CN202578779U - Large-framework concrete gob-side separation wall - Google Patents

Large-framework concrete gob-side separation wall Download PDF

Info

Publication number
CN202578779U
CN202578779U CN 201220101514 CN201220101514U CN202578779U CN 202578779 U CN202578779 U CN 202578779U CN 201220101514 CN201220101514 CN 201220101514 CN 201220101514 U CN201220101514 U CN 201220101514U CN 202578779 U CN202578779 U CN 202578779U
Authority
CN
China
Prior art keywords
divider wall
framework
concrete
along
empty
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220101514
Other languages
Chinese (zh)
Inventor
惠兴田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 201220101514 priority Critical patent/CN202578779U/en
Application granted granted Critical
Publication of CN202578779U publication Critical patent/CN202578779U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

The utility model relates to a large-framework concrete gob-side separation wall, which is formed by supporting bodies and a cementing material filled between the supporting bodies. The material of each supporting body is one or more of a building block, a steel pipe, a concrete framework or a gangue. The large-framework concrete gob-side separation wall has a simple structure and is convenient to use. A plurality of gob-side separation walls which can be adapted to complicated underground conditions of a coal mine can be derived. A large-framework pre-stress steel pipe concrete structure separation wall and a large-framework pre-stress framework concrete separation wall are separation walls which have primary supporting forces and are adapted to large-inclined-angle coal layers. The separation wall has the advantages of fast construction speed, high labor efficiency and good construction effect, and can be widely applied to industries of the coal mine, a metallurgical mine, a water conservancy project, an underground building, national defense and the like.

Description

Big skeleton concrete is along empty divider wall
Technical field
The utility model belongs to the colliery construction field, is specifically related to a kind of big skeleton concrete along empty divider wall.
Background technology
Some gob side entry retainings of face adopt high water filling material divider wall or concrete continuous wall, though the application of such divider wall technology is a lot, have the hypodynamic shortcoming of the slow and early stage support of setting rate, cause the influence to safety in production easily.
The utility model content
The purpose of the utility model is the deficiency that is to prior art, provides a kind of simple in structure, and cost is low, and efficiency of construction is high, has setting load and is adapted to large-inclination-angle coal bed big skeleton concrete along empty divider wall.
For realizing above-mentioned purpose, the technical scheme that the utility model adopts is: a kind of big skeleton concrete is characterized in that by supporter along empty divider wall, and the cementitious materials of between supporter, filling is formed.
Said support body material is one or more in building block, steel pipe, concrete frame or the spoil.
Said supporter is that the column shape of monomer column or multiple concrete block masonry is arranged.
Said supporter is the body of wall that is arranged on along goaf side.
Said supporter is the column that is arranged on along four jiaos of empty divider walls.
Said column stage casing is provided with the prestressing force unit.
Said cementitious materials is the filler that hydraulic material or organic-inorganic reaction generate.
The utility model compared with prior art has the following advantages:
Big skeleton concrete has high strength roof supporting in time along empty divider wall, prevents the inbreak of top board nexine, does not influence the work plane ordinary production, can practice thrift support material, and working security is high.
Description of drawings
Fig. 1 is the utility model embodiment one sketch map.
Fig. 2 is the utility model embodiment two sketch mapes.
Fig. 3 is the utility model embodiment three sketch mapes.
Fig. 4 is the utility model embodiment four sketch mapes.
Fig. 5 is the utility model embodiment five sketch mapes.
Description of reference numerals:
1-filling cementitious matter;
The 2-building block;
3-vertical support unit;
4-prestressing force unit;
The 5-supporting member;
The 6-spoil;
The specific embodiment
Embodiment one:
A kind of big skeleton concrete is along empty divider wall, forms the column frame of multiple lines and multiple rows by building block 2, and the skeleton slit of building block 2 being formed with the filling cementitious matter 1 of hydraulic material is filled and completely constituted complete body of wall.
Filling cementitious matter 1 is a hydraulic material.
Embodiment two:
A kind of big skeleton concrete is made up of along the knee wall of the body of wall both sides of empty divider wall building block 2 along empty divider wall, with the filling cementitious matter 1 of hydraulic material slit between the knee wall of building block 2 compositions is filled completely to constitute big skeleton concrete along empty divider wall.
The filler that filling cementitious matter 1 generates for the organic-inorganic reaction.
Embodiment three:
A kind of big skeleton concrete is along empty divider wall, is made up of along the support column of four jiaos of the bodies of wall of empty divider wall building block 2, and the slit is filled and completely constituted big skeleton concrete along empty divider wall between the support column of building block 2 being formed with the filling cementitious matter 1 of hydraulic material.
Embodiment four:
A kind of big skeleton concrete is along empty divider wall; Form along the support column of four jiaos of empty divider walls by vertical support unit 3; 3 centres, vertical support unit are provided with prestressing force unit 4 up and down, with the filling cementitious matter 1 of hydraulic material slit between the support column are filled completely to constitute big skeleton concrete along empty divider wall.
Vertical support unit 3 is steel pipe or concrete frame.
Embodiment five:
A kind of big skeleton concrete is along empty divider wall; Form along the peripheral support column of empty divider wall by supporting member 5; Empty divider wall centre, edge is provided with spoil 6, with the filling cementitious matter 1 of hydraulic material slit between the support column is filled completely to constitute big skeleton concrete along empty divider wall.
Big skeleton concrete has high strength along empty divider wall, and in time roof supporting prevents the inbreak of top board nexine, does not influence the work plane ordinary production, can practice thrift support material, and working security is high.

Claims (7)

1. one kind big skeleton concrete is characterized in that by supporter along empty divider wall, and the cementitious materials of between supporter, filling is formed.
2. big skeleton concrete according to claim 1 is characterized in that along empty divider wall said support body material is one or more in building block, steel pipe, concrete frame or the spoil.
3. big skeleton concrete according to claim 1 and 2 is characterized in that along empty divider wall said supporter is the column shape arrangement roof supporting of monomer column roof supporting or concrete block masonry.
4. big skeleton concrete according to claim 1 and 2 is characterized in that along empty divider wall said supporter is the body of wall that is arranged on along goaf side.
5. big skeleton concrete according to claim 1 and 2 is characterized in that along empty divider wall said supporter is the column that is arranged on along four jiaos of empty divider walls.
6. big skeleton concrete according to claim 5 is characterized in that along empty divider wall said column is provided with the prestressing force unit in the middle of comprising.
7. big skeleton concrete according to claim 1 and 2 is along empty divider wall, and it is characterized in that being used for the middle cementitious materials of supporter is the filler that hydraulic material or organic-inorganic reaction generate.
CN 201220101514 2012-03-16 2012-03-16 Large-framework concrete gob-side separation wall Expired - Fee Related CN202578779U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220101514 CN202578779U (en) 2012-03-16 2012-03-16 Large-framework concrete gob-side separation wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220101514 CN202578779U (en) 2012-03-16 2012-03-16 Large-framework concrete gob-side separation wall

Publications (1)

Publication Number Publication Date
CN202578779U true CN202578779U (en) 2012-12-05

Family

ID=47248200

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220101514 Expired - Fee Related CN202578779U (en) 2012-03-16 2012-03-16 Large-framework concrete gob-side separation wall

Country Status (1)

Country Link
CN (1) CN202578779U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103089298A (en) * 2013-01-23 2013-05-08 中国矿业大学 Structure and method for building side direction multicolumn gob-side entry retaining filling wall body
CN103195476A (en) * 2013-04-11 2013-07-10 中国矿业大学 Portable waste rock retaining cage
CN104594950A (en) * 2015-01-04 2015-05-06 北京瑞诺安科新能源技术有限公司 Coal mine underground flexible spray coating temporary sealing wall and building method thereof
CN112431630A (en) * 2020-10-27 2021-03-02 河南理工大学 Novel resistance-increasing type large-deformation gob-side entry retaining roadside support structure and construction method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103089298A (en) * 2013-01-23 2013-05-08 中国矿业大学 Structure and method for building side direction multicolumn gob-side entry retaining filling wall body
CN103195476A (en) * 2013-04-11 2013-07-10 中国矿业大学 Portable waste rock retaining cage
CN104594950A (en) * 2015-01-04 2015-05-06 北京瑞诺安科新能源技术有限公司 Coal mine underground flexible spray coating temporary sealing wall and building method thereof
CN104594950B (en) * 2015-01-04 2018-04-13 北京瑞诺安科新能源技术有限公司 A kind of underground coal mine flexible spray temporary airtight wall and its construction method
CN112431630A (en) * 2020-10-27 2021-03-02 河南理工大学 Novel resistance-increasing type large-deformation gob-side entry retaining roadside support structure and construction method

Similar Documents

Publication Publication Date Title
CN201771516U (en) Supporting structure of district passing through cavern and underground river for tunnel
CN101761338B (en) Gob-side entry retaining method of a solid filling coal mining half-section one-leg shed
CN202578779U (en) Large-framework concrete gob-side separation wall
CN102011611A (en) Strip-type filling method of high water-swelling material for controlling movement and deformation of overlying strata
CN202851078U (en) High water material filling column bag body
CN207813629U (en) A kind of strong dynamic load anti-impact supporting new structure in tunnel
CN203978443U (en) A kind of suspension device of gob side entry retaining
CN202767102U (en) Combined type balance weight retaining wall
CN205135707U (en) Withstand voltage fire seal in collecting space area
CN205387946U (en) Closed support
CN203654267U (en) Concrete prefabricated pile
CN205400744U (en) Utilize along empty supporting construction who realizes closely coal seam exploitation in lane that protects
CN203669102U (en) Connecting structure of combined walls and steel beam
CN203334319U (en) Novel joint device of underground diaphragm wall
CN202047398U (en) Steel cable dam
CN204370426U (en) A kind of retaining wall construction equipment based on multilayer template
CN103670449A (en) Local blocking and supporting technology of coal bunker
CN202736375U (en) Experimental model for filling, and displacing fault protection coal pillar in arch bridge type
CN203256771U (en) Semi-gravity type column and board combined retaining wall structure
CN202250119U (en) Totally-enclosed U-shaped shed support frame for roadway supporting
CN105332720B (en) The construction method of I-shaped steel skeleton water-proof sealing
CN105781611B (en) Across the mineral building construction design method of company based on indeterminate three-hinged arch
CN204370472U (en) A kind of retaining wall construction equipment
CN203347805U (en) Bearing seepage prevention structure of bottom of karst area pressure tunnel
CN104452806B (en) A kind of two-way multi-arch type view retaining wall based on soft based structures

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121205

Termination date: 20130316