The suspended roof brick assembly that a kind of kiln is used
Technical field
The utility model relates to refractory material, specifically is the suspended roof brick that a kind of kiln is used.
Background technology
At present, existing general kiln furred ceiling, all the suspended roof brick assembly is hung to install and is formed one by one.Suspended roof brick assembly is mainly hung reinforcing bar by two brick monomers, a slice stainless steel hanging film and one and is constituted.The brick monomer is the square brick of rectangular structure; Square brick and top, the corresponding side of kiln width offer the shallow slot that connects to the square brick end face; The bottom land of shallow slot is concaved with hangs eye; Two brick monomers have corresponding applying between the respective side of shallow slot; And the joint place sticks together with high temperature adhesive or pressing clip is provided with ceramic wool, and the shallow slot of latter two brick monomer of fitting is common to be constituted and hangs groove, and the stainless steel hanging film is provided with the lower end of hanging eye and is contained in this and hangs in the groove; Hang reinforcing bar pass the stainless steel hanging film hang the hole and wear respectively to the shallow slot of two brick monomers at two ends, the upper end that the stainless steel hanging film is installed hanging hook (being anchor pole) is stretched out and is hung outside the groove.
During installation; The suspended roof brick assembly is hung the outer hook hole of groove through being exposed at of stainless steel hanging film and is cooperated and add anchor pole and screw is hung on angle steel or square steel; A plurality of suspended roof brick assemblies are hung respectively and are close together; Stick together through high temperature adhesive equally between the respective side of adjacent suspended roof brick assembly or pressing clip is provided with ceramic wool, thereby accomplish flat furred ceiling, to reduce the kiln upper and lower temperature difference.
The suspended roof brick assembly that existing this kiln is used; Its weak point is; The high temperature adhesive or the ceramic wool that reach between two brick monomers of same suspended roof brick assembly between the adjacent suspended roof brick assembly can drop in the process of expansion and contraction that the kiln temperature changes in efflorescence; Can cause product a large amount of to fall dirtyly, form waste product, have a strong impact on the raising of product quality and the lifting of economic benefit.Even kiln can all fall light with high temperature adhesive or ceramic wool long afterwards, the stainless steel hanging film with hang that reinforcing bar is oxidized to be burnt out, cause fieryly, the kiln that collapses brings potential safety hazard and heavy losses.
The utility model content
The purpose of the utility model provides a kind ofly can effectively prevent the suspended roof brick assembly that the dirty kiln of falling stop is used.
To achieve these goals, the utility model adopts following technical scheme:
The suspended roof brick assembly that a kind of kiln is used; Comprise the first brick monomer, the second brick monomer and the hanging mechanism that is used to hang the first brick monomer and the second brick monomer; The first brick monomer and the second brick monomer have the first brick main body that fits and the second brick main body of square structure respectively, and the place of fitting of the two pressing clip is provided with fire-resistant cotton; The bottom of the first brick main body and the second brick main body is correspondingly provided with and can prevents product in the kiln is caused dirty curved seal structure.
The end face of above-mentioned first brick main body and the above-mentioned second brick main body offers the corresponding groove of hanging respectively; This hangs and is inserted with the stainless steel hanging film in the groove respectively; This stainless steel hanging film is provided with the lower end of hanging the hole and plugs and be contained in the upper end of corresponding above-mentionedly hanging in the groove, hanging hook being installed and stretch out corresponding above-mentioned hanging outside the groove respectively; Run through the eye of hanging that the hole aligns and is communicated with of hanging that offers with above-mentioned stainless steel hanging film on above-mentioned first brick main body and the above-mentioned second brick main body respectively, hang reinforcing bar and be arranged in hanging intraocular and passing the hole of hanging of corresponding above-mentioned stainless steel hanging film of above-mentioned first brick main body and the above-mentioned second brick main body.
Above-mentionedly hang the end face middle part that groove is opened in above-mentioned first brick main body and the above-mentioned second brick main body respectively.
Above-mentioned curved seal structure comprises the first bent envelope body of being located at the above-mentioned first brick lower body part and the second bent envelope body of being located at the above-mentioned second brick lower body part; The corresponding side of each binding face of the above-mentioned first brick main body of the above-mentioned first bent Feng Tiyu is respectively equipped with raised line, and each respective side of the above-mentioned second bent envelope body is respectively equipped with the corresponding recess of raised line therewith.
The vertical binding face of corresponding above-mentioned raised line and above-mentioned recess is provided with the auxiliary curved seal structure of concavo-convex cooperation.
Above-mentioned auxiliary curved seal structure is a half cylindrical structure.
Above-mentioned fire-resistant cotton is a ceramic wool.
After adopting such scheme; The suspended roof brick assembly that a kind of kiln of the utility model is used; The joint place pressing clip of the first brick main body and the second brick main body is provided with fire-resistant cotton, and is correspondingly provided with curved seal structure in the bottom of the first brick main body and the second brick main body, and the things that drop such as dust that produce between the first brick main body and the second brick main body can be accepted by this curved seal structure; Can not cause dirty to product in the kiln, can not influence product quality.And curved seal structure can prevent the stainless steel hanging film and hang that reinforcing bar is oxidized to be burnt out, avoid fire, the kiln that collapses, the potential safety hazard of bringing and heavy losses.
In order further to strengthen the song envelope effect of curved seal structure, the utility model also vertical binding face of the raised line in the curved seal structure and recess is provided with the auxiliary curved seal structure of concavo-convex cooperation.Auxiliary curved seal structure can adopt simple, the bent envelope effect of processing half cylindrical structure preferably.
The utility model will be hung the end face that groove is opened in above-mentioned first brick main body and the above-mentioned second brick main body, can more effectively prevent to burn bad suspender member and strengthen hanging stability simultaneously.
Description of drawings
Fig. 1 is the structural representation (omit the stainless steel hanging film and hang reinforcing bar) of the utility model;
Fig. 2 is the structural representation of the first brick monomer in the utility model;
Fig. 3 is the structural representation of the second brick monomer in the utility model;
Fig. 4 is the horizontal cut-away view (omit the stainless steel hanging film and hang reinforcing bar) after the suspended roof brick combination of components of many group the utility model are used;
Fig. 5 is the vertical cut-away view (omit the stainless steel hanging film and hang reinforcing bar) after the suspended roof brick combination of components of many group the utility model are used.
The specific embodiment
The suspended roof brick assembly that the kiln of the utility model is used shown in Fig. 1-3, comprises the first brick monomer 1, the second brick monomer 2, stainless steel hanging film and hangs reinforcing bar.The first brick monomer 1 and the second brick monomer 2 are refractory brick.
The first brick monomer 1 and the second brick monomer 2 have the first brick main body 11, the second brick main body 21 of square structure respectively.Width with kiln serves as laterally, and the length direction of kiln is that vertically the short transverse of kiln is vertical.The first brick main body 11 has the horizontal binding face 113 that the respective face of the second brick main body that is arranged in a horizontal side and same suspended roof brick assembly fits; Be arranged in the horizontal outer binding face 114 that the respective face of the second brick main body of horizontal opposite side and adjacent suspended roof brick assembly fits, and the vertical binding face 115,116 that fits with the respective face of the second brick main body of adjacent suspended roof brick assembly respectively outside being arranged in vertically.
The end face middle part of the first brick main body 11 and the second brick main body 21 offers the corresponding groove 111,211 of hanging respectively; Hang in the groove 111,211 and be inserted with the stainless steel hanging film respectively; This stainless steel hanging film is provided with the lower end of hanging the hole and plugs respectively and be contained in the upper end of corresponding above-mentionedly hanging in the groove, hanging hook (being anchor pole) being installed and stretch out corresponding above-mentioned hanging outside the groove respectively; Run through respectively on the first brick main body 11 and the second brick main body 21 offer with above-mentioned stainless steel hanging film hang the hole align be communicated with hang eye 112,212, hang reinforcing bar and be arranged in hanging in the eye 112,212 and passing the hole of hanging of corresponding above-mentioned stainless steel hanging film of the first brick main body and the second brick main body.
The laterally interior binding face 113 of the first brick main body 11 and the respective face of the second brick main body 21 fit; Make the length direction of hanging groove 111,211 longitudinally be provided with; That is, hang reinforcing bar along the horizontal expansion setting, the joint place pressing clip of the first brick main body 11 and the second brick main body 21 is provided with ceramic wool 3.
The bottom of the first brick main body 11 and the second brick main body 21 is correspondingly provided with curved seal structure, and this curved seal structure comprises the first bent envelope body 12 of being located at the first brick main body, 11 bottoms and the second bent envelope body 22 of being located at the second brick main body, 21 bottoms.
The first song envelope body 12 comprises longitudinally is located at first raised line 121 that horizontal interior binding face 113 lower ends and vertical two ends and laterally interior binding face 113 flush; Longitudinally be located at second raised line 122 that horizontal outer binding face 114 lower ends and vertical two ends and horizontal outer binding face 114 flush, and respectively along laterally being located at vertical binding face 115,116 lower ends and transverse ends the 3rd raised line 123 than vertical binding face 115,116 indentations.The second bent envelope body 22 has the square song envelope body with the 21 coaxial settings of the second brick main body; Four sides inside indentation respectively of this bent envelope body; Form and first raised line, 121 corresponding first recesses 221; With second raised line, 122 corresponding second recesses 222, respectively with two the 3rd raised lines, 123 corresponding the 3rd recesses 223.In the present embodiment, the height of each raised line is that 50 millimeters, width are the 30-50 millimeter, and the width of each recess is the 30-50 millimeter; Dirty for preventing between bent envelope that friction falls, the height of each recess is designed to 52 millimeters.For preventing the right angle clashing and breaking, the junction of each raised line and each recess is 2 millimeters fillet.
For preventing that the butt joint Xiao Qi that two row's brick joint portions of furred ceiling occur on the kiln length direction from stitching dirty; Vertical middle part at first raised line 121 and second raised line 122 is provided with the semicolumn groove 124 that longitudinally runs through setting; The corresponding site that the corresponding site of first recess 221 and second recess 222 is provided with suitable semicolumn raised line 224, the three raised lines 123 is provided with suitable semicolumn raised line 125.Cooperatively interacting through each corresponding semicolumn groove and semicolumn raised line constitutes auxiliary curved seal structure, through dual curved seal structure realize in used ceramic wool or the seam thing entirely by song seal can not fall cause in the kiln dirty with prevent that heat from directly passing through up the purpose that furred ceiling is burnt out.
Shown in Fig. 1-5; During use; First recess 221 of the second brick monomer 2 in first raised line 121 of the first brick monomer 1 and the same suspended roof brick assembly is corresponding chimeric; Second recess 222 of the second brick monomer 2 in second raised line 122 of the first brick monomer 1 and the adjacent suspended roof brick assembly is corresponding chimeric, two the 3rd raised lines 123 of the first brick monomer 1 respectively with adjacent suspended roof brick assembly in two the 3rd recesses 223 of the second brick monomer 2 corresponding chimeric.And stretch out respectively outside first recess 221 at the two ends of first raised line, 121 longitudinal directions, supply with adjacent suspended roof brick assembly in the 3rd raised line 123 corresponding engagements of the first brick monomer 1, make each adjacent suspended roof brick assembly form interlaced masonry construction.
During installation, be positioned at the first brick monomer 1 and the raised line and the recess that 2 of the second brick monomers need not to be provided with respective face of the edge of kiln.
Because when mounted; The binding face of the first brick main body 11 and the second brick main body 21 is folded with ceramic wool 3; Therefore; The width dimensions of each raised line of the first brick monomer 1 will design greatlyyer than the depth dimensions of each respective recess of the second brick monomer 2, so that leave the gap that folder is established ceramic wool 3 between each binding face of the first brick main body 11 and the second brick main body 21.Approximately about 2 meters dilatation joint is set one along kiln length direction (vertically); The structure of the suspended roof brick assembly at dilatation joint place slightly changes; Promptly; The width of the 3rd raised line 123 of the first brick monomer 1 is more longer, makes the binding face of win the brick main body 11 and the second brick main body 21 laterally leave the seam of a 17-20 millimeter, and the ceramic wool 4 of in this seam, filling in 25 millimeters thick increases its flexible dilatancy.
The utility model is correspondingly provided with curved seal structure in the bottom of the first brick main body and the second brick main body; The things that drop such as dust that produce between the first brick main body and the second brick main body can be accepted by this curved seal structure; Can not cause dirty to product in the kiln, can not influence product quality.And curved seal structure can prevent the stainless steel hanging film and hang that reinforcing bar is oxidized to be burnt out, avoid fire, the kiln that collapses, the potential safety hazard of bringing and heavy losses.Brickwork joint adopts the ceramic wool filling to help building by laying bricks or stones maintain and replace, can reduce greatly and build by laying bricks or stones difficulty and time.
In order further to strengthen the song envelope effect of curved seal structure; The utility model also vertical binding face of the raised line in the curved seal structure and recess is provided with the auxiliary curved seal structure of concavo-convex cooperation; Form dual bent envelope; Not only further avoided the dirty influence of falling of kiln, also effectively prevented the potential safety hazard and the heavy losses that fire causes that pass through of kiln simultaneously product.
The utility model will be hung the end face that groove is opened in the first brick main body and the second brick main body, can more effectively prevent to burn bad suspender member and strengthen hanging stability simultaneously.