CN202574214U - Simple structure of the front throat area in parking garage of rail passenger transport system - Google Patents

Simple structure of the front throat area in parking garage of rail passenger transport system Download PDF

Info

Publication number
CN202574214U
CN202574214U CN 201220202710 CN201220202710U CN202574214U CN 202574214 U CN202574214 U CN 202574214U CN 201220202710 CN201220202710 CN 201220202710 CN 201220202710 U CN201220202710 U CN 201220202710U CN 202574214 U CN202574214 U CN 202574214U
Authority
CN
China
Prior art keywords
track
frog
storehouse
line
track switch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220202710
Other languages
Chinese (zh)
Inventor
孙继忠
张奔
张旭久
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Design Corp
Original Assignee
Third Railway Survey and Design Institute Group Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Railway Survey and Design Institute Group Corp filed Critical Third Railway Survey and Design Institute Group Corp
Priority to CN 201220202710 priority Critical patent/CN202574214U/en
Application granted granted Critical
Publication of CN202574214U publication Critical patent/CN202574214U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model provides a simple structure of the front throat area in a parking garage of a rail passenger transport system. The structure comprises an outlet line, an inlet line, tracks, turnouts and a train parking and inspecting depot, wherein the outlet line and the inlet line are arranged on the ground; the tracks and the turnouts are arranged on depot lines; the outlet line and the inlet line enter a depot and then end at a turnout frog J4 and a turnout frog J2; a track G6 extends out of an extended line and a curved line from a turnout frog JI to the turnout frog J2 and enters the train parking and inspecting depot; a track G15 extends out of an extended line and a curved from a turnout frog J3 to the turnout frog J4 and enters the train parking and inspecting depot; and a plurality of groups of turnouts are arranged on the track G6 and the track J15; and a plurality of tracks extend out of the track G6 and the track J15 and enter the train parking and inspecting depot. Compared with a common structure, the simple structure with the arrangement has the advantages that the field length is shortened by 36.660 m, laid rails are saved by 571 m, the occupied land can be saved by 6,599 m<2>, and the area of the internal vacant lot of the throat area is increased by 1,541 m<2>; and the pattern is beautiful and elegant and facilitates the design and construction in related professions.

Description

The brief structure of bottle-neck section before the orbit passenger transport system parking area storehouse
Technical field
The utility model provides the brief structure of bottle-neck section before a kind of orbit passenger transport system parking area storehouse.
Background technology
Orbital Transport Systems is comparatively safe with it, technology maturation, freight volume is big, speed is high, to the adaptable characteristics of adverse weather, just in high speed development.The city rail passenger-traffic system occurs in many cities gradually; Car depot and parking area are necessity of city rail passenger-traffic system and important component part, and the appropriate design of a section bottle-neck section has crucial effects for conveying efficiency, productive costs, soil utilization, working environment, Employees'Emotions.
The design custom in state iron station throat district is continued to use in the design of bottle-neck section before some phase library, goes out two backbones of lambda line and directly penetrates in the parking area storehouse.In order to adapt to the distance between centers of tracks in the parking area storehouse, like 4.8m, 4.6m, 4.2m, also go specially to study with the storehouse in the scissors crossing that adapts of distance between centers of tracks, perhaps establish a line straight line and penetrate in the storehouse, another line is established place's reverse curve and penetrated in the storehouse, and is as shown in Figure 2.Conventional design is generally trunk structure; Trunk and branch have tangible difference: the major branch on the trunk structure goes out from trunk; The branch structure is to tell major branch from trunk, from major branch, tells branch more then, sees that from realm of nature the trees of trunk will be higher than the trees of no trunk.The bottle-neck section at the station of state's iron is generally trunk structure, and main track is a trunk, connects whole station.If bottle-neck section is also made trunk structure before the phase library of subway field, then occupation of land is many, and it is many to lay a railway track, the distance travelled length of train inbound/outbound process.Moreover, when receiving the landform restriction, also to look for the place to arrange again in addition, perhaps bottle-neck section track switch moved to the station direction, worsen the plane vertical section condition that lambda line.
Summary of the invention
Have problems for solving in the above-mentioned technology, the purpose of the utility model provides the brief structure of bottle-neck section before a kind of orbit passenger transport system parking area storehouse, is beneficial to save the area, and minimizing is laid a railway track, and simplified structure, is that general design is created a good condition.
For realizing above-mentioned purpose; The technical scheme that the utility model adopts provides the brief structure of bottle-neck section before a kind of orbit passenger transport system parking area storehouse; This structure includes track, track switch and the parking row inspection storehouse of building to go out on the ground lambda line and parking lot line in; Wherein: said go out end at the frog J4 of track switch and the frog J2 of track switch after lambda line gets into parking area; Then through extended line from the frog J1 of track switch to the frog J2 of track switch with curve extraction orbit G6 and get into the row that stop and examine the storehouse; Through extended line from the frog J3 of track switch to the frog J4 of track switch and curve extraction orbit G15 and get into the row inspection storehouse of stopping, said track G6 and track G15 are provided with many group track switches and draw many tracks and get into the row inspection storehouses of stopping.
Said many group track switches all near the row inspection storehouse of stopping the storehouse door be provided with.
The beneficial effect of the utility model is:
Save the distance of land used by frog J3 frog to the parking area storehouse door of track switch, common way is 258.849m, and brief way is 222.189m, piece of smooth land contraction in length 36.660m.The row inspection storehouse width that stops among the present invention is 112.8m, presses 180m parking area width gauge, and 6599 square meters of can saving the area are amounted to 9.9 mu.Reduce cost by transferring 200,000 yuan/mu of valencys, can practice thrift 1,980,000 yuan,, can practice thrift 49,500,000 yuan by 5,000,000 yuan/mu of suburbs market prices.
Reduce and walk line length, 20 trains warehouse-in traveling total length shortens 730m.
Minimizing is laid a railway track, the common way 3024.5m that lays a railway track, and the brief way 2452.7m that lays a railway track, brief texture ratio ordinary construction is saved the 571m that lays a railway track.Reduce by 285.5 ten thousand yuan of costs.
Reduce the laying of power supply, telecommunications and signal facility, reduce by 228.4 ten thousand yuan of costs.
Utilize the thought design vehicle section of the utility model, the land used of being practiced thrift with lay a railway track generally more than the parking area saving.Reach more than 100 according to a statistics a plurality of cities, whole nation rail transportation projects yet to be built, every line is one one section, and save the area is very considerable with cost.The station track of drawing in the parking area storehouse per 5 strands for a branch of, the station track is arranged compactly in the bundle, spacious penetrating between bundle and the bundle, the vacant lot area of vacateing is big, and is open, is convenient to layout like facilities such as contact system bar, weep drain, cable ducts.Also can the vacant lot of vacateing be used to afforest and beautify environment, reduce exposed land area.
The integral layout spaciousness is penetrating, and the outline area comparison of bottle-neck section own reduces 39m according to ordinary construction outline area 2, but inner vacant area is compared according to ordinary construction increase 1541m 2, be convenient to the design and construction of relevant speciality.Integral layout is elegant in appearance.
Description of drawings
Fig. 1 is the planar view of the utility model bottle-neck section;
Fig. 2 is the planar view of common bottle-neck section;
Fig. 3 is the vacant lot figure after the bottle-neck section deduction 2.4m of the utility model influences line;
Fig. 4 is the vacant lot figure after common bottle-neck section deduction 2.4m influences line.
Among the figure:
F, the row inspection storehouse of stopping
CX, go out trajectory RX, go into trajectory G1~G20, track
The frog of the brief structure bottle-neck section track switch of J1~J21, the utility model
C1~C21, ordinary construction bottle-neck section track switch
track, curve and straight line point of connection sign and circuit number
Figure BDA00001614096100032
track switch and numbering
The specific embodiment
In conjunction with accompanying drawing and embodiment to the orbit passenger transport system parking area storehouse of the utility model before the brief structure of bottle-neck section explain.
The brief structure design thought of bottle-neck section is no trunk structure before the orbit passenger transport system parking area storehouse of the utility model, and bottle-neck section is not through train before the section garage parking, and the speed and the frequency of every station track turnover train equate; The problem that does not have effective length; Therefore the perforation circuit needn't painstakingly be set, the station track in the deflection axis outside turns in advance, and track switch is arranged near the storehouse door as far as possible; The side control station track does not have under the situation of waste outside, and in-to-in bottle-neck section sky more is good more.
There are 2 important difference in the parking area bottle-neck section of orbit passenger transport system and state iron station throat district:
One. the train frequency that passes through on every station track at state iron station is unequal, and main line that is main track have through train and speed and frequency than higher, therefore must establish the perforation circuit.The parking area of orbit passenger transport system and vehicle phase library anterior pharynx larynx district be not through train (even through car depot generally passes through train yet); Every station track passes in and out train every day in the storehouse speed and usage frequency are not high, therefore just can not establish yet yet and needn't establish the perforation circuit specially.Therefore some track switch need not go out from trunk.
Two. all there is effective long problem in every station track at state iron station, and under the motionless situation of outermost track switch, it is good more that the effectively long track switch of general influence is more outwards moved, within the outline of bottle-neck section general arrange fuller.There is not effective long problem in bottle-neck section before the parking area storehouse of orbit passenger transport system, as long as satisfy the principle of floor plan, door is good more closely more apart from the storehouse for track switch, and the side control station track does not have under the situation of waste outside, and marginal track in-to-in bottle-neck section sky more is good more.
According to these two important difference, the brief structure of bottle-neck section before the design parking area storehouse:
One. painstakingly do not establish the perforation circuit, need turn in advance through the circuit in the track switch steer axis outside;
Two. satisfying under the prerequisite of standard, track switch is arranged near parking area storehouse door;
Three. do the sky bottle-neck section, the bottle-neck section of doing on preceding two basis is then empty than common bottle-neck section.
The meaning of doing the sky bottle-neck section is very big, and many people do not recognize that it is important, and the empty more good more theory of bottle-neck section is felt puzzled.Because bottle-neck section is storehouse external equipment the most concentrated place at most, bottle-neck section is done after the sky, no matter design and construction makes things convenient for configuration to other professional all providing like signalling set, power equipment supply, plumbing equipment.
The brief structure of bottle-neck section is before the orbit passenger transport system parking area storehouse of the utility model; This structure includes track, track switch and the parking row inspection storehouse of building to go out on the ground lambda line and parking lot line in; Said go out end at the frog J4 of track switch and the frog J2 of track switch after lambda line gets into parking area; Then through extended line from the frog J1 of track switch to the frog J2 of track switch with curve extraction orbit G6 and get into the row that stop and examine the storehouse; Through extended line from the frog J3 of track switch to the frog J4 of track switch and curve extraction orbit G15 and get into the row inspection storehouse of stopping, said track G6 and track G15 are provided with many group track switches and draw many tracks and get into the row inspection storehouses of stopping.Said many group track switches all are provided with near the storehouse door of the row inspection storehouse F that stops.
The brief structure of bottle-neck section is achieved in that before the orbit passenger transport system parking area storehouse of the utility model
This structure includes the track of building to go out on the ground lambda line and parking lot line in, track switch and parking row inspection storehouse, and the said lambda line CX of going out is not to penetrate into the row that stop to examine in the F of storehouse after getting into parking area with RX, but after end at frog J4 and the track switch of track switch the frog of frog J2.Extended line and the curve of the frog J2 of frog J1 through track switch and track switch are drawn into storehouse track G6 then, and extended line and the curve of the frog J3 through track switch and the frog J4 of track switch are drawn into storehouse track G15.
On the basis of track G6, be equipped with many group track switches and draw many tracks of G1~G10, and the extended line and the curve connection of drawing with J2.
On the basis of track G15, be equipped with many group track switches and draw many tracks of G11~G20, and the extended line and the curve connection of drawing with J4.
Satisfying under the prerequisite of standard, track switch arranges near the storehouse door of the row inspection storehouse F that stops, thereby reduces the quantity of laying a railway track, do the sky bottle-neck section.
Table 1 be the utility model bottle-neck section from the frog J3 of track switch to the storehouse gate way analytical table;
Table 2 for common bottle-neck section from the C3 frog to the storehouse gate way analytical table (J3 and C3 are same point);
Table 3 is that parking area parking row of the present invention are examined the preceding bottle-neck section of storehouse F and common bottle-neck section is examined each station track path analysis synopsis in the F of storehouse from the frog J3 entering parking area parking row of track switch.
The main technical standards relevant with the utility model
1. the rail-car field wire adopts the 50kg/m rail.
2. track switch parking lot line adopts No. 7 simple turnouts of 50kg/m rail and scissors crossing.Long 11.194m before the track switch, the long 12.433m in back, 8 ° 07 ' 48 at track switch angle ".
3. the circuit radius of curve is not less than 160m in the track plan parking area, and intermediate straight line length is not less than 10m between two curves.Track switch can not be arranged within the curve ranges, and track switch two end distance EOC portions are not less than 5m.Insert the make-up rail that is not less than 4.5m between the adjoining point.Minimum line spacing 4.5m between parallel lines.Storehouse linear portion in front of the door is not less than 20m.To be used for car depot's effect more obvious for the brief structure of bottle-neck section before the orbit passenger transport system parking area storehouse of the utility model.
Figure BDA00001614096100061
Figure BDA00001614096100071
Figure BDA00001614096100081

Claims (2)

1. the brief structure of bottle-neck section before the orbit passenger transport system parking area storehouse, this structure includes track, track switch and the parking row inspection storehouse of building to go out on the ground lambda line and parking lot line in, it is characterized in that:
Said go out end at the frog J4 of track switch and the frog J2 of track switch after lambda line gets into parking area; Then through extended line from the frog J1 of track switch to the frog J2 of track switch with curve extraction orbit G6 and get into the row that stop and examine the storehouse; Through extended line from the frog J3 of track switch to the frog J4 of track switch and curve extraction orbit G15 and get into the row inspection storehouse of stopping, said track G6 and track G15 are provided with many group track switches and draw many tracks and get into the row inspection storehouses of stopping.
2. the brief structure of bottle-neck section before the orbit passenger transport system parking area according to claim 1 storehouse is characterized in that: said many group track switches all are provided with near the storehouse door in the row inspection storehouse of stopping.
CN 201220202710 2012-05-08 2012-05-08 Simple structure of the front throat area in parking garage of rail passenger transport system Expired - Lifetime CN202574214U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220202710 CN202574214U (en) 2012-05-08 2012-05-08 Simple structure of the front throat area in parking garage of rail passenger transport system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220202710 CN202574214U (en) 2012-05-08 2012-05-08 Simple structure of the front throat area in parking garage of rail passenger transport system

Publications (1)

Publication Number Publication Date
CN202574214U true CN202574214U (en) 2012-12-05

Family

ID=47243658

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220202710 Expired - Lifetime CN202574214U (en) 2012-05-08 2012-05-08 Simple structure of the front throat area in parking garage of rail passenger transport system

Country Status (1)

Country Link
CN (1) CN202574214U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102649434A (en) * 2012-05-08 2012-08-29 铁道第三勘察设计院集团有限公司 Simple structure for front throat region of parking lot library of railway passenger transport system
CN106087603A (en) * 2016-08-03 2016-11-09 中铁第四勘察设计院集团有限公司 Urban track traffic eight word formula washing track hyperbola shortens branch-cut bridge compact Layout structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102649434A (en) * 2012-05-08 2012-08-29 铁道第三勘察设计院集团有限公司 Simple structure for front throat region of parking lot library of railway passenger transport system
CN106087603A (en) * 2016-08-03 2016-11-09 中铁第四勘察设计院集团有限公司 Urban track traffic eight word formula washing track hyperbola shortens branch-cut bridge compact Layout structure
CN106087603B (en) * 2016-08-03 2017-12-26 中铁第四勘察设计院集团有限公司 The word formula washing track hyperbola of urban track traffic eight shortens branch-cut bridge compact Layout structure

Similar Documents

Publication Publication Date Title
CN102649434A (en) Simple structure for front throat region of parking lot library of railway passenger transport system
CN102501852B (en) Layout structure for integration of train depot and junction station of urban rail
CN102529980A (en) Intensive structure for railcar-train parks
CN104032980B (en) A kind of crossing bus station&#39;s arrangement and public transport passing method
CN205370061U (en) Automatic lifting and horizontal moving formula stereo garage who accesses car outside storehouse
CN108891423B (en) Track line structure of reserved branch line condition
CN202574214U (en) Simple structure of the front throat area in parking garage of rail passenger transport system
CN104032993A (en) Novel rectangular intelligent three-dimensional garage with multiple exchange areas
CN104477170A (en) Standard bridge type elevated station
CN203296425U (en) Novel rectangular intelligent three-dimensional garage with multiple exchange areas
CN107585166A (en) A kind of track traffic turn back line arrangement
CN107054380B (en) Arrangement structure and construction method of urban rail transit incoming and outgoing line rail
CN207089296U (en) A kind of urban track traffic line section station that comes in and goes out integrates with arrangement
CN204401479U (en) The novel station of tram
CN202574213U (en) Intensive structure for railroad train park lot
CN102194019A (en) Method for determining transportation facility layout of high-speed rail comprehensive transportation hub
CN209833610U (en) Through type tramcar vehicle base overall structure
CN204296710U (en) A kind of standardization bridge type elevated station
CN210554777U (en) Arrangement structure for connecting rails in parallel between turnout and field section for urban rail transit
CN208636829U (en) A kind of heavy haul railway annular loading station
CN107128315A (en) The arrangement of main line and branch line and the track traffic for having the structure integrate with station
CN208363743U (en) A kind of rail traffic two-layer vehicle segment structure
CN110539754A (en) Arrangement structure for connecting rails in parallel between turnout and field section for urban rail transit
CN112031490A (en) Vehicle base structure of moving platform of suspended monorail train and process flow
CN206841422U (en) A kind of track traffic turned back using section is turned back cable architecture

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 300010 Hebei District, Zhongshan Road, No. 10,

Patentee after: China Railway Design Group Limited

Address before: 300010 Hebei District, Zhongshan Road, No. 10,

Patentee before: China Railway Third Survey and Design Institute Group Ltd.

CP01 Change in the name or title of a patent holder
CX01 Expiry of patent term

Granted publication date: 20121205

CX01 Expiry of patent term