CN202424918U - Linked device for video monitoring system and smart regulating and controlling operating system - Google Patents

Linked device for video monitoring system and smart regulating and controlling operating system Download PDF

Info

Publication number
CN202424918U
CN202424918U CN2011205550620U CN201120555062U CN202424918U CN 202424918 U CN202424918 U CN 202424918U CN 2011205550620 U CN2011205550620 U CN 2011205550620U CN 201120555062 U CN201120555062 U CN 201120555062U CN 202424918 U CN202424918 U CN 202424918U
Authority
CN
China
Prior art keywords
module
strategy
real
interlock
operating system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011205550620U
Other languages
Chinese (zh)
Inventor
毛秀伟
黄红兵
陈蕾
杨鸿珍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Zhejiang Electric Power Co Ltd
Zhejiang Electric Power Co
Original Assignee
Zhejiang Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Electric Power Co filed Critical Zhejiang Electric Power Co
Priority to CN2011205550620U priority Critical patent/CN202424918U/en
Application granted granted Critical
Publication of CN202424918U publication Critical patent/CN202424918U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The embodiment of the utility model provides a linked device for a video monitoring system and a smart regulating and controlling operating system, wherein the device comprises a smart regulating and controlling operating module, a strategy scheme configuration module, a real-time monitoring module and a linked control module, wherein the smart regulating and controlling operating module is used for exchanging data and instructions with an external system; the strategy scheme configuration module is connected with the smart regulating and controlling operating module, and is used for implementing the subscription of dispatching operation and the configuration of the linked scheme; the real-time monitoring module is connected with the strategy scheme configuration module, obtains a configuration linked strategy, is connected with a smart regulating and controlling operating system module, and is used for receiving data in real time from a smart regulating and controlling operating system, screening the data corresponding to the configuration strategy, and transmitting the data; and the linked control module is connected with the real-time monitoring module, and is used for receiving information corresponding to the configuration strategy from the real-time monitoring module, and sending control command to a video monitoring system terminal according to the information.

Description

The equipment of a kind of video monitoring system and the interlock of intelligent control operating system
Technical field
The utility model relates to technical field of video monitoring, the equipment of particularly a kind of video monitoring system and the interlock of intelligent control operating system.
Background technology
Traffic department is the transmission and the modulation maincenter of electric energy in the electric power system, and in power system operation, action needs such as back brake, switch frequently change system operation mode.Dispatching of power netwoks operation then is important routine work of dispatcher, and it is concerning the safe operation of electric power system, also is related to the staff that just on electric equipment, working and operating personnel's safety.
In addition; Multimedia service is used especially video monitoring system in each link utilization such as electrical network production, marketing, scheduling, integrated management extensively, and constituent parts is realized the supervision to productions such as equipment, circuit and surrounding enviroment, management element in the electric power system through video monitoring system.Video monitoring system is that remote measurement, remote signalling, remote control, the further of four kinds of remote functionalitys of remote regulating are replenished; It can keep watch on and write down the safety of transformer station, power transmission and transformation line and equipment and the ruuning situation of equipment, and the relevant image document of ex-post analysis accident is provided.
In the middle of prior art, at present the dispatcher issues the control manipulation order, and the site operation people is in on-the-spot executable operations order such as transformer station place, machine room, and dispatchers at different levels can't the on-site supervision situation, and the site operation personnel also can't obtain remote assistance.Dispatchers at different levels and transformer station control room monitoring personnel can't the on-site supervision situation, can't obtain in-situ data accurately, and the site operation personnel also can't obtain remote assistance.Special site operation personnel's quantity is few for present unattended substation, under the situation that lacks auxiliary supervision and remote assistance, misoperation takes place more easily.
The utility model content
In view of this, the utility model provides the equipment of a kind of video monitoring system and the interlock of intelligent control operating system.
The concrete technical scheme of the utility model is following:
The equipment of a kind of video monitoring system and the interlock of intelligent control operating system, said equipment comprises:
The intelligent control operational module is used for carrying out with external system the exchange of data and instruction;
The strategy protocol configuration module, connection of intelligent control manipulation module is used to realize to the subscription of scheduling operation and the configuration of interlock scheme;
The real-time listening module is connected with the strategy protocol configuration module, obtains the configuration linkage strategy, and inserts the intelligent control operating system module, is used for receiving data in real time from intelligent control operating system, and filters out the data that meet collocation strategy and sends;
The interlock control module connects the real-time listening module, is used for receiving the information that meets collocation strategy from the real-time listening module, arrives the video monitoring system terminal according to the information transmitting control commands.
Said equipment further comprises:
Picture recording module is connected to the interlock control module, is used to receive the video recording instruction that the interlock control module is sent, and opens recording function.
Can know that through above technical scheme the utility model realized the interlock of video monitoring system and intelligent control operating system for the intelligent control operation site, timely, accurately with the visual field conditions that obtains; And then dispatcher and monitoring personnel can make correct guidance more easily, reduce misuse rate; Simultaneously, can record, record a video video pictures, so that operating procedure and content provide strong foundation before collecting evidence, looking back in the future through video monitoring system.
Description of drawings
In order to be illustrated more clearly in the utility model embodiment or technical scheme of the prior art; To do to introduce simply to the accompanying drawing of required use in embodiment or the description of the Prior Art below; Obviously, the accompanying drawing in describing below is some embodiment of the utility model, for those of ordinary skills; Under the prerequisite of not paying creative work, can also obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is the said device structure sketch map of the utility model
Fig. 2 is the said method flow diagram of the utility model.
Embodiment
Video monitoring system and intelligent control operating system that the utility model will be applied in the electric power system link, thereby realize the direct more information promptly and accurately of intelligent control operating process is obtained and Operating Guideline.To combine accompanying drawing that the technical scheme of the utility model is carried out complete description below.And described embodiment only is part embodiment in the utility model.Based on the embodiment in the utility model, those of ordinary skills are not passing through other execution modes that draw under the creative work situation, belong to the scope of the utility model protection equally.
With reference to shown in Figure 1, the said equipment concrete structure of the utility model comprises:
The intelligent control operational module promptly on original intelligent control operating system, has increased the interface of external interlock, makes it can carry out the exchange of data and instruction with other system;
The strategy protocol configuration module comprises the video monitoring system server, is used to realize to the subscription of scheduling operation and the configuration of interlock scheme;
The real-time listening module is connected with the strategy protocol configuration module, receives strategy protocol; And access intelligent control operating system; Be the part that video monitoring system and intelligent control operating system are contacted directly, be responsible for from intelligent control operating system, receiving in real time data, the scheduling operating command that monitoring reception intelligent control operating system is sent; And will from the strategy protocol configuration module, receive the strategy protocol configuration information and compare with the information that listens to from intelligent control operating system; As not within subscription range, then it is abandoned the final screening information afterwards of sending;
The interlock control module; Connect the real-time listening module; Realize the function of the parsing and the interlock control of data, receive in the real-time listening module through the information after the screening, based on the scheduling operating command and the interlock scheme of the intelligent control operating system that receives; Send control command; The other end of interlock control module connects the video frequency terminal apparatus on video monitoring system front end system and the client, promptly on front end system and the client monitoring camera is installed, and the interlock control module is the control hinge of system;
Picture recording module realizes recording function, is connected to the interlock control module, and the linkage strategy of sending when the interlock control module is video recording, and control terminal is handled camera and opened recording function;
Strategy protocol configuration module, real-time listening module, interlock control module and picture recording module constitute the video monitoring system module.
With reference to shown in Figure 2, the said equipment of the utility model, concrete workflow is following:
1, the real-time listening module receives the scheduling operating command that intelligent control operating system is sent;
2, obtain the configuration linkage strategy; Real-time listening module contact strategy protocol configuration module, and therefrom obtain the configuration linkage strategy compares according to the content of the linkage strategy scheduling operating command with the intelligent control operating system of receiving; Screen according to linkage strategy; Formulate corresponding interlock action, the scheduling operating command beyond the automatic fitration strategy, the interlock action mainly comprises: presetting bit interlock, video recording, video ejection etc.;
3, the interlock action message of formulating after the real-time listening module will be screened sends to the interlock control module, and the interlock action is implemented at interlock control module control picture recording module and video monitoring system terminal.
Said interlock action is generally following several kinds of situation:
The presetting bit interlock, the interlock control module is to video monitoring system terminal transmitting control commands, and front end system turns to relevant device in the presetting bit of setting according to order;
Video recording, the interlock control module is sent the order of recording video recording to picture recording module, and the picture recording module time that operation takes place based on intelligent control is recorded the video recording in the corresponding time range;
Video ejects, and coordinated control system sends the order of ejection video image to the preceding end subscriber of video monitoring system, and user side ejects corresponding video image based on order.
More than be merely the listed specific embodiment of enumerating, in the actual mechanical process, can also select other preferred versions as required.Should be pointed out that for those skilled in the art, under the prerequisite that does not break away from the utility model principle, can also make some improvement and retouching, these improvement and retouching also should be regarded as the protection range of the utility model.

Claims (2)

1. the equipment of video monitoring system and intelligent control operating system interlock is characterized in that said equipment comprises:
The intelligent control operational module is used for carrying out with external system the exchange of data and instruction;
The strategy protocol configuration module, connection of intelligent control manipulation module is used to realize to the subscription of scheduling operation and the configuration of interlock scheme;
The real-time listening module is connected with the strategy protocol configuration module, obtains the configuration linkage strategy, and inserts the intelligent control operating system module, is used for receiving data in real time from intelligent control operating system, and filters out the data that meet collocation strategy and sends;
The interlock control module connects the real-time listening module, is used for receiving the information that meets collocation strategy from the real-time listening module, arrives the video monitoring system terminal according to the information transmitting control commands.
2. according to the said equipment of claim 1, it is characterized in that said equipment further comprises:
Picture recording module is connected to the interlock control module, is used to receive the video recording instruction that the interlock control module is sent, and opens recording function.
CN2011205550620U 2011-12-27 2011-12-27 Linked device for video monitoring system and smart regulating and controlling operating system Expired - Lifetime CN202424918U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011205550620U CN202424918U (en) 2011-12-27 2011-12-27 Linked device for video monitoring system and smart regulating and controlling operating system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011205550620U CN202424918U (en) 2011-12-27 2011-12-27 Linked device for video monitoring system and smart regulating and controlling operating system

Publications (1)

Publication Number Publication Date
CN202424918U true CN202424918U (en) 2012-09-05

Family

ID=46749637

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011205550620U Expired - Lifetime CN202424918U (en) 2011-12-27 2011-12-27 Linked device for video monitoring system and smart regulating and controlling operating system

Country Status (1)

Country Link
CN (1) CN202424918U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103369306A (en) * 2013-06-28 2013-10-23 南京南瑞继保电气有限公司 Voice linkage method and system for transformer substation

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103369306A (en) * 2013-06-28 2013-10-23 南京南瑞继保电气有限公司 Voice linkage method and system for transformer substation
CN103369306B (en) * 2013-06-28 2016-05-25 南京南瑞继保电气有限公司 A kind of transformer substation video interlock method and system

Similar Documents

Publication Publication Date Title
CN106953918B (en) Master-slave station programmed control system and method based on universal service protocol
CN102523433A (en) Video monitoring system and data acquisition monitoring system linkage equipment and method thereof
CN107121606B (en) Intelligent terminal for transformer substation operation and patrol
CN103076792B (en) Perception transmission equipment administrating system
CN111597231B (en) Intelligent substation inspection system based on multi-source heterogeneous system data mining
CN104574580A (en) Remote control system for access control system
CN214337647U (en) Online intelligent inspection system of transformer substation
CN102404553A (en) Method for integrating image monitoring with an integration automation background of electric power system
CN110957704B (en) Intelligent inspection method and system for protection action tripping of transformer substation
CN104954235A (en) WeChat platform based interactive intelligent monitoring method for transmission line passage ways
CN201426053Y (en) Intelligent visual remote control operating system for substation equipment
CN101917061A (en) Automatic inspection method and device for substation
CN201163437Y (en) Automatization remote real-time monitoring system for client distribution network
CN105978140B (en) Information fusion method of power equipment
CN202333525U (en) Intelligent robot inspection system with long-distance video instruction function for transformer substation
CN110311469B (en) Distribution automation intelligent feeder terminal
CN112367500A (en) System and method for fusing electric quantity and video information of power distribution room
CN102427522A (en) Equipment and method for linking video monitoring system with intelligent regulation and control operating system
CN202424918U (en) Linked device for video monitoring system and smart regulating and controlling operating system
CN111864894A (en) Remote uninterrupted power transmission calibration method suitable for line protection device
CN103369306B (en) A kind of transformer substation video interlock method and system
CN201846134U (en) Automatic inspecting system for transformer substation
CN103559652A (en) Communication work-ticket management system based on unattended substation and operation method of communication work-ticket management system
CN204515470U (en) The long-range gate control system of sun power
CN102968837A (en) Control method and system for substation access control system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20120905

CX01 Expiry of patent term