CN202594361U - Logistics system from material storage area to material storage bin - Google Patents

Logistics system from material storage area to material storage bin Download PDF

Info

Publication number
CN202594361U
CN202594361U CN2012201811467U CN201220181146U CN202594361U CN 202594361 U CN202594361 U CN 202594361U CN 2012201811467 U CN2012201811467 U CN 2012201811467U CN 201220181146 U CN201220181146 U CN 201220181146U CN 202594361 U CN202594361 U CN 202594361U
Authority
CN
China
Prior art keywords
bin
material storage
steel pipe
storage bin
storing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2012201811467U
Other languages
Chinese (zh)
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen City Tuo Tuo Electromechanical Ltd By Share Ltd
Original Assignee
SHENZHEN CEMCN Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN CEMCN Ltd filed Critical SHENZHEN CEMCN Ltd
Priority to CN2012201811467U priority Critical patent/CN202594361U/en
Application granted granted Critical
Publication of CN202594361U publication Critical patent/CN202594361U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Warehouses Or Storage Devices (AREA)

Abstract

A logistics system from a material storage area to a material storage bin comprises a steel pipe material area storage mechanism, a chain conveying mechanism and a production material storage bin, wherein the chain conveying mechanism takes the shape of an n; a semilunar claw is arranged on the chain conveying mechanism; the steel pipe material area storage mechanism is provided with a buffer material storage bin and a buffer material storage lifting material frame; the buffer material storage bin is provided with a discharge opening connected with the chain conveying mechanism; steel pipes are conveyed to the chain conveying mechanism through the discharge opening; and the chain conveying mechanism conveys the steel pipes to the production material storage bin to finish the production material storage of the steel pipes to be processed in the later process. The logistics system can achieve the automatic material conveying and material storage from the material storage area to the material storage bin, can effectively reduce the labor intensity, improves the working efficiency, and achieves the automatic production connection.

Description

Material is distinguished the feed bin logistics system
Technical field
The present invention relates to steel pipe storing district to producing the storage bin logistics system, particularly a kind of mining " band conveyor DTII type carrying roller " manufacturing line steel pipe storing district is to producing the storage bin logistics system.
Background technology
Existing " band conveyor DTII type carrying roller " manufacturing line steel pipe storage rack is logistics system to the material district, adopts overhead traveling crane will store the steel pipe of having packed in the material district more and slings for whole bundle, starts overhead traveling crane; The steel pipe of having packed is tied material be transported to the storage rack top, slowly descend general who has surrendered's steel pipe to tie material and be placed on the storage rack, a bundle material of having packed is opened in manual work again; Steel pipe is tiled on the inclined races face of storage rack and accomplishes storing, the defective of this logistics system is: used logistics time is long, needs artificial auxiliary; Because high hovering falls weight; There is potential safety hazard, employed storage rack form, floor area is big; Storage capacity is little in the finite space scope, is prone to the left-falling stroke, card and the bridging phenomenon that form because of piling up.
Summary of the invention
Technical matters to be solved by this invention is: provide a kind of and carry and aggregate-storing system from steel pipe storing district to the automated material of producing storage bin; Also to have the labor strength of alleviating simultaneously; Increase work efficiency, safety performance is good, realizes characteristics such as automated production linking.
For addressing the above problem; The present invention adopts following technical scheme: feed bin is logistics system to the material district; Comprise steel pipe material district storing mechanism, chain delivery machanism, production storage bin part, said steel pipe material district storing mechanism is provided with buffering storage bin and buffering storing up-down bin, and said buffering storage bin has discharging opening; Discharging opening is connected with chain delivery machanism; Said production storage bin is connected with production storing up-down bin, and storing up-down bin is connected with chain delivery machanism, produces storage bin and is provided with the steel pipe feeding port.
Said chain delivery machanism is " n " font, and it is provided with the half moon hook.
Said production storage bin is provided with produces feed bin layering bin and steel pipe feeding port, and the layering bin is for more than two-layer at least.
The upper end, inclined-plane of said layering bin is provided with the steel pipe feeding mouth, and the lower end, inclined-plane of layering bin is provided with the steel pipe discharging opening, and the steel pipe discharging opening of said every layer of layering bin communicates, and communicates with the storage rack discharging opening again.
Steel pipe flows to chain delivery machanism through buffering storage bin discharging opening; Chain delivery machanism is defeated by the steel pipe material and is produced storing up-down bin; Producing storing up-down bin successively is delivered to steel pipe on the production storage bin layering bin; Accomplish the steel pipe's production storing, process through steel pipe material loading confession later process.
Description of drawings
Accompanying drawing 1: feed bin is the logistics system structural representation to the material district;
In the accompanying drawing 1: 1, pipe material district's storing mechanism, 2, buffering storing up-down bin, 3, the buffering storage bin, 4, buffering feed bin layering bin; 5, fender warehouse discharging raceway, 6, chain type promotes conveying mechanism, 7, promote actuating device, 8, the conveying mechanism support; 9, buffering raceway bracing frame, 10, chain type material loading conveying mechanism, 11, the material loading actuating device, 12, produce storing up-down bin; 13, produce storage bin, 14, produce feed bin layering bin, 15, produce feed bin discharging raceway, 16, produce storing material loading chain; 17, produce storing material loading sprocket wheel, 18, arc hook one, 19, arc hook two; 20, buffering storing material loading chain, 21, buffering storing material loading sprocket wheel, 22, steel pipe (round steel).
The specific embodiment
Logistics system describes in further detail to the material district to a kind of feed bin of the present invention in conjunction with the drawings below.
Shown in accompanying drawing 1; Feed bin is distinguished logistics system to material and is comprised that pipe material district storing mechanism 1, chain type promote parts such as conveying mechanism 2, chain type material loading conveying mechanism 10, production storage bin 13; Pipe material district storing mechanism 1 is provided with buffering storing automatic lifting material rest 2, buffering storage bin 3; Buffering storage bin 3 is provided with buffering feed bin layering bin 4 and fender warehouse discharging raceway 5; Chain type promotes conveying mechanism 2 and is provided with lifting actuating device 7, buffering storing material loading chain 20, arc hook 2 19 and buffering storing material loading sprocket wheel 21, and chain type material loading conveying mechanism 10 is provided with material loading actuating device 11, produces storing material loading chain 16, produces storing material loading sprocket wheel 17; Arc hook 1; Chain type promotes conveying mechanism 2, chain type material loading conveying mechanism 10 is connected with conveying mechanism support 8 simultaneously, and buffering raceway bracing frame 9 is fixed on the conveying mechanism support 8, and steel pipe 22 can roll on buffering raceway bracing frame 9 roller surfaces; Producing storage bin 13 is provided with production storing up-down bin 12, produces storage bin 13; Produce storage bin 13 and be provided with production feed bin layering bin 14, produce feed bin discharging raceway 15, fender warehouse discharging raceway 5 promotes conveying mechanism 2 with chain type and is connected, and chain type material loading conveying mechanism 10 is connected with production material loading automatic lifting material rest 12.
Principle of work of the present invention is: at " band conveyor DTII type carrying roller " manufacturing line steel pipe (round steel) feed bin when logistics system needs automatic feeding and material loading storing to material district; Fender warehouse discharging raceway 5 is delivered to assigned address with steel pipe 22 in advance in the pipe material district storing mechanism 1; Start chain type and promote the lifting actuating device 7 on the conveying mechanism 2; Driving buffering storing material loading chain 20 through buffering storing material loading sprocket wheel 21 moves; Be fixed on arc hook 2 19 on the buffering storing material loading chain 20 and move steel pipe 22 is limited in the hook and promotes conveying, steel pipe 22 by gravitys that promote on the conveying mechanism 2 roll downwards along buffering raceway bracing frame 9, start the material loading actuating device 11 on the chain type material loading conveying mechanism 10; Move through producing storing material loading sprocket wheel 17 drive production storing material loading chains 16; Be fixed on the steel pipe 22 that arc hook 1 drives on the buffering raceway bracing frames 9 on the production storing material loading chain 16 and move, and flow to production material loading automatic lifting material rest 12, material loading automatic lifting material rest 8 is given steel pipe the production feed bin layering bin of producing on the storage bin 13 14; Successively pile; Accomplish the material loading storing, produce feed bin discharging raceway 15 steel pipe 22 fixed points are seen off, and be connected with production facilities.
The invention has the beneficial effects as follows: can realize steel pipe is carried and storing from the material district to the automated material of producing storage bin, alleviate labor strength, production efficiency is high, and safety performance is good, and conveying and storage capacity are big, are connected with automated production.

Claims (1)

1. material is distinguished the feed bin logistics system; Comprise steel pipe material district storing mechanism, chain delivery machanism, production storage bin part, said steel pipe material district storing mechanism is provided with buffering storage bin and buffering storing up-down bin, and said buffering storage bin has discharging opening; Discharging opening is connected with chain delivery machanism; Said production storage bin is connected with production storing up-down bin, and storing up-down bin is connected with chain delivery machanism, produces storage bin and is provided with the steel pipe feeding port.  
According to the said material of claim 1 district to the feed bin logistics system, it is characterized in that: said chain delivery machanism be " n" font, it is provided with the half moon hook.
3. arrive the feed bin logistics system according to the said material of claim 1 district; It is characterized in that: be provided with the layering bin on said buffering storage bin and the production storage bin; The layering bin is for more than two-layer at least, and layering bin upper surface is horizontal by certain angle, and attitude takes the form of inclined plane.
4. arrive the feed bin logistics system according to the said material of claim 3 district; It is characterized in that: the upper end, inclined-plane of said layering bin is provided with the steel pipe feeding mouth; The lower end, inclined-plane of layering bin is provided with the steel pipe discharging opening; The steel pipe discharging opening of said every layer of layering bin communicates, and communicates with the storage rack discharging opening again.
CN2012201811467U 2012-04-26 2012-04-26 Logistics system from material storage area to material storage bin Expired - Lifetime CN202594361U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012201811467U CN202594361U (en) 2012-04-26 2012-04-26 Logistics system from material storage area to material storage bin

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012201811467U CN202594361U (en) 2012-04-26 2012-04-26 Logistics system from material storage area to material storage bin

Publications (1)

Publication Number Publication Date
CN202594361U true CN202594361U (en) 2012-12-12

Family

ID=47311922

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012201811467U Expired - Lifetime CN202594361U (en) 2012-04-26 2012-04-26 Logistics system from material storage area to material storage bin

Country Status (1)

Country Link
CN (1) CN202594361U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105712100A (en) * 2016-03-02 2016-06-29 杭州电子科技大学 Automatic code spraying and stacking machine for spandex filament paper pipes and use method of automatic code spraying and stacking machine
CN106429269A (en) * 2016-11-17 2017-02-22 安徽工业大学 Express transportation robot
CN106826352A (en) * 2016-12-23 2017-06-13 昆山昆光自动化科技有限公司 A kind of full-automatic storage bar system of processing
CN109455471A (en) * 2018-11-30 2019-03-12 登封市启明轩程控设备有限公司 Rod piece hoisting equipment and dried noodle machine return lever system
CN115418466A (en) * 2022-05-25 2022-12-02 临海伟星新型建材有限公司 Pipe conveying assembly of plastic pipe continuous annealing furnace

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105712100A (en) * 2016-03-02 2016-06-29 杭州电子科技大学 Automatic code spraying and stacking machine for spandex filament paper pipes and use method of automatic code spraying and stacking machine
CN105712100B (en) * 2016-03-02 2017-11-17 杭州电子科技大学 A kind of spandex thread paper tube automatic code-spraying piler and its application method
CN106429269A (en) * 2016-11-17 2017-02-22 安徽工业大学 Express transportation robot
CN106826352A (en) * 2016-12-23 2017-06-13 昆山昆光自动化科技有限公司 A kind of full-automatic storage bar system of processing
CN106826352B (en) * 2016-12-23 2019-01-15 昆山昆光自动化科技有限公司 A kind of full-automatic storage bar system of processing
CN109455471A (en) * 2018-11-30 2019-03-12 登封市启明轩程控设备有限公司 Rod piece hoisting equipment and dried noodle machine return lever system
CN115418466A (en) * 2022-05-25 2022-12-02 临海伟星新型建材有限公司 Pipe conveying assembly of plastic pipe continuous annealing furnace
CN115418466B (en) * 2022-05-25 2024-02-13 临海伟星新型建材有限公司 Pipe transmission assembly of plastic pipe continuous annealing furnace

Similar Documents

Publication Publication Date Title
CN102642707A (en) Logistic system from material section to material warehouse
CN202594361U (en) Logistics system from material storage area to material storage bin
CN103950574B (en) Pipe automatic packing machine
CN103029993A (en) Stacking device suitable for layered staggered superposition of goods of stacking machine
CN203612655U (en) Tile automatic stacking device
CN203652796U (en) Material bag tray unstacker
CN104801481B (en) High energy efficiency pocket segregation apparatus
CN204823359U (en) Cardboard loading attachment
CN202201478U (en) Automatic bottle body overturning and conveying mechanism
CN205766951U (en) A kind of processing of stone feedstock device
CN103787087A (en) Automatic stacking system for precast pile reinforcement cages
CN202226370U (en) Automatic feeding system for cross members of container
CN105501992A (en) Automatic low stacking machine
CN203095029U (en) Conveyer line tray recycling device
CN103171901A (en) Discharging system allowing front sides and reverse sides of container gooseneck tanks to be stacked
CN209427657U (en) Workpiece buffer memory device
CN207511203U (en) A kind of feed mechanism for turnover box
CN106742282A (en) A kind of bag folding containerized machine
CN203199680U (en) Stacking device suitable for layered and staggered superposition of goods of stacker crane
CN103144926A (en) Reinforcement rotating conveying mechanism of mesh welding machine
CN206494176U (en) A kind of bag folding containerized machine
CN104590899A (en) Automatic stacking machine for crude tobacco hemp bags
CN104494932B (en) It is a kind of to move automatically bag mechanism
CN104477578B (en) A kind of automatic feeder of indoor apparatus of air conditioner packaging structure
CN204384462U (en) Packaging body depalletizer

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: SHENZHEN CEMCN CO., LTD.

Free format text: FORMER NAME: SHENZHEN CEMCN LTD.

CP01 Change in the name or title of a patent holder

Address after: 518000 Guangdong city of Shenzhen province Luohu District Cuizhu North South East Kelly building two floor

Patentee after: Shenzhen City Tuo Tuo electromechanical Limited by Share Ltd

Address before: 518000 Guangdong city of Shenzhen province Luohu District Cuizhu North South East Kelly building two floor

Patentee before: Shenzhen CEMCN Ltd.

C56 Change in the name or address of the patentee
CP02 Change in the address of a patent holder

Address after: 518000, Guangdong Province, Longgang District, Henggang Shenzhen Street Ping Road No. 138, 101

Patentee after: Shenzhen City Tuo Tuo electromechanical Limited by Share Ltd

Address before: 518000 Guangdong city of Shenzhen province Luohu District Cuizhu North South East Kelly building two floor

Patentee before: Shenzhen City Tuo Tuo electromechanical Limited by Share Ltd

C56 Change in the name or address of the patentee
CP02 Change in the address of a patent holder

Address after: 518000 Guangdong province Shenzhen City Pingshan Kengzi streets rongshou Ludongdeta high-tech factory 1 building two layer

Patentee after: Shenzhen City Tuo Tuo electromechanical Limited by Share Ltd

Address before: 518000, Guangdong Province, Longgang District, Henggang Shenzhen Street Ping Road No. 138, 101

Patentee before: Shenzhen City Tuo Tuo electromechanical Limited by Share Ltd

CX01 Expiry of patent term

Granted publication date: 20121212

CX01 Expiry of patent term