CN202349976U - Waste heat boiler for zinc concentrate acid-making - Google Patents

Waste heat boiler for zinc concentrate acid-making Download PDF

Info

Publication number
CN202349976U
CN202349976U CN2011204355442U CN201120435544U CN202349976U CN 202349976 U CN202349976 U CN 202349976U CN 2011204355442 U CN2011204355442 U CN 2011204355442U CN 201120435544 U CN201120435544 U CN 201120435544U CN 202349976 U CN202349976 U CN 202349976U
Authority
CN
China
Prior art keywords
waste heat
heat boiler
heated surface
boiler
tube bank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011204355442U
Other languages
Chinese (zh)
Inventor
王渭清
许胜利
顾春华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHINA ENERGY RECOVERY (YANGZHOU) INC.
Original Assignee
ZHONGJIANG ENERGY RECOVERY (YANGZHOU) CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHONGJIANG ENERGY RECOVERY (YANGZHOU) CO Ltd filed Critical ZHONGJIANG ENERGY RECOVERY (YANGZHOU) CO Ltd
Priority to CN2011204355442U priority Critical patent/CN202349976U/en
Application granted granted Critical
Publication of CN202349976U publication Critical patent/CN202349976U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a waste heat boiler for zinc concentrate acid-making and relates to a forced-circulation and sub-medium-pressure waste heat boiler with a membrane water-cooling wall structure, and the waste heat boiler is provided with sub-medium-pressure superheated steam parameters and a full-membrane water-cooling wall structure. A steam manifold is formed by carrying out roll-welding on steel plates; the heads at the two ends of the steam manifold are provided with manhole devices; the boiler is of a horizontal passage type structure; a heated surface is of a serpentine tube bundle structure which is assembled through a top cover and is vertically hung in a flue; flue gas transversely scours a heated surface tube bundle; the heated surface tube bundle is provided with an ash-removing rapping device; boiler water is forcibly circulated by using a hot water circulating pump; and a boil wall is replaced by a membrane water-cooling wall. The waste heat boiler for the zinc concentrate acid-making has the advantages that the waste heat boiler is of a horizontal passage type; the heated surface is of the serpentine tube bundle structure, the flue gas transversely scours the heated surface tube bundle, the waste heat boiler is provided with the membrane water-cooling wall structure, so that the sealability is good, and the heat-transferring effect is good; the heated surface tube bundle is provided with the special rapping device, so that the ash cleaning is easy, the ash deposition is difficult, and the probability of bridging arising from deposition does not exist; the boiler water is forcibly circulated by using the hot water circulating pump, so that the circulating effect of the boiler water is stable, and the booster of the boiler is prevented; and the structural layout of the heated surface tube bundle of the boiler is compact, and the overall weight of the waste heat boiler is light.

Description

Zinc concentrate relieving haperacidity waste heat boiler
Technical field
The utility model relates to zinc concentrate relieving haperacidity waste heat boiler; Press superheated steam parameter, forced circulation, film water cold wall structure waste heat boiler in particularly a kind of time; Be installed in raw material ore deposit (zinc concentrate, troilite etc.) roaster outlet; The heat of high-temperature flue gas is produced time middle device of pressing superheated steam (2.5Pa, 400 ℃) steam supply wheel unit generation through this patent equipment.
Background technology
Waste heat boiler in the raw material ore deposit roaster outlet configuration of nonferrous metallurgy system all is to produce saturated vapor, is main with steam supply all generally, because the type selecting of saturated vapor generating set difficulty, the generating efficiency is low.The scope and the development prospect of nonferrous metallurgy system raw material ore deposit roaster outlet high-temperature flue gas UTILIZATION OF VESIDUAL HEAT IN have been limited.And waste heat boiler produces superheated steam, and can make full use of the energy carries out cogeneration or steam supply, has enlarged the purposes scope of UTILIZATION OF VESIDUAL HEAT IN.
The utility model content
The utility model technical problem to be solved is to provide a kind of zinc concentrate relieving haperacidity waste heat boiler, and boiler is the horizontal channel formula, and heating surface is that snakelike Pipe bundle structure vertically is suspended in the flue flue gas transversal flow heating surface pipe through the assembling of top cover case; Heated surface bundle has special rapping apparatus, and stove water is made forced circulation with hot water circulating pump; Waste heat boiler heating surface is that snakelike Pipe bundle structure is assembled into integral body through the top cover case, and boiler does not have wall pipe, good airproof performance; Fin panel casing replaces furnace wall, and heat-insulating property is high; The heated surface bundle compact conformation, the waste heat boiler overall weight is light.
In order to solve the problems of the technologies described above; The utility model provides a kind of zinc concentrate relieving haperacidity waste heat boiler, is a kind of forced circulation film water cold wall structure time middle waste heat boiler of pressing, and comprises drum, heated surface bundle, film water cold wall structure, connection tube bank, ash disposal vibrator five parts; Wherein, Waste heat boiler is time middle full film water cold wall structure of superheated steam parameter of pressing, and drum is formed by the roll of steel plate weldering, and the manhole device is all arranged on the end socket at two ends; Boiler is a horizontal channel formula structure; Heating surface is that snakelike Pipe bundle structure vertically is suspended in the flue through the assembling of top cover case, the horizontal punching out heated surface bundle of flue gas, and heated surface bundle is equipped with the ash disposal rapping apparatus; Stove water is used the hot water circulating pump forced circulation, and furnace wall is replaced by fin panel casing.Said connection tube bank is the connection pipeline between boiler-steam dome, hot water circulating pump, the heated surface bundle.
Described heated surface bundle is followed successively by front-packed evaporator, superheater, evaporimeter from front to back, vertically is suspended in the flue; The structure of superheater, evaporimeter is assembled into integral body respectively by collection case, top cover case, furred ceiling pipe, snakelike tube bank, rapping pipe; Be welded through connecting tube bank, wherein, the collection case is installed in the top cover upper box part again; The snakelike tube bank and the furred ceiling pipe of drawing from the collection case are suspended under the top cover case, seal with sleeve pipe when passing the top cover case; Snakelike tube bank bottom is connected with the rapping pipe.
Described top cover case is a cuboid steel plate hermetically-sealed construction, middle filling refractory material and insulation material.
Said film water cold wall structure is to be formed by pipe and fin welded seal, and stove water circulation cooling is arranged in the pipe, absorbs the flue gas heat release simultaneously.The parcel boiler heating surface plays the effect of sealing body of heater and insulation.
Pressing the superheated steam parameter in described time is 2.5Mpa, 400 ℃.
Said connection tube bank is the connection pipeline between boiler-steam dome, hot water circulating pump, the heated surface bundle.Boiler feedwater directly gets into drum through connecting tube bank, and the stove water in the drum gets into hot water circulating pump through connecting tube bank, and stove water is depressed through connecting tube bank in adding of hot water circulating pump and got into front-packed evaporator, evaporimeter successively; Stove water through after the evaporimeter heating becomes steam water interface, goes out evaporimeter and turns back to drum; Steam water interface is done carbonated drink separation in drum, the stove water after the separation circulates through connecting tube bank entering hot water circulating pump once more.Isolated steam gets into superheater in drum; Steam after heating is seen off through pipeline, goes Turbo-generator Set generating or hot user to use.
The beneficial effect of the utility model is:
1, selected middle superheated steam parameter (2.5MPa that presses; 400 ℃); Be specially adapted to zinc concentrate relieving haperacidity waste heat boiler, also can be used for the pyrite-based sulfuric acid production waste heat boiler, and other nonferrous metallurgy system waste heat boiler; Superheated steam be used for generating or heat supply can, enlarged the purposes scope of UTILIZATION OF VESIDUAL HEAT IN; Time middle pressure steam parameter has been avoided the temperature range of ash-laden gas bonding high temperature tube wall simultaneously;
2, waste heat boiler is horizontal channel, film water cold wall structure, effectively prevents to be bonded on the brick wall when zinc concentrate ash from meeting the high temperature furnace wall;
3, to be snakelike Pipe bundle structure vertically be suspended in the flue through the assembling of top cover case heating surface, flue gas transversal flow heating surface pipe, and good seal performance, heat-transfer effect are good;
4, heated surface bundle has special rapping apparatus, and deashing is easy, is difficult for dust stratification, the possibility that does not exist accumulation to put up a bridge;
5, stove water is made forced circulation with hot water circulating pump, and stove water circulating effect is stable, prevents the boiler booster, and the boiler heating surface Pipe bundle structure is arranged compact, saves steel and occupation of land.
Description of drawings
Fig. 1 is the structural representation of the utility model waste heat boiler;
Fig. 2 is the vertical view of the utility model;
Fig. 3 is the right view of the utility model;
Fig. 4 is the heated surface bundle structural representation of the utility model;
Fig. 5 is the side view of Fig. 4.
Label declaration in the accompanying drawing:
1-drum;
2-front-packed evaporator; 3-superheater;
4-evaporimeter; 5-membrane wall;
6-connect and restrain; 7-hot water circulating pump;
8-ash disposal rapping apparatus; 9-rapping pipe;
10-collection case; 11-top cover case;
12-furred ceiling pipe; 13-snakelike tube bank bundle.
The specific embodiment
See also shown in the accompanying drawing, the utility model is done further to describe.
Like Fig. 1, Fig. 2 and shown in Figure 3; The utility model provides a kind of zinc concentrate relieving haperacidity waste heat boiler, is a kind of forced circulation film water cold wall structure time middle waste heat boiler of pressing, and comprises drum 1, heated surface bundle, film water cold wall structure, connection tube bank 6, ash disposal vibrator 8 five parts; Wherein, Waste heat boiler is time middle full film water cold wall structure of superheated steam parameter of pressing, and drum 1 is formed by the roll of steel plate weldering, and the manhole device is all arranged on the end socket at two ends; Two water level meters on the spot are housed on the boiler, also leave two pairs of water level balance container joints in addition, supply warning, the indication of control room water level and steam water-level to regulate control use automatically.Drum 1 is provided with relief valve connection, guarantees the unlikely superpressure of drum pressure.For preventing that foreign material from getting into hot water circulating pump, is equipped with filter at the decline mouth of pipe.On steelframe, an end is a hold-down support to drum 1 through two bearing supports, and the other end is a movable bearing support, and drum is free wxpansion vertically.
Boiler is a horizontal channel formula structure; Heating surface is that snakelike Pipe bundle structure vertically is suspended in the flue through 11 assemblings of top cover case, the horizontal punching out heated surface bundle of flue gas, and heated surface bundle is equipped with ash disposal rapping apparatus 8; Stove water is used the hot water circulating pump forced circulation, and furnace wall is replaced by fin panel casing.
Like Fig. 4 and shown in Figure 5; Described heated surface bundle is a superheater bank, is followed successively by front-packed evaporator 2, superheater 3, evaporimeter 4 from front to back, vertically is suspended in the flue; The structure of superheater 3, evaporimeter 4 is assembled into integral body respectively by collection case 10, top cover case 11, furred ceiling pipe 12, snakelike tube bank bundle 13, rapping pipe 9; Be welded through connecting tube bank 6, wherein, collection case 10 is installed in top cover case 11 tops again; The snakelike tube bank bundle 13 of drawing from collection case 10 is suspended in the top cover case 11 times with furred ceiling pipe 12, seals with sleeve pipe when passing top cover case 11; Snakelike tube bank is restrainted 13 bottoms and is connected with rapping pipe 9.Only need put during installation in the square hole that is placed on furnace roof, all around with furnace roof steel construction sealing welding.
Described top cover case 11 is a cuboid steel plate hermetically-sealed construction, middle filling refractory material and insulation material.
Snakelike tube bank 13 is all participated in the circulation of stove water with furred ceiling pipe 12; Connection between furred ceiling pipe 12 and the snakelike tube bank 13 is as hinge; Snakelike tube bank 13 is freely swung in certain scope; The rapping pipe 9 that under the effect of ash disposal rapping apparatus 8, can be fixed in the tube bank obtains bump, reaches the dedusting purpose.When being heated, snakelike tube bank 13 can also freely expand downwards
Described membrane wall 5 is formed horizontal flue, and heated surface bundle is suspended in the flue.Said film water cold wall structure is to be formed by pipe and fin welded seal, and stove water circulation cooling is arranged in the pipe, absorbs the flue gas heat release simultaneously.The parcel boiler heating surface plays the effect of sealing body of heater and insulation.Fin panel casing also is the long-pending part of waste heat boiler heating surface.
Pressing the superheated steam parameter in described time is 2.5Mpa, 400 ℃.
Described connection tube bank 6 is the connection pipeline between boiler-steam dome 1, hot water circulating pump 7, the heated surface bundle.Boiler feedwater directly gets into drum 1 through connecting tube bank 6, and the stove water in the drum 1 gets into hot water circulating pump 7 through connecting tube bank 6, and stove water is depressed through connecting tube bank 6 in adding of hot water circulating pump 7 and got into front-packed evaporator 2, evaporimeter 4 successively; Stove water through after the evaporimeter heating becomes steam water interface, goes out evaporimeter and turns back to drum 1; Steam water interface is done carbonated drink separation in drum 1, the stove water after the separation circulates through connecting tube bank 6 entering hot water circulating pumps 7 once more.Isolated steam gets into superheater 2 in drum 1; Steam after heating is seen off through pipeline, goes Turbo-generator Set generating or hot user to use.
Described ash disposal rapping apparatus 8, heated surface bundle adopt efficient elasticity rapping mode, and the tube bank of every group of heating surface all has special rapping apparatus, and the rapping pipe is the heat-resistance stainless steel pipe.Rapping is to hit the pipe row who shakes and can freely swing through motor drives spring hammering device, removes the dust stratification on the tube wall, and dust stratification falls into ash bucket and discharges body of heater.

Claims (5)

1. zinc concentrate relieving haperacidity waste heat boiler; It is characterized in that: comprise drum, heated surface bundle, film water cold wall structure, connection tube bank, ash disposal vibrator five parts; Wherein, waste heat boiler is time middle full film water cold wall structure of superheated steam parameter of pressing, and heating surface is that snakelike tube bank bundle structure vertically is suspended in the flue through the assembling of top cover case; The horizontal punching out heated surface bundle of flue gas; Heated surface bundle is equipped with the ash disposal rapping apparatus, and stove water is used the hot water circulating pump forced circulation, connects tube bank and is the connection pipeline between boiler-steam dome, hot water circulating pump, the heated surface bundle.
2. zinc concentrate relieving haperacidity waste heat boiler according to claim 1; It is characterized in that: described heated surface bundle, be followed successively by front-packed evaporator, superheater, evaporimeter from front to back, vertically be suspended in the flue; The structure of superheater, evaporimeter is assembled into integral body respectively by collection case, top cover case, furred ceiling pipe, snakelike tube bank, rapping pipe; Be welded through connecting tube bank, wherein, the collection case is installed in the top cover upper box part again; The snakelike tube bank and the furred ceiling pipe of drawing from the collection case are suspended under the top cover case, seal with sleeve pipe when passing the top cover case; Snakelike tube bank bottom is connected with the rapping pipe.
3. zinc concentrate relieving haperacidity waste heat boiler according to claim 1 and 2 is characterized in that: described top cover case is a cuboid steel plate hermetically-sealed construction, middle filling refractory material and insulation material.
4. zinc concentrate relieving haperacidity waste heat boiler according to claim 1 is characterized in that: said film water cold wall structure is to be formed by pipe and fin welded seal, and stove water circulation cooling is arranged in the pipe, absorbs the flue gas heat release simultaneously.
5. zinc concentrate relieving haperacidity waste heat boiler according to claim 1 is characterized in that: pressing the superheated steam parameter in described time is 2.5Mpa, 400 ℃.
CN2011204355442U 2011-11-07 2011-11-07 Waste heat boiler for zinc concentrate acid-making Expired - Fee Related CN202349976U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011204355442U CN202349976U (en) 2011-11-07 2011-11-07 Waste heat boiler for zinc concentrate acid-making

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011204355442U CN202349976U (en) 2011-11-07 2011-11-07 Waste heat boiler for zinc concentrate acid-making

Publications (1)

Publication Number Publication Date
CN202349976U true CN202349976U (en) 2012-07-25

Family

ID=46538978

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011204355442U Expired - Fee Related CN202349976U (en) 2011-11-07 2011-11-07 Waste heat boiler for zinc concentrate acid-making

Country Status (1)

Country Link
CN (1) CN202349976U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102913899A (en) * 2012-09-13 2013-02-06 浙江金锅锅炉有限公司 Three-in-one furnace of circulating fluidized bed steam, organic heat carrier and hot air
CN105465764A (en) * 2015-03-12 2016-04-06 无锡华光锅炉股份有限公司 Overheater coiled pipe series hanger rod device
CN106195967A (en) * 2016-07-29 2016-12-07 太仓英达锅炉设备有限公司 A kind of Modularized waste heat boiler
CN107917411A (en) * 2017-11-28 2018-04-17 湖南长宏南雁锅炉修理安装有限公司 Collect the waste heat boiler of three waste heats

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102913899A (en) * 2012-09-13 2013-02-06 浙江金锅锅炉有限公司 Three-in-one furnace of circulating fluidized bed steam, organic heat carrier and hot air
CN102913899B (en) * 2012-09-13 2015-12-02 浙江金锅锅炉有限公司 Recirculating fluidized bed steam, organic heat carrier, hot-air Three-in-one
CN105465764A (en) * 2015-03-12 2016-04-06 无锡华光锅炉股份有限公司 Overheater coiled pipe series hanger rod device
CN105465764B (en) * 2015-03-12 2017-11-17 无锡华光锅炉股份有限公司 A kind of superheater coil tubes system derrick rig
CN106195967A (en) * 2016-07-29 2016-12-07 太仓英达锅炉设备有限公司 A kind of Modularized waste heat boiler
CN107917411A (en) * 2017-11-28 2018-04-17 湖南长宏南雁锅炉修理安装有限公司 Collect the waste heat boiler of three waste heats

Similar Documents

Publication Publication Date Title
CN202349976U (en) Waste heat boiler for zinc concentrate acid-making
CN201382702Y (en) Power generation boiler for low-temperature flue gas waste heat in avasite heat furnace
CN113405079A (en) Heat storage type waste heat recovery device
CN104728899B (en) Hot blast and electric additional hot mixing formula heat exchanger
CN201386997Y (en) Forced circulation type waste heat boiler of cement kiln
CN100520268C (en) Fume-fume hot pipe heater exchanger for fume desulphurization in heat-engine plant
CN108286700A (en) New heat pipe steam boiler
CN104406144A (en) Double-medium waste heat boiler
CN201637298U (en) Smoke gas condensed-type combined energy saver
CN204372879U (en) A kind of two medium waste heat boiler
CN103471071B (en) The heat supply method of the supercharging waste heat boiler that water pipe, fire tube combine
CN203454081U (en) Vertical type carbon waste heat boiler
CN202349996U (en) Boiler waste heat recycling device
CN214038332U (en) Power generation system is collected in melting reduction waste heat circulation
CN210511631U (en) Modular water condensing heater
CN204372901U (en) The flue gas waste heat recovery apparatus of dual-use
CN201697095U (en) Steam generator
CN202048555U (en) Sensible heat afterheat recycling device with special heating surface structure
CN201104012Y (en) Domestic vertical heating boiler
CN201242166Y (en) Thermal brake hydrologic cycle hollow stove bridge
CN100573013C (en) The high temperature steam condenser that is used for garbage power plant
CN203928799U (en) Dedusting Natural Circulation augmentation of heat transfer flue gas waste heat recovery apparatus
CN102589121B (en) Box type steam heat cycle base station
CN204153762U (en) Deaerator exhaust waste-heat recovery device
CN204678300U (en) A kind of steam generator

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CER ENERGY RECOVERY YANGZHOU CO., LTD.

Free format text: FORMER NAME: CER ENERGY RECOVERY (YANGZHOU) CO., LTD.

CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 211400 No. 100, Zhongjiang Road, Yizheng Automotive Industry Park, Yangzhou, Jiangsu

Patentee after: CHINA ENERGY RECOVERY (YANGZHOU) INC.

Address before: 211400 No. 100, Zhongjiang Road, Yangzhou Automotive Industry Park, Jiangsu

Patentee before: Zhongjiang energy recovery (Yangzhou) Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120725

Termination date: 20161107