CN202348432U - 一种发电机组搬运手柄的安装结构 - Google Patents
一种发电机组搬运手柄的安装结构 Download PDFInfo
- Publication number
- CN202348432U CN202348432U CN2011204598158U CN201120459815U CN202348432U CN 202348432 U CN202348432 U CN 202348432U CN 2011204598158 U CN2011204598158 U CN 2011204598158U CN 201120459815 U CN201120459815 U CN 201120459815U CN 202348432 U CN202348432 U CN 202348432U
- Authority
- CN
- China
- Prior art keywords
- handle
- plastic face
- carrying handle
- lifting handle
- generator set
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Manufacture Of Motors, Generators (AREA)
Abstract
本实用新型涉及一种发电机组搬运手柄的安装结构,其包括搬运手柄,手柄安装架、前塑料面罩、后塑料面罩及机架;所述搬运手柄两端分别装入前塑料面罩及后塑料面罩孔中,再固定于手柄安装架上,特征是:所述安装手柄架由第一限位板和第二限位块焊接而成,第一限位板和第二限位块焊接在机架上;所述第二限位块上设有安装平面,所述安装平面为正方形;在所述安装平面上设有开口槽;所述第一限位板上开有螺栓孔。所述搬运手柄呈压扁的U型形状。所述搬运手柄两端制成方形;中间部位制成圆柱形。本实用新型结构简单、合理;拆装方便,工艺性好,能够保证发电机组前后塑料面罩的完整性,降低产品的制造成本;搬运手柄通过螺栓固定,可以自由拆卸。
Description
技术领域
本实用新型涉及一种发电机组搬运手柄安装结构,属于发电机组的辅助装置。
背景技术
目前,公告的发电机组搬运手柄是在发电机组前后塑料面罩内部固定的,将前后塑料面罩分割为两部分,小的部分先安装在发电机组上,然后将搬运手柄焊接在手柄安装架上,接着再将剩余的前后塑料面罩安装在搬运手柄外。这样,搬运手柄被焊接在手柄安装架上,无法正常拆卸,同时搬运手柄安装在前后塑料面罩内,所以必须将前后塑料面罩分割成两部分才可以安装,这样就将前后塑料面罩的整体性破坏了,同时也增加了制造成本。
发明内容
本实用新型的目的在于克服上述不足之处,提供一种发电机组搬运手柄的安装结构,该安装结构能使该搬运手柄可以在手柄安装架上自由装卸,同时保证了发电机前后塑料面罩的完整性。
按照本实用新型提供的技术方案,一种发电机组搬运手柄的安装结构包括搬运手柄,手柄安装架、前塑料面罩、后塑料面罩及机架;所述搬运手柄两端分别装入前塑料面罩及后塑料面罩孔中,再固定于手柄安装架上,特征是: 所述安装手柄架由第一限位板和第二限位块焊接而成,第一限位板和第二限位块焊接在机架上;
所述第二限位块上设有安装平面,所述安装平面为正方形;在所述安装平面上设有开口槽;所述第一限位板上开有螺栓孔。
所述搬运手柄呈压扁的U型形状。 所述搬运手柄两端制成方形。
所述搬运手柄两端设有螺栓孔;中间部位制成圆柱形,方便搬运。
本实用新型与已有技术相比具有以下优点:
本实用新型结构简单、合理;拆装方便,工艺性好,能够保证发电机组前后塑料面罩的完整性,降低产品的制造成本;搬运手柄通过螺栓固定,可以自由拆卸。
附图说明
图1是本实用新型的搬运手柄结构示意图。
图2是本实用新型的搬运手柄A-A剖面示意图。
图3是本实用新型的手柄安装架结构示意图。
图4是本实用新型的搬运手柄安装示意图。
图5是本实用新型的手柄安装结构B-B剖视图。
图6是本实用新型的立体结构示意图。
具体实施方式
下面本实用新型将结合附图中的实施例作进一步描述:
如图1~图6所示,包括搬运手柄1,手柄安装架2、前塑料面罩3、后塑料面罩4、螺栓5及机架6等。所述手柄安装架2由第一限位板21和第二限位块22组成。
本实用新型在前塑料面罩3及后塑料面罩4侧面分别开有通孔,搬运手柄1两端分别装入前塑料面罩3及后塑料面罩4的侧面通孔中,再用螺栓5固定于手柄安装架2上,保证其不会脱落。
所述手柄安装架2由第一限位板21和第二限位块22焊接而成,第一限位板21和第二限位块22焊接在机架6上,第一限位板21限定搬运手柄1的左右移动;所述第二限位块22上设有安装平面,在所述安装平面上设有开口槽;所述安装平面为方形;第二限位块22对搬运手柄1的上、下、后三个方向作出限定,在相互作用下限定了搬运手柄1在安装平面内的转动。所述第一限位板21上开有螺栓孔。
所述搬运手柄1呈压扁的U型形状,其中间部分设为手柄把持部,两端分别设有左右安装部,两端左右安装部与中间手柄把持部直接铸造为一体。 所述搬运手柄1两端设计为方形,装入安装平面可以防止搬运手柄1的转动;两端有螺栓孔,用于固定;中间设计为圆柱形,方便搬运。
安装时,先将搬运手柄1装入前、后塑料面罩3、4侧孔内,孔内留有左右移动位置,将搬运手柄1插到底,再将前塑料面罩3及后塑料面罩4装到机体上,这样就可以把搬运手柄1的两端卡入第二限位块22的安装平面内,此时,第一限位板21和第二限位块22限定搬运手柄1的左右、上下及向后的移动,然后将螺栓装入螺栓孔内,同时将前塑料面罩3及后塑料面罩4上的螺栓孔装入螺栓。这样就可以将搬运手柄1固定。
本实用新型结构简单,搬运手柄的安装、拆卸方便;同时前后塑料面罩保持了整体性,工艺性更好,制造成本降低。
Claims (4)
1. 一种发电机组搬运手柄的安装结构,包括搬运手柄(1),手柄安装架(2)、前塑料面罩(3)、后塑料面罩(4)及机架(6);所述搬运手柄(1)两端分别装入前塑料面罩(3)及后塑料面罩(4)孔中,再固定于手柄安装架(2)上,其特征是:所述手柄安装架(2)由第一限位板(21)和第二限位块(22)焊接而成,第一限位板(21)和第二限位块(22)焊接在机架(6)上;所述第二限位块(22)上设有安装平面,所述安装平面为正方形;在所述安装平面上设有开口槽;所述第一限位板(21)上开有螺栓孔。
2.如权利要求1所述的一种发电机组搬运手柄的安装结构,其特征是:
所述搬运手柄(1)呈压扁的U型形状。
3.如权利要求1所述的一种发电机组搬运手柄的安装结构,其特征是:
所述搬运手柄(1)两端制成方形。
4.如权利要求1所述的一种发电机组搬运手柄的安装结构,其特征是: 所述搬运手柄(1)两端设有螺栓孔,中间部位制成圆柱形。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011204598158U CN202348432U (zh) | 2011-11-18 | 2011-11-18 | 一种发电机组搬运手柄的安装结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011204598158U CN202348432U (zh) | 2011-11-18 | 2011-11-18 | 一种发电机组搬运手柄的安装结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202348432U true CN202348432U (zh) | 2012-07-25 |
Family
ID=46537441
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011204598158U Expired - Fee Related CN202348432U (zh) | 2011-11-18 | 2011-11-18 | 一种发电机组搬运手柄的安装结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202348432U (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2013071799A1 (zh) * | 2011-11-18 | 2013-05-23 | 无锡开普动力有限公司 | 一种发电机组搬运手柄的安装结构 |
-
2011
- 2011-11-18 CN CN2011204598158U patent/CN202348432U/zh not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2013071799A1 (zh) * | 2011-11-18 | 2013-05-23 | 无锡开普动力有限公司 | 一种发电机组搬运手柄的安装结构 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206274530U (zh) | 一种拼装式电池包箱体 | |
CN202348432U (zh) | 一种发电机组搬运手柄的安装结构 | |
CN203265996U (zh) | 汽车柔性总拼台车身侧围夹具单元安装机构 | |
CN102364074A (zh) | 一种发电机组搬运手柄的安装结构 | |
CN204167382U (zh) | 一种动力电池固定装置 | |
CN203312964U (zh) | 一种电机的端盖组 | |
CN202989570U (zh) | 滚筒洗衣机箱体 | |
CN201956582U (zh) | 便于安装的电力控制柜 | |
CN201815832U (zh) | 一种用于动车组机车变压器油箱翻转的翻身架 | |
CN203404179U (zh) | 具可拆卸式卡扣结构的塑料开关元件及可拆卸式卡扣结构 | |
CN203344679U (zh) | 汽车的后下控制臂及汽车 | |
CN202977509U (zh) | 一种拆框机构 | |
CN207303152U (zh) | 一种一体冲压成型新能源汽车电池包 | |
CN203486014U (zh) | 发动机舱前护板总成 | |
CN206615061U (zh) | 发动机后悬置支架 | |
CN202906622U (zh) | 通用汽油发电机支架 | |
CN203839439U (zh) | 一种电动汽车及其电池组 | |
CN206471267U (zh) | 一种无标准件连接的隔离开关操作机构 | |
CN202276712U (zh) | 盒式双面瓦楞纸立柱 | |
CN203352529U (zh) | 一种模块化变频器 | |
CN204102980U (zh) | 一种蓄电池极柱位返修装置 | |
CN202535182U (zh) | 发电机机架 | |
CN201975438U (zh) | 摩托车蓄电池安装结构 | |
CN202846642U (zh) | 带有气缸后端支撑装置的刨片机装载部 | |
CN202150672U (zh) | 一种配电箱背板固定卡件 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120725 Termination date: 20171118 |
|
CF01 | Termination of patent right due to non-payment of annual fee |