CN202416096U - 用于群枕式铺轨机组的轨枕匀设装置 - Google Patents

用于群枕式铺轨机组的轨枕匀设装置 Download PDF

Info

Publication number
CN202416096U
CN202416096U CN 201120532527 CN201120532527U CN202416096U CN 202416096 U CN202416096 U CN 202416096U CN 201120532527 CN201120532527 CN 201120532527 CN 201120532527 U CN201120532527 U CN 201120532527U CN 202416096 U CN202416096 U CN 202416096U
Authority
CN
China
Prior art keywords
sleeper
laying
pillow
railway track
cluster
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201120532527
Other languages
English (en)
Inventor
李世龙
朱焱
董帅
王心利
陈孟强
曾敏
叶玉森
赖云
刘乃生
雷高攀
范平清
陶中兴
何湘健
唐海斌
尤旺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhuzhou Changyuan Zhizhuang Co ltd
China Railway No 2 Engineering Group Co Ltd
Xinyun Emgineering Co Ltd of China Railway No 2 Engineering Group Co Ltd
Original Assignee
Zhuzhou Changyuan Railway Construction Machinery Co Ltd
China Railway Erju Co Ltd
Xinyun Emgineering Co Ltd of China Railway No 2 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhuzhou Changyuan Railway Construction Machinery Co Ltd, China Railway Erju Co Ltd, Xinyun Emgineering Co Ltd of China Railway No 2 Engineering Group Co Ltd filed Critical Zhuzhou Changyuan Railway Construction Machinery Co Ltd
Priority to CN 201120532527 priority Critical patent/CN202416096U/zh
Application granted granted Critical
Publication of CN202416096U publication Critical patent/CN202416096U/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Machines For Laying And Maintaining Railways (AREA)

Abstract

本实用新型公开了一种用于群枕式铺轨机组的轨枕匀设装置,本实用新型的优点是:实现了轨枕自动匀设作业,为群枕式长轨铺轨机组的成功研制奠定了基础,根本上改变了有砟无缝线路的轨枕铺放作业方式,铺轨施工过程中,轨枕以自然状态水平传送,机构工作平稳,避免了卡枕和翻枕现象,消除了轨枕对布枕机构的冲击;采用轨枕匀设装置的群枕式长轨铺轨机组相对于“单枕法”铺轨机组,取消了多级轨枕传送机构,结构上大大简化,各机构相对独立,工作可靠,便于维护,轨枕铺设精度高,对线路适应性强,机械化作业程度高。

Description

用于群枕式铺轨机组的轨枕匀设装置
技术领域
本实用新型涉及有砟无缝铁路轨枕铺设施工领域,具体的讲,涉及一种用于群枕式铺轨机组的轨枕匀设装置。
背景技术
近年来,我国时速200km/h的有砟铁路无缝轨道施工技术飞速发展,“换铺法”和“单枕法”长轨铺轨机组铺设轨枕是有砟铁路无缝轨道的主要施工方法。传统的“换铺法”因工效低工序繁杂渐渐地少被采用,多数工期要求较紧的铺轨施工均采用长轨铺轨机组在施工现场进行轨枕铺设作业,因而,长轨铺轨机组及其应用技术有了长足的发展,从国外引进购买到国内自行设计制造出比较成熟的长轨铺轨机组,期间经历了十余年时间,目前,国内铁路施工单位采用的长轨铺轨机组中有外国引进产品,亦有一部分为国产设备,比较具有代表性的有砟线路长轨铺轨机组有:SUZ-500J、TCM60、SVM-1000、CPG500型等,此类铺轨机组均属“单枕法”作业模式的长轨铺轨设备,进行轨枕铺设作业时通过三级轨枕传送机构将轨枕连续不断地输送到布枕机构,接着由布枕机构将轨枕一根一根地铺放至有砟线路的道床上面,然后由收轨装置将长钢轨收入轨枕承轨槽内形成轨道线路。“单枕法”布枕方式的铺轨机组设计需要重点解决轨枕传送和轨枕布放等技术问题,并不涉及轨枕的匀设作业。铺轨机的结构方面,为了确保轨枕能够顺利传送至布枕机构,轨枕传送机构的结构设计比较复杂,关联部件较多,其造价昂贵,从国外进口铺轨机组的单价在肆仟万元左右,国产的同类型设备价格在贰仟万左右;从实际使用情况来看,“单枕法”长轨铺轨机组作业过程中,轨枕需通过倾斜角度的三级传送链条将轨枕接力传输至布枕机构,常常因为轨枕倾斜出现卡枕和翻枕现象,另一方面,较重的轨枕在就位过程中对布枕机构的冲击较大,致使布枕机构部件易损坏,设备故障率比较高。
群枕式长轨铺轨机组是在单枕法长轨铺轨机组的概念基础上提出的创新型铺轨设备,“群枕式”是相对于“单枕法”而言,“群枕式”的具体含义是轨枕一群一群(或一组一组)而非一根一根地铺设,即将N根轨枕均匀布置,使轨枕间距误差在允许范围,然后一次性铺设至有砟道床上,进行轨枕铺设作业过程中涉及如何使靠拢的轨枕均匀分开并保证轨枕间距符合施工规范的技术问题,因此,群枕式长轨铺轨机组必须解决轨枕均匀布置即轨枕匀设问题,该问题也是群枕式铺轨机组研制工作的瓶颈和难点所在,据悉,此前国内外尚无技术成熟、功能先进的群枕式长轨铺轨机组。
实用新型内容
本实用新型克服了现在技术中的缺点,提供了一种用于群枕式铺轨机组的轨枕匀设装置。
本实用新型的技术方案是:一种用于群枕式铺轨机组的轨枕匀设装置,包括:链条驱动装置、可升降的轨枕支架、走行轨道及可在走行轨道上来回移动的匀枕小车,所述匀枕小车的数量与每组待铺轨枕的根数相等,每辆匀枕小车之间通过相同长度的链条进行连接,且最前端的一辆匀枕小车通过销轴与链条驱动装置的驱动链条进行铰连接。
所述链条驱动装置包括驱动链条、链轮、电动机,电动机与电气控制系统连接。
所述电气控制系统包括设置在走行轨道上的传感器和限位开关。
与现有技术相比,本实用新型的优点是:
1、轨枕匀设装置实现了轨枕自动匀设作业,为群枕式铺轨机组的成功研制奠定了基础,攻克了“群枕法”长轨铺轨机组铺设有砟轨道线路的技术难题。
2、从根本上改变了有砟无缝线路铺轨施工的轨枕铺放作业方式,铺设过程中轨枕不再采用“单枕法”铺轨机组的倾斜传递方式而改为水平传送,机构工作平稳,避免了卡枕和翻枕现象,消除了轨枕对布枕机构的冲击,实践证明:设备故障率也因此大大减少。
3、采用轨枕匀设装置的群枕式长轨铺轨机组相对于“单枕法”铺轨机组,取消了多级轨枕传送机构,结构上大大简化,各机构相对独立,工作可靠,便于维护,轨枕铺设精度高,对线路适应性强,机械化作业程度高。
4、群枕式长轨铺轨机组因主机结构变得相对简单,制造成本大幅降低,市场竞争优势明显,具有良好的经济效益和极其重要的推广意义。
附图说明
本实用新型将通过例子并参照附图的方式说明,其中:
图1是支架临时支撑轨枕示意图;
图2是支架下降后轨枕落放到每辆匀枕小车上面的示意图;
图3是轨枕匀设后匀枕小车与轨枕位置示意图。
具体实施方式
一种用于群枕式铺轨机组的轨枕匀设装置,如图1至图3所示,包括:支架1、匀枕小车2、走行轨道3、链条4及链条驱动装置组成。所述支架1由两根平行且有一定距离的型钢组成,其作用是临时支撑轨枕(支点靠近轨枕两端),支架长度等于N根(即每组轨枕的根数)Ⅱ型或Ⅲ型砼轨枕并排放置时的长度,通过支架1下部设置的液压油缸5的活塞杆左右移动可使轨枕随支架升高或降低,支架升高后,匀枕小车2可进入两根支架临时支撑的轨枕下方空间,匀枕小车2的数量为N辆,支架下降后,每辆匀枕小车驮放一根轨枕,可沿走行轨道3来回行驶,相邻的两匀枕小车间通过链条4“软”连接,既可以成一定间距均匀分开,亦可靠拢在一起,链条驱动装置用于驱动链条,使其带动匀枕小车前进或后退,链条驱动装置仅与最前端的第一辆匀枕小车(即图1至图3中左侧的第一辆)发生联系:匀枕小车通过销轴与驱动链条铰连接,驱动链条移动时,第一辆匀枕小车随之同步移动。
由于轨枕匀设装置适用于群枕式长轨铺轨机组,因此,先对群枕式长轨铺轨机组结构和工作原理作简要介绍。群枕式长轨铺轨机组由长轨拖拉机、轨枕运输列车、轨枕搬运车、主机、辅机、匀枕小车2、电气控制系统、液压系统、操作司机室等组成。轨枕运输列车用于从铺轨基地装载并运输长轨和轨枕至施工现场与辅机连挂,长轨拖拉机由履带式拖拉机改装而成,用于施工现场拖拉长轨至待铺线路两侧,主机上面设有分轨、收轨、就位装置、轨枕布设机和轨枕匀设装置,轨枕搬运车的用途是沿轨枕运输列车两侧的走行轨道行驶将紧密并排的轨枕分组搬运至主机的支架1上面,匀枕小车2沿走行轨道进入轨枕下方驮枕,待匀枕小车2完成轨枕匀设作业后,由轨枕布设机对位吊取间隔均匀的一组轨枕,前行至主机的前端将该组轨枕铺放至道床上面,完成一组轨枕的铺设作业,轨枕搬运车搬运第二组轨枕送至主机的支架1上面临时支撑,轨枕匀设装置、轨枕布设机等进入下一工作循环(即下一组轨枕的铺设)。
本实用新型的工作原理是:为了保证轨枕匀设后相邻轨枕间距精度符合施工技术标准(根据铁路施工规范,要求两根轨枕的间距误差小于等于10mm,连续六根轨枕间距的累计误差小于等于30mm),匀枕机构及电气控制系统设计上采用了以下措施:相邻两匀枕小车通过金属铁链“软”连接,作业前将铁链的工作长度调整至规定值,定位最后一辆匀枕小车,第一辆匀枕小车在链条驱动下前进开始匀枕作业,当第一辆小车前行到预定的位置时,传感器检测其位置信号反馈至电气系统,同时限位开关起作用,在二者的双重作用下断开控制电路使其自动停车,此时N根轨枕的距离总长度控制在线路施工规范要求范围内,相邻匀枕小车间的金属铁链条正好均匀拉紧,保证匀枕小车均匀分布,每辆匀枕小车上面均有一根轨枕,两根轨枕的间距由匀枕小车的间距决定,因此,匀枕小车均匀分布即保证了轨枕间的距离必然均匀分布。

Claims (3)

1.一种用于群枕式铺轨机组的轨枕匀设装置,包括:链条驱动装置、可升降的轨枕支架、走行轨道以及可在走行轨道上来回移动的匀枕小车;所述匀枕小车的数量与每组待铺轨枕的根数相等,其特征在于:每辆匀枕小车之间通过相同长度的链条进行连接,且最前端的一辆匀枕小车通过销轴与链条驱动装置的驱动链条进行铰连接。
2.根据权利要求1所述的用于群枕式铺轨机组的轨枕匀设装置,其特征在于:所述链条驱动装置与电气控制系统连接。
3.根据权利要求2所述的用于群枕式铺轨机组的轨枕匀设装置,其特征在于:所述电气控制系统包括设置在走行轨道上的传感器和限位开关。
CN 201120532527 2011-12-19 2011-12-19 用于群枕式铺轨机组的轨枕匀设装置 Expired - Lifetime CN202416096U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201120532527 CN202416096U (zh) 2011-12-19 2011-12-19 用于群枕式铺轨机组的轨枕匀设装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201120532527 CN202416096U (zh) 2011-12-19 2011-12-19 用于群枕式铺轨机组的轨枕匀设装置

Publications (1)

Publication Number Publication Date
CN202416096U true CN202416096U (zh) 2012-09-05

Family

ID=46740875

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201120532527 Expired - Lifetime CN202416096U (zh) 2011-12-19 2011-12-19 用于群枕式铺轨机组的轨枕匀设装置

Country Status (1)

Country Link
CN (1) CN202416096U (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103161103A (zh) * 2011-12-19 2013-06-19 中铁二局股份有限公司 用于群枕式铺轨机组的轨枕匀设装置及匀设施工方法
CN105143555A (zh) * 2013-04-10 2015-12-09 普拉塞-陶伊尔铁路机械出口股份有限公司 具有免于侧向挣脱的安全绳开关的轨道清扫机器的清理链
JP2019507836A (ja) * 2016-03-07 2019-03-22 プラッサー ウント トイラー エクスポート フォン バーンバウマシーネン ゲゼルシャフト ミット ベシュレンクテル ハフツングPlasser & Theurer, Export von Bahnbaumaschinen, Gesellschaft m.b.H. 軌道を区分ごとに補修するレール締結手段および方法
CN112014848A (zh) * 2020-02-11 2020-12-01 深圳技术大学 一种轨枕定位方法、轨枕定位装置及电子设备

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103161103A (zh) * 2011-12-19 2013-06-19 中铁二局股份有限公司 用于群枕式铺轨机组的轨枕匀设装置及匀设施工方法
CN103161103B (zh) * 2011-12-19 2015-05-13 中铁二局股份有限公司 用于群枕式铺轨机组的轨枕匀设装置及匀设施工方法
CN105143555A (zh) * 2013-04-10 2015-12-09 普拉塞-陶伊尔铁路机械出口股份有限公司 具有免于侧向挣脱的安全绳开关的轨道清扫机器的清理链
CN105143555B (zh) * 2013-04-10 2017-07-18 普拉塞-陶伊尔铁路机械出口股份有限公司 具有免于侧向挣脱的安全绳开关的轨道清扫机器的清理链
JP2019507836A (ja) * 2016-03-07 2019-03-22 プラッサー ウント トイラー エクスポート フォン バーンバウマシーネン ゲゼルシャフト ミット ベシュレンクテル ハフツングPlasser & Theurer, Export von Bahnbaumaschinen, Gesellschaft m.b.H. 軌道を区分ごとに補修するレール締結手段および方法
CN112014848A (zh) * 2020-02-11 2020-12-01 深圳技术大学 一种轨枕定位方法、轨枕定位装置及电子设备
CN112014848B (zh) * 2020-02-11 2023-06-23 深圳技术大学 一种轨枕定位方法、轨枕定位装置及电子设备

Similar Documents

Publication Publication Date Title
CN202416096U (zh) 用于群枕式铺轨机组的轨枕匀设装置
CN103161103B (zh) 用于群枕式铺轨机组的轨枕匀设装置及匀设施工方法
CN102285616B (zh) 步履式盾构机侧移系统及侧移方法
CN107653755A (zh) 地铁区间分离式隧道内整体道床浇筑逆作式施工方法
CN104775834A (zh) 同时适应整环管片输送及小曲线掘进功能的管片输送小车
CN201598007U (zh) 一种垂直钢卷步进式运输装置
CN106882572A (zh) 灭火器瓶体平转立调整输送装置
CN211174116U (zh) 一种盾构隧道管线移动装置
CN210510510U (zh) 一种管廊热力管线轴线微调对口装置
CN202296310U (zh) 钢卷翻转机
CN202063155U (zh) 矿井空车平移换道装置
CN210943420U (zh) 车架输送装置
CN206634682U (zh) 灭火器瓶体平转立调整输送装置
CN203212958U (zh) 一种侧翻式单枕抽换装置
CN108529197A (zh) 一种建筑梁柱智能化制造设备的搬运装置
CN107973131A (zh) 一种隧道砖生产用自动收集装置
CN104929000A (zh) 一种节段式铁路铺轨机组及其组装方法
CN202125299U (zh) 步履式盾构平移过站系统
CN108004930A (zh) 纵移系杆拱桥的施工方法
CN206957228U (zh) 一种用于板梁侧面的快速凿毛机
CN204097810U (zh) 一种快速换轨作业车
CN103510436B (zh) 底座板模板快速转运装置及其快速转运工艺
CN204957763U (zh) 一种生产线自动接板转换系统
CN107585521A (zh) 一种全自动升降电动台车
CN206156620U (zh) 盾构隧道施工用临时轨道拆除用的可移动式轨道吊装小车

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160105

Address after: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16

Patentee after: CHINA RAILWAY NO.2 BUREAU ENGINEERING Co.,Ltd.

Patentee after: ZHUZHOU CHANGYUAN RAILWAY CONSTRUCTION MACHINERY Co.,Ltd.

Address before: 610041, No. nine, No. 156, building B, Gao Xing Road, Chengdu hi tech Development Zone, Chengdu, Sichuan

Patentee before: CHINA RAILWAY ERJU Co.,Ltd.

Patentee before: CHINA RAILWAY ERJU CORPORATION CHING ENGINEERING Co.,Ltd.

Patentee before: ZHUZHOU CHANGYUAN RAILWAY CONSTRUCTION MACHINERY Co.,Ltd.

CP01 Change in the name or title of a patent holder

Address after: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16

Co-patentee after: Zhuzhou Changyuan Zhizhuang Co.,Ltd.

Patentee after: CHINA RAILWAY NO.2 BUREAU ENGINEERING Co.,Ltd.

Address before: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16

Co-patentee before: ZHUZHOU CHANGYUAN RAILWAY CONSTRUCTION MACHINERY Co.,Ltd.

Patentee before: CHINA RAILWAY NO.2 BUREAU ENGINEERING Co.,Ltd.

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan

Co-patentee after: Zhuzhou Changyuan Zhizhuang Co.,Ltd.

Patentee after: CHINA RAILWAY NO.2 ENGINEERING GROUP Co.,Ltd.

Address before: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan

Co-patentee before: Zhuzhou Changyuan Zhizhuang Co.,Ltd.

Patentee before: CHINA RAILWAY NO.2 BUREAU ENGINEERING Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190226

Address after: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan

Co-patentee after: CHINA RAILWAY ERJU CORPORATION CHING ENGINEERING Co.,Ltd.

Patentee after: CHINA RAILWAY NO.2 ENGINEERING GROUP Co.,Ltd.

Co-patentee after: Zhuzhou Changyuan Zhizhuang Co.,Ltd.

Address before: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan

Co-patentee before: Zhuzhou Changyuan Zhizhuang Co.,Ltd.

Patentee before: CHINA RAILWAY NO.2 ENGINEERING GROUP Co.,Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20120905