CN104234447B - Deep foundation ditch tool-type hangs stair - Google Patents

Deep foundation ditch tool-type hangs stair Download PDF

Info

Publication number
CN104234447B
CN104234447B CN201410490893.2A CN201410490893A CN104234447B CN 104234447 B CN104234447 B CN 104234447B CN 201410490893 A CN201410490893 A CN 201410490893A CN 104234447 B CN104234447 B CN 104234447B
Authority
CN
China
Prior art keywords
steel
girder steel
ladder
stair
foundation ditch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410490893.2A
Other languages
Chinese (zh)
Other versions
CN104234447A (en
Inventor
丛欣江
王先堂
路长来
王昭
孙佳伟
李德全
孙克军
郭振虎
郭宏蕾
鲁兴
冷显军
韩邦栋
郭亚曦
郭超
蒋海涛
韩雷
赵前程
杨帅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BCEG Civil Engineering Co Ltd
Original Assignee
BCEG Civil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BCEG Civil Engineering Co Ltd filed Critical BCEG Civil Engineering Co Ltd
Priority to CN201410490893.2A priority Critical patent/CN104234447B/en
Publication of CN104234447A publication Critical patent/CN104234447A/en
Application granted granted Critical
Publication of CN104234447B publication Critical patent/CN104234447B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Steps, Ramps, And Handrails (AREA)

Abstract

本发明公开了一种深基坑用工具式吊挂楼梯,包括梯架、梯架支座和楼梯,梯架由两组梯架单元组成,两组梯架单元之间设置安装楼梯的间隙,每组梯架单元包括4个立柱,梯架单元的横截面呈矩形,立柱的上端与其上方的钢梁垂直固定连接,立柱的下端垂直伸向基坑底面;梯架支座与基坑围护结构固定连接,梯架支座包括2个或4个钢梁,钢梁固定在围护结构冠梁的上表面;楼梯自上而下依次安装在两组梯架单元之间,相邻楼梯之间的转角处设置休息平台,休息平台固定在梯架单元的内部空间。本发明的楼梯具有吊挂特点,楼梯自上而下安装,能够完全与基坑工程的工序紧密结合;便于施工人员通行,安全性能高,拆装速度快,周转率高。

The invention discloses a tool-type hanging staircase for deep foundation pits, which comprises a ladder frame, a ladder frame support and a staircase. Each set of ladder frame unit includes 4 columns, the cross section of the ladder frame unit is rectangular, the upper end of the column is vertically fixedly connected with the steel beam above it, and the lower end of the column extends vertically to the bottom of the foundation pit; the ladder frame support and the foundation pit enclosure The structure is fixedly connected. The ladder support includes 2 or 4 steel beams, and the steel beams are fixed on the upper surface of the crown beam of the enclosure structure; the stairs are installed between two sets of ladder units in sequence from top to bottom. A rest platform is set at the corner of the room, and the rest platform is fixed in the inner space of the ladder frame unit. The staircase of the present invention has the feature of hanging, the staircase is installed from top to bottom, and can be closely integrated with the process of foundation pit engineering; it is convenient for construction personnel to pass, has high safety performance, fast disassembly and assembly speed, and high turnover rate.

Description

深基坑用工具式吊挂楼梯Tool type hanging stairs for deep foundation pit

技术领域 technical field

本发明属于建筑工程技术领域,涉及一种用于建筑施工现场安全防护的楼梯,具体涉及一种吊挂在深基坑内的工具式楼梯。 The invention belongs to the technical field of construction engineering, and relates to a staircase used for safety protection at a construction site, in particular to a tool-type staircase suspended in a deep foundation pit.

背景技术 Background technique

基坑(foundationpit),是在基础设计位置按基底标高和基础平面尺寸所开挖的土坑。建筑基坑是指为进行建筑物(包括构筑物)基础与地下室的施工所开挖的地面以下空间。基坑属于临时性工程,其作用是提供一个空间,使基础的砌筑作业得以按照设计所指定的位置进行。根据建设部建质200987号文关于印发《危险性较大的分部分项工程安全管理办法的通知》规定,一般深基坑是指开挖深度超过5米(含5米)或地下室三层以上(含三层),或深度虽未超过5米,但地质条件和周围环境及地下管线特别复杂的工程。 A foundation pit is a soil pit excavated at the foundation design position according to the base elevation and foundation plane size. Building foundation pit refers to the space below the ground excavated for the construction of the foundation and basement of buildings (including structures). The foundation pit is a temporary project, and its function is to provide a space so that the foundation masonry can be carried out according to the position specified by the design. According to the Ministry of Construction's Jianzhi No. 200987 document on the issuance of the "Notice on the Safety Management Measures for Sub-projects with Higher Risks", the general deep foundation pit refers to the excavation depth exceeding 5 meters (including 5 meters) or the basement of more than three floors (including three floors), or projects whose depth does not exceed 5 meters, but the geological conditions, surrounding environment and underground pipelines are particularly complicated.

基坑工程主要包括基坑支护体系设计与施工和土方开挖,是一项综合性很强的系统工程。基坑工程要求岩土工程和结构工程技术人员密切配合。基坑工程是由地面向下开挖一个地下空间,深基坑四周一般设置垂直的挡土围护结构,围护结构一般是在开挖面基底下有一定插入深度的板(桩)墙结构。所述板(桩)墙主要有悬臂式、单撑式、多撑式。为了减小围护结构的变形,控制墙体的弯矩,需要在基坑四周设置支撑结构。至于深基坑围护结构类型,在我国应用较多的有板柱式、柱列式、重力式挡墙、组合式以及土层锚杆、逆筑法、沉井等类型。 Foundation pit engineering mainly includes the design and construction of foundation pit support system and earthwork excavation, which is a highly comprehensive system engineering. Excavation engineering requires close cooperation between geotechnical and structural engineering technicians. The foundation pit project is to excavate an underground space from the ground down. A vertical retaining enclosure structure is generally set around the deep foundation pit. The enclosure structure is generally a plate (pile) wall structure with a certain insertion depth under the foundation of the excavation surface. . The slab (pile) wall mainly includes cantilever type, single support type and multi-support type. In order to reduce the deformation of the enclosure structure and control the bending moment of the wall, it is necessary to set up supporting structures around the foundation pit. As for the types of deep foundation pit enclosure structures, there are more types of plate-column type, column type, gravity retaining wall, combined type, soil anchor, reverse construction method, caisson and other types that are widely used in our country.

在基坑施工中,马道是进入基坑或上楼的临时脚手架。马道属一次性安拆结构,即支搭完毕开始使用,随着结构施工进展,当马道位置妨碍结构施工时,便将一次性全部拆除,在该层结构完成部位再另行搭设。以往深基坑人行马道多采用脚手架进行搭设,由于这种人行马道属于一般临时性设施,搭设简易,存在着诸多安全隐患,极易造成人员高处坠落事故。再者,脚手架绝大多数需从基底开始向上搭设,与深基坑土方开挖工序不符,往往土方开挖过程中不能及时规整搭设,施工人员主要通过机动车出土马道上下基坑进行施工作业,存在人车混行、防护不到位等诸多安全隐患,同时也难以满足工程安全文明施工要求,也不利于施工快速组织和高效实施。 In the foundation pit construction, the horseway is a temporary scaffold for entering the foundation pit or going upstairs. The bridleway is a one-time installation and dismantling structure, that is, it will be used after the erection. As the structure construction progresses, when the position of the bridleway hinders the structural construction, it will be completely dismantled at one time, and another one will be erected at the completed part of the structure. In the past, scaffolding was often used to build sidewalks in deep foundation pits. Since this kind of sidewalk is a general temporary facility and easy to erect, there are many safety hazards, which can easily cause accidents of people falling from heights. Furthermore, most of the scaffolding needs to be erected upwards from the base, which is inconsistent with the excavation process of the deep foundation pit. Often the earthwork cannot be erected in a timely and orderly manner during the excavation process. The construction workers mainly use motor vehicles to unearth the horses and go up and down the foundation pit. There are many safety hazards such as mixed traffic of people and vehicles, inadequate protection, etc. At the same time, it is difficult to meet the requirements of safe and civilized construction of the project, and it is also not conducive to the rapid organization and efficient implementation of construction.

随着地铁建设和城市地下空间开发的步伐不断加快,深基坑工程正朝着“密、深、大”的方向发展,为保证施工人员的安全,必须制作安全规范的上下通道楼梯。目前,施工现场上下基坑的工具多为钢爬梯。这种简易的钢爬梯基本上都是由钢管、角钢等材料焊接而成,存在着诸多的缺陷。此类人行通道的缺陷主要表现为:一是拆装过程烦琐,费工、费事;二是周围无防护结构,安全性能低;三是不利于周转使用,重复利用率较低、材料浪费大。 As the pace of subway construction and urban underground space development continues to accelerate, deep foundation pit projects are developing in the direction of "dense, deep, and large". To ensure the safety of construction personnel, it is necessary to make safe and standardized access stairs. At present, the tools for going up and down the foundation pit on the construction site are mostly steel ladders. This simple and easy steel ladder all is welded by materials such as steel pipe, angle steel substantially, has many defectives. The defects of this kind of pedestrian walkway are mainly as follows: first, the disassembly process is cumbersome, labor-intensive and labor-intensive; second, there is no protective structure around, and the safety performance is low; third, it is not conducive to turnover, low reuse rate, and large waste of materials.

针对上述所涉及的现有深基坑楼梯存在的技术缺陷,目前,公开的专利为数不多,现对检索到的现有专利进行说明。 Aiming at the above-mentioned technical defects of existing deep foundation pit stairs, currently, there are not many published patents, and the retrieved existing patents are now described.

专利文献CN201962965U公开了一种深基坑施工用笼梯,由多个结构和尺寸均相同的笼梯分节从下至上依次拼装组成,多个笼梯分节布设在同一竖直线上且相邻两个笼梯分节之间通过紧固连接件进行紧固连接;笼梯分节包括立方体形外围骨架、布设在外围骨架四周侧的防护结构和安装在外围骨架内的扶梯;多个笼梯分节内部所安装的扶梯由上至下连通组成一个深基坑施工过程中供施工人员行走的折线形上下通道,所述折线形上下通道的竖直高度与所施工深基坑的深度相对应。本专利的加工制作及拼装方便、拼装高度可调,能解决现有深基坑上下通道人员上下基坑不便、扶梯占用基底面积大、移动不便等实际问题。 Patent document CN201962965U discloses a cage ladder for deep foundation pit construction, which is composed of multiple cage ladder sections with the same structure and size assembled sequentially from bottom to top. The two adjacent cage ladder sections are fastened and connected by fastening connectors; the cage ladder sections include a cube-shaped peripheral frame, protective structures arranged around the peripheral frame and escalators installed in the peripheral frame; multiple cages The escalators installed inside the ladder section are connected from top to bottom to form a zigzag-shaped upper and lower passages for construction personnel to walk during the construction of deep foundation pits. correspond. The patent has the advantages of convenient processing and assembling, and adjustable assembling height, which can solve practical problems such as the inconvenience of personnel going up and down the foundation pit, the large base area occupied by the escalator, and the inconvenience of moving.

专利文献CN202731730U公开了一种搭建在基坑内的组装型安全楼梯,包括两侧支架、连接两侧支架的十块以上楼梯踏步和两侧的扶手杆;每侧支架由前楼梯梁、后楼梯梁、上水平连杆和下水平连杆组成平行四边形框架;上、下水平连杆的外伸端分别用螺栓固定于基坑上沿地面和基坑内的混凝土基础底座;前楼梯梁和后楼梯梁的内侧面上均布设有十个以上插孔,与楼梯踏步底面四角部的插销配合;通过插销与插孔的插接将楼梯踏步安装到位。每侧上水平连杆与后楼梯梁顶端的连接处垂直设有上立柱,下水平连杆和前楼梯梁底端的连接处垂直设有下立柱,两者由扶手杆连接。本专利的优点是安置灵活,结构稳定。 Patent document CN202731730U discloses an assembled safety staircase built in the foundation pit, including two side brackets, more than ten stair steps connecting the two side brackets and handrail bars on both sides; each side bracket consists of a front stair beam and a rear stair beam 1, the upper horizontal connecting rod and the lower horizontal connecting rod form a parallelogram frame; the extended ends of the upper and lower horizontal connecting rods are respectively bolted to the upper edge of the foundation pit and the concrete foundation base in the foundation pit; the front stair beam and the rear stair beam More than ten jacks are evenly distributed on the inner side of the stair step, which cooperate with the bolts at the four corners of the bottom surface of the stair step; the stair step is installed in place through the plugging of the bolt and the jack. An upper column is vertically arranged at the joint between the upper horizontal connecting rod and the top of the rear stair beam on each side, and a lower column is vertically provided at the joint between the lower horizontal connecting rod and the bottom end of the front stair beam, and the two are connected by a handrail. The advantages of this patent are flexible arrangement and stable structure.

专利文献CN203213639U公开了一种用于基坑的组合式楼梯,包括多个连接单元,每个连接单元均包括一对相互平行的底梁,至少两根底挡,底挡分别设置于两根底梁之间并与底梁牢固连接,至少四根竖杆,每两根竖杆为一组,分别纵向设置于两根底梁上,至少两根横杆,两横杆分别设于两则竖杆的顶部并与竖杆牢固连接;还包括若干纵向连接套和横杆连接片;各连接单元间,通过纵向连接套和横杆连接片链接各连接单元的底梁及横杆而实现各连接单元的纵向连接。本专利具有可在现场安装、省时省力、所有元件可拆除,可重复安装使用的有益效果。 Patent document CN203213639U discloses a combined staircase for foundation pits, including a plurality of connecting units, each connecting unit includes a pair of bottom beams parallel to each other, at least two bottom stops, and the bottom stops are respectively arranged between the two bottom beams between them and firmly connected with the bottom beam, at least four vertical bars, each two vertical bars as a group, respectively set longitudinally on the two bottom beams, at least two horizontal bars, and the two horizontal bars are respectively set on the top of the two vertical bars And it is firmly connected with the vertical bar; it also includes a number of longitudinal connecting sleeves and horizontal bar connecting pieces; between each connecting unit, the bottom beam and horizontal bar of each connecting unit are connected through the longitudinal connecting sleeve and the horizontal bar connecting piece to realize the longitudinal connection of each connecting unit. connect. The patent has the beneficial effects of being able to be installed on site, saving time and effort, all components can be dismantled, and can be installed and used repeatedly.

专利文献CN203755717U公开了一种深基坑装配式上下人行通道,包括分别由四个方通立柱按长方形四个顶点位置竖立形成的左固定架和右固定架,左固定架和右固定架在竖直方向上分别间隔分布有多层楼梯平台,且左固定架楼梯平台与右固定架楼梯平台在高度上间隔错开,楼梯平台一侧与位于相对一侧固定架的上一层楼梯平台通过一倾斜设置的楼梯台阶板相连,楼梯平台另一侧与下一层楼梯平台通过倾斜设置的楼梯台阶板相连。本专利的优点是采用了装配式结构,拆装过程简单,可反复拆装重复使用。 Patent document CN203755717U discloses a deep foundation pit assembly type upper and lower walkways, including left and right fixed frames formed by four square columns erected at the four apex positions of the rectangle respectively, the left fixed frame and the right fixed frame There are multi-layer stair platforms at intervals in the vertical direction, and the left and right fixed frame stair platforms are staggered in height. One side of the stair platform and the upper stair platform on the opposite side of the fixed frame pass through an inclined The set stair step boards are connected, and the other side of the stair platform is connected with the stair platform of the next floor through the obliquely arranged stair step boards. The advantage of this patent is that it adopts an assembled structure, the assembly and disassembly process is simple, and it can be repeatedly disassembled and assembled for reuse.

需要指出的是,上述专利所涉及的楼梯虽对现有深基坑楼梯进行了改进,但楼梯的设计仍不够合理,不能满足深基坑工程不同施工区域或阶段的通行要求;还有,楼梯的安装为从下至上安装,这与深基坑土方开挖工序不符,不能完全与基坑土方开挖、边坡支护及后续结构施工工序紧密结合。为此,需要设计一种可直接应用于明挖地下空间工程、地铁工程或其它地下工程建设施工过程中的深基坑用楼梯。 It should be pointed out that although the stairs involved in the above-mentioned patents have improved the existing deep foundation pit stairs, the design of the stairs is still not reasonable enough to meet the traffic requirements of different construction areas or stages of deep foundation pit engineering; The installation is from bottom to top, which is inconsistent with the deep foundation pit earthwork excavation process, and cannot be completely combined with the foundation pit earthwork excavation, slope support and subsequent structural construction procedures. For this reason, it is necessary to design a kind of stairs that can be directly applied to the deep foundation pit in the construction process of open-cut underground space engineering, subway engineering or other underground engineering.

发明内容 Contents of the invention

本发明的目的在于提供一种深基坑用工具式吊挂楼梯,为施工人员通行提供安全与便利,并使其具有拆装速度快、周转率高、安全性能好等优点。重要的是,本发明的工具式吊挂楼梯,能够完全与基坑土方开挖、边坡支护及后续结构施工工序紧密结合,适用开挖深度10~30m深基坑。 The object of the present invention is to provide a tool-type hanging staircase for deep foundation pits, which provides safety and convenience for construction personnel to pass, and makes it have the advantages of fast disassembly and assembly, high turnover rate, and good safety performance. What is important is that the tool-type hanging staircase of the present invention can be closely integrated with the excavation of foundation pit earthwork, slope support and subsequent structural construction procedures, and is suitable for excavation depths of 10-30m deep foundation pits.

为实现上述目的,本发明采取的技术方案是: For realizing above-mentioned purpose, the technical scheme that the present invention takes is:

一种深基坑用工具式吊挂楼梯,包括安装在基坑中的梯架、支撑梯架的梯架支座以及安装在梯架内部空间的楼梯,其特征在于,所述梯架支座与基坑围护结构固定连接,梯架支座包括2个或4个钢梁,钢梁的一端或两端固定在围护结构冠梁的上表面;所述梯架由两组梯架单元组成,两组梯架单元之间设置有安装楼梯的间隙,每组梯架单元包括4个立柱,梯架单元的横截面呈矩形,立柱的上端与其上方的钢梁垂直固定连接,立柱的下端垂直伸向基坑底面;所述楼梯自上而下依次安装在两组梯架单元之间的空间内,相邻楼梯之间的转角处设置休息平台,休息平台固定于梯架单元的内部空间。 A tool-type hanging staircase for a deep foundation pit, comprising a ladder frame installed in the foundation pit, a ladder frame support supporting the ladder frame, and a staircase installed in the inner space of the ladder frame, characterized in that the ladder frame support It is fixedly connected with the enclosure structure of the foundation pit, and the ladder frame support includes 2 or 4 steel beams, one or both ends of which are fixed on the upper surface of the crown beam of the enclosure structure; the ladder frame is composed of two sets of ladder frame units There is a gap for installing stairs between the two sets of ladder frame units. Each set of ladder frame units includes 4 columns. The cross section of the ladder frame unit is rectangular. Extend vertically to the bottom of the foundation pit; the stairs are installed sequentially in the space between two sets of ladder frame units from top to bottom, and a rest platform is set at the corner between adjacent stairs, and the rest platform is fixed in the inner space of the ladder frame unit .

所述梯架支座可包括4个相同的钢梁且安装在基坑一边,钢梁相互平行设置且均与基坑的围护结构冠梁相互垂直,钢梁的一端与围护结构冠梁的上表面通过螺栓和焊接固定,4个钢梁的自由端位于基坑的上方;所述钢梁的上表面设置若干个横向连接杆,横向连接杆沿水平方向平行设置且与钢梁相互垂直,横向连接杆与钢梁通过螺栓固定连接。 The ladder support can include 4 identical steel beams and be installed on one side of the foundation pit. The steel beams are arranged parallel to each other and are perpendicular to the crown beam of the enclosure structure of the foundation pit. One end of the steel beam is connected to the crown beam of the enclosure structure. The upper surface of the steel beam is fixed by bolts and welding, and the free ends of the four steel beams are located above the foundation pit; several transverse connecting rods are arranged on the upper surface of the steel beams, and the horizontal connecting rods are arranged parallel to the horizontal direction and perpendicular to the steel beams , the transverse connecting rod and the steel beam are fixedly connected by bolts.

所述梯架支座还可包括水平斜撑、斜支撑和加劲肋板;所述水平斜撑设置在外侧钢梁的一侧,水平斜撑的一端通过预埋在围护结构冠梁的预埋螺栓与围护结构冠梁固定连接,水平斜撑的另一端与一连接板螺栓连接,连接板与钢梁焊接;所述斜支撑设置在钢梁的下方,斜支撑的一端通过预埋在围护结构冠梁侧面的预埋螺栓与围护结构冠梁固定连接,斜支撑的另一端通过一垫板与钢梁螺栓连接,垫板与钢梁焊接;所述加劲肋板焊接在钢梁的自由端。 The ladder support can also include horizontal braces, braces and stiffeners; the horizontal braces are arranged on one side of the outer steel beam, and one end of the horizontal braces is embedded in the pre-embedded crown beam of the enclosure structure. Buried bolts are fixedly connected to the crown beam of the enclosure structure, the other end of the horizontal brace is bolted to a connecting plate, and the connecting plate is welded to the steel beam; the diagonal brace is arranged under the steel beam, and one end of the diagonal brace is embedded The pre-embedded bolts on the side of the crown beam of the enclosure structure are fixedly connected with the crown beam of the enclosure structure, the other end of the diagonal support is connected with the steel beam bolts through a backing plate, and the backing plate is welded to the steel beam; the stiffening ribs are welded on the steel beam free end.

所述梯架支座也可以包括2个钢梁且安装在基坑的转角部位,钢梁相互平行设置,钢梁与基坑的转角边的夹角为45度,每个钢梁的两端均与围护结构冠梁的上表面通过螺栓和焊接固定;所述2个钢梁之间焊接2组相互交叉的钢筋或小号型钢,钢筋或小号型钢设置在梯架单元的外侧。 The ladder frame support can also include 2 steel beams and be installed at the corner of the foundation pit, the steel beams are arranged parallel to each other, the angle between the steel beam and the corner side of the foundation pit is 45 degrees, and the two ends of each steel beam Both are fixed to the upper surface of the crown beam of the enclosure structure by bolts and welding; two sets of intersecting steel bars or small-sized steel bars are welded between the two steel beams, and the steel bars or small-sized steel bars are arranged on the outside of the ladder frame unit.

所述梯架支座还可包括斜支撑;所述斜支撑设置在钢梁的下方,斜支撑的一端通过预埋在围护结构冠梁侧面的预埋螺栓与围护结构冠梁固定连接,斜支撑的另一端通过一垫板与钢梁螺栓连接,垫板与钢梁焊接。 The ladder support can also include an oblique support; the oblique support is arranged below the steel beam, and one end of the oblique support is fixedly connected with the enclosing structure crown beam through the pre-embedded bolt embedded in the side of the enclosing structure crown beam, The other end of the oblique support is bolted to the steel beam through a backing plate, and the backing plate is welded to the steel beam.

所述钢梁与围护结构冠梁的连接处可设置有垫板,围护结构冠梁中的预埋螺栓通过垫板与钢梁连接,垫板的上表面与钢梁焊缝连接,垫板的下表面与围护结构冠梁的上表面之间的缝隙中填充有灌浆料。 The connection between the steel beam and the crown beam of the enclosure structure can be provided with a backing plate, the embedded bolts in the crown beam of the enclosure structure are connected with the steel beam through the backing plate, the upper surface of the backing plate is connected with the weld seam of the steel beam, and the backing plate The gap between the lower surface of the board and the upper surface of the crown beam of the enclosure structure is filled with grouting material.

所述立柱与钢梁可通过螺栓固定连接,在立柱与钢梁之间设置有连接板,螺栓穿过连接板连接立柱与钢梁,连接板的上表面与钢梁焊缝连接。 The column and the steel beam can be fixedly connected by bolts, a connecting plate is arranged between the column and the steel beam, the bolt passes through the connecting plate to connect the column and the steel beam, and the upper surface of the connecting plate is connected to the weld seam of the steel beam.

所述楼梯可包括踏步板、踏步板支撑板以及设置在踏步板两侧的防护栏杆,踏步板焊接在踏步板支撑板上,踏步板支撑板的端部与立柱焊接,所述防护栏杆上设置有封闭金属网。 The stairs may include a step plate, a step plate support plate and protective railings arranged on both sides of the step plate. With closed metal mesh.

所述休息平台可包括边框、若干个承重件和平台板,所述边框的转角处与构成梯架单元的立柱连接,承重件平行焊接在边框的内部,平台板铺设在边框和承重件所在的平面上;所述休息平台的侧边设置防护栏杆,防护栏杆上设置有封闭金属网。 The rest platform may include a frame, several load-bearing parts and platform boards, the corners of the frame are connected with the columns forming the ladder frame unit, the load-bearing parts are welded in parallel inside the frame, and the platform board is laid on the side where the frame and the load-bearing parts are located. On the plane; the side of the rest platform is provided with protective railings, and a closed metal mesh is arranged on the protective railings.

所述休息平台的转角处可通过槽钢与立柱固定连接,槽钢的腰高部与立柱焊接,槽钢的上腿宽部上表面安装休息平台,槽钢的下腿宽部与设置在槽钢下方的角铁的一边螺栓连接,角铁的另一边与立柱焊接。 The corner of the rest platform can be fixedly connected with the column through the channel steel, the waist height of the channel steel is welded with the column, the upper surface of the upper leg width of the channel steel is installed with a rest platform, and the lower leg width of the channel steel is arranged under the channel steel One side of the angle iron is bolted, and the other side of the angle iron is welded to the column.

与现有适用于深基坑的楼梯相比,本发明具有的有益效果如下: Compared with existing stairs suitable for deep foundation pits, the present invention has the following beneficial effects:

(1)随着绿色施工、安全文明施工的不断推进,使安全防护装置标准化式、工具式是实现建筑业可持续发展的有效途径。显然,本发明提供的深基坑用工具式吊挂楼梯符合这一发展理念,可直接应用于明挖地下空间工程、地铁工程或其它地下工程建设施工过程中,尤其适用于开挖深度10~30m深基坑。 (1) With the continuous advancement of green construction and safe and civilized construction, standardizing and tooling safety protection devices is an effective way to achieve sustainable development of the construction industry. Obviously, the tool-type hanging staircase for deep foundation pits provided by the present invention conforms to this development concept, and can be directly applied to the construction process of open-cut underground space projects, subway projects or other underground projects, especially suitable for excavation depths of 10~ 30m deep foundation pit.

(2)本发明的深基坑用楼梯具有吊挂特点,在基坑土方开挖及围护结构施工过程中,根据实际情况由上至下安装楼梯构件;地下主体结构工程施工过程中,可以选择由下至上拆卸楼梯构件;对于楼梯底部距离基坑底面的距离小于楼梯构件高度的部分,可以使用扣件式脚手架管搭设临时马道作为补充,能够充分满足深基坑工程不同施工阶段的通行需求。因此,本发明能够完全与基坑土方开挖、边坡支护及后续结构施工工序紧密结合。 (2) The staircase for deep foundation pit of the present invention has the characteristics of hanging. During the excavation of the foundation pit and the construction of the enclosure structure, the staircase components are installed from top to bottom according to the actual situation; during the construction of the underground main structure, it can be Choose to disassemble the stair components from bottom to top; for the part where the distance between the bottom of the stairs and the bottom of the foundation pit is less than the height of the stair components, you can use fastener-type scaffolding pipes to build temporary horse paths as a supplement, which can fully meet the traffic needs of different construction stages of deep foundation pit projects . Therefore, the present invention can be fully integrated with the earthwork excavation of foundation pit, side slope support and subsequent structure construction procedures.

(3)在本发明的深基坑用工具式吊挂楼梯中,钢梁作为主要受力构件,具有不同的安装方式,比如4个钢梁固定在基坑的同一边,或是2个钢梁固定在基坑的转角处。因此,本发明可以根据具体的施工需要,选择不同的钢梁安装方式,具有可供选择性。当基坑的冠梁横截面尺寸难以满足钢梁力臂长度要求时,可以加长力臂,并加以配重满足受力要求。 (3) In the tool-type hanging staircase for deep foundation pits of the present invention, steel beams are used as the main force-bearing components, and there are different installation methods, such as four steel beams fixed on the same side of the foundation pit, or two steel beams The beam is fixed at the corner of the foundation pit. Therefore, the present invention can select different steel girder installation methods according to specific construction needs, and has optionality. When the cross-sectional size of the crown beam of the foundation pit is difficult to meet the length requirement of the steel beam force arm, the force arm can be lengthened and a counterweight can be added to meet the force requirement.

(4)在本发明的深基坑用工具式吊挂楼梯中,楼梯主要以标准节的形式存在,加工制作时,便于确保尺寸及螺栓孔位置的准确性。现场安装过程中,不需要工人再行较多思考或创造性改变,确保安装流畅,省时省力,从而提高普及率。 (4) In the tool-type hanging staircase for deep foundation pit of the present invention, the staircase mainly exists in the form of standard joints, which is convenient to ensure the accuracy of the size and the position of the bolt holes during manufacturing. During the on-site installation process, there is no need for workers to think or make creative changes to ensure smooth installation, save time and effort, and increase the penetration rate.

(5)本发明的深基坑用工具式吊挂楼梯可以为施工人员通行提供安全与便利,具有拆装速度快、周转率高、安全性能好等优点。 (5) The tool-type hanging staircase for deep foundation pits of the present invention can provide safety and convenience for construction personnel to pass, and has the advantages of fast disassembly and assembly, high turnover rate, and good safety performance.

附图说明 Description of drawings

图1是安装在基坑一边的深基坑用工具式吊挂楼梯的梯架支座平面图。 Fig. 1 is a plan view of the ladder support of the tool-type hanging stairs installed in the deep foundation pit on one side of the foundation pit.

图2是图1的断面示意图。 FIG. 2 is a schematic cross-sectional view of FIG. 1 .

图3是安装在基坑转交处的深基坑用工具式吊挂楼梯的梯架支座平面图。 Fig. 3 is the plan view of the ladder support of the tool-type hanging staircase installed in the deep foundation pit at the transition place of the foundation pit.

图4是图3的断面示意图。 FIG. 4 is a schematic cross-sectional view of FIG. 3 .

图5是预埋螺栓和预埋钢板连接关系图。 Fig. 5 is a connection diagram of the embedded bolt and the embedded steel plate.

图6是钢梁与围护结构冠梁的固定连接关系图。 Fig. 6 is a fixed connection diagram of the steel beam and the crown beam of the enclosure structure.

图7是楼梯和休息平台的连接关系图。 Fig. 7 is a connection diagram of stairs and a rest platform.

图8是休息平台的平面图。 Figure 8 is a plan view of the rest platform.

图9是图8的断面示意图。 FIG. 9 is a schematic cross-sectional view of FIG. 8 .

图10是休息平台与立柱的连接关系图。 Fig. 10 is a connection relationship diagram between a rest platform and a column.

图11是楼梯的正立面图。 Figure 11 is a front elevation view of the staircase.

图12是图11的侧视图。 FIG. 12 is a side view of FIG. 11 .

附图标记说明:1、立柱;2、钢梁;3、围护结构冠梁;4、休息平台;5、横向连接杆;6、水平斜撑;7、加劲肋板;8、连接板;9、钢筋或小号型钢;10、预埋螺栓;11、预埋钢板;12、垫板;13、灌浆料;14、连接板;15、踏步板;16、踏步板支撑板;17、防护栏杆;18、边框;19、承重件;20、平台板;21、过渡构件;22、斜支撑;23、防护棚;24、临时马道。 Explanation of reference signs: 1. Upright column; 2. Steel beam; 3. Crown beam of enclosure structure; 4. Rest platform; 5. Transverse connecting rod; 6. Horizontal diagonal brace; 9. Steel bar or small section steel; 10. Embedded bolt; 11. Embedded steel plate; 12. Backing plate; 13. Grouting material; 14. Connecting plate; 15. Step plate; 16. Step plate support plate; 17. Protection Railing; 18. Frame; 19. Load-bearing parts; 20. Platform board; 21. Transition member; 22. Diagonal support; 23. Protective shed;

具体实施方式 detailed description

随着绿色施工、安全文明施工的不断推进,贯彻国家关于加强节能减排的发展战略,建设资源节能型社会,环境友好型社会,使安全防护装置标准化式、工具式是实现建筑业可持续发展的有效途径。特别是当前地铁建设和城市地下空间开发的步伐不断加快,深基坑工程带来的安全问题日益突出。现有适用于深基坑工程的人行通道的安全性能低,并且拆装过程烦琐,重复利用率较低,尤其是与基坑工程的施工顺序不符合。 With the continuous advancement of green construction and safe and civilized construction, implementing the national development strategy of strengthening energy conservation and emission reduction, building a resource-saving and environment-friendly society, and making safety protection devices standardized and tool-based is the key to achieving sustainable development of the construction industry effective way. In particular, the current pace of subway construction and urban underground space development is accelerating, and the safety problems brought about by deep foundation pit projects are becoming increasingly prominent. The existing pedestrian passages suitable for deep foundation pit engineering have low safety performance, and the disassembly and assembly process is cumbersome, and the reuse rate is low, especially it does not conform to the construction sequence of the foundation pit engineering.

本发明为解决上述问题,适应施工安全防护装置的标准化式、工具式发展要求,提供了一种深基坑用工具式吊挂楼梯。深基坑用工具式吊挂楼梯的结构如图1、图2、图3和图4所示,包括梯架、梯架支座和楼梯。其中,梯架安装在基坑中,对供施工人员通行的楼梯起支撑作用;梯架支座与基坑固定连接,用于支撑和固定梯架;楼梯安装于梯架内部空间,可以方便施工人员进出基坑。还有,如图11和图12所示,在所述梯架支座的上方安装有防护棚23。 In order to solve the above problems and adapt to the development requirements of standardized and tool-type construction safety protection devices, the present invention provides a tool-type hanging staircase for deep foundation pits. The structure of the tool-type hanging stairs for deep foundation pits is shown in Figure 1, Figure 2, Figure 3 and Figure 4, including ladder frames, ladder frame supports and stairs. Among them, the ladder frame is installed in the foundation pit to support the stairs for construction personnel; the ladder frame support is fixedly connected with the foundation pit to support and fix the ladder frame; the stairs are installed in the inner space of the ladder frame to facilitate construction People enter and leave the foundation pit. Also, as shown in FIGS. 11 and 12 , a protective shed 23 is installed above the ladder frame support.

具体而言,所述梯架由两组梯架单元组成,两组梯架单元之间留有安装楼梯的间隙。每组梯架单元包括4个立柱1,梯架单元的横截面呈矩形,立柱1的上端与其上方的钢梁2垂直固定连接,立柱1的下端垂直伸向基坑底面。作为实施例的优选,4个立柱1可以是4个相同的立柱1,立柱1可以选用方钢。所述钢梁2的材质需要根据钢梁2的安装位置及方式进行选择,可以选用工字钢,也可以选用H型钢。 Specifically, the ladder frame is composed of two sets of ladder frame units, and there is a gap for installing stairs between the two sets of ladder frame units. Each ladder frame unit includes four columns 1, the cross section of the ladder frame unit is rectangular, the upper end of the column 1 is vertically fixedly connected with the steel beam 2 above it, and the lower end of the column 1 extends vertically to the bottom of the foundation pit. As a preferred embodiment, the four uprights 1 can be four identical uprights 1, and the uprights 1 can be made of square steel. The material of the steel girder 2 needs to be selected according to the installation position and method of the steel girder 2, and I-beam or H-beam can be selected.

所述梯架支座与基坑围护结构固定连接,梯架支座伸向基坑的上部空间。根据基坑工程的施工需要,梯架支座可以安装在基坑的同一边或是安装在基坑的转角处。梯架支座包括2个或4个钢梁2,钢梁2的一端或两端固定在围护结构冠梁3的上表面。 The ladder frame support is fixedly connected with the foundation pit enclosure structure, and the ladder frame support extends to the upper space of the foundation pit. According to the construction needs of the foundation pit project, the ladder support can be installed on the same side of the foundation pit or at the corner of the foundation pit. The ladder support includes 2 or 4 steel beams 2, and one or both ends of the steel beams 2 are fixed on the upper surface of the crown beam 3 of the enclosure structure.

若梯架支座安装在基坑的边部,如图1和图2所示,本发明的深基坑用工具式吊挂楼梯采用悬挑式安装。作为实施例的优选,所述梯架支座包括4个相同的钢梁2且安装在基坑一边,钢梁2相互平行设置且均与基坑的围护结构冠梁3相互垂直,钢梁2的一端与围护结构冠梁3的上表面通过螺栓和焊接固定,4个钢梁2的自由端位于基坑的上方。特别地,4个钢梁2的自由端处于同一条直线上,该直线与钢梁2固定连接的围护结构冠梁3相互平行。此种情况下,钢梁2可以选用工字钢,处于两侧的钢梁2与其相临的钢梁2之间的安装间距可以是900mm,位于中部的两个钢梁2之间的安装间距可以是2170mm。 If the ladder support is installed on the edge of the foundation pit, as shown in Figure 1 and Figure 2, the tool-type hanging staircase for deep foundation pits of the present invention adopts cantilevered installation. As a preferred embodiment, the ladder support includes 4 identical steel beams 2 and is installed on one side of the foundation pit. The steel beams 2 are arranged parallel to each other and are all perpendicular to the crown beam 3 of the enclosure structure of the foundation pit. The steel beams One end of 2 and the upper surface of crown beam 3 of the enclosure structure are fixed by bolts and welding, and the free ends of the four steel beams 2 are located above the foundation pit. In particular, the free ends of the four steel beams 2 are on the same straight line, and the straight line is parallel to the crown beam 3 of the enclosure structure that is fixedly connected to the steel beams 2 . In this case, the steel beam 2 can be I-beam, the installation distance between the steel beam 2 on both sides and the adjacent steel beam 2 can be 900mm, and the installation distance between the two steel beams 2 in the middle It can be 2170mm.

进一步地,所述梯架支座还包括横向连接杆5、水平斜撑6和加劲肋板7。为增强整个梯架支座的整体性,在钢梁2的上表面设置有横向连接杆5。作为实施例的优选,设置在钢梁2上的横向连接杆5可以有3个,横向连接杆5可以选用角钢。3个横向连接杆5沿水平方向相互平行设置且与钢梁2相互垂直,其中,2个横向连接杆5安装在钢梁2与立柱1连接位置的上方,另一个横向连接杆5安装在围护结构冠梁3的上方。横向连接杆5与钢梁2通过螺栓固定连接。作为进一步的优选,处于钢梁2和立柱1连接位置上方的横向连接杆5与处于中间位置的横向连接杆5之间的安装间距可以是2130mm,处于中间位置的横向连接杆5与安装在围护结构冠梁3上方的横向连接杆5之间的安装间距可以是1550mm。 Further, the ladder support also includes transverse connecting rods 5 , horizontal braces 6 and stiffeners 7 . In order to enhance the integrity of the entire ladder frame support, a transverse connecting rod 5 is arranged on the upper surface of the steel beam 2 . As a preferred embodiment, there can be three transverse connecting rods 5 arranged on the steel beam 2, and the transverse connecting rods 5 can be selected from angle steel. Three transverse connecting rods 5 are arranged parallel to each other along the horizontal direction and perpendicular to the steel beam 2, wherein two transverse connecting rods 5 are installed above the connection position between the steel beam 2 and the column 1, and the other transverse connecting rod 5 is installed on the surrounding The top of the protective structure crown beam 3. The transverse connecting rod 5 is fixedly connected with the steel beam 2 through bolts. As a further preference, the installation distance between the transverse connecting rod 5 above the connection position of the steel beam 2 and the column 1 and the transverse connecting rod 5 in the middle position can be 2130mm, and the transverse connecting rod 5 in the middle position and the transverse connecting rod 5 installed in the surrounding The installation spacing between the transverse connecting rods 5 above the crown beam 3 of the protective structure can be 1550mm.

为了提高安全系数,增加对悬挑的楼梯的约束,所述在外侧钢梁的一侧设置水平斜撑6,水平斜撑6的一端通过预埋在围护结构冠梁3的预埋螺栓10与围护结构冠梁3固定连接,水平斜撑6的另一端与一连接板8螺栓连接,连接板8与钢梁2焊接。此外,在钢梁2的下方还设置斜支撑22,作为实施例的优选,每个钢梁2的下方可以设置一个斜支撑22。斜支撑22的一端通过预埋螺栓10与围护结构冠梁3的内侧面(朝向基坑的一面)固定连接;斜支撑22的另一端通过一垫板12与钢梁2连接,斜支撑22与垫板12螺栓连接,垫板12与钢梁2焊接。需要说明的是,在斜支撑22与钢梁2之间设置垫板12的目的是确保斜支撑22与钢梁2之间的连接更加的牢靠。作为实施例的优选,斜支撑22与围护结构冠梁3的内侧面的夹角为45度,斜支撑22与钢梁2之间的夹角也为45度,斜支撑22可以选用方钢。此外,由于钢梁2是本发明的深基坑用工具式吊挂楼梯的主要载荷构建,为了增强钢梁2受力点的截面刚度,在钢梁2的自由端焊接加劲肋板7。 In order to improve the safety factor and increase the constraints on the cantilevered stairs, a horizontal diagonal brace 6 is set on one side of the outer steel beam, and one end of the horizontal diagonal brace 6 is pre-embedded in the crown beam 3 of the enclosure structure. It is fixedly connected with the crown beam 3 of the enclosure structure, and the other end of the horizontal brace 6 is connected with a connecting plate 8 by bolts, and the connecting plate 8 is welded with the steel beam 2 . In addition, diagonal supports 22 are provided under the steel beams 2 . As a preferred embodiment, one diagonal support 22 may be provided under each steel beam 2 . One end of the diagonal support 22 is fixedly connected to the inner surface of the enclosure structure crown beam 3 (the side facing the foundation pit) through the embedded bolt 10; the other end of the diagonal support 22 is connected to the steel beam 2 through a backing plate 12, and the diagonal support 22 It is bolted to the backing plate 12, and the backing plate 12 is welded to the steel beam 2. It should be noted that the purpose of providing the backing plate 12 between the diagonal support 22 and the steel beam 2 is to ensure a more reliable connection between the diagonal support 22 and the steel beam 2 . As a preferred embodiment, the angle between the oblique support 22 and the inner surface of the enclosure structure crown beam 3 is 45 degrees, and the angle between the oblique support 22 and the steel beam 2 is also 45 degrees, and the oblique support 22 can be made of square steel . In addition, since the steel beam 2 is the main load structure of the tool-type hanging staircase for deep foundation pits of the present invention, in order to enhance the section stiffness of the stress point of the steel beam 2, the free end of the steel beam 2 is welded with stiffeners 7 .

若梯架支座安装在基坑的转角处,图3和图4所示,本发明的深基坑用工具式吊挂楼梯采用简支式安装。作为实施例的优选,所述梯架支座包括2个钢梁2且安装在基坑的转角部位,2个钢梁2平行设置,钢梁2与基坑的转角边的夹角为45度,每个钢梁2的两端均与围护结构冠梁3的上表面通过螺栓和焊接固定。此种情况下,钢梁2可以选用H型钢,靠近基坑转角的一个钢梁2较短。2个钢梁之间的安装间距可以为2280mm,每个梯架单元的宽度均为900mm,相邻两个梯架单元的安装间距可以是2170mm。 If the ladder frame support is installed at the corner of the foundation pit, as shown in Figure 3 and Figure 4, the tool-type hanging staircase for deep foundation pits of the present invention adopts simply supported installation. As a preferred embodiment, the ladder support includes two steel beams 2 and is installed at the corner of the foundation pit, the two steel beams 2 are arranged in parallel, and the angle between the steel beams 2 and the corner side of the foundation pit is 45 degrees , both ends of each steel beam 2 are fixed to the upper surface of the enclosure structure crown beam 3 by bolts and welding. In this case, the steel beam 2 can be H-shaped steel, and the steel beam 2 near the corner of the foundation pit is shorter. The installation distance between two steel beams can be 2280mm, the width of each ladder frame unit is 900mm, and the installation distance between two adjacent ladder frame units can be 2170mm.

为了增强相邻2个钢梁之间的整体稳定性,同时提高安全系数,作为优选,所述2个钢梁2之间焊接两组相互交叉的钢筋或小号型钢9,钢筋或小号型钢9设置在梯架单元的外侧,即钢筋或小号型钢9处于梯架单元与基坑的转角边的之间。此外,在钢梁2的下方还设置斜支撑22,作为实施例的优选,每个钢梁2的下方可以设置一个斜支撑22。斜支撑22的一端通过预埋螺栓10与围护结构冠梁3的内侧面(朝向基坑的一面)固定连接;斜支撑22的另一端通过一垫板12与钢梁2连接,斜支撑22与垫板12螺栓连接,垫板12与钢梁2焊接。需要说明的是,在斜支撑22与钢梁2之间设置垫板12的目的是确保斜支撑22与钢梁2之间的连接更加的牢靠。作为实施例的优选,斜支撑22与围护结构冠梁3的内侧面的夹角为45度,斜支撑22与钢梁2之间的夹角也为45度,斜支撑22可以选用方钢。 In order to enhance the overall stability between two adjacent steel beams and improve the safety factor, as a preference, two sets of intersecting steel bars or small-sized steel bars 9, steel bars or small-sized steel bars are welded between the two steel beams 2 9 is arranged on the outside of the ladder frame unit, that is, the steel bar or small section steel 9 is between the corner edge of the ladder frame unit and the foundation pit. In addition, diagonal supports 22 are provided under the steel beams 2 . As a preferred embodiment, one diagonal support 22 may be provided under each steel beam 2 . One end of the diagonal support 22 is fixedly connected to the inner surface of the enclosure structure crown beam 3 (the side facing the foundation pit) through the embedded bolt 10; the other end of the diagonal support 22 is connected to the steel beam 2 through a backing plate 12, and the diagonal support 22 It is bolted to the backing plate 12, and the backing plate 12 is welded to the steel beam 2. It should be noted that the purpose of providing the backing plate 12 between the diagonal support 22 and the steel beam 2 is to ensure a more reliable connection between the diagonal support 22 and the steel beam 2 . As a preferred embodiment, the angle between the oblique support 22 and the inner surface of the enclosure structure crown beam 3 is 45 degrees, and the angle between the oblique support 22 and the steel beam 2 is also 45 degrees, and the oblique support 22 can be made of square steel .

需要说明的是,无论深基坑用工具式吊挂楼梯采用哪种安装方式,为了提高钢梁2与围护结构冠梁3连接在牢固性,钢梁2与围护结构冠梁3之间不仅有螺栓连接还采用了焊接。为达到这一目的,如图5和图6所示,所述围护结构冠梁3的内部设置有预埋螺栓10和预埋钢板11,预埋螺栓10的基部设置在预埋钢板11的上部且通过塞焊连接。作为本发明技术方案的进一步优选,为了增大钢梁2支点部位的受力面积,确保钢梁2在围护结构冠梁3表面的受力均匀,钢梁2与围护结构冠梁3的连接处还设置有垫板12,预埋螺栓10通过垫板12与钢梁2连接,垫板12的上表面与钢梁2焊缝连接,垫板12的下表面与围护结构冠梁3的上表面之间的缝隙中填充有灌浆料13。 It should be noted that no matter which installation method is used for the tool-type hanging stairs for deep foundation pits, in order to improve the firmness of the connection between the steel beam 2 and the crown beam 3 of the enclosure structure, the gap between the steel beam 2 and the crown beam 3 of the enclosure structure Not only bolted but also welded. In order to achieve this purpose, as shown in Figure 5 and Figure 6, the inside of the enclosure structure crown beam 3 is provided with embedded bolts 10 and embedded steel plates 11, and the base of the embedded bolts 10 is arranged on the base of the embedded steel plates 11. upper and connected by plug welding. As a further optimization of the technical solution of the present invention, in order to increase the force bearing area of the fulcrum of the steel beam 2, ensure that the steel beam 2 is evenly stressed on the surface of the enclosure structure crown beam 3, the distance between the steel beam 2 and the enclosure structure crown beam 3 A backing plate 12 is also provided at the joint, and the pre-embedded bolts 10 are connected to the steel beam 2 through the backing plate 12, the upper surface of the backing plate 12 is welded to the steel beam 2, and the lower surface of the backing plate 12 is connected to the crown beam 3 of the enclosure structure. Grouting material 13 is filled in the gap between the upper surfaces.

为了进一步提高立柱1与钢梁2之间连接的牢靠性,在立柱1与钢梁2通过螺栓固定连接的基础上,在立柱1与钢梁2之间设置有连接板14,螺栓穿过连接板14连接立柱1与钢梁2,连接板14的上表面与钢梁2焊缝连接。 In order to further improve the reliability of the connection between the column 1 and the steel beam 2, on the basis that the column 1 and the steel beam 2 are fixedly connected by bolts, a connecting plate 14 is arranged between the column 1 and the steel beam 2, and the bolt passes through the connection The plate 14 connects the column 1 and the steel beam 2 , and the upper surface of the connecting plate 14 is welded to the steel beam 2 .

进一步地,所述楼梯自上而下依次安装在两组梯架单元之间的空间内,相邻楼梯之间的转角处设置休息平台4,休息平台4固定在梯架单元的内部空间。具体而言,如图7所示,所述楼梯包括踏步板15、踏步板支撑板16和防护栏杆17,其中,踏步板15焊接在踏步板支撑板16上,踏步板支撑板16的端部与立柱1焊接,防护栏杆17设置在踏步板15两侧。特别地,所述防护栏杆17上设置有封闭金属网,以提高施工人员在通过楼梯时的安全性能。作为实施例的优选,防护栏杆17可以选用方钢焊接而成;踏步板支撑板16可以为C型钢,C型钢的选用规格是高度160mm、中腿边长60mm;在踏步板15与休息平台4的连接处还可以设置一个20mm厚钢板作为过渡构件21,钢板的侧边与立柱1焊接;踏步板15可以为3mm厚花纹钢板。 Further, the stairs are sequentially installed in the space between two sets of ladder frame units from top to bottom, and rest platforms 4 are arranged at the corners between adjacent stairs, and the rest platforms 4 are fixed in the inner space of the ladder frame units. Specifically, as shown in Figure 7, the stairs include a tread plate 15, a tread plate support plate 16 and a protective railing 17, wherein the tread plate 15 is welded on the tread plate support plate 16, and the end of the tread plate support plate 16 Welded with column 1, protective railing 17 is arranged on step plate 15 both sides. In particular, the protective railing 17 is provided with a closed metal mesh, so as to improve the safety performance of the construction personnel when passing the stairs. Preferably as an embodiment, the protective railing 17 can be welded with square steel for use; the step plate support plate 16 can be a C-shaped steel, and the selection specification of the C-shaped steel is height 160mm, middle leg side length 60mm; between the step plate 15 and the rest platform 4 A 20mm thick steel plate can also be set as the transition member 21 at the junction of the steel plate, and the side of the steel plate is welded with the column 1; the tread plate 15 can be a 3mm thick checkered steel plate.

在本发明的深基坑用工具式吊挂楼梯中,楼梯主要以标准节的形式存在,加工制作时,便于确保尺寸及螺栓孔位置的准确性。现场安装过程中,不需要工人再行较多思考或创造性改变,确保安装流畅,省时省力,从而提高普及率。 In the tool-type hanging staircase for deep foundation pit of the present invention, the staircase mainly exists in the form of standard joints, and it is convenient to ensure the accuracy of the size and the position of the bolt holes during manufacturing. During the on-site installation process, there is no need for workers to think or make creative changes to ensure smooth installation, save time and effort, and increase the penetration rate.

在本发明的深基坑用工具式吊挂楼梯中,如图8和图9所示,休息平台4包括边框18、若干个承重件19和平台板20。其中,边框18的转角处与构成梯架单元的立柱1连接,承重件19平行焊接在边框18的内部,平台板20铺设在边框18和承重件19所在的平面上。所述休息平台4的侧边设置防护栏杆17,防护栏杆17上设置有封闭金属网。作为实施例的优选,边框18由槽钢构成,边框18的宽度为1000mm,边框18的长度为2130mm;该休息平台4包括5个承重件19,承重件19沿边框18的宽度方向等间距平行设置,承重件19由角钢构成;平台板20为3mm厚花纹钢板,一共有6块,依次铺设在边框18和承重件19所在的平面上。 In the tool-type hanging staircase for deep foundation pits of the present invention, as shown in FIG. 8 and FIG. 9 , the rest platform 4 includes a frame 18 , several load-bearing parts 19 and a platform board 20 . Wherein, the corners of the frame 18 are connected with the columns 1 constituting the ladder frame unit, the load-bearing parts 19 are welded in parallel inside the frame 18, and the platform board 20 is laid on the plane where the frame 18 and the load-bearing parts 19 are located. The side of the rest platform 4 is provided with protective railings 17, and the protective railings 17 are provided with closed metal meshes. Preferably as embodiment, frame 18 is made of channel steel, and the width of frame 18 is 1000mm, and the length of frame 18 is 2130mm; Setting, the load-bearing member 19 is made of angle steel; the platform plate 20 is a 3mm thick checkered steel plate, there are 6 pieces in total, which are laid on the plane where the frame 18 and the load-bearing member 19 are located in sequence.

作为本发明技术方案的进一步优选,如图10所示,所述休息平台4的转角处通过槽钢与立柱1固定连接,槽钢的腰高部与立柱1焊接,槽钢的上腿宽部上表面安装休息平台4,槽钢的下腿宽部与设置在槽钢下方的角铁的一边螺栓连接,角铁的另一边与立柱1焊接。 As a further optimization of the technical solution of the present invention, as shown in Figure 10, the corner of the rest platform 4 is fixedly connected with the column 1 through the channel steel, the waist height of the channel steel is welded with the column 1, and the upper leg width of the channel steel is fixed. The rest platform 4 is installed on the surface, the lower leg width of the channel steel is connected with one side of the angle iron arranged under the channel steel by bolts, and the other side of the angle iron is welded with the column 1 .

需要说明的是,当基坑的围护结构冠梁3横截面尺寸难以满足钢梁2力臂长度要求时,可以加长力臂,并加以配重满足受力要求。 It should be noted that when the cross-sectional dimension of the crown beam 3 of the enclosure structure of the foundation pit is difficult to meet the length requirement of the force arm of the steel beam 2, the force arm can be lengthened and a counterweight can be added to meet the force requirement.

从上述可以看出,本发明的深基坑用楼梯的最大特点是吊挂式的,根据施工的实际情况由上至下安装楼梯构件。在地下主体结构工程施工过程中,可以选择由下至上拆卸楼梯构件;如图11和图12所示,对于楼梯底部距离基坑底面的距离小于楼梯构件高度的部分,可以使用扣件式脚手架管搭设临时马道24作为补充,能够充分满足深基坑工程不同施工阶段的通行需求。因此,本发明能够完全与基坑土方开挖、边坡支护及后续结构施工工序紧密结合,可直接应用于明挖地下空间工程、地铁工程或其它地下工程建设施工过程中,尤其适用于开挖深度10~30m深基坑。 As can be seen from the above, the biggest feature of the staircase for deep foundation pits of the present invention is that it is suspended, and the staircase components are installed from top to bottom according to the actual situation of construction. During the construction of the main underground structure, you can choose to disassemble the stair components from bottom to top; as shown in Figure 11 and Figure 12, for the part where the distance from the bottom of the stairs to the bottom of the foundation pit is less than the height of the stair components, you can use fastener-type scaffolding pipes A temporary horse track 24 is set up as a supplement, which can fully meet the traffic needs of different construction stages of the deep foundation pit project. Therefore, the present invention can be closely combined with foundation pit earthwork excavation, side slope support and follow-up structural construction procedures, and can be directly applied to open-cut underground space engineering, subway engineering or other underground engineering construction processes, and is especially suitable for excavation Dig the foundation pit to a depth of 10-30m.

下面举一个实际的施工例子。 Here is an actual construction example.

以五棵松地下停车库工程为例,对深基坑用工具式吊挂钢楼梯的具体实施方式进行说明。具体实施方式主要体现在安装、使用、拆卸三个方面。 Taking the Wukesong underground parking garage project as an example, the specific implementation of the tool-type hanging steel stairs for deep foundation pits is described. The specific implementation is mainly reflected in three aspects of installation, use and disassembly.

五棵松地下停车库为典型地下空间项目,主体结构为地下三层钢筋混凝土框架结构,停车库基坑东西向长252m、南北向长287m,基底埋深约21.45m,基坑规模较大。 Wukesong underground parking garage is a typical underground space project. The main structure is an underground three-story reinforced concrete frame structure. The foundation pit of the parking garage is 252m long from east to west and 287m long from north to south. The foundation pit is about 21.45m deep.

受周边环境及场地条件限制,基坑开挖、支护仅能由南向北进行,机动车出土马道设置在基坑北侧;现场办公及工人生活区均布置在基坑南侧和西侧,为确保施工人员上下基坑安全同时满足施工组织需求,根据施工进展在基坑南侧先行安装3部钢楼梯,后期跟随土方收尾在基坑北侧安装2部钢楼梯。 Restricted by the surrounding environment and site conditions, the excavation and support of the foundation pit can only be carried out from south to north, and the excavation road for motor vehicles is set on the north side of the foundation pit; on-site office and workers' living areas are arranged on the south and west sides of the foundation pit , in order to ensure the safety of the construction workers going up and down the foundation pit and meet the needs of the construction organization, according to the construction progress, 3 steel stairs were installed on the south side of the foundation pit first, and 2 steel stairs were installed on the north side of the foundation pit following the end of the earthwork.

单部钢楼梯安装流程均相同:前期筹划(设置位置及楼梯吊挂方式);委托加工(先加工预埋件;预埋件安装;钢梁2安装(首跑楼梯、平台及护头棚搭设);随基坑土方开挖施工,自上而下循环安装楼梯标准节(含楼梯底部临时马道);基坑开挖至基底,随主体结构施工,自下而上循环拆除楼梯标准节;楼梯构件周转使用;拆除楼梯上部结构及钢梁2。 The installation process of a single steel staircase is the same: pre-planning (setting position and stair hanging method); entrusted processing (processing of embedded parts first; installation of embedded parts; installation of steel beam 2 (installation of first run stairs, platforms and head guards) ); along with the excavation of foundation pit earthwork, the stair standard section (including the temporary curb at the bottom of the staircase) shall be installed circularly from top to bottom; the foundation pit shall be excavated to the base, and the stair standard section shall be dismantled circularly from bottom to top along with the construction of the main structure; Component turnover; demolition of the upper structure of the stairs and steel beams 2.

上面结合实施例对本发明做了进一步的叙述,但本发明并不限于上述实施方式,在本领域的普通技术人员所具备的知识范围内,还可以在不脱离本发明宗旨的前提下做出各种变化。 The present invention has been further described above in conjunction with the embodiments, but the present invention is not limited to the above-mentioned embodiments. Within the scope of knowledge possessed by those of ordinary skill in the art, various modifications can be made without departing from the gist of the present invention. kind of change.

Claims (10)

1. a deep foundation ditch tool-type hangs stair, comprise the ladder be arranged in foundation ditch, support the ladder bearing of ladder and be arranged on the stair of ladder inner space, it is characterized in that, described ladder bearing is fixedly connected with foundation pit enclosure structure, ladder bearing comprises 2 or 4 girder steels, and the one or both ends of girder steel are fixed on the upper surface of space enclosing structure Guan Liang; Described ladder is made up of two groups of ladder unit, be provided with the gap of installing stair between two groups of ladder unit, often organize ladder unit and comprise 4 columns, the cross section of ladder unit is rectangular, the upper end of column is fixedly connected with the girder steel above it is vertical, and foundation ditch bottom surface is vertically stretched in the lower end of column; Described stair are arranged in the space between two groups of ladder unit from top to bottom successively, and the corner between adjacent stair arranges half space, and half space is fixed on the inner space of ladder unit.
2. deep foundation ditch tool-type according to claim 1 hangs stair, it is characterized in that, described ladder bearing comprises 4 identical girder steels and is arranged on foundation ditch on one side, girder steel is arranged in parallel and all mutually vertical with the space enclosing structure Guan Liang of foundation ditch, one end of girder steel and the upper surface of space enclosing structure Guan Liang are by bolt and be welded and fixed, and the free end of 4 girder steels is positioned at the top of foundation ditch; The upper surface of described girder steel arranges several lateral connection bars, and lateral connection bar be arranged in parallel and mutually vertical with girder steel in the horizontal direction, and lateral connection bar and girder steel are bolted to connection.
3. deep foundation ditch tool-type according to claim 2 hangs stair, it is characterized in that, described ladder bearing also comprises horizontal diagonal brace, bearing diagonal and floor of putting more energy into; Described horizontal diagonal brace is arranged on the side of outside girder steel, and one end of horizontal diagonal brace is fixedly connected with space enclosing structure Guan Liang by the pre-embedded bolt being embedded in space enclosing structure Guan Liang, and the other end of horizontal diagonal brace is connected with a plate bolt, and junction plate welds with girder steel; Described bearing diagonal is arranged on the below of girder steel, and one end of bearing diagonal is fixedly connected with space enclosing structure Guan Liang by the pre-embedded bolt being embedded in space enclosing structure hat beam sides, and the other end of bearing diagonal is connected with girder steel bolt by a backing plate, and backing plate welds with girder steel; Described floor of putting more energy into is welded on the free end of girder steel.
4. deep foundation ditch tool-type according to claim 1 hangs stair, it is characterized in that, described ladder bearing comprises 2 girder steels and is arranged on the rotation angle position of foundation ditch, girder steel is arranged in parallel, the angle on the corner limit of girder steel and foundation ditch is 45 degree, the two ends of each girder steel all with the upper surface of space enclosing structure Guan Liang by bolt be welded and fixed; Weld 2 groups of cross one another reinforcing bars or small size shaped steel between described 2 girder steels, reinforcing bar or small size shaped steel are arranged on the outside of ladder unit.
5. deep foundation ditch tool-type according to claim 4 hangs stair, it is characterized in that, described ladder bearing also comprises bearing diagonal; Described bearing diagonal is arranged on the below of girder steel, and one end of bearing diagonal is fixedly connected with space enclosing structure Guan Liang by the pre-embedded bolt being embedded in space enclosing structure hat beam sides, and the other end of bearing diagonal is connected with girder steel bolt by a backing plate, and backing plate welds with girder steel.
6. the deep foundation ditch tool-type according to claim 2 or 4 hangs stair, it is characterized in that, the junction of described girder steel and space enclosing structure Guan Liang is provided with backing plate, pre-embedded bolt in space enclosing structure hat beam is connected with girder steel by backing plate, the upper surface of backing plate and girder steel solder design, be filled with grouting material in the gap between the soffit of backing plate and the upper surface of space enclosing structure Guan Liang.
7. deep foundation ditch tool-type according to claim 1 hangs stair, it is characterized in that, described column and girder steel are bolted to connection, between column and girder steel, be provided with junction plate, bolt connects column and girder steel through junction plate, the upper surface of junction plate and girder steel solder design.
8. deep foundation ditch tool-type according to claim 1 hangs stair, it is characterized in that, described stair comprise step plate, step plate gripper shoe and are arranged on the guard rail of step plate both sides, step plate is welded in step plate gripper shoe, the end of step plate gripper shoe is welded with column, described guard rail is provided with closed metal net.
9. deep foundation ditch tool-type according to claim 1 hangs stair, it is characterized in that, described half space comprises frame, several supporting parts and landing slab, the corner of described frame is connected with the column forming ladder unit, supporting part is welded on the inside of frame in parallel, and landing slab is laid in the plane at frame and supporting part place; The side of described half space arranges guard rail, guard rail is provided with closed metal net.
10. deep foundation ditch tool-type according to claim 9 hangs stair, it is characterized in that, the corner of described half space is fixedly connected with column by channel-section steel, the waist height portion of channel-section steel welds with column, the upper leg wide portion upper surface of channel-section steel installs half space, the wide portion of lower leg of channel-section steel is connected with one side bolt of the angle bar be arranged on below channel-section steel, and the another side of angle bar welds with column.
CN201410490893.2A 2014-09-24 2014-09-24 Deep foundation ditch tool-type hangs stair Expired - Fee Related CN104234447B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410490893.2A CN104234447B (en) 2014-09-24 2014-09-24 Deep foundation ditch tool-type hangs stair

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410490893.2A CN104234447B (en) 2014-09-24 2014-09-24 Deep foundation ditch tool-type hangs stair

Publications (2)

Publication Number Publication Date
CN104234447A CN104234447A (en) 2014-12-24
CN104234447B true CN104234447B (en) 2016-02-24

Family

ID=52223270

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410490893.2A Expired - Fee Related CN104234447B (en) 2014-09-24 2014-09-24 Deep foundation ditch tool-type hangs stair

Country Status (1)

Country Link
CN (1) CN104234447B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106869421A (en) * 2017-01-10 2017-06-20 中国建筑第八工程局有限公司 Assembled staircase structure and installation method thereof
CN109958133B (en) * 2018-11-20 2021-08-24 黄建勇 A safety-based adjustment method for the suspension angle of up and down stairs in deep foundation pits
CN111456348B (en) * 2020-05-20 2024-10-15 北京市建筑设计研究院股份有限公司 Steel stair structure
CN112727152B (en) * 2020-12-28 2022-06-03 宜昌富海建设工程有限公司 Connection structure between construction stair and floor in deep basal pit
CN112922029A (en) * 2021-03-18 2021-06-08 中铁隧道局集团有限公司 Shaft-up and shaft-down channel for constructing ultra-deep shaft by reverse construction method and building method thereof
CN116561853B (en) * 2023-04-26 2024-07-23 青岛理工大学 A calculation method for the overall stability of foundation pit ladder

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0921238A (en) * 1995-07-04 1997-01-21 Shuji Takase Entrance structure in building construction site
DE102009024857A1 (en) * 2009-06-09 2010-12-16 Rux Gmbh Treppenwange
CN202215006U (en) * 2011-09-07 2012-05-09 中国建筑土木建设有限公司路桥分公司 Tool type ladder stand for construction
CN203755717U (en) * 2014-02-28 2014-08-06 中国建筑第五工程局有限公司广州分公司 Assembly type up and down pedestrian path for deep foundation pit

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101067300A (en) * 2007-06-01 2007-11-07 天津一建建筑工程有限公司 Deep foundation pits rampway structure

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0921238A (en) * 1995-07-04 1997-01-21 Shuji Takase Entrance structure in building construction site
DE102009024857A1 (en) * 2009-06-09 2010-12-16 Rux Gmbh Treppenwange
CN202215006U (en) * 2011-09-07 2012-05-09 中国建筑土木建设有限公司路桥分公司 Tool type ladder stand for construction
CN203755717U (en) * 2014-02-28 2014-08-06 中国建筑第五工程局有限公司广州分公司 Assembly type up and down pedestrian path for deep foundation pit

Also Published As

Publication number Publication date
CN104234447A (en) 2014-12-24

Similar Documents

Publication Publication Date Title
CN106760529B (en) Roof steel truss sliding assembly construction platform and installation method
CN104234447B (en) Deep foundation ditch tool-type hangs stair
CN111779248A (en) High-support formwork system and its construction method
CN212507296U (en) High formwork system
CN207160629U (en) Spliced type constructor walking system
CN104831928B (en) High-altitude long-span concrete conjoined structure shuttering supporting steel platform construction method
CN104533106B (en) Single layered stereo is prefabricated with excavation of foundation pit assembling sunk type construction cat ladder and construction method
CN114704064A (en) Flow combination construction method for disk-buckle type self-overhanging operation frame and rope net operation frame
CN103334580B (en) Section steel tripod in a kind of overhanging scaffold and connection system for guide rail
CN114961212B (en) Operation platform for reducing temporary space height of assembled stairway and construction method thereof
CN114215333B (en) Quick construction method for outer cornices of high-rise buildings
CN113463653B (en) A construction method for vertical section type dismantling of inner support
CN208183778U (en) Temporary building foundation structure for complicated landform
CN110847289A (en) Ultra-deep large-span circular water intake pump house roof support and construction method thereof
CN110552519A (en) Deep foundation pit assembled type safe passage construction method
CN211815605U (en) Construction device for pile column type pier tie beam and capping beam
CN204590035U (en) Single layered stereo is prefabricated with excavation of foundation pit assembling sunk type construction cat ladder
CN219931554U (en) A cantilevered steel structure construction platform with formwork system
CN217001645U (en) Construction cat ladder passageway that high altitude construction used
CN215670884U (en) A prefabricated building stairwell operating platform
CN116657875A (en) Cantilever steel structure construction platform with formwork system and construction method
CN104195954B (en) Overhead column erection without scaffolding platform and erection method thereof
CN115788111A (en) Deep foundation pit ladder cage subsection reverse installation method
CN212507305U (en) High-altitude operation platform applied to large-span factory building
CN116255033A (en) Construction method of steel structure conversion layer for stage mechanical equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160224

Termination date: 20210924

CF01 Termination of patent right due to non-payment of annual fee