CN202467921U - Hauling pipe type filling system for thin-seam cracked roof - Google Patents
Hauling pipe type filling system for thin-seam cracked roof Download PDFInfo
- Publication number
- CN202467921U CN202467921U CN2011205709834U CN201120570983U CN202467921U CN 202467921 U CN202467921 U CN 202467921U CN 2011205709834 U CN2011205709834 U CN 2011205709834U CN 201120570983 U CN201120570983 U CN 201120570983U CN 202467921 U CN202467921 U CN 202467921U
- Authority
- CN
- China
- Prior art keywords
- filling
- pipe
- hauling
- girdle
- steel pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model relates to a hauling pipe type filling system for a thin-seam cracked roof, wherein the hauling pipe type filling system comprises a main filling pipe, a high-level filling steel pipe, a high-pressure rubber pipe and a plurality of filling pipes arranged in a gate road of a working surface; a variable tee joint is arranged on the main filling pipe; the high-pressure rubber pipe is connected onto the main filling pipe through the variable tee joint; the filling pipes are connected onto the high-pressure rubber pipe in parallel; the filling pipes are fixedly connected on a hydraulic bracket of the working surface between a worked out section and a coal layer and move along with moving of the hydraulic bracket; the filling holes of the filling pipes stretch into the worked out section; one end of the high-level filling steel pipe is connected onto the main filling pipe; the other end of the high-level filling steel pipe passes through a filling wall of a roadside and stretches into the worked out section; and the filling hole of the high-level filling steel pipe is higher than that of the filling pipes.
Description
Technical field
The utility model relates to the filling of a kind of colliery and uses system, relates in particular to a kind of hauling pipe formula filling system that is applicable to the girdle breaking roof.
Background technology
The girdle coalfield is very common in the colliery of China, just belongs to typical thin basement rock, thick alluvium coal seam like bog-head coal field, north, the Yellow River.Its girdle mainly refers to seven, ten layers of coal, and bedrock thickness is generally 30~40 meters, and thickness of surface soil is generally about 200m, and coal seam thickness is merely about 1.2m; The inclination angle is little, and gas is high, and water yield is big, and top board is broken unusually; The face of land is alluvial plain, the Yellow River north, and physical features is smooth in the field with "nine squares" in, and phreatic table is below the face of land about 1.5 meters, and exploitation afterwards subsidence coefficient reaches 0.82; Above ground structure is than comparatively dense, and underground mining is bigger to the face of land and building influence, and ton coal profit is merely 50 yuan/ton.Several kinds of filling methods of using at present; Like fall behind paste body filling, the efficient frame cash filling, high water filling etc., because filling cost is higher relatively, the paste body filling cost falls the cash filling cost at 100 yuan/ton behind 120 yuan/ton, efficient frame; 160 yuan/ton of high water filling costs, ore deposit side can not accept.
The utility model content
The utility model is to the girdle special geological condition; Directly the top is with adopting with emitting and unusual fragmentation; Old top presses step pitch about 12~14m; There is the time and the space of certain movement on promptly old top (basic top), design a kind of " hauling pipe " formula filling process system that utilizes the direct top of fragmentation behind the seam mining as the leak stopping wall.This system can form casting resin to the spoil that driving produces through broken back and a certain amount of flyash, cement, utilizes batch (-type) concrete pump and pipeline pack to the goaf, reaches the purpose of control rock stratum depression.
Its technical solution is:
A kind of girdle breaking roof hauling pipe formula filling system; Comprise and be arranged in the filling person in charge, high-order filling steel pipe, high-pressure rubber pipe and Duo Gen filling pipe in the work plane crossheading; Said filling is responsible for and is provided with reducing tee, and said high-pressure rubber pipe is connected to said filling through said reducing tee and is responsible for; Said filling pipe is connected in parallel on the said high-pressure rubber pipe, and said filling pipe is fixedly connected on the working surface hydraulic support between goaf and the coal seam, and with moving of hydraulic support, the filling mouth of said filling pipe extend in the goaf; One end of said high-order filling steel pipe is connected said filling and is responsible for, and the other end passes lane group filling wall and extend in the goaf, and the height of the filling mouth of said high-order filling steel pipe is higher than the height of said filling pipe filling mouth.
The quantity of preferred said filling pipe is identical with the quantity of working surface hydraulic support, and a filling pipe is set on every hydraulic support.
Preferred every filling pipe is provided with valve and flow, pressure sensor.
Preferred said filling is responsible for and is provided with valve and flow, pressure sensor.
The filling mouth of preferred said high-order filling steel pipe is pressed close to the gob floor setting.
The diameter of preferred said high-order filling steel pipe is greater than the diameter of filling pipe.
The beneficial effect of the utility model is: under the situation that need not transform support and structure leak stopping wall, directly to goaf filling, reduced the motion of overlying rock, reached the purpose of control subsidence; Filling pipe is directly followed support with the propelling of work plane and is moved forward, and has improved pack effectiveness; Through high-order Grouting Pipe, directly bashing roof collapse band makes caving zone and broken overlying rock bond together through slip casting, has reduced the pressure of overlying rock to lane group filling wall, has protected lane group filling wall.
Description of drawings
Accompanying drawing 1 is the structural representation of the said girdle hauling pipe of the utility model formula filling system.
The specific embodiment
Referring to accompanying drawing 1, a kind of girdle breaking roof hauling pipe formula filling system comprises being arranged in the filling person in charge 1, high-order filling steel pipe 4, high-pressure rubber pipe 3 and Duo Gen filling pipe 6 in the work plane crossheading; The filling person in charge 1 can select common steel tube for use with high-order filling steel pipe 4, and diameter is freely chosen according to the underground filling needs, and the withstand voltage properties of high-pressure rubber pipe 3 wants to satisfy the needs of stowing pressure; Filling pipe selects for use the common filling floral tube in down-hole to get final product; Middle part on filling is responsible for is provided with reducing tee 2, and high-pressure rubber pipe 3 is connected to filling through reducing tee 2 and is responsible on 1, and many filling pipes 6 are connected in parallel on the high-pressure rubber pipe 3; Filling pipe is fixedly connected on the working surface hydraulic support between goaf and the coal seam simultaneously; With moving of hydraulic support, form " hauling pipe formula " filling system, the filling mouth of filling pipe 6 (floral tube end) extend in the goaf; The quantity of preferred filling pipe is identical with the quantity of working surface hydraulic support, promptly on every hydraulic support a filling pipe 6 is set; One end of high-order filling steel pipe 4 is connected said filling and is responsible on 1; The other end, just filling mouth end passes lane group filling wall 5 and extend in the goaf 7, and the height of the filling mouth of high-order filling steel pipe 4 will be higher than the height of filling pipe 6 filling mouths; Preferred its is close to the goaf top plate setting; That is to say as much as possible near goaf top plate,, the diameter of the diameter of high-order filling steel pipe greater than filling pipe can be set for guaranteeing the filling effect of top board.
For detecting charging quantity and filling velocity, can on the every filling pipe and the filling person in charge, flow, pressure sensor be set, through the control system; Like monitoring of tools filling situations such as computer, PLC; Simultaneously can also on every filling pipe and the filling person in charge, valve be set, when needs stopped the filling in somewhere, the valve of closing on the filling pipe of relevant position got final product; When needs stop whole filling, then close the valve that filling is responsible for.
In stowing operation; Along with the passing of coal-face 8, open each road valve, filling pipe carries out filling to the goaf; The direct bashing roof collapse of high-order filling steel pipe of while band; Caving zone and broken overlying rock are bonded together through slip casting, reduced the pressure of overlying rock, protected lane group filling wall lane group filling wall; When work plane moved forward, hydraulic support moved forward with moving of coal-face, and the filling pipe on the hydraulic support also moves forward thereupon, at this moment, can artificially move high-order filling steel pipe, and it is adjusted to correct position, began the stowing operation of next stage.
The above; Be merely the preferable specific embodiment of the utility model patent; But the protection domain of the utility model patent is not limited thereto; Any technician who is familiar with the present technique field is in the technical scope that the utility model patent discloses, and the variation that can expect easily or replacement all should be encompassed within the protection domain of the utility model patent.
Claims (6)
1. a girdle breaking roof hauling pipe formula filling system comprises being arranged in the filling person in charge in the work plane crossheading, high-pressure rubber pipe and Duo Gen filling pipe, it is characterized in that: also comprise high-order filling steel pipe;
Said filling is responsible for and is provided with reducing tee, and said high-pressure rubber pipe is connected to said filling through said reducing tee and is responsible for;
Said filling pipe is connected in parallel on the said high-pressure rubber pipe, and said filling pipe is fixedly connected on the working surface hydraulic support between goaf and the coal seam, and with moving of hydraulic support, the filling mouth of said filling pipe extend in the goaf;
One end of said high-order filling steel pipe is connected said filling and is responsible for, and the other end passes lane group filling wall and extend in the goaf, and the height of the filling mouth of said high-order filling steel pipe is higher than the height of said filling pipe filling mouth.
2. a kind of girdle breaking roof hauling pipe formula filling system as claimed in claim 1 is characterized in that: a filling pipe is set on every hydraulic support.
3. a kind of girdle breaking roof hauling pipe formula filling system as claimed in claim 2 is characterized in that: every filling pipe is provided with valve and flow, pressure sensor.
4. a kind of girdle breaking roof hauling pipe formula filling system as claimed in claim 3 is characterized in that: said filling is responsible for and is provided with valve and flow, pressure sensor.
5. a kind of girdle breaking roof hauling pipe formula filling system as claimed in claim 4, it is characterized in that: the filling mouth of said high-order filling steel pipe is pressed close to the gob floor setting.
6. a kind of girdle breaking roof hauling pipe formula filling system as claimed in claim 5, it is characterized in that: the diameter of said high-order filling steel pipe is greater than the diameter of filling pipe.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011205709834U CN202467921U (en) | 2011-12-31 | 2011-12-31 | Hauling pipe type filling system for thin-seam cracked roof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011205709834U CN202467921U (en) | 2011-12-31 | 2011-12-31 | Hauling pipe type filling system for thin-seam cracked roof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202467921U true CN202467921U (en) | 2012-10-03 |
Family
ID=46916086
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011205709834U Expired - Fee Related CN202467921U (en) | 2011-12-31 | 2011-12-31 | Hauling pipe type filling system for thin-seam cracked roof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202467921U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102444419A (en) * | 2011-12-31 | 2012-05-09 | 山东科技大学 | Pipe-hauling-type filling system for thin seam breaking roof |
CN102966359A (en) * | 2012-11-09 | 2013-03-13 | 山西潞安环保能源开发股份有限公司 | Working face ventilation oxidization zone roof control method |
CN103016053A (en) * | 2012-12-07 | 2013-04-03 | 中国矿业大学 | Method of local filling to control surface subsidence in gob |
CN103321677A (en) * | 2013-06-04 | 2013-09-25 | 山东科技大学 | Method for actively controlling motion of coal mine critical layers by using strip filling walls |
CN113339053A (en) * | 2021-06-07 | 2021-09-03 | 山东康格能源科技有限公司 | Fully mechanized caving mining filling process for coal mine |
-
2011
- 2011-12-31 CN CN2011205709834U patent/CN202467921U/en not_active Expired - Fee Related
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102444419A (en) * | 2011-12-31 | 2012-05-09 | 山东科技大学 | Pipe-hauling-type filling system for thin seam breaking roof |
CN102966359A (en) * | 2012-11-09 | 2013-03-13 | 山西潞安环保能源开发股份有限公司 | Working face ventilation oxidization zone roof control method |
CN103016053A (en) * | 2012-12-07 | 2013-04-03 | 中国矿业大学 | Method of local filling to control surface subsidence in gob |
CN103016053B (en) * | 2012-12-07 | 2015-03-04 | 中国矿业大学 | Method of local filling to control surface subsidence in gob |
CN103321677A (en) * | 2013-06-04 | 2013-09-25 | 山东科技大学 | Method for actively controlling motion of coal mine critical layers by using strip filling walls |
CN113339053A (en) * | 2021-06-07 | 2021-09-03 | 山东康格能源科技有限公司 | Fully mechanized caving mining filling process for coal mine |
CN113339053B (en) * | 2021-06-07 | 2023-06-06 | 山东康格能源科技有限公司 | Fully-mechanized caving mining and filling process for coal mine |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102444419A (en) | Pipe-hauling-type filling system for thin seam breaking roof | |
CN108222938B (en) | Combined grouting filling mining method for large-inclination-angle coal seam goaf | |
CN103016053B (en) | Method of local filling to control surface subsidence in gob | |
CN103953390B (en) | The water-retaining production Tight filling method of control overlying mining rock crack and subsidence | |
CN202467921U (en) | Hauling pipe type filling system for thin-seam cracked roof | |
CN108661705B (en) | Strip goaf four-in-one comprehensive treatment construction method | |
CN102425427B (en) | Method for constructing tunnel by utilizing shield empty-pushing crossing mine method | |
CN104564137B (en) | Handling method and device for double-medium stacked supporting and hard top plate type mined-out area | |
CN102392644A (en) | Stripped fluid expansion filling mining method for below middle thick coal seam | |
CN104775816B (en) | Isolated grouting-filling mining method for overburden rock without village migration under cut-side local pressed-coal conditions | |
CN105240047A (en) | Filling reinforcement method for managing underground mined area of open-pit mine | |
CN103670496A (en) | Gob-side entry retaining and sectional coal seam gas pre-extracting method for single low-permeability outburst coal seam | |
CN102230396A (en) | Filling method capable of exploring while filling coal mine goaf | |
CN108087021A (en) | A kind of method that filling coal mining recycling leaves coal column and water-resisting key strata is controlled to stablize | |
CN109594990B (en) | Large-section jacking pipe construction method for complex stratum | |
CN103498696A (en) | Method for grouting, filling and compacting goaf filling body from roof roadway | |
CN101021162A (en) | Overlying strata separation layer grouting filling device and grouting filling system | |
CN105464700A (en) | Method for determining length of filling segment of fully mechanized mining and filling mixed mining working face | |
CN105756702A (en) | Roadway-side mesh cage filling supporting gob-side entry retaining method | |
CN102444420B (en) | Dragging tube type filling method of thin coal bed fractured roof | |
CN107100666B (en) | Down-blasting and up-squeezing outburst elimination and dust fall method for gas outburst coal seam coal roadway tunneling | |
CN105298494A (en) | Solid and cementing body composite filling coal mining method | |
CN203702244U (en) | Breaking roof caving area grouting filling system | |
CN209818103U (en) | Goaf grouting filling system suitable for entry retaining | |
CN113944510A (en) | Determination method for rock stratum movement conjugate inner and outer hyperbolic-like models |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20121003 Termination date: 20151231 |
|
EXPY | Termination of patent right or utility model |