CN202510132U - 高速铁路隧道仰拱模板 - Google Patents

高速铁路隧道仰拱模板 Download PDF

Info

Publication number
CN202510132U
CN202510132U CN 201220152596 CN201220152596U CN202510132U CN 202510132 U CN202510132 U CN 202510132U CN 201220152596 CN201220152596 CN 201220152596 CN 201220152596 U CN201220152596 U CN 201220152596U CN 202510132 U CN202510132 U CN 202510132U
Authority
CN
China
Prior art keywords
moldboards
speed railway
railway tunnel
invert form
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220152596
Other languages
English (en)
Inventor
张斌
李建军
张沛杰
鞠年军
王光勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 12th Bureau Group Co Ltd
Third Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Original Assignee
China Railway 12th Bureau Group Co Ltd
Third Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 12th Bureau Group Co Ltd, Third Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd filed Critical China Railway 12th Bureau Group Co Ltd
Priority to CN 201220152596 priority Critical patent/CN202510132U/zh
Application granted granted Critical
Publication of CN202510132U publication Critical patent/CN202510132U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

本实用新型具体为一种高速铁路隧道仰拱模板,解决了现有仰拱模板采用小块钢板施工存在劳动强度大、质量偏差且施工效率低下的问题。高速铁路隧道仰拱模板,包括由左右方向放置且相互平行的两块端头模板,端头模板的中部之间固定有左右分布的两块中心水沟模板,且端头模板的左右两端均固定有弧形模板,端头模板、中心水沟模板及弧形模板的背面均固定有由骨架焊接而成的桁架。本实用新型结构设计合理可靠,施工过程不易发生跑模、混凝土不密实及空洞等现象,而且加快了仰拱施工进度的同时降低了作业人员的劳动强度,提高了机械化作业程度,减少了施工人员的安全风险,同时减少了材料的消耗,占用场地面积小,有利于文明施工。

Description

高速铁路隧道仰拱模板
技术领域
本实用新型涉及隧道施工用模板,具体为一种高速铁路隧道仰拱模板。
背景技术
在高速铁路隧道仰拱施工中,端头模板和中心水沟模板采用小块钢板人工拼装,并通过钢管支架加固;仰拱弧形钢模,也采用小块弧形钢模人工拼装,并在钢筋支架上安装加固。该结构设计存在很多缺点:一是仰拱施工进度慢,由于铁道部对隧道安全步距有严格要求,仰拱施工制约了整个隧道施工进度;二是工人搬运安装模板时,劳动强度大,安全风险大;三是有时出现模板跑位偏移,造成仰拱混凝土外观质量差,止水带偏位;四是现场机具材料多,场地占用面积大等问题。
发明内容
本实用新型为了解决现有仰拱模板采用小块钢板施工存在劳动强度大、质量偏差且施工效率低下的问题,提供了一种高速铁路隧道仰拱模板。
本实用新型是采用如下技术方案实现的:高速铁路隧道仰拱模板,包括由左右方向放置且相互平行的两块端头模板,端头模板的中部之间固定有左右分布的两块中心水沟模板,且端头模板的左右两端均固定有弧形模板,端头模板、中心水沟模板及弧形模板的背面均固定有由骨架焊接而成的桁架。
仰拱模板安装时,采用8t汽车吊及装载机配合吊装端头模板及中心水沟模板,两侧同时起吊,同时前移至测量的定位点处,调整顶面标高到位后进行定位支撑,克服了现有仰拱模板采用小块钢板施工存在劳动强度大、质量偏差且施工效率低下的问题。
本实用新型结构设计合理可靠,采用吊车一次吊装,支撑固定化,另外仰拱模板刚度大,施工过程不易发生跑模、混凝土不密实及空洞等现象,确保仰拱砼线型顺直、止水带定位准确,而且加快了仰拱施工进度的同时降低了作业人员的劳动强度,提高了机械化作业程度,减少了施工人员的安全风险,同时减少了材料的消耗,占用场地面积小,有利于文明施工。
附图说明
图1为本实用新型的结构示意图。
图中:1-端头模板,2-中心水沟模板,3-弧形模板。
具体实施方式
高速铁路隧道仰拱模板,包括由左右方向放置且相互平行的两块端头模板1,端头模板1的中部之间固定有左右分布的两块中心水沟模板2,且端头模板1的左右两端均固定有弧形模板3,端头模板1、中心水沟模板2及弧形模板3的背面均固定有由骨架焊接而成的桁架。
具体实施过程中,端头模板1背面的桁架采用工字钢及槽钢作为骨架制成,桁架宽100cm,仰拱及填充模板加工成一块整体模板,仰拱与填充模板错开20cm,仰拱模板底部连接一活动的20号槽钢,槽钢与充填模板之间缝隙宽2cm,便于安装固定中埋式止水带。

Claims (1)

1.一种高速铁路隧道仰拱模板,其特征在于:包括由左右方向放置且相互平行的两块端头模板(1),端头模板(1)的中部之间固定有左右分布的两块中心水沟模板(2),且端头模板(1)的左右两端均固定有弧形模板(3),端头模板(1)、中心水沟模板(2)及弧形模板(3)的背面均固定有由骨架焊接而成的桁架。
CN 201220152596 2012-04-12 2012-04-12 高速铁路隧道仰拱模板 Expired - Fee Related CN202510132U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220152596 CN202510132U (zh) 2012-04-12 2012-04-12 高速铁路隧道仰拱模板

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220152596 CN202510132U (zh) 2012-04-12 2012-04-12 高速铁路隧道仰拱模板

Publications (1)

Publication Number Publication Date
CN202510132U true CN202510132U (zh) 2012-10-31

Family

ID=47062624

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220152596 Expired - Fee Related CN202510132U (zh) 2012-04-12 2012-04-12 高速铁路隧道仰拱模板

Country Status (1)

Country Link
CN (1) CN202510132U (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103147763A (zh) * 2013-01-04 2013-06-12 中铁二十二局集团有限公司 一种隧道仰拱端头组合钢模
CN103775105A (zh) * 2014-02-20 2014-05-07 中铁十局集团第三建设有限公司 双铰接可翻转式隧道衬砌台车钢端模
CN106223960A (zh) * 2016-07-22 2016-12-14 中铁建大桥工程局集团第五工程有限公司 高铁长大隧道仰拱整体移动模架施工工法

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103147763A (zh) * 2013-01-04 2013-06-12 中铁二十二局集团有限公司 一种隧道仰拱端头组合钢模
CN103775105A (zh) * 2014-02-20 2014-05-07 中铁十局集团第三建设有限公司 双铰接可翻转式隧道衬砌台车钢端模
CN106223960A (zh) * 2016-07-22 2016-12-14 中铁建大桥工程局集团第五工程有限公司 高铁长大隧道仰拱整体移动模架施工工法

Similar Documents

Publication Publication Date Title
CN108952759B (zh) 一种使用钢管混凝土和叠合板的隧道衬砌结构及施工方法
CN104405041B (zh) 钢结构建筑装配式预制楼板连接件及其安装方法
CN102635369B (zh) 栈桥配合顶模整体浇筑仰拱混凝土施工方法
CN204899941U (zh) 整体可移动式隧道水沟电缆槽模板台车
CN102146799A (zh) 一种用于高速铁路双线隧道仰拱的施工设备
CN204225277U (zh) 钢结构建筑装配式预制楼板连接件
CN202659247U (zh) 隧道仰拱施工背模及其组合钢模
CN104533450A (zh) 单线隧道仰拱矮边墙一次浇筑施工方法
CN202510132U (zh) 高速铁路隧道仰拱模板
CN204552761U (zh) 复合式曲中墙全液压自行式模板台车
CN103669872B (zh) 一种筑墙方法和筑墙设备
CN103244129B (zh) 一种立体交叉凹凸支点施工方法
CN204676608U (zh) 一种用于地下室墙体预留后浇带的模板设置结构
CN109610509A (zh) 一种综合管廊自控断面的可调模架系统和施工方法
CN204386615U (zh) 一种自行式隧道仰拱施工台车
CN204267046U (zh) 一种隧道衬砌混凝土注浆装置
CN202148694U (zh) 预制t型梁钢筋绑扎定位装置
CN203835403U (zh) 一种既有隧道拱部衬砌严重开裂有净空加固体系
CN210599005U (zh) 一种tbm隧道仰拱块衬砌结构
CN202989781U (zh) 宽幅变宽现浇箱梁移动支架
CN209603182U (zh) 一种综合管廊自控断面的可调模架系统
CN204552774U (zh) 一种可定位纵向止水带的整体式仰拱模架
CN204386608U (zh) 一种隧道仰拱施工工装
CN103967332B (zh) 一种建筑工地围挡的施工方法
CN202622992U (zh) 通用型模块拆卸式可调钢构件后张法t梁预制台座

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121031

Termination date: 20200412

CF01 Termination of patent right due to non-payment of annual fee