CN202474778U - Three-core middle restriction power cable armor clamp for cable tunnel engineering - Google Patents

Three-core middle restriction power cable armor clamp for cable tunnel engineering Download PDF

Info

Publication number
CN202474778U
CN202474778U CN2012200938827U CN201220093882U CN202474778U CN 202474778 U CN202474778 U CN 202474778U CN 2012200938827 U CN2012200938827 U CN 2012200938827U CN 201220093882 U CN201220093882 U CN 201220093882U CN 202474778 U CN202474778 U CN 202474778U
Authority
CN
China
Prior art keywords
gold utensil
power cable
main body
cores
constraint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2012200938827U
Other languages
Chinese (zh)
Inventor
张宇
顾撼宇
贲飞
蔡翊清
庞仲豪
余来意
吴素萍
潘捷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI HENGNENGTAI ENTERPRISE MANAGEMENT Co.,Ltd.
Original Assignee
SHANGHAI ELECTROPHYSICS COLLECTIVE ASSET MANAGEMENT CO Ltd
Shanghai Municipal Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI ELECTROPHYSICS COLLECTIVE ASSET MANAGEMENT CO Ltd, Shanghai Municipal Electric Power Co filed Critical SHANGHAI ELECTROPHYSICS COLLECTIVE ASSET MANAGEMENT CO Ltd
Priority to CN2012200938827U priority Critical patent/CN202474778U/en
Application granted granted Critical
Publication of CN202474778U publication Critical patent/CN202474778U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The utility model provides a three-core middle restriction power cable armor clamp for cable tunnel engineering. The three-core middle restriction power cable armor clamp comprises an upper armor clamp main body and a lower armor clamp main body, which can be used for restricting, clamping and fixing three power cables simultaneously. The power cable armor clamp with a three-core middle restriction cavity is formed by integrally connecting the upper armor clamp main body and the lower armor clamp main body; the three-core middle restriction cavity is an entire cavity; and one or two connection positions of the upper armor clamp main body and the lower armor clamp main body is/are in movable connection. The three-core middle restriction power cable armor clamp provided by the utility model is applicable to an arc-shaped mounting bracket of a modern power cable tunnel, has the advantages of convenience in installation and maintenance, and can be used for tunnel reinstallation, such as bending, tunnel changing, redirection and the like. The three-core middle restriction power cable armor clamp provided by the utility model is paved in a snake shaped and in a phase division manner so that the installation density and the space use efficiency of the power cable tunnel can be greatly improved. Furthermore, the power cable armor clamp can be used for mounting the three power cables simultaneously.

Description

A kind of cable tunnel engineering is with constraint power cable gold utensil in the middle of three cores
Technical field
The utility model relates to the gold utensil that a kind of power cable laying is used, and in particular, the utility model relates to a kind of power cable gold utensil that can retrain three cables simultaneously.
Background technology
Power cable tunnel is the requisite facility of urbanization process and power grid construction.In the past, power cable tunnel was generally rectangle, was power cable laying hereinto, adopted linear angle steel column and angle steel cross-arm usually, on single pair of cross-arm, set up power cable.In order to be applicable to that suspender installs, this moment, employed power cable gold utensil was generally the rectangle global shape, perhaps, was formed with on said gold utensil that size, bigger being used to of intensity are installed, the member of fastening bolt and lifting usefulness.Thus, cause power cable gold utensil volume bigger, floor space is also bigger.
Along with the rhythm of urbanization process and power grid construction is accelerated, the use of electric power tunnel is increasingly extensive.Therefore, laying also of power cable had higher requirement.
For example, along with the raising requirement of the volume installation of power cable, the power cable number that need be installed in the electric power tunnel is also increasing day by day.For dealing with the power cable of this increase, said power cable must overcome the pattern of linear installation in the past, optionally, in power cable tunnel, said power cable bending is installed.And rectilinear power cable gold utensil installation in the past can't be satisfied this requirement.
In addition, modern power cable tunnel extensively adopts circular tunnel, replaces the linear angle steel column and the angle steel cross-arm of installation power cable in the past, and the support that the power cable gold utensil is installed in the power cable tunnel has also adopted arc support.At this moment, continue to use big moment of volume shape gold utensil in the past to meet the demands, and reduce the space service efficiency of power cable tunnel.
The utility model content
The technical problem that the utility model will solve provides a kind of power cable gold utensil of small size, is convenient to install.
For solving above technical problem, the technical scheme of constraint power cable gold utensil is following in the middle of three cores of the utility model:
A kind of cable tunnel engineering is with constraint power cable gold utensil in the middle of three cores; Comprise simultaneously three power cables are retrained the main body of gold utensil up and down that grips; Said bottom gold utensil main body is connected the power cable anchor clamps that fit back formation one has the middle constraint of three cores cavity with top gold utensil main body; The constraint cavity is an entire cavity in the middle of said three cores, and the cross section of constraint cavity is " article " font structure in the middle of said three cores.
Cable tunnel engineering according to the utility model retrains the power cable gold utensil with three cores centre, and preferably, the place that said bottom gold utensil main body is connected with top gold utensil main body is that hinge connects.Another place connects for bolt.
Cable tunnel engineering according to the utility model retrains the power cable gold utensil with three cores centre, and preferably, gold utensil main body below in said bottom is provided with down the gold utensil firm banking.Base be provided with can be in needs bottoms use fixedly the time.
Further, on said down gold utensil firm banking, on the power cable direction, be formed with dish-shaped neonychium.
Cable tunnel engineering according to the utility model retrains the power cable gold utensil with three cores centre, and preferably, the cavity face of said bottom gold utensil main body is a matsurface.
In a preferred embodiment, said gold utensil forms different tubaeform in cavity two ports footpath.Being provided with like this can make the crooked when needed installation of power cable.
Preferably, the junction of said top and the bottom gold utensil main body is provided with elastomeric element, makes top and the bottom gold utensil main body bear the elastic force cushioning effect.
Further, preferred one or both in spring, rubber blanket, foam-rubber cushion of said elastomeric element.Also can be other parts that play the elastic force cushioning effect.
The beneficial effect of constraint power cable gold utensil is that this power cable gold utensil is applicable to the arc mounting bracket of modern power cable tunnel in the middle of the utility model three cores; Its installation, maintenance is convenient; And can do lane changes such as bending, lane change, changed course and install, snake laying and phase-splitting are laid, and improve the space service efficiency of packing density and power cable tunnel greatly.In addition, the power cable gold utensil of the utility model can be installed three power cables simultaneously, has saved installation cost.
Description of drawings
Fig. 1 was for be installed on the sketch map of the power cable gold utensil in the tunnel support in the past.
Fig. 2 is the front view of the middle constraint of the three cores power cable gold utensil of the utility model.
Fig. 3 is the sketch map of another execution mode of the utility model.
Among the figure, 1-top gold utensil main body, 2-bottom gold utensil main body, 3-bolt, gold utensil firm banking under the 4-, 5-dish neonychium, 6-elastomeric element, 7-hinge.
Embodiment
As shown in Figure 2; A kind of cable tunnel engineering is with constraint power cable gold utensil in the middle of three cores; Comprise top and the bottom gold utensil main body 1 and 2; Said bottom gold utensil main body is connected the power cable anchor clamps that fit back formation one has the middle constraint of three cores cavity with top gold utensil main body, the constraint cavity is an entire cavity in the middle of this three core, and the big or small external diameter size with a cable of the internal diameter of the independent core in the middle part of this cavity adapts.The cross section of constraint cavity is " article " font structure in the middle of three cores.Said anchor clamps are concentrated constraint to three power cables, and an end connects through hinge 7 between the gold utensil main body up and down, and the other end is spirally connected fixing through bolt 3.Constraint power cable gold utensil is used for the installation on the arc support of power cable tunnel in the middle of said three cores.Said gold utensil is an aluminium alloy system.
Gold utensil main body 2 belows, bottom are provided with down the fixing end 4 of gold utensil, and following gold utensil firm banking 4 is being formed with dish-shaped neonychium 5 on the power cable direction.The cavity face of bottom gold utensil main body is a matsurface, and its matsurface plays strengthens fixing effect.
The cavity side of gold utensil main body has neoprene pad 6 up and down; Shown in top gold utensil main body 1 and bottom gold utensil main body 2 and cavity thereof to form an end diameter bigger; Outside slightly little tubaeform of one end diameter, other small one and large one bendings that can realize power cable of diameter as the two ends of embodiment 1. cavitys are installed.
In another embodiment, bottom gold utensil main body and top gold utensil main body all fix (see figure 3) through bolt 3.
According to constraint power cable gold utensil in the middle of three cores of the utility model, said power cable gold utensil is applicable to the arc mounting bracket of modern power cable tunnel; Its installation, maintenance is convenient; And can do lane changes such as bending, lane change, changed course and install, snake laying and phase-splitting are laid, and improve the space service efficiency of packing density and power cable tunnel greatly.

Claims (8)

1. a cable tunnel engineering is with constraint power cable gold utensil in the middle of three cores; Comprise simultaneously three power cables are retrained the main body of gold utensil up and down that grips; It is characterized in that: said bottom gold utensil main body is connected the power cable anchor clamps that fit back formation one has the middle constraint of three cores cavity with top gold utensil main body; The constraint cavity is an entire cavity in the middle of said three cores, and the cross section of constraint cavity is " article " font structure in the middle of said three cores.
2. cable tunnel according to claim 1 engineering is characterized in that with constraint power cable gold utensil in the middle of three cores: the place that said bottom gold utensil main body is connected with top gold utensil main body is that hinge connects.
3. cable tunnel according to claim 1 and 2 engineering is with constraint power cable gold utensil in the middle of three cores, and it is characterized in that: gold utensil main body below in said bottom is provided with down the gold utensil firm banking.
4. cable tunnel according to claim 3 engineering is characterized in that with constraint power cable gold utensil in the middle of three cores: on said gold utensil firm banking down, on the power cable direction, be formed with dish-shaped neonychium.
5. cable tunnel according to claim 1 engineering is with constraint power cable gold utensil in the middle of three cores, and it is characterized in that: the cavity face of said bottom gold utensil main body is a matsurface.
6. cable tunnel according to claim 1 engineering is characterized in that with constraint power cable gold utensil in the middle of three cores: said gold utensil forms different tubaeform in cavity two ports footpath.
7. cable tunnel according to claim 1 engineering is with constraint power cable gold utensil in the middle of three cores, and it is characterized in that: the junction of said top and the bottom gold utensil main body is provided with elastomeric element, makes top and the bottom gold utensil main body bear the elastic force cushioning effect.
8. cable tunnel according to claim 1 engineering is with constraint power cable gold utensil in the middle of three cores, and it is characterized in that: said elastomeric element is selected from one or both in spring, rubber blanket, the foam-rubber cushion.
CN2012200938827U 2012-03-13 2012-03-13 Three-core middle restriction power cable armor clamp for cable tunnel engineering Expired - Lifetime CN202474778U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012200938827U CN202474778U (en) 2012-03-13 2012-03-13 Three-core middle restriction power cable armor clamp for cable tunnel engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012200938827U CN202474778U (en) 2012-03-13 2012-03-13 Three-core middle restriction power cable armor clamp for cable tunnel engineering

Publications (1)

Publication Number Publication Date
CN202474778U true CN202474778U (en) 2012-10-03

Family

ID=46922906

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012200938827U Expired - Lifetime CN202474778U (en) 2012-03-13 2012-03-13 Three-core middle restriction power cable armor clamp for cable tunnel engineering

Country Status (1)

Country Link
CN (1) CN202474778U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103225714A (en) * 2013-04-07 2013-07-31 陕西申瑞电化器材科技有限公司 High-voltage anti-eddy cable clamp
CN104052009A (en) * 2014-06-19 2014-09-17 国网四川省电力公司成都市新都供电分公司 Hoop type cable duct cable support
CN105729302A (en) * 2016-03-21 2016-07-06 中国人民解放军第三军医大学第一附属医院 Clamp for preparing dental micro-tensile specimen and process for clamp
CN110637401A (en) * 2017-03-30 2019-12-31 株式会社自动网络技术研究所 Protection member and wire harness
US10903633B2 (en) 2018-06-07 2021-01-26 Panduit Corp. Interlocking cable cleat

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103225714A (en) * 2013-04-07 2013-07-31 陕西申瑞电化器材科技有限公司 High-voltage anti-eddy cable clamp
CN103225714B (en) * 2013-04-07 2016-05-04 陕西申瑞电化器材科技有限公司 The anti-eddy current cable cleat of high pressure
CN104052009A (en) * 2014-06-19 2014-09-17 国网四川省电力公司成都市新都供电分公司 Hoop type cable duct cable support
CN105729302A (en) * 2016-03-21 2016-07-06 中国人民解放军第三军医大学第一附属医院 Clamp for preparing dental micro-tensile specimen and process for clamp
CN110637401A (en) * 2017-03-30 2019-12-31 株式会社自动网络技术研究所 Protection member and wire harness
CN110637401B (en) * 2017-03-30 2021-01-22 株式会社自动网络技术研究所 Protection member and wire harness
US10903633B2 (en) 2018-06-07 2021-01-26 Panduit Corp. Interlocking cable cleat

Similar Documents

Publication Publication Date Title
CN202474778U (en) Three-core middle restriction power cable armor clamp for cable tunnel engineering
CN202913749U (en) Support telegraph pole
CN201142557Y (en) Three-core intermediate restriction power cable tools
CN208310789U (en) A kind of integrated bracket for tunnel pre-buried channel flow
CN206128808U (en) Novel single loop cable dead end tower
CN202646930U (en) Electric power cable arc-shaped installing support frame for tunnel
CN205706240U (en) A kind of insulation support device
CN204664625U (en) A kind of cable bearer being applicable to Large space and installing
CN201904595U (en) Fixture suitable for large cross-section cables
CN106042985A (en) Insulation supporting device
CN204068170U (en) A kind of easy to use, electric power tunnel three core intermediate restriction power cable tools
CN101807781B (en) Damper for 800kV extra-high voltage alternative-current transmission line
CN201818904U (en) Clamp-type cable bridge
CN205046915U (en) Adopt two sides in two return circuits of V style of calligraphy combination cluster to cut -off steel pipe shaft tower
CN205857791U (en) Electric pole heightening device
CN203377560U (en) A cable branch box support
CN202474750U (en) Elbow for cable bridge
CN202271866U (en) Method for hanging fixed contact net by utilizing beam string structure
CN101807782B (en) Damper for 1000kV extra-high voltage alternative-current transmission line
CN101996739B (en) Mounting and fixing structure for oil immersed transformer
CN204586874U (en) A kind of track traffic evacuation platform support
CN205986029U (en) Tubular busbar's fixing device
CN204870602U (en) Nothing card hinders rigid suspension contact net busbar and leads smooth serial device
CN204205507U (en) Optical fiber composite overhead insulating cable suspension clamp
CN202765088U (en) Hydraulic pump support frame

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 1122 Yuanshen Road, China (Shanghai) pilot Free Trade Zone, Pudong New Area, Shanghai, 200122

Patentee after: STATE GRID SHANGHAI MUNICIPAL ELECTRIC POWER Co.

Patentee after: SHANGHAI ZHUORUN ASSET MANAGEMENT Co.,Ltd.

Address before: 1122 Yuanshen Road, China (Shanghai) pilot Free Trade Zone, Pudong New Area, Shanghai, 200122

Patentee before: STATE GRID SHANGHAI MUNICIPAL ELECTRIC POWER Co.

Patentee before: Shanghai Dianwu Asset Management Co.,Ltd.

CP01 Change in the name or title of a patent holder
CP03 Change of name, title or address

Address after: 1122 Yuanshen Road, China (Shanghai) pilot Free Trade Zone, Pudong New Area, Shanghai, 200122

Patentee after: STATE GRID SHANGHAI MUNICIPAL ELECTRIC POWER Co.

Patentee after: Shanghai Dianwu Asset Management Co.,Ltd.

Address before: 200122, 1122 deep road, Pudong New Area, Shanghai

Patentee before: SHANGHAI MUNICIPAL ELECTRIC POWER Co.

Patentee before: SHANGHAI ELECTRIC POWER EQUIPMENT COLLECTIVE ASSETS MANAGEMENT Co.,Ltd.

CP03 Change of name, title or address
TR01 Transfer of patent right

Effective date of registration: 20210519

Address after: 1122 Yuanshen Road, China (Shanghai) pilot Free Trade Zone, Pudong New Area, Shanghai, 200122

Patentee after: STATE GRID SHANGHAI MUNICIPAL ELECTRIC POWER Co.

Patentee after: SHANGHAI HENGNENGTAI ENTERPRISE MANAGEMENT Co.,Ltd.

Address before: 1122 Yuanshen Road, China (Shanghai) pilot Free Trade Zone, Pudong New Area, Shanghai, 200122

Patentee before: STATE GRID SHANGHAI MUNICIPAL ELECTRIC POWER Co.

Patentee before: SHANGHAI ZHUORUN ASSET MANAGEMENT Co.,Ltd.

TR01 Transfer of patent right
CX01 Expiry of patent term

Granted publication date: 20121003

CX01 Expiry of patent term