of whip-typed tower crane
CN204152192U (en) A kind of scaffold fastenings
CN202924585U (en) Diameter expanding head installing hanger
CN203959647U (en) Whole spelling formula wood formwork plate hoisting ring
CN204569024U (en) Reassembling type vast capacity roller of continuous oil pipe
CN202577932U (en) Connection component of wall bodies
CN203878752U (en) Connecting device for large steel beam and connecting plate
CN203373955U (en) Inner blocking protection device for outer wall scaffold
CN204640102U (en) 80 tons of crane hydraulic oil pipe special tool for services
CN203650408U (en) Tool for replacing automobile rubber sleeve
CN203034798U (en) Hydraulic pressure creeping formwork hanging shoe strengthening tool
CN203394406U (en) Horizontal directional drilling emergency rescue device
CN203347209U (en) Exit passageway supporting frame based on concrete work combined steel formwork
CN202936998U (en) Novel connecting component of steel pipe scaffold
CN202912191U (en) Heating pipe supporting frame
CN203582408U (en) Segmented mold water cylinder hanging tool tooling

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131120

Termination date: 20150510

EXPY Termination of patent right or utility model