CN202519959U - Quick scaffold for overhauling large transformer - Google Patents

Quick scaffold for overhauling large transformer Download PDF

Info

Publication number
CN202519959U
CN202519959U CN2012201509867U CN201220150986U CN202519959U CN 202519959 U CN202519959 U CN 202519959U CN 2012201509867 U CN2012201509867 U CN 2012201509867U CN 201220150986 U CN201220150986 U CN 201220150986U CN 202519959 U CN202519959 U CN 202519959U
Authority
CN
China
Prior art keywords
scaffold
layer support
working platform
quick
right sides
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012201509867U
Other languages
Chinese (zh)
Inventor
王军
陈滨汉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Three Gorges Corp
Original Assignee
China Three Gorges Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Three Gorges Corp filed Critical China Three Gorges Corp
Priority to CN2012201509867U priority Critical patent/CN202519959U/en
Application granted granted Critical
Publication of CN202519959U publication Critical patent/CN202519959U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a quick scaffold for overhauling a large transformer. The quick scaffold comprises two lower-layer supports distributed on the left and the right, wherein a left upper-layer support and a right upper-layer support are arranged on the left lower-layer support and the right lower-layer support; a cross connecting rod is arranged between the left upper-layer support and the right upper-layer support; a working platform is arranged on the left upper-layer support and the right upper-layer support; a guardrail is arranged on the periphery of the working platform; a plurality of casing pipe holes are arranged in the working platform; and the upper-layer supports can be adjusted in a horizontal direction and a vertical direction. The utility model provides a flexible, safe and stable working space, the scaffold can be erected and disassembled quickly and conveniently, and the cost is saved; and the scaffold is made of aluminium alloy materials so as to have the characteristics of portability and high rigidity, the probability of damaging a radiating system, a neutral bushing and an instrument of the transformer in a scarffold erecting and disassembling process is greatly reduced, the working efficiency is improved, the working quality is ensured, and the scaffold is very suitable to be used for power generation.

Description

Quick scaffold is used in a kind of high-power transformer maintenance
Technical field
The utility model relates to a kind of high-power transformer maintenance and uses quick scaffold.
Background technology
Domesticly newly build up and generally use SF at the large hydropower station of founding a capital 6/ tubing and casing directly links to each other GIS equipment with the main transformer high-pressure side, has both improved equipment dependability, has practiced thrift the valuable device space in hydroelectric power plant again.In case but need carry out test such as winding deformation, D.C. resistance, partial discharge test or GIS loop resistance, switching characteristic after the main transformer overhaul time; Need bushing be connected disconnection so that make an experiment with GIS, treat that recovering the connection side after test finishes can use.Break and draw complicated operation again in (following this operation is called for short to break and draws again) scene; Technological requirement is higher; And the space, power station is compact, is difficult to use high-altitude operation vehicle or on main transformer, reserves permanent inspection platform, could construct so each maintenance needs the scene to set up scaffold.But reasons such as transformer device structure make the scaffold construction have following problem: 1, the disconnected construction point below of drawing again is transformer radiator and pipeline, control system etc., and there is cobble on ground, and common fast-assembling scaffold is difficult to use; 2, many main transformers maybe be with a batch difference, or because cause of reform, exists appearance and size, cooling system structure different, can't make the general quick scaffold of a cover, as making separately according to each transformation, the equipment purchase cost is multiplied; Though 3, adopt that steel pipe/bamboo springboard scaffold cost is lower, structure is flexible, have that bearing capacity is limited, the construction period long, easily transformer radiating system or sleeve pipe are caused defectives such as damage.
Summary of the invention
The technical problem that the utility model will solve is to provide a kind of high-power transformer maintenance to use quick scaffold for the deficiency that has overcome prior art; It has general, safe, quick, stable properties, can reach the purpose of in same power station, " producing once, standing entirely and use ".
The purpose of the utility model is achieved in that
Quick scaffold is used in a kind of high-power transformer maintenance; Two lower floor supports that distribute about it comprises, lower floor support top, the left and right sides is provided with left and right sides upper layer bracket, is provided with tranverse connecting rod between the upper layer bracket of the left and right sides; Upper layer bracket top, the left and right sides is provided with working platform; Top is provided with guardrail around the working platform, and working platform is provided with a plurality of collar aperture, and described upper layer bracket can be adjusted with vertical direction in the horizontal direction; The horizontal direction adjustment is used to make each parts of scaffold to avoid radiator and pipeline thereof, and the vertical direction adjustment is used to make the scaffold height freely to adjust according to bushing and GIS structure difference.
Above-mentioned lower floor support bottom, the left and right sides is that leg is regulated, and is used to regulate lower floor support level and locking.
Above-mentioned working platform top is provided with antiskid plate.
Above-mentioned collar aperture inwall is provided with flexible material layer.
Above-mentioned flexible material layer is a rubber tile.
Technique effect below the utility model has been obtained:
1. the utility model has overcome the drawbacks of the special-purpose scaffold fast of the use of large-scale power station main transformer maintenance in the past or steel pipe/springboard scaffold; The different structure main transformer maintenance construction that can be each power station provides a cover flexible, safe, stable working space; It is quick and convenient to set up dismounting, has practiced thrift cost again; The employing aluminum alloy material is made; Have light, high-strength characteristics, significantly reduced to take and torn the possibility of in the scaffold process transformer radiating system, neutral bushing and instrument being damaged open, improved operating efficiency; Guaranteed work quality, be fit to very much electrical production and use.
Description of drawings
Below in conjunction with accompanying drawing and embodiment the utility model is described further.
Fig. 1 is the front view of the utility model;
Fig. 2 is the lateral view of the utility model;
Fig. 3 is the vertical view of working platform in the utility model;
Fig. 4 is the structural representation of Fig. 3 middle sleeve hole and housing thereof;
Fig. 5 is provided with sketch map for lower floor support;
Fig. 6 is the lateral view of Fig. 5.
The specific embodiment
Shown in Fig. 1-6, a kind of high-power transformer maintenance is used quick scaffold, two lower floor supports 1 that distribute about it comprises; Lower floor support top, the left and right sides is provided with left and right sides upper layer bracket 2; Be provided with tranverse connecting rod 3 between the upper layer bracket of the left and right sides, upper layer bracket top, the left and right sides is provided with working platform 4, and top is provided with guardrail 5 around the working platform; Working platform is provided with a plurality of collar aperture 6; Described upper layer bracket can be adjusted with vertical direction in the horizontal direction, and the horizontal direction adjustment is used to make each parts of scaffold to avoid radiator and pipeline thereof, and the vertical direction adjustment is used to make the scaffold height freely to adjust according to bushing and GIS structure difference.
Preferably, lower floor support bottom, the described left and right sides is that leg regulates 7, is used to regulate lower floor support level and locking.Described working platform top is provided with antiskid plate 8.Described collar aperture inwall is provided with flexible material layer 9, and described flexible material layer is a rubber tile.
Lower floor support is made up of left and right sides two parts fully independently; Adopt prewelding to connect truss and tubing on-site consolidation formation; Assembled on site; Relative position can be adjusted according to each transformer foundation, is responsible for the weight of fast-assembling scaffold self and load is transferred to stable, firm plane, can regulate own level and locking through leg.
Upper layer bracket left and right sides two parts connect through length-adjustable tranverse connecting rod; The employing prewelding connects framework and the tubing scene is spliced to form; With bottom support relative position can be along truss direction horizontal adjusting; Self can vertically adjust simultaneously, the horizontal direction adjustment can make each parts of scaffold avoid radiator and pipeline thereof, and the vertical direction adjustment can make whole fast-assembling scaffold height freely change according to bushing and GIS structure difference.
Working platform adopts prewelding to connect framework and antiskid pedal splicing, is connected by flexible material with circular GIS shell, prevents that the scaffold beat from causing damage to GIS, avoids working platform and GIS shell spacing bigger simultaneously, and the maintainer is caused potential safety hazard;
Guardrail is spliced to form by the tubing scene, is connected on the working platform staff is formed protection.
The utlity model has following characteristics:
1, scaffold stand adopts upper and lower layer structure, and separate adjustment can guarantee that the scaffold basis is all the time stable
On the plane; Again can be to the radiator of different structure; Avoid radiator and pipeline thereof for each parts of support the adjustment space is provided, face height can be adjusted according to each bushing shell for transformer and GIS structure within the specific limits, be fit to each Repair of Transformer of same power station and use;
2, scaffold adopts aluminum alloy material in light weight, that intensity is high to make fast, and each preparatory assembling parts weight can be controlled
In 15kg, be convenient to set up and demolishing process in transmit and control;
3, consider electrical production site safety distance limit and be convenient to transportation, long transverse lever and long leg adopt accordion structure, and miscellaneous part dismounting back length, width are less.

Claims (5)

1. quick scaffold is used in a high-power transformer maintenance; It is characterized in that: two lower floor supports (1) that distribute about it comprises, lower floor support top, the left and right sides is provided with left and right sides upper layer bracket (2), is provided with tranverse connecting rod (3) between the upper layer bracket of the left and right sides; Upper layer bracket top, the left and right sides is provided with working platform (4); Top is provided with guardrail (5) around the working platform, and working platform is provided with a plurality of collar aperture (6), and described upper layer bracket can be adjusted with vertical direction in the horizontal direction; The horizontal direction adjustment is used to make each parts of scaffold to avoid radiator and pipeline thereof, and the vertical direction adjustment is used to make the scaffold height freely to adjust according to bushing and GIS structure difference.
2. quick scaffold is used in high-power transformer maintenance according to claim 1, it is characterized in that: lower floor support bottom, the described left and right sides is that leg is regulated (7), is used to regulate lower floor support level and locking.
3. quick scaffold is used in high-power transformer maintenance according to claim 1 and 2, and it is characterized in that: described working platform top is provided with antiskid plate (8).
4. quick scaffold is used in high-power transformer maintenance according to claim 1 and 2, and it is characterized in that: described collar aperture inwall is provided with flexible material layer (9).
5. quick scaffold is used in high-power transformer maintenance according to claim 4, and it is characterized in that: described flexible material layer is a rubber tile.
CN2012201509867U 2012-04-11 2012-04-11 Quick scaffold for overhauling large transformer Expired - Fee Related CN202519959U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012201509867U CN202519959U (en) 2012-04-11 2012-04-11 Quick scaffold for overhauling large transformer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012201509867U CN202519959U (en) 2012-04-11 2012-04-11 Quick scaffold for overhauling large transformer

Publications (1)

Publication Number Publication Date
CN202519959U true CN202519959U (en) 2012-11-07

Family

ID=47102914

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012201509867U Expired - Fee Related CN202519959U (en) 2012-04-11 2012-04-11 Quick scaffold for overhauling large transformer

Country Status (1)

Country Link
CN (1) CN202519959U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103293411A (en) * 2013-05-10 2013-09-11 吉林省电力有限公司长春供电公司 220KV transformer testing auxiliary support

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103293411A (en) * 2013-05-10 2013-09-11 吉林省电力有限公司长春供电公司 220KV transformer testing auxiliary support

Similar Documents

Publication Publication Date Title
CN102359302B (en) Extra-high voltage large-span iron tower assembling method
CN106012852B (en) Support integrally falls frame construction method
CN102612598A (en) Wind power plant for producing electric energy, and relative pylon construction method
CN105442853B (en) A kind of long-span deformed Elements of Space Grid Truss and landing Steel Structure Installation construction method
CN207048345U (en) Construction discharge platform device
CN102661057B (en) Power angle tower pull leg main material changing method and special main material clamp
CN202519959U (en) Quick scaffold for overhauling large transformer
CN105016220B (en) A kind of pole guide support adding device
CN103334383B (en) Elevating device special for viaduct maintenance construction
CN202978125U (en) Cable pay-off rack
CN105672192B (en) Dam body moment unstability is burst under extreme loading condition analogue means and operation method
CN202578109U (en) Double-upright-post type aluminum alloy accident repair tower
CN204940133U (en) Hydraulic pressure sliding sash climbing frame
CN207108409U (en) Repair of Transformer scaffold
CN204190233U (en) A kind of low pressure rod-type power distribution cabinet operating platform
CN202602133U (en) Multifunctional portable climbing pole
CN206931905U (en) Low-voltage platform area special operation platform device
CN202627194U (en) Large-scale energy dissipation damping space structure system
CN202578116U (en) Single-person on-pole assembler for dual-fan cross arm
CN106129898A (en) Auxiliary device crossed over by a kind of ground wire of changing
CN106150176B (en) Extra high voltage network emergency first-aid repair strain rod tower column module
CN203301061U (en) Combined special tool for elevation of supporting erecting bottle of bus
CN104377578A (en) Low-voltage pole type power distribution cabinet operating platform
WO2014153962A1 (en) Upright-column type rush-repair tower for combined type high-voltage line iron tower
CN203826824U (en) Single holding pole for replacing disconnecting link

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121107

Termination date: 20160411