CN104728899B - Hot blast and electric additional hot mixing formula heat exchanger - Google Patents
Hot blast and electric additional hot mixing formula heat exchanger Download PDFInfo
- Publication number
- CN104728899B CN104728899B CN201510108057.8A CN201510108057A CN104728899B CN 104728899 B CN104728899 B CN 104728899B CN 201510108057 A CN201510108057 A CN 201510108057A CN 104728899 B CN104728899 B CN 104728899B
- Authority
- CN
- China
- Prior art keywords
- heat exchange
- exchange body
- heating
- air
- electric
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Heat-Pump Type And Storage Water Heaters (AREA)
- Cleaning Of Streets, Tracks, Or Beaches (AREA)
Abstract
本发明属于供热系统的技术领域,尤其涉及一种热风与电辅加热混合式换热器,具体是由热风与电辅助加热方式组合在一起的流体换热器,是在金属壳体内焊接和组装由热风道、水管路及电加热管等元器件组成的一种换热器。包括高温热风道、风管束组、水内胆与电辅助加热管组。本发明采用由热风与电辅助加热方式组合在一起的流体换热器,可以实现蓄热锅炉当余热量不足时,利用电力进行辅助快速加热的直热方式配合供热,且在连续供热要求的环境下,利用谷时段蓄热炉蓄热的同时,用辅助直热电加热供暖。这种混合式制热方法,有效地解决了电蓄热式锅炉的硬伤缺陷。配套生产这种换热器为电蓄热式锅炉大量推广应用创造有利条件。市场远景良好,经济效益可观。
The invention belongs to the technical field of heating systems, and in particular relates to a hot air and electric auxiliary heating hybrid heat exchanger, specifically a fluid heat exchanger combined with hot air and electric auxiliary heating, which is welded and welded in a metal shell. Assemble a heat exchanger composed of components such as hot air ducts, water pipes, and electric heating pipes. Including high-temperature hot air duct, air duct bundle, water liner and electric auxiliary heating tube group. The present invention adopts a fluid heat exchanger combined with hot air and electric auxiliary heating, which can realize the direct heating method of assisting rapid heating with electric power when the waste heat of the regenerative boiler is insufficient. In an environment where the heat is stored in the regenerative furnace during the off-peak period, the auxiliary direct thermal electric heating is used for heating. This hybrid heating method effectively solves the defects of electric heat storage boilers. The supporting production of this kind of heat exchanger creates favorable conditions for the large-scale popularization and application of electric heat storage boilers. The market prospect is good and the economic benefits are considerable.
Description
技术领域technical field
本发明属于供热系统的技术领域,尤其涉及一种热风与电辅加热混合式换热器,具体是由热风与电辅助加热方式组合在一起的流体换热器,是在金属壳体内焊接和组装由热风道、水管路及电加热管等元器件组成的一种换热器。The invention belongs to the technical field of heating systems, and in particular relates to a hot air and electric auxiliary heating hybrid heat exchanger, specifically a fluid heat exchanger combined with hot air and electric auxiliary heating, which is welded and welded in a metal shell. Assemble a heat exchanger composed of components such as hot air ducts, water pipes, and electric heating pipes.
背景技术Background technique
目前在国内城乡、工厂及企事业单位使用的锅炉房或换热站,基本都是采用燃煤制热蒸汽和水暖锅炉、燃油制热蒸汽和水暖锅炉、电直热水暖锅炉、电蓄热蒸汽和水暖锅炉等几种方式。燃煤、燃油制热污染环境且资源日渐枯竭,中小型锅炉被逐渐取缔。直热式电锅炉耗电量大,制热成本高,一般单位使用不起。At present, the boiler rooms or heat exchange stations used in urban and rural areas, factories, enterprises and institutions in China basically use coal-fired heating steam and water heating boilers, oil heating steam and water heating boilers, electric direct water heating boilers, electric heat storage Several ways such as steam and water heating boilers. Coal-burning and oil-fired heating pollute the environment and resources are increasingly exhausted, and small and medium-sized boilers are gradually banned. The direct heating electric boiler consumes a lot of electricity and has high heating costs, so it cannot be used by ordinary units.
现代新兴的电蓄热式锅炉采用谷时段低价电蓄热,峰或平时段(高价或平价电)放热生产热水、热风、热油或蒸汽。但谷电时间有限,一般在7个小时,所蓄之热能量随放热时间延长(24小时)逐渐减弱,满足不了供热需求,供暖系统温度难以达标,所以推广迟缓,效果不好。Modern emerging electric heat storage boilers use low-priced electricity to store heat during valley hours, and release heat to produce hot water, hot air, hot oil or steam during peak or normal hours (high-priced or cheap electricity). However, the off-peak power time is limited, generally 7 hours, and the stored thermal energy gradually weakens with the extension of the heat release time (24 hours), which cannot meet the heating demand, and the temperature of the heating system is difficult to meet the standard, so the promotion is slow and the effect is not good.
发明内容Contents of the invention
为了解决上述现有技术存在的技术问题,本发明提供一种热风与电辅加热混合式换热器。目的是为了提供一种混合式制热方法,有效地解决电蓄热式锅炉的无法保证连续供热的硬伤缺陷问题。In order to solve the above-mentioned technical problems in the prior art, the present invention provides a hybrid heat exchanger of hot air and electric auxiliary heating. The purpose of the invention is to provide a hybrid heating method, which can effectively solve the flaw problem that the electric heat storage boiler cannot guarantee continuous heating.
本发明实现发明的技术方案如下:The present invention realizes the technical scheme of invention as follows:
热风与电辅加热混合式换热器,包括高温热风道、风管束组、水内胆与电辅助加热管组;在换热体的上部设有进风道箱,换热体的下部设有出风道箱,换热体部连接的伸缩节将换热体分为上下两部分;所述的进风道箱上连接有进风道口和进风道温度传感器;所述的换热体的内部包括:水内胆、风管路束及辅助加热丝组;换热体的一侧连接辅助加热丝组,辅助加热丝组横向穿入在换热体的水内胆中;换热体内连接有风管路束;换热体的上部连接有安全阀和出水管,出水管上连接有出水管温度传感器;换热体下部连接有回水管和排污阀;其中回水管上连接有回水管温度传感器,回水管和回水管温度传感器之间连接回水管流量计。Hot air and electric auxiliary heating hybrid heat exchanger, including high-temperature hot air passage, air pipe bundle group, water liner and electric auxiliary heating pipe group; the upper part of the heat exchange body is equipped with an air inlet box, and the lower part of the heat exchange body is equipped with The expansion joint connected to the air outlet box and the heat exchange body divides the heat exchange body into upper and lower parts; the air inlet box is connected with an air inlet port and an air inlet temperature sensor; the heat exchange body The interior includes: water liner, air duct bundle and auxiliary heating wire group; one side of the heat exchange body is connected to the auxiliary heating wire group, and the auxiliary heating wire group penetrates horizontally into the water liner of the heat exchange body; the heat exchange body is connected There is an air pipe bundle; the upper part of the heat exchange body is connected with a safety valve and an outlet pipe, and the outlet pipe is connected with a temperature sensor of the outlet pipe; the lower part of the heat exchange body is connected with a return pipe and a drain valve; the return pipe is connected with a return pipe temperature sensor. The sensor is connected to the return pipe flow meter between the return pipe and the return pipe temperature sensor.
所述的换热体内侧的上下两端分别设有管焊接板,管焊接板上设有多个孔,两块管焊接板上的孔与风管路束中的金属管两端相密闭连接;风管路束的金属管外侧与两块管焊接板及换热体壳内壁组成密闭水内胆。The upper and lower ends of the inner side of the heat exchange body are respectively provided with tube welding plates, and the tube welding plates are provided with a plurality of holes, and the holes on the two tube welding plates are airtightly connected with the two ends of the metal tubes in the air duct bundle The outer side of the metal tube of the air duct bundle, the two tube welding plates and the inner wall of the heat exchange body shell form a sealed water liner.
所述的水内胆中间穿入辅助加热丝组,辅助加热丝组的接线柱与换热体密闭连接。The middle of the water liner penetrates the auxiliary heating wire group, and the terminal of the auxiliary heating wire group is airtightly connected with the heat exchange body.
所述的换热体和出风道箱通过出风道箱与换热体法兰相连接;出风道箱的底部连接有出风道口,出风道口连接变频风机D;出风道口上还连接有出风道温度传感器。The heat exchange body and the air outlet box are connected to the flange of the heat exchange body through the air outlet box; the bottom of the air outlet box is connected to an air outlet, and the air outlet is connected to the frequency conversion fan D; Connected to the air outlet temperature sensor.
所述的辅助加热丝组设有8组。There are 8 groups of auxiliary heating wire groups.
本发明的优点效果是:Advantageous effect of the present invention is:
采用由热风与电辅助加热方式组合在一起的流体换热器,可以实现蓄热锅炉当余热量不足时,利用电力进行辅助快速加热的直热方式配合供热,且在连续供热要求的环境下,利用谷时段蓄热炉蓄热的同时,用辅助直热电加热供暖。这种混合式制热方法,有效地解决了电蓄热式锅炉的硬伤缺陷。配套生产这种换热器为电蓄热式锅炉大量推广应用创造有利条件。市场远景良好,经济效益可观。是将来电力供热工程必选方案之一。Using a fluid heat exchanger combined with hot air and electric auxiliary heating can realize the direct heating method of using electric power to assist rapid heating when the waste heat of the regenerative boiler is insufficient, and it can be used in an environment that requires continuous heating. Next, while using the regenerative furnace to store heat during the valley period, the auxiliary direct heating electric heating is used for heating. This hybrid heating method effectively solves the defects of electric heat storage boilers. The supporting production of this kind of heat exchanger creates favorable conditions for the large-scale popularization and application of electric heat storage boilers. The market prospect is good and the economic benefits are considerable. It is one of the must-choice schemes for power heating projects in the future.
附图说明Description of drawings
图1是本发明的原理图;Fig. 1 is a schematic diagram of the present invention;
图2是本发明的立体图;Fig. 2 is a perspective view of the present invention;
图3是本发明的结构示意图;Fig. 3 is a structural representation of the present invention;
图4是图3的俯视图;Fig. 4 is the top view of Fig. 3;
图5是图4的剖面示意图;Fig. 5 is a schematic cross-sectional view of Fig. 4;
图6是图3的剖面图;Fig. 6 is the sectional view of Fig. 3;
图7是本发明中辅助电力加热丝结构示意图;Fig. 7 is a schematic diagram of the structure of the auxiliary electric heating wire in the present invention;
图8是图7的左视图;Fig. 8 is the left view of Fig. 7;
图9是图8的剖面图;Fig. 9 is a sectional view of Fig. 8;
图10是图7的右视图;Fig. 10 is the right view of Fig. 7;
图11是图4的剖面图。FIG. 11 is a sectional view of FIG. 4 .
图中:进风道箱1,进风道口2、进风道温度传感器3,法兰4,换热体5,伸缩节6,出风道箱7,出风道箱与换热体法兰8,出风道口9,辅助加热丝组10,出水管11,出水管温度传感器12,回水管流量计13,回水管温度传感器14,出风道温度传感器15,回水管16,安全阀17,排污阀18,风管路束19,水内胆20,管焊接板21;蓄热锅炉蓄热体A,换热器B,变频风机D,上风道热风F1,下风道热风F2,上供暖热水系统循环水S1,下供暖热水系统循环水S2。In the figure: air inlet box 1, air inlet port 2, air inlet temperature sensor 3, flange 4, heat exchange body 5, expansion joint 6, air outlet box 7, air outlet box and heat exchange body flange 8. Air outlet port 9, auxiliary heating wire group 10, outlet pipe 11, outlet pipe temperature sensor 12, return pipe flowmeter 13, return pipe temperature sensor 14, air outlet temperature sensor 15, return pipe 16, safety valve 17, Sewage valve 18, air pipe bundle 19, water liner 20, pipe welding plate 21; regenerative boiler regenerator A, heat exchanger B, frequency conversion fan D, upper air passage hot air F1, lower air passage hot air F2, upper heating heat Circulating water S1 of the water system, circulating water S2 of the heating and hot water system.
具体实施方式detailed description
本发明是一种热风与电辅加热混合式换热器。具体是将高温热风道、风管束组、水内胆与电辅助加热管组四种元器件交互连接设计在一台金属换热器壳体中,如图1-图11所示。The invention is a hot air and electric auxiliary heating hybrid heat exchanger. Specifically, the four components of the high-temperature hot air duct, the air tube bundle, the water liner and the electric auxiliary heating tube group are designed to be interactively connected in a metal heat exchanger shell, as shown in Figures 1-11.
热风进入进风道口2中,进风道口2连接进风道箱1,同时进风道口2还连接进风道温度传感器3。进风道箱1通过法兰4与换热体5上部连接;换热体5中间部分焊接伸缩节6调节换热体受热膨胀量。换热体5的上部连接出水管11,出水管11上连接有出水管温度传感器12。换热体5上部还连接有安全阀17。换热体5下部连接回水管16,回水管16上接有回水管温度传感器14,回水管口和回水管温度传感器14之间连接回水管流量计13。 换热体5下部还连接排污阀18。所述的换热体5包括:水内胆、风管路束及辅助加热丝组。The hot air enters the air inlet opening 2, and the air inlet opening 2 is connected to the air inlet box 1, and meanwhile, the air inlet opening 2 is also connected to the air inlet temperature sensor 3. The air inlet channel box 1 is connected to the upper part of the heat exchange body 5 through the flange 4; the middle part of the heat exchange body 5 is welded with an expansion joint 6 to adjust the thermal expansion of the heat exchange body. The upper part of the heat exchange body 5 is connected with a water outlet pipe 11 , and a water outlet pipe temperature sensor 12 is connected with the water outlet pipe 11 . A safety valve 17 is also connected to the upper part of the heat exchange body 5 . The lower part of the heat exchange body 5 is connected with a return pipe 16 , the return pipe 16 is connected with a return pipe temperature sensor 14 , and a return pipe flowmeter 13 is connected between the return pipe mouth and the return pipe temperature sensor 14 . The lower part of the heat exchange body 5 is also connected to a drain valve 18 . The heat exchange body 5 includes: a water liner, an air duct bundle and an auxiliary heating wire group.
换热体5和出风道箱7通过出风道箱与换热体法兰8相连接;出风道箱7的底部连接有出风道口9,出风道口9连接变频风机D。出风道口9上还连接有出风道温度传感器15。The heat exchange body 5 and the air outlet box 7 are connected with the heat exchange body flange 8 through the air outlet box; An air outlet temperature sensor 15 is also connected to the air outlet opening 9 .
换热体5的一侧连接辅助加热丝组10,辅助加热丝组10横向穿入换热体5的水内胆20中。One side of the heat exchange body 5 is connected with an auxiliary heating wire group 10 , and the auxiliary heating wire group 10 penetrates laterally into the water liner 20 of the heat exchange body 5 .
换热体5内部结构为:换热体5内侧的上下两端分别焊有管焊接板21,管焊接板21面上有300多个孔,两块管焊接板21上的孔与风管道路束19中所有约300余根金属管,两端外沿焊接,需要密闭,承压,不能漏水。风管路束19的金属管内壁通过热风;风管路束19的金属管外侧与两块管焊接板21及换热体5壳内壁组成密闭水内胆20。The internal structure of the heat exchange body 5 is: the upper and lower ends of the inner side of the heat exchange body 5 are respectively welded with tube welding plates 21, and there are more than 300 holes on the surface of the tube welding plates 21, and the holes on the two tube welding plates 21 are connected with the air duct road. All about 300 metal tubes in beam 19 are welded on the outer edges of both ends, and need to be airtight, pressure-bearing, and water-tight. The inner wall of the metal tube of the air duct bundle 19 passes hot air; the outer side of the metal tube of the air duct bundle 19 forms an airtight water liner 20 with two tube welding plates 21 and the inner wall of the heat exchange body 5 shell.
换热体5水内胆20中间留有安装电加热丝组的空间,可以穿入8组辅助加热丝组10,8组辅助加热丝组10接线柱应与换热体5密闭,不能漏水。 热风与辅助电加热同时启用,也可以交替使用。In the middle of the heat exchange body 5 water liner 20, there is a space for installing the electric heating wire group, and 8 groups of auxiliary heating wire groups 10 can be penetrated. Hot air and auxiliary electric heating are enabled at the same time, and can also be used alternately.
本发明的工作原理如下:The working principle of the present invention is as follows:
如图1所示,蓄热锅炉蓄热体A,换热器B,变频风机D,上风道热风F1和下风道热风F2,供暖热水系统循环水S1和供暖热水系统循环水S2。利用谷时段将蓄热锅炉蓄热体A蓄热至500℃以上。此时,在蓄热锅炉蓄热体A蓄热时,用辅助电加热换热器B。在供热时,启动变频风机D在蓄热锅炉蓄热体A与换热器B之间送风,在换热器B内的上风道热风F1和下风道热风F2内的高温热风与供暖热水系统循环水S1和供暖热水系统循环水S2进行热交换,实现供暖。As shown in Figure 1, heat storage boiler heat storage body A, heat exchanger B, frequency conversion fan D, hot air in the upper air passage F1 and hot air in the lower air passage F2, circulating water S1 and S2 of the heating hot water system. Use the off-peak period to store heat in the heat storage body A of the heat storage boiler to above 500°C. At this time, when the heat storage body A of the heat storage boiler is storing heat, the heat exchanger B is heated with auxiliary electricity. When heating, start the frequency conversion fan D to blow air between the heat storage body A of the heat storage boiler and the heat exchanger B. The circulating water S1 of the water system and the circulating water S2 of the heating hot water system perform heat exchange to realize heating.
对于换热器来讲是:通过高温热风把水加热产生热水或蒸汽,是由换热器来实现能量转换的。换热器内胆纵向列排几百根不锈钢管或紫铜管作为风管路束19,用管焊接板连接固定在壳体内,风管路束19外侧与壳体连接密闭形成水内胆。又从换热器中间横向插入8组电加热管即辅助加热丝组10,穿在水胆里作为辅助加热器。首先,从回水管16流入低温水灌满水内胆,从出水管11流出热水进入供暖系统管道。电蓄热锅炉的热量用变频风机在密闭风道循环,产生高温热风送入换热器顶部进风道,进入风管路束19的几百根金属管中,被水内胆20中循环水吸热后带走热量,降温的热风经过底部回风道返回到电蓄热锅炉。并通过调频控制热风量的大小来调节出水温度。For the heat exchanger, it is: the water is heated by high-temperature hot air to generate hot water or steam, and the energy conversion is realized by the heat exchanger. Hundreds of stainless steel tubes or red copper tubes are arranged vertically in the inner tank of the heat exchanger as the air duct bundle 19, which are connected and fixed in the shell with tube welding plates, and the outside of the air duct bundle 19 is connected and sealed with the shell to form a water inner tank. Transversely insert 8 groups of electric heating tubes and auxiliary heating wire groups 10 from the middle of the heat exchanger again, and wear them in the water bladder as auxiliary heaters. First, low-temperature water flows in from the return pipe 16 to fill the water inner tank, and hot water flows out from the water outlet pipe 11 to enter the heating system pipe. The heat of the electric heat storage boiler is circulated in the closed air duct by the frequency conversion fan, and the high-temperature hot air is sent to the air intake duct on the top of the heat exchanger, and enters the hundreds of metal tubes in the air duct bundle 19, and is circulated by the water liner 20. After absorbing heat, it takes away the heat, and the cooled hot air returns to the electric heat storage boiler through the bottom return air duct. And through the frequency modulation to control the size of the hot air volume to adjust the outlet water temperature.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510108057.8A CN104728899B (en) | 2015-03-12 | 2015-03-12 | Hot blast and electric additional hot mixing formula heat exchanger |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510108057.8A CN104728899B (en) | 2015-03-12 | 2015-03-12 | Hot blast and electric additional hot mixing formula heat exchanger |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104728899A CN104728899A (en) | 2015-06-24 |
CN104728899B true CN104728899B (en) | 2017-11-07 |
Family
ID=53453050
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510108057.8A Expired - Fee Related CN104728899B (en) | 2015-03-12 | 2015-03-12 | Hot blast and electric additional hot mixing formula heat exchanger |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104728899B (en) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106931643A (en) * | 2015-12-30 | 2017-07-07 | 沈阳兰昊新能源科技有限公司 | Portable electricity accumulation of energy hot air boiler |
CN106931642A (en) * | 2015-12-30 | 2017-07-07 | 沈阳兰昊新能源科技有限公司 | Biomass fuel heat accumulating type hot air boiler |
CN107289622A (en) * | 2017-08-11 | 2017-10-24 | 安徽科海压缩机制造有限公司 | A kind of heated by natural gas device for being capable of temperature control |
CN110500782A (en) * | 2019-10-08 | 2019-11-26 | 沈阳工程学院 | Arrangement scheme of electric heating power of solid electric heat storage boiler device |
CN111023229A (en) * | 2019-11-19 | 2020-04-17 | 中科凯瑞新能源有限公司 | Complementary type solid electric heat storage unit |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2275701Y (en) * | 1996-09-13 | 1998-03-04 | 张玉斌 | Dual-purpose water heater using solar energy or electric heating |
CN202002315U (en) * | 2011-03-21 | 2011-10-05 | 石家庄华安热能科技有限公司 | Self-energy-storage electric boiler |
CN202133111U (en) * | 2011-07-19 | 2012-02-01 | 朱杰 | Closed hot-air circulation high-temperature solid heat-accumulation electric water heater unit |
GB2500735A (en) * | 2012-03-26 | 2013-10-02 | Basic Holdings | Hot liquid cylinder having a controller arranged to communicate with a remote operator |
CN204574199U (en) * | 2015-03-12 | 2015-08-19 | 李安平 | Hot blast and the additional hot direct contact heat exchanger of electricity |
-
2015
- 2015-03-12 CN CN201510108057.8A patent/CN104728899B/en not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2275701Y (en) * | 1996-09-13 | 1998-03-04 | 张玉斌 | Dual-purpose water heater using solar energy or electric heating |
CN202002315U (en) * | 2011-03-21 | 2011-10-05 | 石家庄华安热能科技有限公司 | Self-energy-storage electric boiler |
CN202133111U (en) * | 2011-07-19 | 2012-02-01 | 朱杰 | Closed hot-air circulation high-temperature solid heat-accumulation electric water heater unit |
GB2500735A (en) * | 2012-03-26 | 2013-10-02 | Basic Holdings | Hot liquid cylinder having a controller arranged to communicate with a remote operator |
CN204574199U (en) * | 2015-03-12 | 2015-08-19 | 李安平 | Hot blast and the additional hot direct contact heat exchanger of electricity |
Also Published As
Publication number | Publication date |
---|---|
CN104728899A (en) | 2015-06-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104728899B (en) | Hot blast and electric additional hot mixing formula heat exchanger | |
CN101693230B (en) | Coating machine heat recovery utilization energy-saving device | |
CN203757824U (en) | Heat supply system capable of reducing return water temperature of primary network | |
CN107560044B (en) | Evaporative cooling air-conditioning system for providing electric energy by using industrial waste heat | |
CN204806941U (en) | Heat exchanger | |
CN105043138A (en) | Flue gas waste heat recovery system | |
CN205939378U (en) | Split type solid heat storage medium electric boiler | |
CN201973897U (en) | Split solar water heater taking gas as working medium | |
CN203719469U (en) | Pressure-bearing smoke waste heat exchanger | |
CN201903278U (en) | Combined-type condensing heat exchanger | |
CN204574199U (en) | Hot blast and the additional hot direct contact heat exchanger of electricity | |
CN202792923U (en) | Spiral heat exchange device for rotary kiln | |
CN102200398B (en) | Double-shell heat exchanger | |
CN210921355U (en) | Steam boiler waste heat recovery device | |
CN108625915A (en) | It is a kind of using boiler blowdown water and flue gas as the organic rankine cycle system of heat source | |
CN103353107A (en) | Device capable of obtaining superheated steam from high-temperature high-pressure gas | |
CN206695648U (en) | Gas waste-heat retracting device | |
CN202853139U (en) | Novel high-efficiency corrosion-resistant split type solar water heater | |
CN207701210U (en) | A kind of jet dynamic control tail gas waste heat utilizing device | |
CN201757600U (en) | Waste heat recovery device for industrial furnace exhaust gas or coal gas | |
CN202432885U (en) | Floating plate type tubular preheater | |
CN201935401U (en) | Fin type vertical water pipe return stroke | |
CN207019035U (en) | Smoke and waste steam boiler | |
CN107289796B (en) | High-efficient heat transfer horizontal conduction oil heat exchanger | |
CN217504461U (en) | Multi-medium energy storage intermediate heat exchanger |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Zhao Qingqi Inventor after: Yang Dongsheng Inventor after: Wen Jin Inventor after: Yang Baoqu Inventor after: Pang Yongheng Inventor after: Li Anping Inventor after: Yang Yingxuan Inventor after: Shang Yue Inventor before: Li Anping Inventor before: Zhao Qingqi Inventor before: Guo Zhenwei Inventor before: Jiang Libing |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20171221 Address after: Heping District, Siping City of Shenyang province Liaoning 110006 Street No. 39-7 Co-patentee after: STATE GRID LIAONING ENERGY SAVING SERVICES CO., LTD. Patentee after: Electric Power Research Institute of State Grid Liaoning Electric Power Co., Ltd. Co-patentee after: Northeastern University Co-patentee after: State Grid Corporation of China Address before: No. 9-6, Jiahe Road, peace zone, Shenyang, Liaoning, Liaoning, 311 Co-patentee before: Zhao Qingqi Patentee before: Li Anping |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171107 Termination date: 20180312 |