CN202499676U - 一种立井施工吊盘的自动平衡调节系统 - Google Patents

一种立井施工吊盘的自动平衡调节系统 Download PDF

Info

Publication number
CN202499676U
CN202499676U CN2012200677738U CN201220067773U CN202499676U CN 202499676 U CN202499676 U CN 202499676U CN 2012200677738 U CN2012200677738 U CN 2012200677738U CN 201220067773 U CN201220067773 U CN 201220067773U CN 202499676 U CN202499676 U CN 202499676U
Authority
CN
China
Prior art keywords
hanging scaffold
attitude angle
tension
wire ropes
shaft construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012200677738U
Other languages
English (en)
Inventor
朱真才
曹国华
邵杏国
张磊
王进杰
吴荣华
王重秋
李伟
周公博
彭玉兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN2012200677738U priority Critical patent/CN202499676U/zh
Application granted granted Critical
Publication of CN202499676U publication Critical patent/CN202499676U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

一种立井施工吊盘的自动平衡调节系统,尤其适用于由PLC控制和变频调速的绞车控制系统。系统包括设置在悬吊钢丝绳上的张力传感器、安装在吊盘上的姿态角传感器、信号采集卡和设置在绞车房的PLC控制器;由PLC控制器通过姿态角传感器和张力传感器实时采集吊盘姿态角和钢丝绳张力信号,计算四根钢丝绳长度与其平均长度之间的长度差、张力与其平均张力之间的张力差,然后以四根钢丝绳长度同时向平均长度靠拢、钢丝绳张力同时向平均张力靠拢的原则计算四台绞车的转速调节量,并驱动绞车进行调节。本实用新型可以在吊盘绞车机构的运行过程中将吊盘从倾斜位姿自动调节到水平状态,将钢丝绳张力从分布不均匀的状态自动调节到均衡状态。

Description

一种立井施工吊盘的自动平衡调节系统
技术领域
本发明涉及一种立井施工吊盘的自动平衡调节系统,尤其适用于PLC控制和变频调速的立井施工吊盘在井筒的运行过程中调平吊盘姿态、均衡四根悬吊钢丝绳张力、保证吊盘平稳、安全、可靠运行。
背景技术
吊盘绞车机构是立井施工过程中的重要设备,在建井施工作业中,需要提升和下放吊盘。由于吊盘在运行过程中没有导向装置,吊盘质心偏心和四台绞车运行速度不同步,这些因素都会导致吊盘在升降过程中运行不平稳,容易发生倾斜,也会导致悬吊吊盘的钢丝绳张力分布变得不均匀。倾斜的吊盘势必会危及作业工人的人身安全;不均匀的张力分布一方面会影响钢丝绳的整体使用寿命,另一方面也会产生安全隐患。目前,吊盘绞车控制系统由于采用了PLC控制和变频调速的先进技术,对传统的继电器控制系统进行技术改造,虽然提高了绞车之间运行的同步性,但是整个控制系统缺少对吊盘姿态和钢丝绳张力的信息反馈,这种开环的控制方式导致吊盘运行过程中依然存在吊盘倾斜和钢丝绳张力分布不均的问题。当吊盘运行一段距离发生倾斜后,必须将绞车系统停车进行调平,由吊盘上的信号工和地面绞车的操作工协同配合将吊盘手动调平后再继续运行,这不仅降低了生产效率,同时也存在因人工操作失误而产生的安全隐患。
发明内容
本发明的目的是克服现有技术中的不足之处,提供一种系统简单、操作方便、能自动将吊盘从倾斜位姿自动调节到水平状态的立井施工吊盘的自动平衡调节系统。
本发明的立井施工吊盘的自动平衡调节系统,包括吊盘、均布悬挂吊盘的四根钢丝绳、分别控制四根钢丝绳的四个绞车、PLC控制器,所述均布悬挂在吊盘上的四根钢丝绳上分别安装有张力传感器,吊盘上安装有姿态角传感器和信号采集卡,张力传感器与姿态角传感器经通信电缆与设置在吊盘上的信号采集卡连接,信号采集卡经通信电缆与设置在绞车房的PLC控制器连接,PLC控制器经通信电缆与设置在井口的绞车连接;所述安装在吊盘上的姿态角传感器的X、Y惯性主轴分别与由钢丝绳和吊盘的连接点呈平行四边形的矩形,姿态角传感器的Z惯性主轴垂直于吊盘且竖直向上。
有益效果:由于采用了上述技术方案,本实用新型可以在吊盘绞车机构的运行过程中将吊盘从倾斜位姿自动调节到水平状态,将钢丝绳张力从分布不均匀的状态自动调节到均衡状态,最适用于采用了PLC控制和变频调速的绞车控制系统,保证吊盘的平稳、安全、可靠运行,具体优点主要为:
1、通过吊盘姿态角的信息反馈来调节绞车的转速,使得吊盘在运行过程中保持水平状态,解决了吊盘运行一段距离后就发生倾斜的问题;
2、通过钢丝绳张力信息反馈来调节绞车的转速,一方面使得钢丝绳张力分布变得均匀,另一方面可以避免单独采用姿态角反馈进行吊盘姿态调平而产生的钢丝绳松绳的问题;
3、采用自动平衡调节方式代替了现场工作人员手动调节的方式,提高了吊盘的调平效率,避免了人工调节的操作失误,提高了绞车运行的安全性和可靠性。
附图说明
图1是本发明的系统示意图。
图2是本发明的吊盘倾斜时根据姿态角计算钢丝绳长度差原理示意图。
图中:姿态角传感器-1,张力传感器-2;吊盘-3,钢丝绳-4,绞车-5,PLC控制器-6,信号采集卡-7。
具体实施方式
图1所示,本发明的立井施工吊盘的自动平衡调节系统,主要由姿态角传感器1、张力传感器2、均布悬挂吊盘3的四根钢丝绳4、分别控制四根钢丝绳4的四个绞车5、PLC控制器6、信号采集卡7构成。均布悬挂在吊盘3上的四根钢丝绳4上分别安装有张力传感器2,吊盘3上安装有姿态角传感器1和信号采集卡7,张力传感器2与姿态角传感器1经通信电缆与设置在吊盘3上的信号采集卡7连接,信号采集卡7经通信电缆与设置在绞车房的PLC控制器6连接,PLC控制器6经通信电缆与设置在井口的绞车5连接;安装在吊盘3上的姿态角传感器1的X、Y惯性主轴分别与由钢丝绳4和吊盘3的连接点呈平行四边形的矩形,即钢丝绳4与吊盘3形成的连接点为A、B、C和D的矩形,姿态角传感器1的X惯性主轴与边AB或边CD平行,姿态角传感器1的Y惯性主轴与边AD或边BC平行,姿态角传感器1的Z惯性主轴垂直于吊盘3且竖直向上;吊盘3分别绕X、Y和Z惯性主轴转过的三个姿态角:横滚角                                               
Figure DEST_PATH_IMAGE002
、俯仰角
Figure DEST_PATH_IMAGE004
和偏转角
Figure DEST_PATH_IMAGE006
,通过姿态角传感器1测出;张力传感器2安装在钢丝绳4距离吊盘3一米的位置处,由张力传感器2测量出钢丝绳4的张力分别定义为
Figure DEST_PATH_IMAGE008
图2所示,吊盘3倾斜时根据姿态角计算四根钢丝绳4长度与其平均长度之间的长度差值:过吊盘3的中心O点构建水平基准面;过连接点A、B、C和D向水平基准面作垂线,垂足分别为
Figure DEST_PATH_IMAGE010
Figure DEST_PATH_IMAGE012
Figure DEST_PATH_IMAGE014
Figure DEST_PATH_IMAGE016
;根据姿态角传感器1测出的吊盘3姿态角
Figure DEST_PATH_IMAGE018
,计算四个连接点A、B、C、D和水平基准面的高度差分别为:
Figure DEST_PATH_IMAGE020
Figure DEST_PATH_IMAGE022
Figure DEST_PATH_IMAGE024
Figure DEST_PATH_IMAGE026
式中,
Figure DEST_PATH_IMAGE028
Figure DEST_PATH_IMAGE030
分别为边AB和AD的边长;四根钢丝绳4长度与其平均长度之间的长度差可用四个连接点A、B、C、D和水平基准面的高度差
Figure DEST_PATH_IMAGE032
Figure DEST_PATH_IMAGE036
Figure DEST_PATH_IMAGE038
近似表示,即
Figure DEST_PATH_IMAGE040
Figure DEST_PATH_IMAGE042
Figure DEST_PATH_IMAGE046

Claims (1)

1.一种立井施工吊盘的自动平衡调节系统,包括吊盘(3)、均布悬挂吊盘(3)的四根钢丝绳(4)、分别控制四根钢丝绳(4)的四个绞车(5)、PLC控制器(6),其特征在于:所述均布悬挂在吊盘(3)上的四根钢丝绳(4)上分别安装有张力传感器(2),吊盘(3)上安装有姿态角传感器(1)和信号采集卡(7),张力传感器(2)与姿态角传感器(1)经通信电缆与设置在吊盘(3)上的信号采集卡(7)连接,信号采集卡(7)经通信电缆与设置在绞车房的PLC控制器(6)连接,PLC控制器(6)经通信电缆与设置在井口的绞车(5)连接;所述安装在吊盘(3)上的姿态角传感器(1)的X、Y惯性主轴分别与由钢丝绳(4)和吊盘(3)的连接点呈平行四边形的矩形,姿态角传感器(1)的Z惯性主轴垂直于吊盘(3)且竖直向上。
CN2012200677738U 2012-02-28 2012-02-28 一种立井施工吊盘的自动平衡调节系统 Expired - Fee Related CN202499676U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012200677738U CN202499676U (zh) 2012-02-28 2012-02-28 一种立井施工吊盘的自动平衡调节系统

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012200677738U CN202499676U (zh) 2012-02-28 2012-02-28 一种立井施工吊盘的自动平衡调节系统

Publications (1)

Publication Number Publication Date
CN202499676U true CN202499676U (zh) 2012-10-24

Family

ID=47036296

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012200677738U Expired - Fee Related CN202499676U (zh) 2012-02-28 2012-02-28 一种立井施工吊盘的自动平衡调节系统

Country Status (1)

Country Link
CN (1) CN202499676U (zh)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102602838A (zh) * 2012-02-28 2012-07-25 中国矿业大学 一种立井施工吊盘的自动平衡调节系统及方法
WO2015003489A1 (zh) * 2013-07-08 2015-01-15 中国矿业大学 柔索悬吊平台导向绳张力自动调节系统及方法
CN105856205A (zh) * 2016-06-17 2016-08-17 中国矿业大学 一种并联柔索悬吊模拟系统及其方法
US9488558B2 (en) 2014-01-03 2016-11-08 China University Of Mining And Technology Device and method for detecting the tension on a guide rope of a hanging scaffold in a construction shaft
WO2017092117A1 (zh) * 2015-12-04 2017-06-08 中国矿业大学 一种可水平移动式立井绳罐道及调节方法
WO2018107933A1 (zh) * 2016-12-15 2018-06-21 中国矿业大学 一种测量吊盘转动角度的装置及方法
CN109052043A (zh) * 2018-08-09 2018-12-21 南京铭创测控科技有限公司 一种钢丝绳电缆同步调速装置
CN109928303A (zh) * 2019-04-04 2019-06-25 苏交科集团股份有限公司 多吊点吊装监测装置及监测方法
CN110155904A (zh) * 2018-11-27 2019-08-23 中国国际海运集装箱(集团)股份有限公司 升降机和升降机钢丝绳张力消减控制方法

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102602838B (zh) * 2012-02-28 2014-08-20 中国矿业大学 一种立井施工吊盘的自动平衡调节系统及方法
CN102602838A (zh) * 2012-02-28 2012-07-25 中国矿业大学 一种立井施工吊盘的自动平衡调节系统及方法
DE112014000076B4 (de) 2013-07-08 2020-01-09 China University Of Mining And Technology System und Verfahren zur automatischen Regulierung der Spannung von Führungsseilen einer Plattform mit flexibler Seilaufhängung
WO2015003489A1 (zh) * 2013-07-08 2015-01-15 中国矿业大学 柔索悬吊平台导向绳张力自动调节系统及方法
RU2585947C2 (ru) * 2013-07-08 2016-06-10 Чайна Юниверсити Оф Майнинг Энд Текнолоджи Система и способ автоматического регулирования натяжения направляющих канатов подвесной платформы с гибким кабелем
US9845605B2 (en) 2013-07-08 2017-12-19 Science Academy Of China University Of Mining And Technology System and method for automatically regulating tensions of guide ropes of flexible cable suspension platform
US9488558B2 (en) 2014-01-03 2016-11-08 China University Of Mining And Technology Device and method for detecting the tension on a guide rope of a hanging scaffold in a construction shaft
WO2017092117A1 (zh) * 2015-12-04 2017-06-08 中国矿业大学 一种可水平移动式立井绳罐道及调节方法
US9975737B2 (en) 2015-12-04 2018-05-22 China University Of Mining And Technology Horizontally movable vertical shaft rope guide and regulating method thereof
CN105856205A (zh) * 2016-06-17 2016-08-17 中国矿业大学 一种并联柔索悬吊模拟系统及其方法
WO2018107933A1 (zh) * 2016-12-15 2018-06-21 中国矿业大学 一种测量吊盘转动角度的装置及方法
US10870559B2 (en) 2016-12-15 2020-12-22 China University Of Mining And Technology Apparatus and method for measuring rotational angle of sinking platform
CN109052043A (zh) * 2018-08-09 2018-12-21 南京铭创测控科技有限公司 一种钢丝绳电缆同步调速装置
CN110155904A (zh) * 2018-11-27 2019-08-23 中国国际海运集装箱(集团)股份有限公司 升降机和升降机钢丝绳张力消减控制方法
CN110155904B (zh) * 2018-11-27 2020-11-03 中国国际海运集装箱(集团)股份有限公司 升降机和升降机钢丝绳张力消减控制方法
CN109928303A (zh) * 2019-04-04 2019-06-25 苏交科集团股份有限公司 多吊点吊装监测装置及监测方法

Similar Documents

Publication Publication Date Title
CN102602838B (zh) 一种立井施工吊盘的自动平衡调节系统及方法
CN202499676U (zh) 一种立井施工吊盘的自动平衡调节系统
CN102791608B (zh) 用于控制从承重缆线悬挂的负载相对于承重缆线的定向的方法和绞盘装置
RU2574047C2 (ru) Способ управления подъемным краном
US9321614B2 (en) Crane trolley and hoist position homing and velocity synchronization
EP1773706A1 (en) Hoisting-cable drive comprising a single bottom-hook block and two winches
WO2021115496A2 (zh) 显示实时吊钩偏角防斜吊防摇监控装置及起重机
CN105366556A (zh) 利用核岛环吊自动化翻转主设备的装置及方法
CN112456334A (zh) 多卷扬抬吊吊具调平方法及系统
CN108116989B (zh) 一种起重机控制方法及系统
CN113023544B (zh) 一种异形人行景观桥拱梁段吊装姿态调节装置
CN220283351U (zh) 双吊点行车吊梁自动调平装置
CN208378185U (zh) 配重式换辊机构
CN219507495U (zh) 防摇摆起重机
CN112320595A (zh) 一种多台起重机多吊点联合起吊壁筒的平衡作业方法
CN104878139B (zh) 高炉y型三通式下降管整体吊装一次就位方法
CN103171944B (zh) 电梯的移动线缆装置
CN212779475U (zh) 料位高度测量装置
EP2700604A1 (en) Anti-sway control method and arrangement
JP5580721B2 (ja) 固定式ケーブルクレーンの運転方法
CN112010175B (zh) 起重机多轴联动防摇控制方法和控制系统
CN103612985A (zh) 门式起重机牵引式纠偏装置及方法
CN115072603A (zh) 缆风系统
JP2017114578A (ja) ジブクレーンの合吊りシステム
CN212334414U (zh) 一种基于水平倾角检测的起重机双起升同步控制装置

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121024

Termination date: 20140228