CN202550337U - 带负荷开夹检查、紧固输变电设备引线线夹专用工具 - Google Patents

带负荷开夹检查、紧固输变电设备引线线夹专用工具 Download PDF

Info

Publication number
CN202550337U
CN202550337U CN2012200868453U CN201220086845U CN202550337U CN 202550337 U CN202550337 U CN 202550337U CN 2012200868453 U CN2012200868453 U CN 2012200868453U CN 201220086845 U CN201220086845 U CN 201220086845U CN 202550337 U CN202550337 U CN 202550337U
Authority
CN
China
Prior art keywords
wire
clamp
wire clamp
copper
power transmission
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012200868453U
Other languages
English (en)
Inventor
蔡江河
吴燎原
刘松波
康长波
张大成
骆明章
陈慕福
谢伟峰
黄春林
黄元龙
邓善辉
吕云生
吴长翔
梁鑫海
李晓榕
裴光燚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Fujian Electric Power Co Ltd
Sanming Power Supply Co of State Grid Fujian Electric Power Co Ltd
Original Assignee
Sanming Power Supply Co of State Grid Fujian Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sanming Power Supply Co of State Grid Fujian Electric Power Co Ltd filed Critical Sanming Power Supply Co of State Grid Fujian Electric Power Co Ltd
Priority to CN2012200868453U priority Critical patent/CN202550337U/zh
Application granted granted Critical
Publication of CN202550337U publication Critical patent/CN202550337U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

本实用新型公开了一种带负荷开夹检查、紧固输变电设备引线线夹专用工具,包括有两个旁路分流线夹、旁路分流线和两个铜铝过渡线夹,所述的铜铝过渡线夹固定在旁路分流线的两端,所述的铜铝过渡线夹与旁路分流线夹为活动拆卸式的连接。本专用工具具有拆装方便,安全可靠,工作效率高,实现了输变电设备引线线夹带负荷检修。

Description

带负荷开夹检查、紧固输变电设备引线线夹专用工具
技术领域
             本实用新型涉及一种带电作业工器具,特别是一种带负荷开夹检查、紧固输变电设备引线线夹专用工具。
背景技术
近年来,由于全社会用电量的迅猛增长,输变电设备线夹接点发热频发,给电网安全稳定运行带来重大隐患,特别是运行多年的老旧设备,引线线夹发热现象更是时常发生,每次缺陷发生后,都必须及时调整运行方式,减少输送负荷,严重制约着电网的安全稳定运行。目前,在变电站母线线夹发热处理方法上,通常采用在原发热线夹上进行螺栓紧固,待设备停运或转冷备用后,再解开线夹进行处理,引线线夹松脱或发热等缺陷无法得到及时有效的处理,从而影响输变电设备可靠性和设备的输送能力。
实用新型内容
本实用新型的目的在于克服现有技术的不足之处,而提供一种拆装方便,安全可靠,符合现场工作条件要求的带负荷开夹检查、紧固输变电设备引线线夹发热的专用工具。
一种带负荷开夹检查、紧固输变电设备引线线夹专用工具,其结构要点在于:包括有两个旁路分流线夹、旁路分流线和两个铜铝过渡线夹,所述的铜铝过渡线夹固定在旁路分流线的两端,所述的铜铝过渡线夹与旁路分流线夹为活动拆卸式的连接。
这种结构的带负荷开夹检查、紧固输变电设备引线线夹专用工具,在使用时,只需将两个旁路分流线夹分别固定在输变电设备引线线夹导线侧及线夹跳线侧,使运行中的输变电设备形成另一回旁路分流回路,作业人员使用钳形电流表检测旁路分流线分流情况后,拆除发热点线夹并处理,达到带负荷开夹检查、紧固输变电设备引线线夹的目的。
所述的铜铝过渡线夹与旁路分流线夹之间的活动拆卸式连接为将旁路分流线夹与铜铝过渡线夹之间采用螺紋连接件连接。
所述的铜铝过流线夹为由铜铝套管形成,在铜铝套管上钻有可与旁路分流线夹相配合连接的通孔。
所述的通孔为螺纹孔。
所述的旁路分流线夹为由两片对抱在一起的夹具体构成,在两夹具体相向的面上设置有可卡入导线的线槽,线槽由两部分构成,其分设于两夹具体上,两夹具体的一开口侧铰接在一起以方便线夹的开合,两夹具体的另一开口侧采用锁紧装置进行活动连接。
这种结构的旁路分流线夹,使用时,打开两夹具体的锁紧装置,使两夹具体围绕着另一侧的铰接点打开,而后将其扣入导线,再将锁紧装置将开口锁紧,即可实现该旁路分流线夹在导线上的锁紧。
所述的锁紧装置或为采用搭扣式锁紧装置,或为采用螺纹连接件做为锁紧装置。
所述的旁路分流线为多股软铜绞线。
综上所述的,本实用新型相比现有技术如下优点:
本带负荷开夹检查、紧固输变电设备引线线夹专用工具在工作时,工作人员通过绝缘平梯或绝缘软梯等辅助工具进入作业点,将专用工具一端的旁路分流线夹锁紧装置解开,将线夹安放在输变电设备引线线夹导线侧,而后合上旁路分流线夹,将锁紧装置拧紧;再将专用工具另一端的旁路分流线夹安放在输变电设备引线线夹跳线侧,使运行中的输变电设备形成另一回旁路分流回路,作业人员使用钳形电流表检测旁路分流线分流情况后,拆除发热点线夹并处理,达到带负荷开夹检查、紧固输变电设备引线线夹的目的。整套专用工具具有拆装方便,安全可靠,工作效率高,实现了输变电设备引线线夹带负荷检修。
附图说明
  图1是本实用新型带负荷开夹检查、紧固输变电设备引线线夹专用工具的正视图。
图2是本实用新型带负荷开夹检查、紧固输变电设备引线线夹专用工具安装在输电设备引线的示意图。
标号说明 1 旁路分流线   2 铜铝过渡线夹  3 旁路分流线夹。
具体实施方式
下面结合实施例对本实用新型进行更详细的描述。
实施例1 
如图1所示的带负荷开夹检查、紧固输变电设备引线线夹专用工具,包括有两个旁路分流线夹3、旁路分流线1和两个铜铝过渡线夹2,所述的铜铝过渡线夹压接固定在旁路分流线的两端,所述的铜铝过渡线夹与旁路分流线夹为活动拆卸式的连接。所述的铜铝过渡线夹与旁路分流线夹之间的活动拆卸式连接为将旁路分流线夹与铜铝过渡线夹之间采用螺紋连接件连接。所述的铜铝过流线夹为由铜铝套管形成,在铜铝套管钻有可与旁路分流线夹相配合连接的螺纹通孔。所述的旁路分流线夹为由两片对抱在一起的夹具体构成,在两夹具体相向的面上设置有可卡入导线的线槽,线槽由两部分构成,其分设于两夹具体上,两夹具体的一开口侧铰接在一起以方便于线夹的开合,两夹具体的另一开口侧采用螺纹锁紧装置进行活动连接。
在工作时,如图2所示,等电位电工通过绝缘水平硬梯或绝缘软梯等辅助工具进入作业点, 将专用工具一端的旁路分流线夹螺纹锁紧装置解开,将线夹安放在输变电设备引线线夹导线侧,而后合上旁路分流线夹,将固定式螺栓拧紧;再将专用工具另一端的旁路分流线夹安放在输变电设备引线线夹跳线侧,使运行中的输变电设备形成另一回旁路分流回路,作业人员使用钳形电流表检测旁路分流线分流情况后,拆除发热点线夹并处理,达到带负荷开夹检查、紧固输变电设备引线线夹的目的。
本实施例末述部分与现有技术相同。

Claims (6)

1.一种带负荷开夹检查、紧固输变电设备引线线夹专用工具,其特征在于:包括有两个旁路分流线夹、旁路分流线和两个铜铝过渡线夹,所述的铜铝过渡线夹固定在旁路分流线的两端,所述的铜铝过渡线夹与旁路分流线夹为活动拆卸式的连接。
2.根据权利要求1所述的带负荷开夹检查、紧固输变电设备引线线夹专用工具,其特征在于:所述的铜铝过渡线夹与旁路分流线夹之间的活动拆卸式连接为将旁路分流线夹与铜铝过渡线夹之间采用螺紋连接件连接。
3.根据权利要求2所述的带负荷开夹检查、紧固输变电设备引线线夹专用工具,其特征在于:所述的铜铝过流线夹为由铜铝套管形成,在铜铝套管上钻有可与旁路分流线夹相配合连接的通孔。
4.根据权利要求3所述的带负荷开夹检查、紧固输变电设备引线线夹专用工具,其特征在于:所述的通孔为螺纹孔.
根据权利要求4所述的带负荷开夹检查、紧固输变电设备引线线夹专用工具,其特征在于:所述的旁路分流线夹为由两片对抱在一起的夹具体构成,在两夹具体相向的面上设置有可卡入导线的线槽,线槽由两部分构成,其分设于两夹具体上,两夹具体的一开口侧铰接在一起以方便线夹的开合,两夹具体的另一开口侧采用锁紧装置进行活动连接。
5.根据权利要求5所述的带负荷开夹检查、紧固输变电设备引线线夹专用工具,其特征在于:所述的锁紧装置或为采用搭扣式锁紧装置,或为采用螺纹连接件做为锁紧装置。
6.根据权利要求6所述的带负荷开夹检查、紧固输变电设备引线线夹专用工具,其特征在于:所述的旁路分流线为多股软铜绞线。
CN2012200868453U 2012-03-09 2012-03-09 带负荷开夹检查、紧固输变电设备引线线夹专用工具 Expired - Fee Related CN202550337U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012200868453U CN202550337U (zh) 2012-03-09 2012-03-09 带负荷开夹检查、紧固输变电设备引线线夹专用工具

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012200868453U CN202550337U (zh) 2012-03-09 2012-03-09 带负荷开夹检查、紧固输变电设备引线线夹专用工具

Publications (1)

Publication Number Publication Date
CN202550337U true CN202550337U (zh) 2012-11-21

Family

ID=47170906

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012200868453U Expired - Fee Related CN202550337U (zh) 2012-03-09 2012-03-09 带负荷开夹检查、紧固输变电设备引线线夹专用工具

Country Status (1)

Country Link
CN (1) CN202550337U (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104577831A (zh) * 2014-12-16 2015-04-29 华北电力科学研究院有限责任公司 分流工具和电力设备带电检修方法
CN105406384A (zh) * 2015-12-25 2016-03-16 广东电网有限责任公司佛山供电局 变电站设备不停电检修系统及其方法

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104577831A (zh) * 2014-12-16 2015-04-29 华北电力科学研究院有限责任公司 分流工具和电力设备带电检修方法
CN105406384A (zh) * 2015-12-25 2016-03-16 广东电网有限责任公司佛山供电局 变电站设备不停电检修系统及其方法

Similar Documents

Publication Publication Date Title
CN103490363B (zh) 输电线路直流融冰快速短接装置
CN203288783U (zh) 验电式高压接地线棒
CN102545091B (zh) 带电断接导线引线线夹装置
CN204651526U (zh) 电力系统用组合式线夹
CN201548642U (zh) 高压试验接线杆
CN206490196U (zh) 一种开关柜内电缆头专用接地线
CN202550337U (zh) 带负荷开夹检查、紧固输变电设备引线线夹专用工具
CN202930884U (zh) 一种融冰短接金具
CN203039272U (zh) 变电站管型母线单卡箍接地装置
CN202586173U (zh) 快速连接管式线夹
CN103078190B (zh) 一种拉马式应急电源车快速接入接头
CN201069828Y (zh) 碳纤维复合芯导线用t形线夹
CN203103517U (zh) 一种线夹式应急电源车快速接入接头
CN203895633U (zh) 适用于箱变和配电室的短路接地线
CN103457051A (zh) 一种输电线路管母快速作业线夹
CN202797696U (zh) 地电位处理变电设备节点发热装置的导流线夹
CN203103541U (zh) 一种拉马式应急电源车快速接入接头
CN202026029U (zh) 导线分流夹具
CN204516929U (zh) 用于连接电缆与母排或母线的压接型连接器
CN204651527U (zh) 角度可调式接地线辅助挂接装置
CN204167518U (zh) 大电流导线连接构件
CN203232974U (zh) 一种低压接地线的接地体互换装置
CN203415837U (zh) 变电站用防脱落通用接地线
CN205303894U (zh) 导流线夹
CN203103518U (zh) 一种挂钩式应急电源车快速接入接头

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE GRID FUJIAN ELECTRIC POWER CO., LTD. SANMING

Effective date: 20140113

Owner name: STATE ELECTRIC NET CROP.

Free format text: FORMER OWNER: SANMING POWER SUPPLY CO., LTD. TATE GRID FUJIAN ELECTRIC POWER COMPANY

Effective date: 20140113

C41 Transfer of patent application or patent right or utility model
C56 Change in the name or address of the patentee

Owner name: SANMING POWER SUPPLY CO., LTD. TATE GRID FUJIAN E

Free format text: FORMER NAME: FUJIAN PROVINCE ELETRIC POWER CO., LTD. SANMING POWER SUPPLY BUREAU

COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 365000 SANMING, FUJIAN PROVINCE TO: 100031 XICHENG, BEIJING

CP01 Change in the name or title of a patent holder

Address after: Fujian 365000 Sanming City province Meliet District listed Street No. 1032

Patentee after: SANMING POWER SUPPLY COMPANY OF STATE GRID FUJIAN ELECTRIC POWER Co.,Ltd.

Address before: Fujian 365000 Sanming City province Meliet District listed Street No. 1032

Patentee before: SANMING ELECTRICITY BUREAU OF FUJIAN ELECTRIC POWER Co.,Ltd.

TR01 Transfer of patent right

Effective date of registration: 20140113

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Patentee after: State Grid Corporation of China

Patentee after: STATE GRID FUJIAN ELECTRIC POWER Co.,Ltd.

Patentee after: SANMING POWER SUPPLY COMPANY OF STATE GRID FUJIAN ELECTRIC POWER Co.,Ltd.

Address before: Fujian 365000 Sanming City province Meliet District listed Street No. 1032

Patentee before: SANMING POWER SUPPLY COMPANY OF STATE GRID FUJIAN ELECTRIC POWER Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121121

Termination date: 20190309

CF01 Termination of patent right due to non-payment of annual fee