The suspended roof brick assembly that kiln is used
Technical field
The utility model relates to refractory material, specifically is the suspended roof brick that a kind of kiln is used.
Background technology
At present, existing general kiln furred ceiling, all the suspended roof brick assembly is hung to install and is formed one by one.Suspended roof brick assembly is mainly hung reinforcing bar by two brick monomers, a slice stainless steel hanging film and one and is constituted.The brick monomer is the square brick of rectangular structure; Square brick and top, the corresponding side of kiln width offer the shallow slot that connects to the square brick end face; The bottom land of shallow slot is concaved with hangs eye, and two brick monomers have corresponding applying between the respective side of shallow slot, and the joint place sticks together with high temperature adhesive; The shallow slot of latter two brick monomer of fitting is common to be constituted and hangs groove; The stainless steel hanging film is provided with the lower end of hanging eye and is contained in this and hangs in the groove, hang reinforcing bar pass the stainless steel hanging film hang the hole and wear respectively to the shallow slot of two brick monomers at two ends, the upper end that the stainless steel hanging film is installed hanging hook (being anchor pole) is stretched out and is hung outside the groove.
During installation; The suspended roof brick assembly is hung the outer hook hole of groove through being exposed at of stainless steel hanging film and is cooperated and add anchor pole and screw is hung on angle steel or square steel; A plurality of suspended roof brick assemblies are hung respectively and are close together; Stick together through high temperature adhesive equally between the respective side of adjacent suspended roof brick assembly, thereby accomplish flat furred ceiling, to reduce the kiln upper and lower temperature difference.
The suspended roof brick assembly that existing this kiln is used; Its weak point is; The high temperature adhesive that reaches between two brick monomers of same suspended roof brick assembly between the adjacent suspended roof brick assembly can drop in the process of expansion and contraction that the kiln temperature changes; Can cause product a large amount of to fall dirtyly, form waste product, have a strong impact on the raising of product quality and the lifting of economic benefit.Even kiln can all fall light with high temperature adhesive long afterwards, the stainless steel hanging film with hang that reinforcing bar is oxidized to be burnt out, cause fieryly, the kiln that collapses brings potential safety hazard and heavy losses.
The utility model content
The purpose of the utility model provides a kind of high temperature adhesive that can effectively prevent and falls the suspended roof brick assembly that the kiln on the product is used in the kiln.
To achieve these goals, the utility model adopts following technical scheme:
The suspended roof brick assembly that kiln is used; Comprise the first brick monomer, the second brick monomer, stainless steel hanging film and hang reinforcing bar; The first brick monomer and the second brick monomer have the first brick main body and the second brick main body of square structure respectively; The first brick main body and the second brick main body and top, the corresponding side of kiln width offer the shallow slot that connects to brick main body end face respectively; The bottom land of shallow slot is concaved with hangs eye, and the first brick main body and the second brick main body have the corresponding applying of respective side of shallow slot, and the joint place sticks together through high temperature adhesive; The common formation of the shallow slot of the back first brick main body and the second brick main body of fitting is hung groove; The stainless steel hanging film is provided with the lower end of hanging the hole and is contained in this and hangs in the groove, and the upper end that the stainless steel hanging film is installed hanging hook is stretched out and hung outside the groove, hangs the intraocular of hanging that hole and two ends extend the first brick main body and the second brick main body respectively of hanging that reinforcing bar passes the stainless steel hanging film; The bottom of the above-mentioned first brick main body and the second brick main body is correspondingly provided with the curved seal structure that can accept high temperature adhesive.
Above-mentioned curved seal structure comprises the first bent envelope body of being located at the above-mentioned first brick lower body part and the second bent envelope body of being located at the above-mentioned second brick lower body part; The corresponding side of each binding face of the above-mentioned first brick main body of the above-mentioned first bent Feng Tiyu is respectively equipped with raised line, and each respective side of the above-mentioned second bent envelope body is respectively equipped with the corresponding recess of raised line therewith.
The vertical binding face of corresponding above-mentioned raised line and above-mentioned recess is provided with the auxiliary curved seal structure of concavo-convex cooperation.
Above-mentioned auxiliary curved seal structure is a half cylindrical structure.
After adopting such scheme; The suspended roof brick assembly that the kiln of the utility model is used; Bottom in the first brick main body and the second brick main body is correspondingly provided with curved seal structure, and the high temperature adhesive between the first brick main body and the second brick main body falls down in the process of expansion and contraction that the kiln temperature changes, and is accepted by this curved seal structure; Can not fall on the product in the kiln, can not influence product quality.And curved seal structure also can stop fire directly to scurry the stainless steel hanging film and hang on the reinforcing bar, can prevent the stainless steel hanging film and hang that reinforcing bar is oxidized to be burnt out, and avoids fire, the kiln that collapses, the potential safety hazard of bringing and heavy losses.
In order further to strengthen the song envelope effect of curved seal structure, the utility model also vertical binding face of the raised line in the curved seal structure and recess is provided with the auxiliary curved seal structure of concavo-convex cooperation.Auxiliary curved seal structure can adopt simple, the bent envelope effect of processing half cylindrical structure preferably.
Description of drawings
Fig. 1 is the structural representation (omit the stainless steel hanging film and hang reinforcing bar) of the utility model;
Fig. 2 is the structural representation of the first brick monomer in the utility model;
The structural representation of the second brick monomer in Fig. 3 the utility model;
Fig. 4 is the horizontal cut-away view (omit the stainless steel hanging film and hang reinforcing bar) after the suspended roof brick combination of components of many group the utility model are used;
Fig. 5 is the vertical cut-away view (omit the stainless steel hanging film and hang reinforcing bar) after the suspended roof brick combination of components of many group the utility model are used.
The specific embodiment
The suspended roof brick assembly that the kiln of the utility model is used shown in Fig. 1-3, comprises the first brick monomer 1, the second brick monomer 2, stainless steel hanging film and hangs reinforcing bar.The first brick monomer 1 and the second brick monomer 2 are refractory brick.
The first brick monomer 1 has the first brick main body 11 of square structure; The first brick main body 11 offers the shallow slot 111 that connects to brick main body end face with top, the corresponding side of kiln width (right flank as shown in Figure 1), and the bottom land of shallow slot 111 is concaved with hangs eye 112.
The second brick monomer 2 has the second brick main body 21 of square structure; The second brick main body 21 offers the shallow slot 211 that connects to brick main body end face with top, the corresponding side of kiln width (left surface as shown in Figure 1), and the bottom land of shallow slot 211 is concaved with hangs eye 212.
The first brick main body 11 and the second brick main body 21 have the corresponding applying of respective side of shallow slot 111,211; And the joint place sticks together through high temperature adhesive sticking 3; Shallow slot 111, the 211 common formations of the back first brick main body and the second brick main body of fitting are hung groove; The stainless steel hanging film is provided with the lower end of hanging the hole and is contained in this and hangs in the groove; The upper end that the stainless steel hanging film is installed hanging hook (being anchor pole) is stretched out and is hung outside the groove, hang reinforcing bar pass the stainless steel hanging film hang the hole and two ends extend hanging in the eye 112,212 of the first brick main body and the second brick main body respectively.
The bottom of the first brick main body 11 and the second brick main body 21 is correspondingly provided with the curved seal structure that can accept high temperature adhesive, and this curved seal structure comprises the first bent envelope body 12 of being located at the first brick main body, 11 bottoms and the second bent envelope body 22 of being located at the second brick main body, 21 bottoms.
Width with kiln serves as laterally, and the length direction of kiln is that vertically the short transverse of kiln is vertical.The binding face of the first brick main body 11 comprises the horizontal binding face 113 that the respective face of the second brick main body that is arranged in a horizontal side and same suspended roof brick assembly fits; Be arranged in the horizontal outer binding face 114 that the respective face of the second brick main body of horizontal opposite side and adjacent suspended roof brick assembly fits, and the vertical binding face 115,116 that fits with the respective face of the second brick main body of adjacent suspended roof brick assembly respectively outside being arranged in vertically.
The first song envelope body 12 comprises longitudinally is located at first raised line 121 that horizontal interior binding face 113 lower ends and vertical two ends and laterally interior binding face 113 flush; Longitudinally be located at second raised line 122 that horizontal outer binding face 114 lower ends and vertical two ends and horizontal outer binding face 114 flush, and respectively along laterally being located at vertical binding face 115,116 lower ends and transverse ends the 3rd raised line 123 than vertical binding face 115,116 indentations.The second bent envelope body 22 has the square song envelope body with the 21 coaxial settings of the second brick main body; Four sides inside indentation respectively of this bent envelope body; Form and first raised line, 121 corresponding first recesses 221; With second raised line, 122 corresponding second recesses 222, respectively with two the 3rd raised lines, 123 corresponding the 3rd recesses 223.In the present embodiment, the height of each raised line is that 50 millimeters, width are the 30-50 millimeter; The width of each recess is the 30-50 millimeter, and dirty for preventing between bent envelope that friction falls, the height of each recess is designed to 52 millimeters.For preventing the right angle clashing and breaking, the junction of each raised line and each recess is 2 millimeters fillet.
For preventing that the butt joint Xiao Qi that two row's brick joint portions of furred ceiling occur on the kiln length direction from stitching dirty; Vertical middle part at first raised line 121 and second raised line 122 is provided with the semicolumn groove 124 that longitudinally runs through setting; The corresponding site that the corresponding site of first recess 221 and second recess 222 is provided with suitable semicolumn raised line 224, the three raised lines 123 is provided with suitable semicolumn raised line 125.Cooperatively interacting through each corresponding semicolumn groove and semicolumn raised line constitutes auxiliary curved seal structure, through dual curved seal structure realize in the sticking or seam of used high temperature adhesive thing entirely by song seal can not fall cause in the kiln dirty with prevent that heat from directly passing through up the purpose that furred ceiling is burnt out.
In order to make lifting more firm, the horizontal outer binding face 114 of the first brick monomer 1 and the respective face of the second brick monomer 2 can be respectively arranged with the shallow slot that supplies to hang with the common formation of the corresponding site of adjacent suspended roof brick assembly groove.
Shown in Fig. 1-5; During use; First recess 221 of the second brick monomer 2 in first raised line 121 of the first brick monomer 1 and the same suspended roof brick assembly is corresponding chimeric; Second recess 222 of the second brick monomer 2 in second raised line 122 of the first brick monomer 1 and the adjacent suspended roof brick assembly is corresponding chimeric, two the 3rd raised lines 123 of the first brick monomer 1 respectively with adjacent suspended roof brick assembly in two the 3rd recesses 223 of the second brick monomer 2 corresponding chimeric.And stretch out respectively outside first recess 221 at the two ends of first raised line, 121 longitudinal directions, supply with adjacent suspended roof brick assembly in the 3rd raised line 123 corresponding engagements of the first brick monomer 1, make each adjacent suspended roof brick assembly form interlaced masonry construction.
During installation, be positioned at the first brick monomer 1 and the raised line and the recess that 2 of the second brick monomers need not to be provided with respective face of the edge of kiln.
Because when mounted; The binding face of the first brick main body 11 and the second brick main body 21 is stained with high temperature adhesive sticking 3; Design the width dimensions of each raised line of the first brick monomer 1 consistent with the depth dimensions of each respective recess of the second brick monomer 2; Sticking 3 the time when being coated with high temperature adhesive between each binding face of the first brick main body 11 and the second brick main body 21; So just guaranteed that touching between fiery face (i.e. face in kiln) of each brick monomer all has the 1-2 mm clearance, guaranteed the space when brick touches fiery face rising-heat contracting-cold, touched fiery face extruding falls dirty because of expanding with heat and contract with cold mutually and be unlikely to cause.Approximately about 2 meters dilatation joint is set one along kiln length direction (vertically); The structure of the suspended roof brick assembly at dilatation joint place slightly changes; Promptly; The width of the 3rd raised line 123 of the first brick monomer 1 is more longer, makes the binding face of win the brick main body 11 and the second brick main body 21 laterally leave the seam of a 17-20 millimeter, and the ceramic wool 4 of in this seam, filling in 25 millimeters thick increases its flexible dilatancy.
The utility model has adopted dual bent envelope, has not only avoided the dirty influence to product of falling of kiln, has also effectively prevented the potential safety hazard and the heavy losses that fire causes that pass through of kiln simultaneously.The brick type can make builds by laying bricks or stones more flexibly, not only can save time but also can be laborsaving, and convenient for maintaining is changed and increased the service life.