CN106436516A - House type approach bridge and approach bridge combined interchange - Google Patents
House type approach bridge and approach bridge combined interchange Download PDFInfo
- Publication number
- CN106436516A CN106436516A CN201611072819.4A CN201611072819A CN106436516A CN 106436516 A CN106436516 A CN 106436516A CN 201611072819 A CN201611072819 A CN 201611072819A CN 106436516 A CN106436516 A CN 106436516A
- Authority
- CN
- China
- Prior art keywords
- bridge
- arch
- formula
- reversed beam
- access bridge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 27
- 239000010959 steel Substances 0.000 claims abstract description 27
- 238000010276 construction Methods 0.000 claims abstract description 20
- 230000007246 mechanism Effects 0.000 claims abstract description 20
- 230000003321 amplification Effects 0.000 claims abstract description 8
- 238000003199 nucleic acid amplification method Methods 0.000 claims abstract description 8
- 230000003014 reinforcing effect Effects 0.000 claims description 32
- 230000008676 import Effects 0.000 claims description 8
- 230000004888 barrier function Effects 0.000 claims description 5
- 239000000725 suspension Substances 0.000 claims description 5
- 238000003466 welding Methods 0.000 claims description 5
- 239000000203 mixture Substances 0.000 claims 1
- 238000005516 engineering process Methods 0.000 abstract description 3
- 238000009435 building construction Methods 0.000 abstract 1
- 238000010586 diagram Methods 0.000 description 5
- 230000015572 biosynthetic process Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 239000003795 chemical substances by application Substances 0.000 description 1
- 239000000567 combustion gas Substances 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 230000003247 decreasing effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 210000003205 muscle Anatomy 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 239000008400 supply water Substances 0.000 description 1
- 230000007306 turnover Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C1/00—Design or layout of roads, e.g. for noise abatement, for gas absorption
- E01C1/04—Road crossings on different levels; Interconnections between roads on different levels
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The invention relates to the technical field of traffic bridges, in particular to a house type approach bridge and an approach bridge combined urban interchange adopting an arch steel structure. The interchange comprises a main bridge and the approach bridge, wherein the approach bridge comprises an approach bridge pavement and a house type support mechanism, a plurality of house type support mechanisms are arranged at the lower part of the approach bridge pavement and arranged side by side, and each house type support mechanism comprises an eave, beams and walls; the main bridge comprises arch steel structure reversed beams, arch pavement boards, bridge posts and bridge piers, and each arch steel structure reversed beam comprises a reversed beam lining plate, a reversed beam arch plate, a reversed beam outer edge plate and a cross beam. A building construction technology is taken for reference, and the house type approach bridge and the approach bridge combined interchange are researched. The house type approach bridge structure is adopted, a bridge body is not fixed by the aid of a well digging pile, full-range or half-range road closure is not required during construction of the approach bridge, the road passing capability is improved, and construction jamming is substantially reduced. The house type approach bridge can be hoisted and transported to a construction place after being prefabricated on a construction site, the stability of the approach bridge is improved by means of amplification feet, jacking pockets are preformed below the bridge piers, and the bridge piers are easily jacked up by jacks when the bridge piers sink or are adjusted in position. The bridge body safety is effectively guaranteed, and the house type approach bridge is particularly suitable for collapsible loess layers.
Description
Technical field
The present invention relates to traffic bridge technical field of buildings, particularly room formula access bridge and combinations thereof formula viaduct.
Background technology
As the automobile pollution in each city increases year by year, congestion in road difficulty of governance and town road build pressure by
Year aggravation, the setting such as subway, elevated overpass link urban traffic pressure is all being built in a lot of cities, by facts have proved laying
Elevated overpass is to administer one of traffic above-ground congestion best bet, but a lot of reasons governs building for urban interchange
Make, trace it to its cause in terms of mainly including following four:
1st, building viaduct needs to carry out full width or half range road closure, and road closure generally requires the 1-2 year, and car is caused on narrow road surface
Current inconvenience, is declined by efficiency and is further exacerbated by congestion.
2nd, viaduct is bulky, is to realize three-dimensional multi-direction current often design-build over long distances and the drawing of more number
Bridge, the distance of access bridge is long not only to hinder the appearance of the city, and seriously increases the engineering time.
3rd, building viaduct needs in advance well-digging stake, and well stake quantity is many and close, it is easy to supply water below urban road, combustion
Gas, communication pipes intersect, and construction environment complex jamming is many, easily damage other pipelines, increase difficulty of construction and time further.
4th, single bridge investment generally requires several ten million yuan, and its access bridge construction accounts for the 70% of total operating expenses, costly cost
Greatly.
Content of the invention
The present invention solves the deficiencies in the prior art and provides a kind of room formula access bridge that construction is quick, with low cost, combination is various
And combinations thereof formula city arch steel structure viaduct.
The technical solution adopted for the present invention to solve the technical problems is:
Room formula access bridge and combinations thereof formula viaduct, including main bridge and access bridge, the access bridge includes that access bridge road surface and room formula support machine
Structure, access bridge road surface bottom arranges multiple room formula supporting mechanisms, and room formula supporting mechanism is made up of eaves, house beam and body of wall.
Host bridge includes arch steel structure reversed beam, cambered road panel, bridge post and bridge pier, the arch steel structure reversed beam bag
Reversed beam interior lining panel, reversed beam arch sheet, reversed beam curtain plate and crossbeam is included, is provided between the reversed beam interior lining panel and reversed beam curtain plate
Horizontal reinforcing plates, lower horizontal reinforcing plates and vertical reinforcing plates, the reversed beam arch sheet two ends are located at formation arch on little tension board,
Connected by big tension board between reversed beam arch sheet, big tension board top is by supporting transverse slat and supporting riser and cambered road panel
Connection, big tension board bottom is connected with crossbeam, is provided with bridge pier connecting plate, adjacent crossbeam between adjacent arch steel structure reversed beam
It is provided with lateral connection bolt and longitudinally connected bolt.
Centre gangway is provided between the room formula supporting mechanism, on body of wall, opens up import and export, passway respectively, import and export logical
Cross passway to connect with centre gangway;Body of wall bottom arranges body of wall and amplifies foot;Eaves sidepiece is provided with eaves end face connection reinforcing bar, leads to
Cross welding eaves end face connection reinforcing bar both sides eaves link into an integrated entity, body of wall amplifies foot sidepiece and is provided with amplification foot connection reinforcing bar,
By amplifying foot connection reinforcing bar, body of wall amplification foot in both sides is linked into an integrated entity;Room formula supporting mechanism is provided with electric wire through-hole and lifting
Hole.
Access bridge road surface both sides arrange crash barrier and mounting seat, and mounting seat is provided with guard rail, and access bridge road surface is provided with
Expansion joint.
Compensator is provided between the arch steel structure reversed beam and bridge post, and the compensator support block of compensator upper end supports horizontal stroke
Beam, bridge post is connected by bridge post base and bridge pier.
The arch steel structure reversed beam top is provided with lifting suspension ring, and arch steel structure reversed beam bottom is provided with multiple bridge posts and bridge
Pier, bridge pier is provided with jacking pocket, arranges oblique pull bracing frame and pontic bridge intercolumniation gap jacking pocket between bridge post.
Also include to avenge canopy, snow canopy includes carriage, supporting sleeve, crossbeam and arch capplce, supporting sleeve by carriage and
Crossbeam links into an integrated entity, and supporting sleeve is inserted into canopy post, fixing screws locking canopy post and supporting sleeve, carriage top connection arch
Shape capplce and snow refractory slab, arch capplce and snow refractory slab are fixed by rivet, arrange upper pillar stand between carriage and arch capplce,
Lower pillar stand and carriage inclined support bar are set between support frame and crossbeam.
The arch capplce is provided with canopy eaves inclined strut and canopy eaves horizontal strut, is provided with snow board and handrail between canopy post.
Also include to avenge net, snow net includes arch grid structure and tread plate, and arch grid structure splices waviness net, arch grid structure
Top is provided with many tread plates.
The present invention has the beneficial effect that:
1st, the present invention has used for reference building building technology, works out room formula access bridge and combinations thereof formula viaduct.Using room formula access bridge knot
Structure is no longer rely on stake fixed bridge body of digging a well, and no longer needs when building access bridge to carry out full width or half range road closure, generally requires 7 days.Carry
High road passage capability, is greatly decreased construction congestion.Room formula access bridge can pass through in the prefabricated rear hoisting transportation in building site to construction ground
Amplifying foot increases access bridge stability, prefabricated jacking pocket under bridge pier, when pier sinking or position adjustments with jack light and
The jack-up that easily lifts is padded.Pontic safety is effectively ensured, is particularly suitable for yellow soil horizon of collapsibility use.
2nd, the realization left-hand bend necessarily Long span construction that arch steel structure reversed beam can be both economical, is reducing pontic thickness
The length of access bridge is shortened while degree, deadweight, the pontic slope control that connects is 8%.Reduce bridge floor stress torque, it is possible to
Reach that pontic is thick, across footpath big, from heavy and light, eliminate the well-digging stake for building viaduct routine on this basis.According to pressure etc.
In pressure divided by compression area formula, on the basis of existing bituminous paving bears automobile pressure, overstriking bridge pier simultaneously sets up amplification
Foot, and the envisaged underneath reparation special jack seat in bridge pier, when setting of ground, can jack-up bridge pier padded, tiltedly
Top can also shift, and this is the best approach for administering no well stake viaduct disadvantage.The approximate rainbow of the shape of arch viaduct is graceful beautiful
See, the functional parts such as protective plate, baffle are set up, also can be publicized as advertisement position, the viaduct through dressing up can more be formed
One of city landscape.
3rd, bridge construction is no longer rely on stake of digging a well, and construction is greatly reduced with engineering equipment, and construction costs is greatly reduced, constructs
Technical threshold reduces, can prefabricated, can lift, installs soon, can move, shockproof, can be greatly lowered and invest and the duration.Room
Storehouse, switchgear house, office etc. can also be made in son, just in case there is setting of ground, can be padded with jack-up house.Underground piping has
During problem, mobile trenchless rehabilitation can be removed at any time.
4th, Xue Peng ensure that northern area winter driving safety, and snow canopy has preferably blocked sleet, and the gradient of viaduct is carried
10% is risen, the length of access bridge can shorten, fault-tolerant amount of designing and constructing increases.While setting up snow net further, road surface is effectively prevent
Roll repeatedly to form frost zone through automobile, pre- anti-slip.
Particular technique parameter is as follows in sum:
1st, construction-time significantly shortens, and round-the-clock job just can complete pontic construction for about one week.
2nd, operating expenses reduces 70%.
3rd, track quantity can be built as needed.
4th, the main gradient 8%, is easy to vehicle pass-through and construction needs, and shortens access bridge length.
Description of the drawings
Fig. 1 is the structural representation of the present invention;
Fig. 2 is the A-A of Fig. 1 to schematic diagram;
Fig. 3 is the B-B direction schematic diagram of Fig. 1;
Fig. 4 is the C-C of Fig. 2 to schematic diagram;
Fig. 5 is snow booth structure schematic diagram;
Fig. 6 is snow canopy side view;
Fig. 7 is Fig. 6 partial enlarged drawing;
Fig. 8 is snow web frame schematic diagram.
In figure:1st, reversed beam interior lining panel 2, reversed beam arch sheet 3, little tension board 4, upper horizontal reinforcing plates 5, lower horizontal reinforcing plates 6,
Vertical reinforcing plates 7, reversed beam curtain plate 8, big tension board 9, support transverse slat 10, support portrait 11, cambered road panel 12, crossbeam 13,
Compensator support block 14, compensator 15, bridge post 16, bridge post base 17, bridge pier 18, jacking pocket 19, pontic bridge intercolumniation gap thousand
Jin footstock hole 20, oblique pull bracing frame 21, lateral connection bolt 22, bridge pier connecting plate 23, lifting suspension ring 24, longitudinally connected bolt
25th, guard rail 26, mounting seat;27th, crash barrier 28, eaves 29, eaves end face connection reinforcing bar 30, house beam 31, passway 32, turnover
Mouth 33, body of wall 34, body of wall amplifies foot 35, electric wire through-hole 36, centre gangway 37, plays repeated hole 38, amplify foot connection reinforcing bar 39, stretch
Seam 40, access bridge road surface 41, carriage 42, supporting sleeve 43, crossbeam 44, lower pillar stand 45, carriage inclined support bar 46, upper pillar stand
47th, canopy eaves inclined strut 48, canopy eaves horizontal strut 49, arch capplce 50, snow refractory slab 51, rivet 52, canopy post 53, handrail 54, gear snow
Plate 55, fixing screws 56, arch grid structure 57, tread plate.
Specific embodiment
Room formula access bridge and combinations thereof formula viaduct, including main bridge and access bridge, the access bridge includes access bridge road surface 40 and room formula
Supporting mechanism, 40 bottom of access bridge road surface arranges multiple room formula supporting mechanisms, and room formula supporting mechanism is arranged side by side, room formula supporting mechanism
It is made up of eaves 28, house beam 30 and body of wall 33.Host bridge includes arch steel structure reversed beam, cambered road panel 11,15 and of bridge post
Bridge pier 17, the arch steel structure reversed beam includes reversed beam interior lining panel 1, reversed beam arch sheet 2, reversed beam curtain plate 7 and crossbeam 12, described
Horizontal reinforcing plates 4, lower horizontal reinforcing plates 5 and vertical reinforcing plates 6 are provided between reversed beam interior lining panel 1 and reversed beam curtain plate 7, described
2 two ends of reversed beam arch sheet are located at formation arch on little tension board 3, are connected by big tension board 8 between reversed beam arch sheet 2, big drawing
8 top of power plate is by supporting transverse slat 9 and supporting riser 10 to be connected with cambered road panel 11, and 8 bottom of big tension board is with crossbeam 12 even
Connecing, bridge pier connecting plate 22, adjacent crossbeam 12 is provided between adjacent arch steel structure reversed beam and is provided with lateral connection bolt 21
With longitudinally connected bolt 24.
Centre gangway 36 is provided between the room formula supporting mechanism, opens up import and export 32, passway 31 on body of wall 33 respectively,
Import and export 32 to connect with centre gangway 36 by passway 31;33 bottom of body of wall arranges body of wall and amplifies foot 34;28 sidepiece of eaves sets
There is eaves end face connection reinforcing bar 29, by welding eaves end face connection reinforcing bar 29, both sides eaves 28 are linked into an integrated entity, body of wall is put
34 sidepiece of big foot is provided with amplification foot connection reinforcing bar 38, by amplifying foot connection reinforcing bar 38, body of wall amplification foot 34 in both sides is connected into one
Body;Room formula supporting mechanism is provided with electric wire through-hole 35 and plays repeated hole 37.
40 both sides of access bridge road surface arrange crash barrier 27 and mounting seat 26, and mounting seat 26 is provided with guard rail 25, access bridge
Road surface 40 is provided with expansion joint 39.
Compensator 14, the compensator support block of 14 upper end of compensator is provided between the arch steel structure reversed beam and bridge post 15
13 support beams 12, bridge post 15 is connected by bridge post base 16 and bridge pier 17.
The arch steel structure reversed beam top is provided with lifting suspension ring 23, and arch steel structure reversed beam bottom is provided with multiple bridge posts 15
With bridge pier 17, bridge pier 17 is provided with jacking pocket 18, arranges oblique pull bracing frame 20 and pontic bridge intercolumniation gap thousand between bridge post 15
Jin footstock hole 19.
Also include to avenge canopy, snow canopy includes carriage 41, supporting sleeve 42, crossbeam 43 and arch capplce 49, supporting sleeve 42
Carriage 41 and crossbeam 43 are linked into an integrated entity, supporting sleeve 42 is inserted into canopy post 52, fixing screws 55 are locked canopy post 52 and propped up
Support set pipe 42,41 top of carriage connects arch capplce 49 and snow refractory slab 50, and arch capplce 49 and snow refractory slab 50 are by rivet 51
Fixing, between carriage 41 and arch capplce 49, upper pillar stand 46 is set, between carriage 41 and crossbeam 43 setting lower pillar stand 44 and
Carriage inclined support bar 45.
The arch capplce 49 is provided with canopy eaves inclined strut 47 and canopy eaves horizontal strut 48, is provided with snow board between canopy post 52
54 and handrail 53.
Also include to avenge net, snow net includes arch grid structure 56 and tread plate 57, and arch grid structure 56 splices waviness net, arch
56 top of shape rack is provided with many tread plates 57.
During construction, reversed beam interior lining panel 1, reversed beam arch sheet 2, reversed beam curtain plate 7 are integrally welded, reversed beam interior lining panel 1 and anti-
Upper horizontal reinforcing plates 4, lower horizontal reinforcing plates 5 and vertical reinforcing plates 6 are welded between beam curtain plate 7, strengthen reversed beam integrated connection strong
Degree.2 two ends of reversed beam arch sheet are welded on little tension board 3 and form arch, between reversed beam arch sheet 2 by big tension board 8 even
Connect, 8 top of big tension board supports transverse slat 9 to reduce planted agent by supporting transverse slat 9 and supporting riser 10 to weld with cambered road panel 11
Infringement of the power to tension board, supports riser 10 to cause pontic to form casing stress and is unlikely to deform, 8 bottom of big tension board and crossbeam 12
Welding, forms complete arch girder construction.Connected in one, phase by bridge pier connecting plate 22 between adjacent arch steel structure reversed beam
Realize being bi-directionally connected locking by lateral connection bolt 21 and longitudinally connected bolt 24 on adjacent crossbeam 12.
The room formula supporting mechanism prefabricated in factory or ward can be transported afterwards, in being provided between room formula supporting mechanism
Centre passage 36, opens up import and export 32, passway 31 respectively on body of wall 33, import and export 32 by passway 31 with centre gangway 36 even
Logical, it is easy to personnel to enter, the later stage can be reconstructed as house or office space.33 bottom of body of wall arranges body of wall and amplifies foot 34, strengthens wall
Body stability and fastness;28 sidepiece of eaves is provided with eaves end face connection reinforcing bar 29, connects reinforcing bar 29 by welding eaves end face
Both sides eaves 28 are linked into an integrated entity, body of wall amplifies 34 sidepiece of foot and is provided with amplification foot connection reinforcing bar 38, connects steel by amplifying foot
Both sides body of wall is amplified foot 34 and links into an integrated entity by muscle 38, and upper and lower side is all fixedly connected, and ensures supporting & stablizing during vile weather
Property;Room formula supporting mechanism is provided with electric wire through-hole 35 and plays repeated hole 37, and it is smooth that convenient transhipment and later stage circuit lay debugging efforts
Carry out.
40 both sides of access bridge road surface arrange crash barrier 27 and mounting seat 26, can set up guard rail 25 in mounting seat 26, increase
Plus safeguard protection performance, access bridge road surface 40 is provided with expansion joint 39, and the bridge floor shape that temperature Change causes effectively is alleviated at expansion joint 39
Become.The arch steel structure reversed beam top is provided with lifting suspension ring 23, the segmental hoisting of achievable room formula access bridge and the main bridge of arch, arch
Shape steel construction reversed beam bottom is provided with multiple bridge posts 15 and bridge pier 17, and bridge pier 17 is provided with jacking pocket 18, and ground occurs depression
When can effectively adjust pier location and support angle, oblique pull bracing frame 20 and pontic bridge intercolumniation gap jack are set between bridge post 15
Bore 19, fine-tuning pontic and gap and its support angle of bridge post, realize various dimensions regulation.The supporting sleeve 42 of snow canopy will be propped up
Support frame 41 and crossbeam 43 are integrally welded, and supporting sleeve 42 is inserted into canopy post 52, and fixing screws 55 lock canopy post 52 and support set
Pipe 42,41 top of carriage connects arch capplce 49 and snow refractory slab 50, and arch capplce 49 and snow refractory slab 50 arrange riveting by multiple spot
Nail 51 is fixed, and welds upper pillar stand 46 between carriage 41 and arch capplce 49, welds lower pillar stand between carriage 41 and crossbeam 43
44 and carriage inclined support bar 45, support frame more stable firmly, using more safe and reliable under wind and snow environment.The arch
Capplce 49 is provided with canopy eaves inclined strut 47 and canopy eaves horizontal strut 48, lifts canopy eaves wind resistance, and minimizing inadvertently falls off event and sends out
Raw.Heavy snow weather being run into, arch grid structure 54 splices waviness net, Multi-contact is realized with road surface, lifts non-skid property, arch
Frame mode sleet is rolled to form frost zone, many tread plates 57 of 56 upper weld of arch grid structure, lifts vehicle driving safety
Property.
Claims (9)
1. room formula access bridge and combinations thereof formula viaduct, including main bridge and access bridge, it is characterised in that the access bridge includes access bridge road surface
(40) and room formula supporting mechanism, access bridge road surface (40) bottom arranges multiple room formula supporting mechanisms, and room formula supporting mechanism is by eaves
(28), house beam (30) and body of wall (33) composition.
2. formula access bridge in room according to claim 1 and combinations thereof formula viaduct, it is characterised in that host bridge includes arch
Steel construction reversed beam, cambered road panel (11), bridge post (15) and bridge pier (17), the arch steel structure reversed beam includes reversed beam interior lining panel
(1), reversed beam arch sheet (2), reversed beam curtain plate (7) and crossbeam (12), reversed beam interior lining panel (1) and reversed beam curtain plate (7) it
Between be provided with horizontal reinforcing plates (4), lower horizontal reinforcing plates (5) and vertical reinforcing plates (6), reversed beam arch sheet (2) two ends set
Arch is formed on little tension board (3), is connected by big tension board (8), big tension board (8) top between reversed beam arch sheet (2)
By supporting transverse slat (9) and supporting riser (10) to be connected with cambered road panel (11), big tension board (8) bottom is with crossbeam (12) even
Connecing, bridge pier connecting plate (22), adjacent crossbeam (12) is provided between adjacent arch steel structure reversed beam and is provided with lateral connection spiral shell
Bolt (21) and longitudinally connected bolt (24).
3. formula access bridge in room according to claim 1 and 2 and combinations thereof formula viaduct, it is characterised in that the room formula supports machine
Centre gangway (36) being provided between structure, opens up import and export (32), passway (31) on body of wall (33) respectively, imports and exports (32) and lead to
Cross passway (31) to connect with centre gangway (36);Body of wall (33) bottom arranges body of wall and amplifies foot (34);Eaves (28) sidepiece sets
There is eaves end face connection reinforcing bar (29), by welding eaves end face connection reinforcing bar (29), both sides eaves (28) linked into an integrated entity,
Body of wall amplifies foot (34) sidepiece and is provided with amplification foot connection reinforcing bar (38), amplifies both sides body of wall by amplifying foot connection reinforcing bar (38)
Foot (34) links into an integrated entity;Room formula supporting mechanism is provided with electric wire through-hole (35) and plays repeated hole (37).
4. formula access bridge in room according to claim 3 and combinations thereof formula viaduct, it is characterised in that access bridge road surface (40)
Both sides arrange crash barrier (27) and mounting seat (26), and mounting seat (26) is provided with guard rail (25), and access bridge road surface (40) are provided with
Expansion joint (39).
5. formula access bridge in room according to claim 4 and combinations thereof formula viaduct, it is characterised in that the arch steel structure is anti-
It is provided with compensator (14) between beam and bridge post (15), compensator support block (13) support beam (12) of compensator (14) upper end,
Bridge post (15) is connected by bridge post base (16) and bridge pier (17).
6. formula access bridge in room according to claim 4 and combinations thereof formula viaduct, it is characterised in that the arch steel structure is anti-
Beam top is provided with lifting suspension ring (23), and arch steel structure reversed beam bottom is provided with multiple bridge post (15) and bridge pier (17), bridge pier (17)
Jacking pocket (18) is provided with, oblique pull bracing frame (20) and pontic bridge intercolumniation gap jacking pocket are set between bridge post (15)
(19).
7. formula access bridge in room according to claim 2 and combinations thereof formula viaduct, it is characterised in that also include to avenge canopy, Xue Pengbao
Carriage (41), supporting sleeve (42), crossbeam (43) and arch capplce (49) is included, supporting sleeve (42) is by carriage (41) and horizontal stroke
Beam (43) links into an integrated entity, and supporting sleeve (42) is inserted into canopy post (52), fixing screws (55) locking canopy post (52) and support set
Pipe (42), carriage (41) top connection arch capplce (49) and snow refractory slab (50), arch capplce (49) and snow refractory slab (50) lead to
Cross rivet (51) fixing, upper pillar stand (46), carriage (41) and crossbeam are set between carriage (41) and arch capplce (49)
(43) lower pillar stand (44) and carriage inclined support bar (45) are set between.
8. formula access bridge in room according to claim 7 and combinations thereof formula viaduct, it is characterised in that arch capplce (49)
Canopy eaves inclined strut (47) and canopy eaves horizontal strut (48) is provided with, between canopy post (52), is provided with snow board (54) and handrail (53).
9. formula access bridge in room according to claim 2 and combinations thereof formula viaduct, it is characterised in that also include to avenge net, snow net bag
Arch grid structure (56) and tread plate (57) is included, arch grid structure (56) splices waviness net, and arch grid structure (56) top is provided with many
Root tread plate (57).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611072819.4A CN106436516B (en) | 2016-11-29 | 2016-11-29 | Room formula access bridge and combinations thereof formula viaduct |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611072819.4A CN106436516B (en) | 2016-11-29 | 2016-11-29 | Room formula access bridge and combinations thereof formula viaduct |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106436516A true CN106436516A (en) | 2017-02-22 |
CN106436516B CN106436516B (en) | 2018-10-09 |
Family
ID=58219814
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611072819.4A Expired - Fee Related CN106436516B (en) | 2016-11-29 | 2016-11-29 | Room formula access bridge and combinations thereof formula viaduct |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106436516B (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3895339B2 (en) * | 2004-06-24 | 2007-03-22 | 川崎重工業株式会社 | Approach structure of multilevel crossover bridge and its construction method |
JP4047093B2 (en) * | 2002-08-05 | 2008-02-13 | 三井造船株式会社 | Construction method of multilevel intersection road |
CN201704590U (en) * | 2010-06-19 | 2011-01-12 | 丁占科 | Overpass suitable for city crossroad |
CN202559223U (en) * | 2012-05-02 | 2012-11-28 | 邢台路桥建设总公司 | Novel precast approach bridge |
CN203755105U (en) * | 2014-02-12 | 2014-08-06 | 马平 | Overpass main body structure composed of assembled multiple concrete precast elements |
CN206359842U (en) * | 2016-11-29 | 2017-07-28 | 王爱民 | Room formula access bridge and combinations thereof formula viaduct |
-
2016
- 2016-11-29 CN CN201611072819.4A patent/CN106436516B/en not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4047093B2 (en) * | 2002-08-05 | 2008-02-13 | 三井造船株式会社 | Construction method of multilevel intersection road |
JP3895339B2 (en) * | 2004-06-24 | 2007-03-22 | 川崎重工業株式会社 | Approach structure of multilevel crossover bridge and its construction method |
CN201704590U (en) * | 2010-06-19 | 2011-01-12 | 丁占科 | Overpass suitable for city crossroad |
CN202559223U (en) * | 2012-05-02 | 2012-11-28 | 邢台路桥建设总公司 | Novel precast approach bridge |
CN203755105U (en) * | 2014-02-12 | 2014-08-06 | 马平 | Overpass main body structure composed of assembled multiple concrete precast elements |
CN206359842U (en) * | 2016-11-29 | 2017-07-28 | 王爱民 | Room formula access bridge and combinations thereof formula viaduct |
Also Published As
Publication number | Publication date |
---|---|
CN106436516B (en) | 2018-10-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106760529B (en) | Roof steel truss sliding assembly construction platform and installation method | |
CN110847063B (en) | Method for dismantling multi-span double-arch bridge | |
CN101215815B (en) | Method for building integrated cantilever structure composite road adapted for precipitous mountainous area | |
CN105970811A (en) | Construction technology for elevated bridge with large-span spatial 3D-surface fish-bellied box steel structure | |
CN104234447B (en) | Deep foundation ditch tool-type hangs stair | |
KR20100138121A (en) | Movable temporary structure for constructing composite covering arch structure | |
CN113931212A (en) | Road and bridge transition section structure for tramcar and construction method thereof | |
CN206359842U (en) | Room formula access bridge and combinations thereof formula viaduct | |
JP6262805B2 (en) | Temporary roadway with movable lifting column in tunnel and road construction method using the temporary roadway | |
CN105735056A (en) | Method for reinforcing railway through piling girders combined with I-steel cross girders | |
CN106436516B (en) | Room formula access bridge and combinations thereof formula viaduct | |
CN112610244B (en) | Prefabricated part for expanding existing elevated operation subway station platform and installation method thereof | |
CN111945572B (en) | Multi-connected arch bridge erecting machine and multi-connected arch bridge erecting method | |
CN111172819B (en) | Platform for assembling and walking shield trailer and construction method thereof | |
CN107217685A (en) | A kind of Portable piping lane side wall formwork jumbo | |
CN209759904U (en) | integral broken line overhead device for small radius curve railway | |
CN113944106A (en) | Steel trestle bridge channel for upper bridge of land short pier bridge and construction method of steel trestle bridge channel | |
CN112523097A (en) | Large-span bridge gantry crane and construction method thereof | |
CN212801166U (en) | Closed pedestrian bridge | |
CN109972531A (en) | It is a kind of for improving the external prestressing device of Bailey beam falsework span | |
JP3940587B2 (en) | Construction method of divided bridge type traffic route | |
CN113863134B (en) | Bridge deck structure capable of adjusting bridge deck elevation and bridge deck elevation adjusting method | |
CN217104668U (en) | Temporary construction trestle ramp of double-layer beam longitudinal steel truss | |
CN113387277B (en) | Railway shed tunnel T-shaped beam hoisting construction method | |
CN104404884B (en) | For the support of pier prestressed cap beam with extra length Construction Supporting System in water |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181009 |