CN205654094U - A template system that is under construction in being used for narrow space - Google Patents

A template system that is under construction in being used for narrow space Download PDF

Info

Publication number
CN205654094U
CN205654094U CN201620435287.5U CN201620435287U CN205654094U CN 205654094 U CN205654094 U CN 205654094U CN 201620435287 U CN201620435287 U CN 201620435287U CN 205654094 U CN205654094 U CN 205654094U
Authority
CN
China
Prior art keywords
template
narrow space
nut
split bolt
protection sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620435287.5U
Other languages
Chinese (zh)
Inventor
马荣全
苗冬梅
胡成佑
秦聪伟
马建挺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
Tianjin Deman Ruike Technology Co Ltd
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Deman Ruike Technology Co Ltd, China Construction Eighth Engineering Division Co Ltd filed Critical Tianjin Deman Ruike Technology Co Ltd
Priority to CN201620435287.5U priority Critical patent/CN205654094U/en
Application granted granted Critical
Publication of CN205654094U publication Critical patent/CN205654094U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model relates to a template system that is under construction in being used for narrow space, include: immediately, locate the first template of being close to narrow space, the nut has set firmly on the back of the body of first template is stupefied, immediately, locate the second template of keeping away from narrow space, the 2nd penetrating hole has been offered in the second template, prop up and locate first template with protective case between the second template, protective case's first end is worn out first template is stretched to the nut, protective case's second end is arranged in in the 2nd penetrating hole, the cover is located the sealing washer of the first end of protective case, and follow the 2nd penetrating hole stretches into split bolt in the protective case, the split bolt spiral shell fits nut and fastening first template with the second template. The sealing washer is set up, to sealing, the infiltration of concrete can be effectively prevented, because of the inspersed difficult problem of concrete when having avoided demolising split bolt between nut and protective case.

Description

The template system of construction in narrow space
Technical field
This utility model relates to the realm of building construction, refers in particular to a kind of template of construction in narrow space System.
Background technology
When installing template system in narrow space, the template near narrow space side is narrow due to space Narrow and workmen can not be entered so that during template construction, split bolt cannot operate, for solving this Problem, uses side to be screwed into the construction method of split bolt, i.e. near narrow space in prior art Fix nut in the template of side, then stretch into drawing spiral shell from the template facilitating manually-operated side Bolt, screws togather split bolt with the nut fixed, just fastens the template of both sides.Use above-mentioned executing During work method, after casting concrete, concrete can penetrate into the nut fixed along split bolt In, after the concrete has set, and then split bolt is fixed together with the nut in template, so When form removal, bring difficulty to the dismantling operation of split bolt so that form removable becomes a difficult problem.
Utility model content
The purpose of this utility model is to overcome the defect of prior art, it is provided that a kind of for narrow space The template system of interior construction, the concrete solving to exist when existing narrow space installs template system penetrates into Nut and cause form removal difficulty problem.
The technical scheme realizing above-mentioned purpose is:
A kind of template system of construction in narrow space of this utility model, including:
It is erected on the first template near narrow space, described first template offers first and wears Hole, and the outer surface of described first template is provided with back cord, and described back cord is installed with corresponding described first The nut of perforating;
Being erected on the second template away from narrow space, in described second template, corresponding described first wears Hole offers the second perforating;
Prop up and be located at the protection sleeve pipe between described first template and described second template, described protection sleeve pipe First end passes described first perforating and stretches to described nut, and the second end of described protection sleeve pipe is placed in In described second perforating;
It is sheathed on the sealing ring of described protection sleeve first end;And
The split bolt in described protection sleeve pipe, described split bolt spiral shell is stretched into from described second perforating Together in described nut and fasten described first template and described second template.
By arranging protection sleeve pipe, prevent the concrete poured from releasing split bolt, facilitate split bolt Dismounting.Sealing ring is set, seals between nut and protection sleeve pipe, it is possible to effectively prevent coagulation The infiltration of soil, it is to avoid the difficult problem penetrated into because of concrete when removing split bolt.Of the present utility model narrow In narrow space, the template system of construction has easy construction, removes easy advantage.
Further improvement is that of the template system that this utility model is constructed in narrow space, described Sealing ring part is sheathed on described nut.
Further improvement is that of the template system that this utility model is constructed in narrow space, described First end of protection sleeve pipe is resisted against on the end face of described nut.
Further improvement is that of the template system that this utility model is constructed in narrow space, described Protection sleeve pipe is pvc pipe.
Further improvement is that of the template system that this utility model is constructed in narrow space, described The end of split bolt is provided with operating handle.
Further improvement is that of the template system that this utility model is constructed in narrow space, described Being arranged with clamp nut on split bolt, described clamp nut is close proximity to the outside of described second template Face.
Further improvement is that of the template system that this utility model is constructed in narrow space, described The end of sealing ring embeds in described first perforating.
Accompanying drawing explanation
Fig. 1 is that the template system constructed in narrow space of this utility model is at split bolt Cross sectional plan view.
Fig. 2 is enlarged diagram at A in Fig. 1.
Fig. 3 is that the template system constructed in narrow space of this utility model is in the first template side Decomposition texture schematic diagram.
Detailed description of the invention
The utility model is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
This utility model provides a kind of template system of construction in narrow space, is installing template Time, split bolt can be screwed into opposite side template in fixing nut from the side of template, easy to operate, And it is provided with sealing ring between fixing nut and protection sleeve pipe, effectively prevent the concrete edge poured The problem that split bolt penetrates into nut, it is to avoid the split bolt caused because concrete enters is removed Difficulty.Below in conjunction with the accompanying drawings this utility model template system of construction in narrow space is carried out Explanation.
Refering to Fig. 1, it is shown that the template system that this utility model is constructed in narrow space is to drawing Cross sectional plan view at bolt.Refering to Fig. 2, it is shown that enlarged diagram at A in Fig. 1.Below In conjunction with Fig. 1 and Fig. 2, this utility model template system of construction in narrow space is illustrated.
As depicted in figs. 1 and 2, this utility model template system of construction in narrow space includes There are first template the 11, second template 12, nut 21, protection sleeve pipe 22, sealing ring 23 and right Draw bolt 24, the first template 11 and the second template 12 is opposed is located on supporting surface, this supporting surface Can be flooring, it is also possible to for ground.First template 11 is located close to the side of narrow space, the Two templates 12 are located remotely from the side of narrow space, thus make the second template 12 for exercisable Side, the first template 11 cannot be carried out constructing operation due to narrow space.In the first template 11 Outer surface be provided with back cord 111, this outer surface is the side not contacting concrete in the first template 11 Face, offers the first perforating in the first template 11, and this first perforating is used for wearing drawing spiral shell Bolt 24, nut 21 is fixedly arranged on back cord 111, and corresponding first template 11 of this nut 21 is offered First perforating is arranged so that split bolt 24 can be directly threaded into spiral shell after the first perforating passes In female 21.In the second template 12, corresponding first perforating offers the second perforating, split bolt 24 penetrate from the second perforating, pass from the first perforating and then are screwed together in and are fixed on back cord 111 Nut 21 in, just complete the solid to tension of the first template 11 and the second template 12.In order to just In the dismounting of split bolt 24, protection sleeve pipe 22 is located at the first template 11 and the second template 12 Between, shown in Fig. 3, the first end 221 of protection sleeve pipe 22 passes the first perforating and stretches to Nut 21, the second end 222 of protection sleeve pipe 22 is placed in the second perforating, such split bolt 24 When wearing the first template 11 and the second template 12, this split bolt 24 stretches into protection sleeve pipe 22 In, utilize protection sleeve pipe 22 to protect split bolt 24, it is to avoid split bolt 24 and later stage pour Concrete combines, and facilitates the dismounting of split bolt 24.Sealing ring 23 is set in protection sleeve pipe 22 The first end 221, this sealing ring 23 can stop the concrete poured along protection sleeve pipe 22 and ooze Enter in nut 21, prevent nut 21 from removing because making split bolt 24 be difficult to after penetrating into concrete Phenomenon.
When construction, being provided close at narrow space by the first template 11, the second template 12 installs At away from narrow space, then split bolt 24 is stretched into protection sleeve pipe 22 from the second perforating In, split bolt 24 is screwed together in nut 21 when stretching out protection sleeve pipe 22, it is achieved that fasten the first mould Plate 11 and the second template 12.When operation, workmen only need to enter in the outside of the second template 12 Screwing of row split bolt 24, easy construction, and when template needs to remove, also have only to Carry out screwing of split bolt 24 in the outside of the second template 12 to remove.
As a better embodiment of the present utility model, sealing ring 23 part is sheathed on nut 21 On, sealing ring 23 is set on nut 21 near one end of nut 21, is wrapped the end of nut 21 Cover, can preferably prevent concrete from penetrating in the screw thread of nut 21.For preventing concrete from First perforating of one template 11 oozes out, and the end of sealing ring 23 embeds in the first perforating, it is possible to Preferably seal the first perforating, it is therefore prevented that oozing out of concrete.
First end 221 of protection sleeve pipe 22 is resisted against on the end face of nut 21 so that split bolt 24 were put in nut 21 when protection sleeve pipe 22 stretches out.Protection sleeve pipe 22 is pvc pipe.
For convenience of the torquing operations of split bolt 24, it is provided with operating handle in the end of split bolt 24 241.Lateral surface in the second template 12 also is provided with back cord 121, and split bolt 24 is wearing second During template 12, being arranged with clamp nut on split bolt 24, this clamp nut is close proximity to the second mould On the back cord 121 of plate 12.
Above in association with accompanying drawing embodiment, this utility model is described in detail, common skill in this area This utility model can be made many variations example by art personnel according to the above description.Thus, in embodiment Some details should not constitute restriction of the present utility model, and this utility model will be with appended claims The scope defined is as protection domain of the present utility model.

Claims (7)

1. the template system of construction in narrow space, it is characterised in that including:
It is erected on the first template near narrow space, described first template offers first and wears Hole, and the outer surface of described first template is provided with back cord, and described back cord is installed with corresponding described first The nut of perforating;
Being erected on the second template away from narrow space, in described second template, corresponding described first wears Hole offers the second perforating;
Prop up and be located at the protection sleeve pipe between described first template and described second template, described protection sleeve pipe First end passes described first perforating and stretches to described nut, and the second end of described protection sleeve pipe is placed in In described second perforating;
It is sheathed on the sealing ring of described protection sleeve first end;And
The split bolt in described protection sleeve pipe, described split bolt spiral shell is stretched into from described second perforating Together in described nut and fasten described first template and described second template.
2. the template system of construction in narrow space as claimed in claim 1, its feature exists In, described sealing ring part is sheathed on described nut.
3. the template system of construction in narrow space as claimed in claim 2, its feature exists In, the first end of described protection sleeve pipe is resisted against on the end face of described nut.
4. the template system of construction in narrow space as claimed in claim 1, its feature exists In, described protection sleeve pipe is pvc pipe.
5. the template system of construction in narrow space as claimed in claim 1, its feature exists In, the end of described split bolt is provided with operating handle.
6. the template system of construction in narrow space as claimed in claim 1, its feature exists In, described split bolt is arranged with clamp nut, described clamp nut is close proximity to described second template Lateral surface.
7. the template system of construction in narrow space as claimed in claim 1, its feature exists In, the end of described sealing ring embeds in described first perforating.
CN201620435287.5U 2016-05-13 2016-05-13 A template system that is under construction in being used for narrow space Expired - Fee Related CN205654094U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620435287.5U CN205654094U (en) 2016-05-13 2016-05-13 A template system that is under construction in being used for narrow space

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620435287.5U CN205654094U (en) 2016-05-13 2016-05-13 A template system that is under construction in being used for narrow space

Publications (1)

Publication Number Publication Date
CN205654094U true CN205654094U (en) 2016-10-19

Family

ID=57402689

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620435287.5U Expired - Fee Related CN205654094U (en) 2016-05-13 2016-05-13 A template system that is under construction in being used for narrow space

Country Status (1)

Country Link
CN (1) CN205654094U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108930406A (en) * 2018-08-07 2018-12-04 杭州江润科技有限公司 Construction method for large-formwork narrow-space wall based on integral assembly
CN109184744A (en) * 2018-09-25 2019-01-11 中国建筑第八工程局有限公司 Plate device and its construction method for narrow space
CN109403550A (en) * 2017-08-16 2019-03-01 润弘精密工程事业股份有限公司 The method of steel bar connector and continued access spiral

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109403550A (en) * 2017-08-16 2019-03-01 润弘精密工程事业股份有限公司 The method of steel bar connector and continued access spiral
CN108930406A (en) * 2018-08-07 2018-12-04 杭州江润科技有限公司 Construction method for large-formwork narrow-space wall based on integral assembly
CN108930406B (en) * 2018-08-07 2020-08-04 杭州江润科技有限公司 Construction method for large-formwork narrow-space wall based on integral assembly
CN109184744A (en) * 2018-09-25 2019-01-11 中国建筑第八工程局有限公司 Plate device and its construction method for narrow space

Similar Documents

Publication Publication Date Title
CN205654094U (en) A template system that is under construction in being used for narrow space
CN103291072A (en) Method for reserving holes in floors by aid of PVC (polyvinyl chloride) sleeves
CN205617822U (en) Regularization adjustable entrance to a cave protector
CN204001662U (en) A kind of fastening devices external member of Cantilever Beams
KR101364586B1 (en) Nail assembly, reinforcement installation for method of slope reinforcement
CN205000643U (en) Wall stagnant water bolt is worn to waterproof concrete shear force wall
CN204357097U (en) A kind of building scaffold improving working security reinforces base
CN205296358U (en) Floor drain protection device
CN203569888U (en) Water-stop split bolt structure capable of being reused
CN213674732U (en) Concrete pre-buried formula locating component
CN204190276U (en) Hinge-type wire clamp of conductor spacer Quick disassembling tool
CN212271672U (en) Horizontal entrance to a cave protector for building
CN204252513U (en) The disassembled anchor device of a kind of common builder's jack shaped steel end
CN205089236U (en) Sleeve pipe fast -assembling thread protector device
CN204986206U (en) Outlet fastener
CN220184725U (en) Waterproof structure of opposite-pulling screw hole
CN205077869U (en) Can dismantle stagnant water screw rod
CN204983716U (en) Shear force wall open type is faced frontier defense and is protected fastener
CN103615109B (en) A kind of Screw arbor with nut at both-ends
CN210887299U (en) Fixing device for tension rod between construction formworks of comprehensive pipe gallery
CN206917666U (en) Protection tube
JP6251537B2 (en) Water leakage treatment method
CN204065495U (en) A kind of electric power optical cable draws lower steel pipe plugging cap
CN206829619U (en) A kind of recoverable top plate hole to be provided sleeve pipe
CN214538764U (en) Sampling device for sewage treatment

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Ma Rongquan

Inventor after: Miao Dongmei

Inventor after: Hu Chengyou

Inventor after: Qin Congwei

Inventor before: Ma Rongquan

Inventor before: Miao Dongmei

Inventor before: Hu Chengyou

Inventor before: Qin Congwei

Inventor before: Ma Jianting

CB03 Change of inventor or designer information
TR01 Transfer of patent right

Effective date of registration: 20170915

Address after: 200122, Shanghai, China (Shanghai) free trade test zone, 1568 Century Avenue, 27

Patentee after: CHINA CONSTRUCTION EIGHTH ENGINEERING DIVISION Co.,Ltd.

Address before: 200135 Shanghai, China (Shanghai) free trade zone, Century Avenue, No. 27, layer 1568, layer

Co-patentee before: TIANJIN DEMA RUIKE TECHNNOLOGY DEVELOPMENT CO.,LTD.

Patentee before: CHINA CONSTRUCTION EIGHTH ENGINEERING DIVISION Co.,Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161019

CF01 Termination of patent right due to non-payment of annual fee