CN202559223U - Novel precast approach bridge - Google Patents

Novel precast approach bridge Download PDF

Info

Publication number
CN202559223U
CN202559223U CN2012201910157U CN201220191015U CN202559223U CN 202559223 U CN202559223 U CN 202559223U CN 2012201910157 U CN2012201910157 U CN 2012201910157U CN 201220191015 U CN201220191015 U CN 201220191015U CN 202559223 U CN202559223 U CN 202559223U
Authority
CN
China
Prior art keywords
bridge
gripper shoe
precast
access bridge
bridge deck
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012201910157U
Other languages
Chinese (zh)
Inventor
李来宾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xingtai Road and Bridge Construction General Co.
Original Assignee
XINGTAI ROAD AND BRIDGE CONSTRUCTION GENERAL CO
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XINGTAI ROAD AND BRIDGE CONSTRUCTION GENERAL CO filed Critical XINGTAI ROAD AND BRIDGE CONSTRUCTION GENERAL CO
Priority to CN2012201910157U priority Critical patent/CN202559223U/en
Application granted granted Critical
Publication of CN202559223U publication Critical patent/CN202559223U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides a novel precast approach bridge which comprises a bridge panel and supporting plates for supporting the bridge panel, and is characterized in that the bridge panel is of an integral structure combined by at least two parts; a group of parallel supporting plates are arranged below each bridge panel; and the opposite surfaces of the supporting plate at the butt joint of two bridge panels are parallel to each other and are planes. By adopting a split reinforced concrete structure, the approach bridge is precast in a factory, and the conventional total road surface is not required to be destroyed during installation, so that the construction time of an urban overpass is shortened; and moreover, by adopting the split precast and combined bearing mode, the precast approach bridge has high bearing capacity and has less possibility of corroded, and the service life of the approach bridge is prolonged.

Description

A kind of novel prefabricated access bridge
Technical field
The invention belongs to the bridge construction field, especially a kind of novel prefabricated access bridge structure, it can assemble, shorten the time of the building method of urban interchange fast on the basis of not removing original road surface.
Background technology
The traffic congestion phenomenon of modern society big and medium-sized cities is serious day by day, how to realize the urgent problem that solves of the unimpeded human needs of being of urban traffic.The main cause of city traffic congestion is that road junction, city contact is seized by the throat; Because traffic lights are set lets pass by turns; The vehicle that causes all to pass through slatterns the time more than at least 70%, and just compelled to take the road time nearly more than 70% more for vehicle, thereby the formation traffic is often stopped up.Address this problem and can make the at grade intersection of existing road change graded crossing into, promptly build the urban traffic overpass bridge through improving the crossing, let each Hang Qilu of vehicle, do not disturb mutually.
But modern city builds up already, must shut off traffic in the building course of overpass bridge, and the urban traffic of blocking up is made the matter worse.Even prefabricate mode that is employed in bridge modules such as the column of overground part, bent cap, bent cap bearing and bridge panel can reduce the time that part shuts off traffic, but the access bridge part still needs cast on-site.Therefore, need at first original road surface to be abolished, formwork cast then needs also after the cast that maintenance is more than 28 days at least, and the time that shuts off traffic like this is oversize, and the pressure that urban traffic is caused is too big.If adopt the access bridge of steel work, though shorten the time that shuts off traffic, the abutment of steel work access bridge is embedded in underground for a long time, is very easily penetrated into underground inorganic base or acid corrosion, shortens the application life of access bridge.
Summary of the invention
The technical problem that the utility model will solve provides a kind of prefabricated novel access bridge; It adopts split type reinforced concrete structure, and is at first prefabricated in factory, need not abolish whole existing road surfaces during installation; Not only shortened building the time of urban interchange; And adopting mode separate prefabricated, the combination load-bearing, its weight capacity is strong, be difficult for being corroded, and prolonged the application life of access bridge.
For solving the problems of the technologies described above; The technical scheme that the present invention takes is: a kind of prefabricated novel access bridge; Comprise bridge deck and the gripper shoe that supports said bridge deck; Crucial improvement is that said bridge deck are combined into overall structure by two parts at least, and every part bridge deck below is provided with one group of parallel gripper shoe, and the opposite face of the gripper shoe of two bridge deck joints is parallel to each other and is the plane.
The joint of adjacent two bridge deck and gripper shoe is cast with concrete.
The joint of adjacent two bridge deck and gripper shoe is provided with the reinforcing bar dowel that stretches out.
The construction sequence of above-mentioned access bridge:
A, according to access bridge footing width and size and center, the dark 5cm-10cm groove of milling on original road surface, the levelling of making cement concrete;
B, prefabricated access bridge is installed in the groove successively, the groove that is covered with cement concrete is aimed at the access bridge base angle, makes it firm;
C, with junction, original road surface, according to access bridge headrest size, the open channels on original road surface, the degree of depth surpasses height of headrest 10cm, in ditch, fills out 10cm solid cement concrete, and access bridge ground connection piece is installed;
D, install after, build access bridge with the concrete unification and connect seam, re-lay bridge floor.
The bottom of said gripper shoe is fixed in the groove on the road surface by concrete.Through the structure of concrete, prevent the relative ground motion of access bridge with access bridge and an integral body of ground formation.
The beneficial effect that adopts technique scheme to produce is:
1) the utility model will adopt the access bridge of precast reinforced mixed earth, save the curing time of cast-in-site access bridge, thereby accelerate the speed of building of urban interchange, make city intersection of completion in 7 days become possibility; And the steel concrete access bridge is corrosion-resistant, cost is low;
2) every section access bridge all adopts the branch body structure, is convenient to transportation and prefabricated; The joint of two bridge deck and gripper shoe has rebar connector, is cast with concrete, with two bridge deck of butt joint and the structure of an integral body of gripper shoe formation, has increased safety reliability;
3) groove forms an overall structure to the gripper shoe of access bridge with being provided with on the ground through concrete, has increased the stable degree of access bridge, effectively prevents moving of access bridge.
Description of drawings
Fig. 1 is the sectional structure sketch map of the utility model access bridge cross section;
Wherein, 1-1, left side plate, 1-2, intermediate plate, 1-3, right side plate, 2, gripper shoe, 3, groove, 4, concrete.
The specific embodiment
Fig. 1 is the sectional structure sketch map of the utility model cross section, and it comprises bridge deck and the gripper shoe 2 that supports said bridge deck, and in the present embodiment, said bridge deck are formed overall structure by intermediate plate 1-2, left side plate 1-1 and right side plate 1-3; The below of said intermediate plate 1-2, left side plate 1-1 and right side plate 1-3 is equipped with one group of parallel gripper shoe of one cast; The opposite face of the gripper shoe of the joint of on the left side plate 1-1 and intermediate plate 1-2 and intermediate plate 1-2 and right side plate 1-3 is parallel to each other and is the plane; The gripper shoe bottom footing that connects is half shape of a hoof; The footing that is two gripper shoe bottoms of intermediate plate 1-2 all is half shape of a hoof; The side gripper shoe bottom footing of said left side plate 1-1 and right side plate 1-3 is the shape of a hoof, and opposite side gripper shoe bottom is half shape of a hoof; Referring to Fig. 1.The joint of bridge deck that connect and gripper shoe 2 is provided with the reinforcing bar dowel that stretches out, and in the gap of reinforcing bar dowel, is cast with concrete 4, and bridge deck that connect like this and the gripper shoe that connects are integrally formed structure.
The utility model can also be designed to by two or four access bridges that connect with top according to the width and the carrying situation of bridge floor.
The work progress of the utility model: A, according to access bridge gripper shoe footing width and size and center, the dark 5cm-10cm groove 3 of milling on original road surface, the levelling of making cement concrete;
B, prefabricated access bridge is installed in the groove 3 successively, access bridge gripper shoe footing is aimed at the groove 3 that is covered with cement concrete, makes it firm;
C, with junction, original road surface, according to access bridge headrest size, the open channels on original road surface, the degree of depth surpasses height of headrest 10cm, in ditch, fills out 10cm solid cement concrete, and the ground connection piece is installed;
D, install after, build access bridge with the concrete unification and connect seam, re-lay bridge floor.
To sum up, employing the utility model is simple in structure, cost is lower, be convenient to transportation, supporting capacity is strong, and has shortened building the time of urban interchange.

Claims (4)

1. novel prefabricated access bridge; Comprise bridge deck and the gripper shoe (2) that supports said bridge deck; It is characterized in that said bridge deck are combined into overall structure by two parts at least; Every part bridge deck below is provided with one group of parallel gripper shoe (2), and the opposite face of the gripper shoe of adjacent two bridge deck joints is parallel to each other and is the plane.
2. a kind of novel prefabricated access bridge according to claim 1 is characterized in that the joint of adjacent two bridge deck and gripper shoe (2) is cast with concrete (4).
3. a kind of novel prefabricated access bridge according to claim 1 is characterized in that the joint of adjacent two bridge deck and gripper shoe (2) is provided with the reinforcing bar dowel that stretches out.
4. a kind of novel prefabricated access bridge according to claim 1 is characterized in that the bottom of said gripper shoe is fixed in the groove (3) on the road surface by concrete.
CN2012201910157U 2012-05-02 2012-05-02 Novel precast approach bridge Expired - Fee Related CN202559223U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012201910157U CN202559223U (en) 2012-05-02 2012-05-02 Novel precast approach bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012201910157U CN202559223U (en) 2012-05-02 2012-05-02 Novel precast approach bridge

Publications (1)

Publication Number Publication Date
CN202559223U true CN202559223U (en) 2012-11-28

Family

ID=47208893

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012201910157U Expired - Fee Related CN202559223U (en) 2012-05-02 2012-05-02 Novel precast approach bridge

Country Status (1)

Country Link
CN (1) CN202559223U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102677581A (en) * 2012-05-02 2012-09-19 邢台路桥建设总公司 Novel prefabricated bridge approach and construction method thereof
CN106436516A (en) * 2016-11-29 2017-02-22 王爱民 House type approach bridge and approach bridge combined interchange

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102677581A (en) * 2012-05-02 2012-09-19 邢台路桥建设总公司 Novel prefabricated bridge approach and construction method thereof
CN102677581B (en) * 2012-05-02 2015-11-11 邢台路桥建设总公司 Reinforced concrete prefabricated access bridge and construction method thereof
CN106436516A (en) * 2016-11-29 2017-02-22 王爱民 House type approach bridge and approach bridge combined interchange
CN106436516B (en) * 2016-11-29 2018-10-09 王爱民 Room formula access bridge and combinations thereof formula viaduct

Similar Documents

Publication Publication Date Title
CN102155025B (en) Late poured band type assembled pipe jacking working open caisson
CN204530418U (en) A kind of steel plate combination beam bridge
CN104264575B (en) A kind of prestress steel case Concrete Combination Continuous Beam bridge structure and construction technology
CN205474784U (en) Prefabricated T roof beam
CN102644296A (en) Prefabricate assembly type pipe jacking working well
CN202031108U (en) Post-poured band type fabricated pipe-jacking working well
CN205557351U (en) Dun ding sets up structure that bridge was widened to steel bent cap
CN105133486A (en) Corrugated steel web few-main-beam structure
CN109610311A (en) Prefabrication and assembly construction L-type floorings seam construction and implementation method
CN105133493A (en) Embedded track structure suitable for middle-span and small-span bridge and construction method
CN103074846B (en) A kind of lateral bearing system beam bridge
CN202559223U (en) Novel precast approach bridge
CN110565510A (en) Prefabricated assembled segmental pier structure and construction method thereof
CN107905084B (en) RPC steel truss combined bridge deck and continuous beam bridge
CN202369930U (en) Door opening type bearing framed bent device for multiplayer concrete box girder
CN206053079U (en) Assembled beam slab integrated composite floor
CN201891068U (en) U-shaped prestressed concrete continuous beam bridge
CN208235303U (en) A kind of precast prestressed modularization viaduct
CN103669193A (en) Laterally spliced combination T beam with wavy steel webs and construction method thereof
CN104032862B (en) Assembled girder steel seam line L shape mixing coupled wall and construction method thereof
CN102425258A (en) Steel reinforced concrete combined hollow floor and construction method thereof
CN105696455A (en) Box type web simply supported U-shaped girder of double-track railway
CN205012221U (en) Embedded track structure that is fit for medium and small span bridge
CN109505230B (en) Integral beam falling prevention structure of pier on arch
CN205046668U (en) Connected node suitable for frame supported shear wall structure reverse construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: XINGTAI BRIDGE AND ROAD CONSTRUCTION GENERAL CO.

Free format text: FORMER OWNER: XINGTAI ROAD AND BRIDGE CONSTRUCTION GENERAL CO.

Effective date: 20140529

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20140529

Address after: 054001, 79 Qiao Road, Qiaodong District, Hebei, Xingtai

Patentee after: Xingtai Bridge and Road Construction General Co.

Address before: 054001, 79 Qiao Road, Qiaodong District, Hebei, Xingtai

Patentee before: Xingtai Road and Bridge Construction General Co.

ASS Succession or assignment of patent right

Owner name: XINGTAI ROAD AND BRIDGE CONSTRUCTION GENERAL CO.

Free format text: FORMER OWNER: XINGTAI BRIDGE AND ROAD CONSTRUCTION GENERAL CO.

Effective date: 20140901

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20140901

Address after: 054001, 79 Qiao Road, Qiaodong District, Hebei, Xingtai

Patentee after: Xingtai Road and Bridge Construction General Co.

Address before: 054001, 79 Qiao Road, Qiaodong District, Hebei, Xingtai

Patentee before: Xingtai Bridge and Road Construction General Co.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121128

Termination date: 20160502

CF01 Termination of patent right due to non-payment of annual fee