CN202612869U - Floor heating pipe fixing device - Google Patents
Floor heating pipe fixing device Download PDFInfo
- Publication number
- CN202612869U CN202612869U CN 201220155786 CN201220155786U CN202612869U CN 202612869 U CN202612869 U CN 202612869U CN 201220155786 CN201220155786 CN 201220155786 CN 201220155786 U CN201220155786 U CN 201220155786U CN 202612869 U CN202612869 U CN 202612869U
- Authority
- CN
- China
- Prior art keywords
- floor heating
- fixture
- jig
- heating pipe
- fixing device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Steam Or Hot-Water Central Heating Systems (AREA)
Abstract
The utility model discloses a floor heating pipe fixing device. The floor heating pipe fixing device comprises a first fixture and a second fixture which are arranged side by side, opposite faces of the first fixture and the second fixture are respectively and correspondingly provided with a plurality of semicircle fixture holes, one ends of the first fixture and the second fixture are mutually connected through a hinge, the other ends of the first fixture and the second fixture are respectively and correspondingly provided with a bolt hole, and the two bolt holes are provided with locking bolts used for locking the first fixture and the second fixture in a penetrating mode. The floor heating pipe fixing device is used for being installed at headbang positions of floor heating pipes in coiling of pipes and is situated on a floor heating surface layer and under a water segregator. When the floor heating pipe fixing device is used for installation, the floor heating pipes under the water segregator and above the ground are enabled to be orderly in arrangement and beautiful in appearance, a cover shield is not needed in decoration, quality hidden dangers are eliminated at the same time, and manpower and material resources are greatly saved.
Description
Technical field
The utility model relates to a kind of auxiliary device that is used for the floor heating pipe construction, specifically, relates to a kind of fixing device that is used for the above floor heating pipe exposed portions serve in floor heating construction ground, water knockout drum bottom.
Background technique
At present, in China Democratic National Construction Association construction, the floor heating pipe that is installed on the water knockout drum bottom goes out ground and gets rid of head and dock with water knockout drum.Yet; Adopt such mounting type, the floor heating pipe of water knockout drum bottom is said above ground portion fall into disarray very easily usually, causes the floor heating pipe arrangement pitches not wait and influences Homogeneouslly-radiating; Cause the protective layer thickness of floor heating pipe not enough simultaneously, thereby floor heating pipe is destroyed easily; And outward appearance is attractive in appearance inadequately, has to add guard shield during finishing and hides, and has wasted manpower and materials.
The model utility content
What the utility model will solve is the technical problem that the floor heating pipeline of water knockout drum bottom got rid of a fall into disarray during existing floor heating was constructed, and provides a kind of and can eliminate hidden danger of quality, guarantees the neat floor heating pipe fixing device of outward appearance.
In order to solve the problems of the technologies described above, the utility model is achieved through following technological scheme:
A kind of floor heating pipe fixing device; Comprise first jig and second jig that are arranged side by side; Be provided with a plurality of semicircle hole clippings on the opposing side of said first jig and said second jig respectively accordingly; One end of said first jig and said second jig interconnects through hinge, and the other end of said first jig and said second jig is provided with bolt hole respectively accordingly, and two said bolts hole are coated with the lock bolt that is used for sealed said first jig and said second jig.
The beneficial effect of the utility model is:
What the floor heating pipe fixing device of the utility model was used to be installed on floor heating pipe when coil pipe gets rid of the head position; Be positioned at below the above water knockout drum of floor heating surface layer, adopt this fixing device to install, can make the water knockout drum bottom go out the floor heating pipeline marshalling of above ground portion; Appearance looks elegant; Also need not add a cover guard shield during finishing, also eliminate hidden danger of quality simultaneously, greatly practice thrift manpower and materials.
Description of drawings
Fig. 1 is the structural representation of the utility model;
Fig. 2 is the plan view of Fig. 1;
Fig. 3 is the structural representation of the utility model when open mode.
Among the figure: 1: the first jig, 2: the second jigs, 3: hole clipping, 4: lock bolt, 5: hinge, 6: bolt hole.
Embodiment
Below in conjunction with accompanying drawing and embodiment the utility model is done further to describe in detail:
To shown in Figure 3, present embodiment has disclosed a kind of floor heating pipe fixing device, comprises first jig 1 and second jig 2 like Fig. 1, and both are arranged side by side.Be respectively arranged with several semicircle hole clippings 3 on the opposing side of first jig 1 and second jig 2; Hole clipping 3 corresponding settings on first jig 1 and second jig 2; And each group hole clipping 3 can be combined into into a complete circular hole, and the diameter of circular hole is consistent with used floor heating pipe, so that agree with reliable.Wherein the diameter of hole clipping 3, spacing and spread pattern all be according to when construction floor heating pipe diameter, spacing and spread pattern be provided with.
One end of first jig 1 and second jig 2 interconnects through a hinge 5, and the position that the other end of first jig 1 and second jig 2 is provided with 6, two bolts hole 6 of bolt hole also is corresponding with size, and both are coated with lock bolt 4.In order to reach the adjustable of certain limit, lock bolt 4 should be set to enough length.As shown in Figure 1, lock bolt 4 passes two bolts hole 6 and when tightening, first jig 1 and second jig 2 are adjacent to, and this floor heating pipe fixing device fastens; As shown in Figure 3, lock bolt 4 is back-outed when removing a bolt hole 6 at least, and first jig 1 and second jig 2 can separate, and this floor heating pipe fixing device is opened.
The method for using of brief description the utility model when floor heating piping erection:
(1) according to good this floor heating pipe fixing device of arrangement mode processing and fabricating of the floor heating pipe that drawing designed;
(2) in the floor heating pipeline laying construction, the floor heating pipe in the water knockout drum bottom gets rid of the head position this device is installed firmly, floor heating pipe is inserted respectively in the circular hole between first jig 1 and second jig 2, in order to guarantee the floor heating pipe marshalling;
(3) treat that the floor heating concrete topping builds completion, concrete strength reaches can above man-hour, and this device is taken off, and prepares the turnover of next time and uses.
Although combine accompanying drawing that the preferred embodiment of the utility model is described above; But the utility model is not limited to above-mentioned embodiment, and above-mentioned embodiment only is schematically, is not restrictive; Those of ordinary skill in the art is under the enlightenment of the utility model; Not breaking away under the scope situation that the utility model aim and claim protect, can also make the concrete conversion of a lot of forms, these all belong within the protection domain of the utility model.
Claims (1)
1. floor heating pipe fixing device; Constitute by device body; It is characterized in that; Said device body comprises first jig and second jig that is arranged side by side, and is provided with a plurality of semicircle hole clippings on the opposing side of said first jig and said second jig respectively accordingly, and an end of said first jig and said second jig interconnects through hinge; The other end of said first jig and said second jig is provided with bolt hole respectively accordingly, and two said bolts hole are coated with the lock bolt that is used for sealed said first jig and said second jig.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220155786 CN202612869U (en) | 2012-04-13 | 2012-04-13 | Floor heating pipe fixing device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220155786 CN202612869U (en) | 2012-04-13 | 2012-04-13 | Floor heating pipe fixing device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202612869U true CN202612869U (en) | 2012-12-19 |
Family
ID=47346569
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220155786 Expired - Fee Related CN202612869U (en) | 2012-04-13 | 2012-04-13 | Floor heating pipe fixing device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202612869U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104373692A (en) * | 2014-10-31 | 2015-02-25 | 无锡金顶石油管材配件制造有限公司 | Double-pipe supporting frame |
CN106907527A (en) * | 2017-04-24 | 2017-06-30 | 青岛建集团有限公司 | Floor heating pipeline water knockout drum position pipeline positioner and form of construction work |
CN108799631A (en) * | 2017-04-27 | 2018-11-13 | 中建城市建设发展有限公司 | A kind of spool arrangement fixing device complicated within the walls, wall body structure and its construction method |
-
2012
- 2012-04-13 CN CN 201220155786 patent/CN202612869U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104373692A (en) * | 2014-10-31 | 2015-02-25 | 无锡金顶石油管材配件制造有限公司 | Double-pipe supporting frame |
CN106907527A (en) * | 2017-04-24 | 2017-06-30 | 青岛建集团有限公司 | Floor heating pipeline water knockout drum position pipeline positioner and form of construction work |
CN108799631A (en) * | 2017-04-27 | 2018-11-13 | 中建城市建设发展有限公司 | A kind of spool arrangement fixing device complicated within the walls, wall body structure and its construction method |
CN108799631B (en) * | 2017-04-27 | 2024-01-23 | 中建城市建设发展有限公司 | Device for arranging and fixing complex line pipes in wall, wall structure and construction method of wall structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202612869U (en) | Floor heating pipe fixing device | |
CN202438632U (en) | Fixture for gas cylinder liner metal spinning | |
CN103698870B (en) | A kind of optical cable fixing device for seabed adjoining pipe paving cable | |
CN201813110U (en) | Special clamp for drawing cable machine | |
CN102593766A (en) | Cable protecting device | |
CN202488055U (en) | Cable protection device | |
CN201462197U (en) | U-shaped pipe clamp | |
CN205654094U (en) | A template system that is under construction in being used for narrow space | |
CN204243626U (en) | Cable unwinding device | |
CN203674643U (en) | Device for drawing power-cable protection tube | |
CN202215557U (en) | All-split nut with limit boss for supporting anchor bolt | |
CN105782584B (en) | A kind of through-flooring protective case | |
CN203895890U (en) | Cable protective tube convenient to install and made of composite material | |
CN204983658U (en) | Prefabricated component is with box of pre -buried electric end and have prefabricated component of this box of electric end | |
CN104052010A (en) | Composite cable protection pipe convenient to install | |
CN204370829U (en) | Portable loop bar reserved opening protective cover plate locator | |
CN206655136U (en) | A kind of science of bridge building power transmission drawing anchor device | |
CN204238256U (en) | A kind of contraction type handle port lid for building | |
CN203374991U (en) | Steel structure electric line pipe and trunking hanging connecting piece | |
CN203113912U (en) | Temporary barrier suitable for rubble layer of transformer substation | |
CN204628834U (en) | High-strength antibacterial type supply pipe | |
CN204649810U (en) | A kind of support installing three-phase meter case on cement pole | |
CN204532218U (en) | Groundwater monitoring tree-protector | |
CN204418778U (en) | The fixing arm-tie of steel tower | |
CN208763519U (en) | Cable overhead fixed frame depositedly |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20121219 Termination date: 20210413 |