CN202474778U - Three-core middle restriction power cable armor clamp for cable tunnel engineering - Google Patents

Three-core middle restriction power cable armor clamp for cable tunnel engineering Download PDF

Info

Publication number
CN202474778U
CN202474778U CN2012200938827U CN201220093882U CN202474778U CN 202474778 U CN202474778 U CN 202474778U CN 2012200938827 U CN2012200938827 U CN 2012200938827U CN 201220093882 U CN201220093882 U CN 201220093882U CN 202474778 U CN202474778 U CN 202474778U
Authority
CN
China
Prior art keywords
power cable
fitting
core intermediate
cable
main body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2012200938827U
Other languages
Chinese (zh)
Inventor
张宇
顾撼宇
贲飞
蔡翊清
庞仲豪
余来意
吴素萍
潘捷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Dianwu Asset Management Co ltd
Shanghai Hengnengtai Enterprise Management Co ltd
Shanghai Zhuorun Asset Management Co ltd
State Grid Shanghai Electric Power Co Ltd
Original Assignee
SHANGHAI ELECTROPHYSICS COLLECTIVE ASSET MANAGEMENT CO Ltd
Shanghai Electric Power Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI ELECTROPHYSICS COLLECTIVE ASSET MANAGEMENT CO Ltd, Shanghai Electric Power Corp filed Critical SHANGHAI ELECTROPHYSICS COLLECTIVE ASSET MANAGEMENT CO Ltd
Priority to CN2012200938827U priority Critical patent/CN202474778U/en
Application granted granted Critical
Publication of CN202474778U publication Critical patent/CN202474778U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

一种电缆隧道工程用三芯中间约束电力电缆金具,包括同时对三根电力电缆进行约束夹持固定的上下金具主体,所述下部金具主体和上部金具主体连接合体后形成一具有三芯中间约束空腔的电力电缆夹具,三芯中间约束空腔为一整体空腔,所述下部金具主体和上部金具主体连接的一处或两处为活动连接。本实用新型的三芯中间约束电力电缆金具适用于现代化的电力电缆隧道的弧形安装支架;其安装、维修方便;且可作弯曲、变道、改向等变道安装,蛇形敷设及分相敷设,大大提高安装密度和电力电缆隧道的空间使用效率。另外,该电力电缆金具可同时安装三根电力电缆。

A three-core intermediate restraint power cable fitting for cable tunnel engineering, including an upper and lower fitting main body that constrains and clamps three power cables at the same time, and the lower fitting main body and the upper fitting main body are connected and combined to form a three-core intermediate restraining space. Cavity of the power cable clamp, the three-core central constraint cavity is an integral cavity, and one or two places where the lower fitting body and the upper fitting body are connected are movable connections. The three-core intermediate restraint power cable fittings of the utility model are suitable for arc-shaped installation brackets of modern power cable tunnels; they are convenient for installation and maintenance; Phase laying, greatly improving the installation density and space efficiency of power cable tunnels. In addition, the power cable fittings can install three power cables at the same time.

Description

一种电缆隧道工程用三芯中间约束电力电缆金具A three-core intermediate restraint power cable fitting for cable tunnel engineering

技术领域 technical field

本实用新型涉及一种敷设电力电缆用的金具,更具体的说,本实用新型涉一种可同时约束三根电缆的电力电缆金具。The utility model relates to a fitting for laying power cables, more specifically, the utility model relates to a fitting for power cables that can constrain three cables at the same time.

背景技术 Background technique

电力电缆隧道是城市化进程和电网建设必不可少的设施。以往,电力电缆隧道通常为矩形,为在此中敷设电力电缆,通常采用直线形角钢立柱和角钢横担,在单付横担上架设电力电缆。为了适用于吊具安装,此时所使用的电力电缆金具通常为矩形整体形状,或者,在所述金具上一体形成有尺寸、强度较大的用于安装、紧固螺栓及吊装用的构件。由此,导致电力电缆金具体积较大,占地面积也较大。Power cable tunnels are essential facilities for urbanization and power grid construction. In the past, power cable tunnels were usually rectangular. In order to lay power cables in them, straight angle steel columns and angle steel cross arms were usually used to erect power cables on single cross arms. In order to be suitable for the installation of the hanger, the power cable fittings used at this time are generally in the shape of a rectangle, or the fittings are integrally formed with components for installation, fastening bolts and hoisting with larger size and strength. As a result, the metal body of the power cable is larger in size and occupies a larger area.

随着城市化进程和电网建设的节奏加快,电力隧道的使用日益广泛。因此,对电力电缆的敷设也提出了更高的要求。With the accelerated pace of urbanization and power grid construction, power tunnels are increasingly used. Therefore, higher requirements are put forward for the laying of power cables.

例如,随着电力电缆的容积安装量的提高要求,需安装于电力隧道中的电力电缆数目也在日益增加。为应付该增加的电力电缆,所述电力电缆必须克服以往直线形安装的模式,视需要,在电力电缆隧道中将所述电力电缆弯曲安装。而以往的直线形的电力电缆金具安装无法满足此要求。For example, with the increase in the installation capacity of power cables, the number of power cables to be installed in the power tunnel is also increasing. In order to cope with the increased power cables, the power cables must be installed in a curved manner in the power cable tunnel if necessary, overcoming the conventional linear installation mode. However, the previous linear power cable fittings installation cannot meet this requirement.

另外,现代化的电力电缆隧道广泛采用圆形隧道,取代以往的安装电力电缆的直线形角钢立柱和角钢横担,电力电缆隧道中安装电力电缆金具的支架也采用了弧形支架。此时,继续使用以往的大体积矩形金具无法满足要求,且降低电力电缆隧道的空间使用效率。In addition, modern power cable tunnels widely use circular tunnels to replace the previous linear angle steel columns and angle steel cross arms for installing power cables. The brackets for installing power cable fittings in power cable tunnels also use arc brackets. At this time, continuing to use the conventional large-volume rectangular fittings cannot meet the requirements and reduce the space efficiency of the power cable tunnel.

实用新型内容 Utility model content

本实用新型要解决的技术问题是提供一种小体积的电力电缆金具,便于安装。The technical problem to be solved by the utility model is to provide a small-volume power cable fitting, which is convenient for installation.

为解决以上技术问题,本实用新型的三芯中间约束电力电缆金具的技术方案如下:In order to solve the above technical problems, the technical scheme of the three-core intermediate restraint power cable fittings of the present invention is as follows:

一种电缆隧道工程用三芯中间约束电力电缆金具,包括同时对三根电力电缆进行约束夹持固定的上下金具主体,所述下部金具主体和上部金具主体连接合体后形成一具有三芯中间约束空腔的电力电缆夹具,所述三芯中间约束空腔为一整体空腔,所述三芯中间约束空腔的横截面呈“品”字形结构。A three-core intermediate restraint power cable fitting for cable tunnel engineering, including an upper and lower fitting main body that constrains and clamps three power cables at the same time, and the lower fitting main body and the upper fitting main body are connected and combined to form a three-core intermediate restraining space. A power cable clamp with a cavity, the three-core intermediate confinement cavity is an integral cavity, and the cross-section of the three-core intermediate confinement cavity has a "pin"-shaped structure.

根据本实用新型的电缆隧道工程用三芯中间约束电力电缆金具,优选的是,所述下部金具主体和上部金具主体连接的一处为铰链连接。另一处为螺栓连接。According to the three-core intermediate restraint power cable fittings for cable tunnel engineering of the present invention, preferably, the connection between the lower fitting main body and the upper fitting main body is a hinge connection. The other is a bolted connection.

根据本实用新型的电缆隧道工程用三芯中间约束电力电缆金具,优选的是,所述下部金具主体下方设有下金具固定底座。底座的设置可以在需要底部固定时使用。According to the three-core intermediate restraint power cable fittings for cable tunnel engineering of the present invention, preferably, a lower fitting fixing base is provided below the lower fitting main body. The setting of the base can be used when bottom fixing is required.

进一步地,在所述下金具固定底座上、在沿着电力电缆方向上形成有碟形保护垫。Further, a dish-shaped protective pad is formed on the lower hardware fixing base along the direction of the power cable.

根据本实用新型的电缆隧道工程用三芯中间约束电力电缆金具,优选的是,所述下部金具主体的空腔面为一粗糙面。According to the three-core intermediate restraint power cable fittings for cable tunnel engineering of the present invention, preferably, the cavity surface of the lower fitting body is a rough surface.

在一个优选的实施方案中,所述金具形成空腔二端口径不同的喇叭形。这样的设置可以使电力电缆在需要时弯曲安装。In a preferred embodiment, the metal fitting is formed into a trumpet shape with two ports of the cavity having different diameters. Such an arrangement allows the power cable to be bent and installed when required.

优选的是,所述上下部金具主体的连接处设有弹性部件,使上下部金具主体承受弹力缓冲作用。Preferably, an elastic member is provided at the junction of the upper and lower fitting bodies, so that the upper and lower fitting bodies can bear the elastic buffering effect.

进一步地,所述弹性部件优选自弹簧、橡胶垫、海绵垫中的一种或两种。也可以是其他起到弹力缓冲作用的部件。Further, the elastic member is preferably selected from one or both of springs, rubber pads, and sponge pads. It can also be other parts that play the role of elastic cushioning.

本实用新型三芯中间约束电力电缆金具的有益效果是,该电力电缆金具适用于现代化的电力电缆隧道的弧形安装支架;其安装、维修方便;且可作弯曲、变道、改向等变道安装,蛇形敷设及分相敷设,大大提高安装密度和电力电缆隧道的空间使用效率。另外,本实用新型的电力电缆金具可同时安装三根电力电缆,节省了安装成本。The beneficial effect of the utility model three-core intermediate restraint power cable fittings is that the power cable fittings are suitable for arc-shaped installation brackets of modern power cable tunnels; the installation and maintenance are convenient; Road installation, serpentine laying and phase-separated laying, greatly improving the installation density and space efficiency of power cable tunnels. In addition, the power cable fittings of the utility model can install three power cables at the same time, which saves the installation cost.

附图说明 Description of drawings

图1为以往安装于隧道支架中的电力电缆金具的示意图。FIG. 1 is a schematic diagram of conventional power cable fittings installed in tunnel supports.

图2为本实用新型的三芯中间约束电力电缆金具的主视图。Fig. 2 is a front view of the three-core intermediate restraint power cable fittings of the present invention.

图3是本实用新型的另一个实施方式的示意图。Fig. 3 is a schematic diagram of another embodiment of the present invention.

图中,1-上部金具主体,2-下部金具主体,3-螺栓,4-下金具固定底座,5-碟形保护垫,6-弹性部件,7-铰链。In the figure, 1-upper fitting main body, 2-lower fitting main body, 3-bolt, 4-lower fitting fixing base, 5-disc-shaped protective pad, 6-elastic part, 7-hinge.

具体实施方式 Detailed ways

如图2所示,一种电缆隧道工程用三芯中间约束电力电缆金具,包括上下部金具主体1和2,所述下部金具主体和上部金具主体连接合体后形成一具有三芯中间约束空腔的电力电缆夹具,该三芯中间约束空腔为一整体空腔,该空腔中部的单独一芯的内径大小与一根电缆的外径大小相适应。三芯中间约束空腔的横截面呈“品”字形结构。所述夹具对三根电力电缆集中约束,上下金具主体之间一端通过铰链7连接,另一端通过螺栓3螺接固定。所述三芯中间约束电力电缆金具用于电力电缆隧道的弧形支架上的安装。所述金具为铝合金制。As shown in Figure 2, a three-core intermediate restraint power cable fitting for cable tunnel engineering includes upper and lower fitting main bodies 1 and 2, and the lower fitting main body and the upper fitting main body are connected to form a three-core intermediate restraining cavity The clamping cavity for the three cores is an integral cavity, and the inner diameter of a single core in the middle of the cavity is adapted to the outer diameter of a cable. The cross-section of the three-core central confinement cavity is in the shape of a "pin". The fixture centrally restrains the three power cables, one end of the upper and lower fittings is connected by a hinge 7, and the other end is fixed by a bolt 3. The three-core intermediate restraint power cable fittings are used for installation on arc-shaped supports of power cable tunnels. The hardware is made of aluminum alloy.

下部金具主体2下方设有下金具固定底4,下金具固定底座4在沿着电力电缆方向上形成有碟形保护垫5。下部金具主体的空腔面为一粗糙面,其粗糙面起到加强固定的作用。Below the lower fittings main body 2 is provided a lower fittings fixing base 4, and the lower fittings fixing base 4 is formed with a dish-shaped protective pad 5 along the direction of the power cable. The cavity surface of the lower fitting main body is a rough surface, and the rough surface plays a role of strengthening and fixing.

上下金具主体的空腔侧有氯丁橡胶垫6,所示上部金具主体1和下部金具主体2及其空腔形成一端直径较大,一端直径稍小的喇叭形之外,其他如同实施例1.空腔的两端的直径一大一小可实现电力电缆的弯曲安装。There is a neoprene rubber pad 6 on the side of the cavity of the upper and lower fittings main bodies. The upper fittings main body 1 and the lower fittings main body 2 as shown and their cavities form a trumpet shape with a larger diameter at one end and a slightly smaller diameter at the other end. Others are the same as in Embodiment 1 .The diameters of the two ends of the cavity are one large and one small, so that the bending installation of the power cable can be realized.

在另一个实施方式中,下部金具主体和上部金具主体都通过螺栓3来固定(见图3)。In another embodiment, both the lower fitting body and the upper fitting body are fixed by bolts 3 (see FIG. 3 ).

根据本实用新型的三芯中间约束电力电缆金具,所述电力电缆金具适用于现代化的电力电缆隧道的弧形安装支架;其安装、维修方便;且可作弯曲、变道、改向等变道安装,蛇形敷设及分相敷设,大大提高安装密度和电力电缆隧道的空间使用效率。According to the three-core intermediate restraint power cable fittings of the present invention, the power cable fittings are suitable for arc-shaped installation brackets of modern power cable tunnels; they are easy to install and maintain; and can be used for bending, changing lanes, changing directions, etc. Installation, serpentine laying and phase-separated laying, greatly improve the installation density and space utilization efficiency of power cable tunnels.

Claims (8)

1.一种电缆隧道工程用三芯中间约束电力电缆金具,包括同时对三根电力电缆进行约束夹持固定的上下金具主体,其特征在于:所述下部金具主体和上部金具主体连接合体后形成一具有三芯中间约束空腔的电力电缆夹具,所述三芯中间约束空腔为一整体空腔,所述三芯中间约束空腔的横截面呈“品”字形结构。1. A three-core intermediate restraint power cable fitting for cable tunnel engineering, including an upper and lower fitting main body that constrains and clamps three power cables at the same time, and is characterized in that: the lower fitting main body and the upper fitting main body are connected to form a A power cable clamp with a three-core intermediate confinement cavity, the three-core intermediate confinement cavity is an integral cavity, and the cross section of the three-core intermediate confinement cavity has a "pin"-shaped structure. 2.根据权利要求1所述的电缆隧道工程用三芯中间约束电力电缆金具,其特征在于:所述下部金具主体和上部金具主体连接的一处为铰链连接。2. The three-core intermediate restraint power cable fitting for cable tunnel engineering according to claim 1, characterized in that: the connection between the lower fitting main body and the upper fitting main body is a hinge connection. 3.根据权利要求1或2所述的电缆隧道工程用三芯中间约束电力电缆金具,其特征在于:所述下部金具主体下方设有下金具固定底座。3. The three-core intermediate restraint power cable fitting for cable tunnel engineering according to claim 1 or 2, characterized in that: a lower fitting fixing base is provided below the lower fitting main body. 4.根据权利要求3所述的电缆隧道工程用三芯中间约束电力电缆金具,其特征在于:在所述下金具固定底座上、在沿着电力电缆方向上形成有碟形保护垫。4. The three-core intermediate restraint power cable fitting for cable tunnel engineering according to claim 3, characterized in that: a dish-shaped protective pad is formed on the fixing base of the lower fitting along the direction of the power cable. 5.根据权利要求1所述的电缆隧道工程用三芯中间约束电力电缆金具,其特征在于:所述下部金具主体的空腔面为一粗糙面。5. The three-core intermediate restraint power cable fitting for cable tunnel engineering according to claim 1, characterized in that: the cavity surface of the lower fitting body is a rough surface. 6.根据权利要求1所述的电缆隧道工程用三芯中间约束电力电缆金具,其特征在于:所述金具形成空腔二端口径不同的喇叭形。6 . The three-core intermediate restraint power cable fitting for cable tunnel engineering according to claim 1 , wherein the fitting is formed into a trumpet shape with two ports of the cavity having different diameters. 7 . 7.根据权利要求1所述的电缆隧道工程用三芯中间约束电力电缆金具,其特征在于:所述上下部金具主体的连接处设有弹性部件,使上下部金具主体承受弹力缓冲作用。7. The three-core intermediate restraint power cable fitting for cable tunnel engineering according to claim 1, characterized in that: elastic parts are provided at the joints of the upper and lower fitting main bodies, so that the upper and lower fitting main bodies can bear the elastic buffering effect. 8.根据权利要求1所述的电缆隧道工程用三芯中间约束电力电缆金具,其特征在于:所述弹性部件选自弹簧、橡胶垫、海绵垫中的一种或两种。8. The three-core intermediate restraint power cable fittings for cable tunnel engineering according to claim 1, characterized in that: the elastic member is selected from one or both of springs, rubber pads, and sponge pads.
CN2012200938827U 2012-03-13 2012-03-13 Three-core middle restriction power cable armor clamp for cable tunnel engineering Expired - Lifetime CN202474778U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012200938827U CN202474778U (en) 2012-03-13 2012-03-13 Three-core middle restriction power cable armor clamp for cable tunnel engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012200938827U CN202474778U (en) 2012-03-13 2012-03-13 Three-core middle restriction power cable armor clamp for cable tunnel engineering

Publications (1)

Publication Number Publication Date
CN202474778U true CN202474778U (en) 2012-10-03

Family

ID=46922906

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012200938827U Expired - Lifetime CN202474778U (en) 2012-03-13 2012-03-13 Three-core middle restriction power cable armor clamp for cable tunnel engineering

Country Status (1)

Country Link
CN (1) CN202474778U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103225714A (en) * 2013-04-07 2013-07-31 陕西申瑞电化器材科技有限公司 High-voltage anti-eddy cable clamp
CN104052009A (en) * 2014-06-19 2014-09-17 国网四川省电力公司成都市新都供电分公司 Hoop type cable duct cable support
CN105729302A (en) * 2016-03-21 2016-07-06 中国人民解放军第三军医大学第一附属医院 Clamp for preparing dental micro-tensile specimen and process for clamp
CN110637401A (en) * 2017-03-30 2019-12-31 株式会社自动网络技术研究所 Protective components and wiring harnesses
US10903633B2 (en) 2018-06-07 2021-01-26 Panduit Corp. Interlocking cable cleat

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103225714A (en) * 2013-04-07 2013-07-31 陕西申瑞电化器材科技有限公司 High-voltage anti-eddy cable clamp
CN103225714B (en) * 2013-04-07 2016-05-04 陕西申瑞电化器材科技有限公司 The anti-eddy current cable cleat of high pressure
CN104052009A (en) * 2014-06-19 2014-09-17 国网四川省电力公司成都市新都供电分公司 Hoop type cable duct cable support
CN105729302A (en) * 2016-03-21 2016-07-06 中国人民解放军第三军医大学第一附属医院 Clamp for preparing dental micro-tensile specimen and process for clamp
CN110637401A (en) * 2017-03-30 2019-12-31 株式会社自动网络技术研究所 Protective components and wiring harnesses
CN110637401B (en) * 2017-03-30 2021-01-22 株式会社自动网络技术研究所 Protective parts and wiring harnesses
US10903633B2 (en) 2018-06-07 2021-01-26 Panduit Corp. Interlocking cable cleat

Similar Documents

Publication Publication Date Title
CN202474778U (en) Three-core middle restriction power cable armor clamp for cable tunnel engineering
CN202640257U (en) Connection support for dismounting agar gel diffusion (AGD) pipeline for reducing furnace
CN204176142U (en) A kind of antidetonation connects substrate and antidetonation connection bracket composite structure
CN202646930U (en) Electric power cable arc-shaped installing support frame for tunnel
CN216405065U (en) A kind of cable vibration damping lamp and lighting device
CN206806926U (en) Service conductor cable stationary barrier device
CN204156451U (en) Lv power cable fixed support
CN104466846A (en) Support fitting for tubular busbar
CN108167537A (en) A kind of antidetonation suspension and support for pipe laying
CN205857791U (en) Electric pole heightening device
CN203421297U (en) Novel large-span cable bridge
CN105401780A (en) General herringbone derrick base
CN202646927U (en) Turning support of cable bridge
CN201424732Y (en) A cable-stayed ceiling system
CN104376934B (en) A kind of light ice formation V-type suspension string of compact three
CN104074126B (en) A kind of steel reinforced concrete composite beam plate structure of small-sized bridges and culverts
CN208966126U (en) A kind of fixture
CN102361301B (en) Arrangement structure of asymmetrical V-type insulator strings for rigid jumper wires of transmission lines
CN202791871U (en) Integrated trunking lamp support suitable for arc-shaped cardinal plane
CN207033008U (en) A kind of antidetonation suspension and support for building
CN103584469B (en) One is lain bed
CN205706236U (en) Monoblock type shoulder frame in tunnel
CN206694663U (en) A kind of film inner housing surface fixed support
CN206539104U (en) A kind of bar topmast seat
CN205260506U (en) Super extra -high voltage defeated substation equipment equalizer ring fixed knot construct

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 1122 Yuanshen Road, China (Shanghai) pilot Free Trade Zone, Pudong New Area, Shanghai, 200122

Patentee after: STATE GRID SHANGHAI MUNICIPAL ELECTRIC POWER Co.

Patentee after: SHANGHAI ZHUORUN ASSET MANAGEMENT Co.,Ltd.

Address before: 1122 Yuanshen Road, China (Shanghai) pilot Free Trade Zone, Pudong New Area, Shanghai, 200122

Patentee before: STATE GRID SHANGHAI MUNICIPAL ELECTRIC POWER Co.

Patentee before: Shanghai Dianwu Asset Management Co.,Ltd.

CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 1122 Yuanshen Road, China (Shanghai) pilot Free Trade Zone, Pudong New Area, Shanghai, 200122

Patentee after: STATE GRID SHANGHAI MUNICIPAL ELECTRIC POWER Co.

Patentee after: Shanghai Dianwu Asset Management Co.,Ltd.

Address before: 200122, 1122 deep road, Pudong New Area, Shanghai

Patentee before: SHANGHAI MUNICIPAL ELECTRIC POWER Co.

Patentee before: SHANGHAI ELECTRIC POWER EQUIPMENT COLLECTIVE ASSETS MANAGEMENT Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210519

Address after: 1122 Yuanshen Road, China (Shanghai) pilot Free Trade Zone, Pudong New Area, Shanghai, 200122

Patentee after: STATE GRID SHANGHAI MUNICIPAL ELECTRIC POWER Co.

Patentee after: SHANGHAI HENGNENGTAI ENTERPRISE MANAGEMENT Co.,Ltd.

Address before: 1122 Yuanshen Road, China (Shanghai) pilot Free Trade Zone, Pudong New Area, Shanghai, 200122

Patentee before: STATE GRID SHANGHAI MUNICIPAL ELECTRIC POWER Co.

Patentee before: SHANGHAI ZHUORUN ASSET MANAGEMENT Co.,Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20121003