CN202644406U - Box beam cross-river support - Google Patents

Box beam cross-river support Download PDF

Info

Publication number
CN202644406U
CN202644406U CN 201220250717 CN201220250717U CN202644406U CN 202644406 U CN202644406 U CN 202644406U CN 201220250717 CN201220250717 CN 201220250717 CN 201220250717 U CN201220250717 U CN 201220250717U CN 202644406 U CN202644406 U CN 202644406U
Authority
CN
China
Prior art keywords
steel
steel pipe
box beam
river course
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220250717
Other languages
Chinese (zh)
Inventor
汪强
俞文钧
沈建良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG GUOFENG CONSTRUCTION CO Ltd
ZHEJIANG GUOFENG GROUP CO Ltd
Original Assignee
ZHEJIANG GUOFENG CONSTRUCTION CO Ltd
ZHEJIANG GUOFENG GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG GUOFENG CONSTRUCTION CO Ltd, ZHEJIANG GUOFENG GROUP CO Ltd filed Critical ZHEJIANG GUOFENG CONSTRUCTION CO Ltd
Priority to CN 201220250717 priority Critical patent/CN202644406U/en
Application granted granted Critical
Publication of CN202644406U publication Critical patent/CN202644406U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a bridge support, in particular to a box beam cross-river support. The box beam cross-river support mainly solves the technical problems existed in the prior art that the structure of a box beam support is more complex, the installation is more inconvenient, the manufacturing cost is higher and the like. The box beam cross-river support comprises more than two steel pipe columns (1), and is characterized in that two Bailey capping beams (3) are fixed at the upper end of each steel pipe column (1) through a steel cover plate (2); and a Bailey truss lower chord (4) is erected at the upper ends of the Bailey capping beams.

Description

A kind of case girder span river course support
Technical field
The utility model relates to a kind of bridge support, especially relates to a kind of case girder span river course support.
Background technology
At present, along with the high speed development of Chinese national economy, the highway and railway construction also develops rapidly, and bridge erection then becomes the key project in the communications and transportation construction.Especially in middle river channel bridge pier construction works, many uses ponding water blockoff in the river course enters the korneforos with a large amount of earthwork heaps now, then carries out cofferdam construction after the compacting.Because the amount of banketing is large, the one, hindered the proper flow of streamflow, the 2nd, after engineering construction is finished, banket that it is unclean not remove or remove, cause river course flowing water or flood discharge not smooth, caused unnecessary disaster.Part unit in charge of construction is also arranged, adopt the metal bucket cofferdam, but this way is inadaptable to medium and small project, the technical requirement of underwater operation is high, and investment is large, is not easy to transportation and construction, is unfavorable for recycling, and therefore is not easy to promote.Chinese patent discloses a kind of steel box beam erection method (publication number: CN101078198) that is applied to self-anchored suspension bridge, the steps include: (1), on the coast or non-navigation region division steel box beam bracket on the steel box beam bracket, steel case beam to be carried out the pre-assembly unit of segmentation; (2), the steel case girder temporary pier that satisfies waterway classification is set in the river course that suspension bridge is crossed over; (3), pass forward with the method for pushing tow or the towing steel case beam that pre-assembly unit is good, steel case beam is moved on on the steel case girder temporary pier from the steel box beam bracket, utilize steel case girder temporary pier to support; Then continue the pre-jointing steel box beam of segmentation, successively incremeantal launching method or towing, good steel case beam is pushed ahead to make the pre-assembly unit of segmentation, successively by the steel case girder temporary pier on the river course, until arrive the opposite, river course on the bank; During the pre-jointing steel box beam of segmentation, be provided with to be convenient to the steel case beam front launching nose of steel case beam and steel case girder temporary pier overlap joint at the front end of steel case beam.But the structure of this box beam bracket is comparatively complicated, and comparatively inconvenience is installed, and manufacturing cost is higher.
The utility model content
The utility model provides a kind of case girder span river course support, and it mainly is that to solve the structure of the existing box beam bracket of prior art comparatively complicated, install comparatively inconvenient, the technical problem that manufacturing cost is more high.
Above-mentioned technical problem of the present utility model is mainly solved by following technical proposals:
A kind of case girder span of the present utility model river course support comprises the steel pipe column more than 2, and described every steel pipe column upper end is fixed with 2 shellfish thunder bent caps by steel deck-plate, and shellfish thunder bent cap upper end frame is provided with the Bailey truss lower chord.The diameter of steel pipe column can be for about 800mm, and the spacing between the adjacent steel tubing string is about 1700mm.Steel deck-plate can with shellfish thunder bent cap, steel pipe column by being welded and fixed.
As preferably, be fixed with the channel-section steel bridging between described adjacent 2 steel pipe columns.The channel-section steel bridging can be strengthened the intensity between adjacent 2 steel pipe columns.
As preferably, be fixed with the channel-section steel bridging between described adjacent 2 pairs of shellfish thunder bent caps.The channel-section steel bridging can be strengthened the intensity between adjacent 2 pairs of shellfish thunder bent caps.
As preferably, be provided with rubber cushion blocks between described shellfish thunder bent cap upper end and the Bailey truss lower chord.Rubber cushion blocks can play the effect of buffering, prevents that the Bailey truss lower chord is given a shock rear bump shellfish thunder bent cap upper end.
As preferably, be fixed with the steel plate reinforcing rib between described steel deck-plate and the steel pipe column.The steel plate reinforcing rib can be strengthened the intensity between steel deck-plate and the steel pipe column.
Therefore, the structure of the utility model box beam bracket is comparatively simple, reasonable, and it is comparatively convenient to install, and manufacturing cost is lower.
Description of drawings
Accompanying drawing 1 is a kind of structural representation of the present utility model.
Component, position and numbering among the figure: steel pipe column 1, steel deck-plate 2, shellfish thunder bent cap 3, Bailey truss lower chord 4, channel-section steel bridging 5, rubber cushion blocks 6, steel plate reinforcing rib 7.
The specific embodiment
Below by embodiment, and by reference to the accompanying drawings, the technical solution of the utility model is described in further detail.
Embodiment: a kind of case girder span river course support of this example, such as Fig. 1, comprise the steel pipe column 1 more than 2, be fixed with channel-section steel bridging 5 between adjacent two steel pipe columns.Every steel pipe column 1 upper end is fixed with 2 shellfish thunder bent caps 3 by steel deck-plate 2, is fixed with steel plate reinforcing rib 7 between steel deck-plate and the steel pipe column.Be fixed with channel-section steel bridging 5 between adjacent 2 pairs of shellfish thunder bent caps.Shellfish thunder bent cap upper end frame is provided with Bailey truss lower chord 4.Be provided with rubber cushion blocks 6 between shellfish thunder bent cap upper end and the Bailey truss lower chord.
During use, steel pipe column 1, shellfish thunder bent cap 3, channel-section steel bridging 5, steel plate reinforcing rib 7 are welded together fixing getting final product.
The above only is specific embodiment of the utility model, but architectural feature of the present utility model is not limited to this, any those skilled in the art is in field of the present utility model, and the variation of doing or modification all are encompassed among the claim of the present utility model.

Claims (5)

1. a case girder span river course support comprises the steel pipe column (1) more than 2, it is characterized in that described every steel pipe column (1) upper end is fixed with 2 shellfish thunder bent caps (3) by steel deck-plate (2), and shellfish thunder bent cap upper end frame is provided with Bailey truss lower chord (4).
2. a kind of case girder span according to claim 1 river course support is characterized in that being fixed with between described adjacent 2 steel pipe columns (1) channel-section steel bridging (5).
3. a kind of case girder span according to claim 1 and 2 river course support is characterized in that being fixed with between described adjacent 2 pairs of shellfish thunder bent caps (3) channel-section steel bridging (5).
4. a kind of case girder span according to claim 1 and 2 river course support is characterized in that being provided with rubber cushion blocks (6) between described shellfish thunder bent cap (3) upper end and the Bailey truss lower chord (4).
5. a kind of case girder span according to claim 1 and 2 river course support is characterized in that being fixed with steel plate reinforcing rib (7) between described steel deck-plate (2) and the steel pipe column (1).
CN 201220250717 2012-05-31 2012-05-31 Box beam cross-river support Expired - Fee Related CN202644406U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220250717 CN202644406U (en) 2012-05-31 2012-05-31 Box beam cross-river support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220250717 CN202644406U (en) 2012-05-31 2012-05-31 Box beam cross-river support

Publications (1)

Publication Number Publication Date
CN202644406U true CN202644406U (en) 2013-01-02

Family

ID=47413536

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220250717 Expired - Fee Related CN202644406U (en) 2012-05-31 2012-05-31 Box beam cross-river support

Country Status (1)

Country Link
CN (1) CN202644406U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102726876A (en) * 2012-07-03 2012-10-17 吴亚军 Improved massage shoes
CN104711930A (en) * 2015-02-06 2015-06-17 浙江国丰集团有限公司 Installation and construction method for large-diameter pipe bridge on ultra-wide river way
CN110016868A (en) * 2019-04-16 2019-07-16 中国铁建大桥工程局集团有限公司 A kind of steel trestle platform damping and de-noising method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102726876A (en) * 2012-07-03 2012-10-17 吴亚军 Improved massage shoes
CN102726876B (en) * 2012-07-03 2014-12-17 温州腾和鞋业有限公司 Improved massage shoes
CN104711930A (en) * 2015-02-06 2015-06-17 浙江国丰集团有限公司 Installation and construction method for large-diameter pipe bridge on ultra-wide river way
CN110016868A (en) * 2019-04-16 2019-07-16 中国铁建大桥工程局集团有限公司 A kind of steel trestle platform damping and de-noising method

Similar Documents

Publication Publication Date Title
CN101078198A (en) Steel box beam erection method for self-anchored suspension bridge
CN204370384U (en) A kind of mud-rock flow classified energy-dissipation exhaust system
CN202577157U (en) Simple support arch bridge straining beam construction support system
CN105178206B (en) Spliced-type shed tunnel
CN202644406U (en) Box beam cross-river support
CN106049289A (en) Construction method for transforming Bailey beam temporary bridge into reinforced concrete combined permanent bridge
CN103850171B (en) A kind of all steel assembled overpass on an empty stomach
CN103774543B (en) A kind of deck type rope arch combination bridge
CN102912701B (en) Multi-functional left-turn directional interchange overpass
CN204875572U (en) Novel pin -connected panel hangar tunnel
CN102392421B (en) Small-town arch bridge local widening and reinforcing method based on characteristic of tidal traffic flow
CN202482767U (en) Steel tube bailey beam column type support
CN103061248B (en) Water source pollution preventing bridge type tunnel structure and construction method thereof
CN206219994U (en) A kind of temporary support framed bent suitable for bridge construction
CN101570956B (en) Two-lane beam-bridge end reinforcement concrete frame pier in side walk
CN204509922U (en) Underpasses structure
CN201169781Y (en) Cap digging pit structure
CN105019359A (en) Steel girder erecting structure and erecting method
CN203716045U (en) Deck type cable-arch combined structure bridge
CN108330803A (en) Trolley high speed elevated plus crossing overpass
CN201809718U (en) Baseless ground anchoring overpass bridge
CN203174485U (en) Small-span plate girder bridge framework
CN206707724U (en) A kind of tunnel arch wall lining trolley compartment constructing structure
CN203782585U (en) Double-girdertype triangular truss bridge erecting machine
CN217378539U (en) Arched gate-type pier applied to overpass

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130102

Termination date: 20210531