CN202333620U - Transmitting rope control device - Google Patents

Transmitting rope control device Download PDF

Info

Publication number
CN202333620U
CN202333620U CN2011204955846U CN201120495584U CN202333620U CN 202333620 U CN202333620 U CN 202333620U CN 2011204955846 U CN2011204955846 U CN 2011204955846U CN 201120495584 U CN201120495584 U CN 201120495584U CN 202333620 U CN202333620 U CN 202333620U
Authority
CN
China
Prior art keywords
rope
control device
tail
transmitting
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011204955846U
Other languages
Chinese (zh)
Inventor
李树平
刘明亮
梁河雷
何义良
刘林青
杨治
赵建军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Hengshui Power Supply Co of State Grid Hebei Electric Power Co Ltd
Original Assignee
Hengshui Power Supply Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hengshui Power Supply Co filed Critical Hengshui Power Supply Co
Priority to CN2011204955846U priority Critical patent/CN202333620U/en
Application granted granted Critical
Publication of CN202333620U publication Critical patent/CN202333620U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The utility model in particular discloses a transmitting rope control device, belonging to the technical field of transmission devices for electrician tools. The main technical scheme of the transmitting rope control device is as follows: the transmitting rope control device comprises a transmitting rope and a fixed pulley, wherein the fixed pulley is used for dividing the transmitting rope into a traction rope and a tail rope and can be fixed on a power transmission tower, the end of the tail rope is provided with a hanger of electrician tool materials, and a direction control mechanism is arranged on the traction rope of the transmitting rope and the hanger at the end of the tail rope. When the transmitting rope control device is used for transmitting the electrician tool materials, the tail rope forming the transmitting rope is controlled by the traction rope and the angle and position of the tail rope can be regulated at any time according to the practical situations, thus collision of the tool materials with the ropes can be effectively avoided, and the working efficiency can be greatly improved.

Description

Transmit the rope control device
Technical field
The utility model belongs to electrician's instrument transmission apparatus technical field, relates to a kind of maintenance at transmission line, disappears scarce and transforms employed transmission rope control device in the operation.
Background technology
Transmitting the rope control device is to use the maintenance at transmission line, the special-purpose electrician's instrument that lacks and transform in the operation that disappears to transmit apparatus.At present; Carrying out work high above the ground projects such as power transmission lines overhauling, live line working; When use transmitting rope tool for transmitting material, a fixed pulley is set, will transmits rope and placing pulley and should transmit to restrict and be divided into pull rope and tail rope two parts at the top of electric power line steel tower; After the tool materials of required handling were fixed in the tail rope end, the ground handling personnel spurred the transmission rope and through fixed pulley instrument are transferred to the high-altitude.But because the body of the tower of iron tower has constant slope (the iron tower bottom is wide), bump for avoiding tool materials and body of the tower, need 1 operation personnel to control tail rope, the pull rope personnel form counter-force with control tail rope personnel like this, and the pull rope personnel are required great effort more; In addition; Even there is the operating personnel to control tail rope; The phenomenon that tool materials and body of the tower bump also often appears; And use now be mostly valuable Work tools such as electric hydaulic instrument, precision instrumentation, moistureproof tools for live working, in case bump, might produce the article damage Work tool that comes off.
The utility model content
The purpose of the utility model just provides a kind of transmission rope control device that prevents tool materials and electric power pylon collision that in the handling process, can effectively overcome.
The technical scheme that realizes the utility model above-mentioned purpose is:
Transmit the rope control device; Comprise and transmit rope, will transmit rope and be divided into the fixed pulley that pull rope and tail rope two parts also can be fixed with electric power pylon; Said tail rope end is provided with the suspension member of electrician's tool materials, is provided with direction control mechanism at the pull rope of said transmission rope and the suspension member place of tail rope end; But described direction control mechanism is formed by snatch block and carrier bar axle fixed combination; Wherein, but described snatch block constitute by the pulley and the fixed axis of two clamping plate and the two setting, an one of which clamping plate are provided with the breach with described fixed axis active buckle; Described carrier bar comprises two last items that are arranged on connecting plate middle part and the afterbody, and the end of said connecting plate bar is connected with described fixed axis axle.
In addition, the additional technical feature that constitutes above-mentioned transmission rope control device is that the supermedial last item of said connecting plate bar is provided with and transmits the wire clips bar.
The transmission rope control device that the utility model provides is compared with prior art; Owing to be provided with direction control mechanism between the pull rope that formation transmission is restricted and tail rope two parts; And this direction control mechanism can make and be in same angle between the tail rope of hanging electrician's tool materials and pull rope; The control that electrician's tool materials that transmit and tail rope receive pull rope can be adjusted angle and position at any time according to actual conditions, can effectively avoid the extension that bumps of tool materials and rope and iron tower tower body; Because this transmissions rope control device can be controlled through pull rope, in operating process, can avoid in the prior art because waste of manpower and inharmonic problem when distinguishing tractive pull rope and tail rope through different people can effectively be increased work efficiency.
Description of drawings
The structural representation of the transmission rope control device that Fig. 1 provides for the utility model;
Fig. 2 is the positional structure sketch map that transmits rope in the above-mentioned control device;
Fig. 3 is for dismounting or the structural representation that transmits rope is installed.
Embodiment
Below in conjunction with accompanying drawing and embodiment the structure and the use principle of the transmission rope control device that the utility model proposed are done further detailed description.
Be depicted as the structural representation of the transmission rope control device that the utility model provides like Fig. 1,2.The structure that constitutes this transmission rope control device does; Can be with the fixing fixed pulley 1 of electric power pylon, transmit tail rope 3 two parts that rope be divided into the pull rope 2 that is used for staff's tractive through fixed pulley and be used to lift electrician's tool materials; The suspension member 4 of electrician's tool materials is arranged on the end of tail rope, but is provided with by snatch block 5 and 6 direction control mechanisms that formed by fixed axis 7 fixed combination of carrier bar at suspension member 4 places of pull rope and tail rope end.Wherein, But the structure of above-mentioned snatch block is made up of the pulley 10 and the fixed axis 7 of two clamping plate 8,9 and the two setting; An one of which clamping plate 9 are provided with the breach 11 with fixed axis 7 active buckles; Be that clamping plate 9 can make pull rope 2 to pack into and to draw off through the open and close between breach realization and the fixed axis 7; Above-mentioned carrier bar 6 comprises the connecting plate bar 12 that 7 of its end and fixed axis are connected, and is fixed with last item 13,14 at the middle part of this connecting plate and afterbody, and tail rope can articulate electrician's tool materials through this last item 13,14 through suspension member.
In order to realize transmitting buckling into and split out conveniently of tail of rope rope, the last item 13 at above-mentioned connecting plate bar middle part is provided with can be around the transmission wire clips bar 15 of last item 13 rotations.
As shown in Figure 3 during use; At first will transmit the clamping plate 9 of rope control device opens from fixed axis 7 through breach 11; Pull rope 2 can be packed into, simultaneously the transmission wire clips bar 15 on the last item 13 of connecting plate bar middle part is opened, the tail rope end is wrapped in last item 13,14 realize that friction is fixing; Then with clamping plate 9 and fixed axis 7 fastenings, rotation card article 15 and last item 14 chuckings prevent that tail rope from therefrom deviating from.Electrician's tool materials are hung on the suspension member; But pulling traction rope makes between pull rope and the tail rope distance that forms snatch block 5 clamping plate length; The control that electrician's tool materials that transmit and tail rope receive pull rope; Can adjust angle and position at any time according to actual conditions, can effectively avoid the extension that bumps of tool materials and rope.
In the structure of above-mentioned transmission rope control device; But to be stuck in the connecting plate bar of fixing last item 13,14 with the clip slot direction that card article constitutes consistent with the direction of snatch block 5 owing to constitute to transmit the tail rope of rope; Make the tail rope pull rope that transmits rope on same fixed plane; Therefore only need the direction of control pull rope just can make the electrician's tool materials that are fixed on the tail rope suspension member controlled in hoisting process, prevent that it from causing the collision with the iron tower body of the tower because of swing.

Claims (2)

1. transmit the rope control device; Comprise and transmit rope, will transmit rope and be divided into the fixed pulley that pull rope and tail rope two parts also can be fixed with electric power pylon; Said tail rope end is provided with the suspension member of electrician's tool materials, is provided with direction control mechanism at the pull rope of said transmission rope and the suspension member place of tail rope end; It is characterized in that: but described direction control mechanism is formed by snatch block and carrier bar axle fixed combination; Wherein, but described snatch block constitute by the pulley and the fixed axis of two clamping plate and the two setting, an one of which clamping plate are provided with the breach with described fixed axis active buckle; Described carrier bar comprises two last items that are arranged on connecting plate middle part and the afterbody, and the end of said connecting plate bar is connected with described fixed axis axle.
2. transmission rope control device as claimed in claim 1 is characterized in that: the supermedial last item of said connecting plate bar is provided with and transmits the wire clips bar.
CN2011204955846U 2011-12-02 2011-12-02 Transmitting rope control device Expired - Lifetime CN202333620U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011204955846U CN202333620U (en) 2011-12-02 2011-12-02 Transmitting rope control device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011204955846U CN202333620U (en) 2011-12-02 2011-12-02 Transmitting rope control device

Publications (1)

Publication Number Publication Date
CN202333620U true CN202333620U (en) 2012-07-11

Family

ID=46445587

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011204955846U Expired - Lifetime CN202333620U (en) 2011-12-02 2011-12-02 Transmitting rope control device

Country Status (1)

Country Link
CN (1) CN202333620U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102496886A (en) * 2011-12-02 2012-06-13 衡水供电公司 Control device of transfer rope

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102496886A (en) * 2011-12-02 2012-06-13 衡水供电公司 Control device of transfer rope
CN102496886B (en) * 2011-12-02 2014-08-13 国家电网公司 Control device of transfer rope

Similar Documents

Publication Publication Date Title
CN202231327U (en) Heavy component hoisting tool in electrical cabinet
CN203922509U (en) A kind of overhead hoist of hull plate
CN202333620U (en) Transmitting rope control device
CN204551477U (en) A kind of cable transmission lifting appliance
CN202924592U (en) Gripping device
CN202197048U (en) Double angle steel hanging point lifting and connecting tool for tower use
CN102496886B (en) Control device of transfer rope
CN203345975U (en) Installation device of hoisting steel wire rope and tower crane
CN205791248U (en) A kind of power construction cable traction device
CN203653193U (en) Internal inclined type hanging basket device
CN204569122U (en) Building tower crane cargo hook gear
CN103264709B (en) Underground mine automatic tramcar stopper for inclined shaft and inclined shaft automatic car stopping system
CN207842931U (en) Gravity self-locking type cableway tackle
CN202518908U (en) Steel wire rope traction system
CN202107424U (en) Three-jaw sling
CN206562269U (en) A kind of anti-drop device for transmitting rope
CN201352692Y (en) Open beam multi-wheel wire tackle
CN205469056U (en) Light -duty fast cableway power traveling system for loading
CN201169512Y (en) Clamp sling special for mounting electric hoist
CN203026891U (en) Telecommunication cable fixing and branching device
CN205241079U (en) Hose loop wheel machine hoist height stop gear
CN203345781U (en) Transfer platform hand-lifting draft gear
CN203632119U (en) Tightener
CN201801295U (en) Wire rope totally-closed suspender
CN204517590U (en) Penetrate rotor device taken out by horizontal machine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP. HEBEI ELECTRIC POWER CORP

Effective date: 20130308

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20130308

Address after: 053000 Hengshui province Hebei City Taocheng District People's Road No. 185

Patentee after: Hengshui Power Supply Company

Patentee after: State Grid Corporation of China

Patentee after: Hebei Electric Power Corporation

Address before: 053000 Hengshui province Hebei City Taocheng District People's Road No. 185

Patentee before: Hengshui Power Supply Company

ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA

Free format text: FORMER OWNER: HENGSHUI POWER SUPPLY COMPANY

Effective date: 20140219

Owner name: HENGSHUI POWER SUPPLY BRANCH COMPANY, STATE GRID H

Free format text: FORMER OWNER: STATE GRID CORPORATION OF CHINA HEBEI ELECTRIC POWER CORPORATION

Effective date: 20140219

COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 053000 HENGSHUI, HEBEI PROVINCE TO: 100031 XICHENG, BEIJING

TR01 Transfer of patent right

Effective date of registration: 20140219

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Patentee after: State Grid Corporation of China

Patentee after: Hengshui Power Supply Branch, State Grid Hebei Electric Power Co., Ltd.

Patentee after: State Grid Hebei Electric Power Company

Address before: 053000 Hengshui province Hebei City Taocheng District People's Road No. 185

Patentee before: Hengshui Power Supply Company

Patentee before: State Grid Corporation of China

Patentee before: Hebei Electric Power Corporation

TR01 Transfer of patent right
AV01 Patent right actively abandoned

Granted publication date: 20120711

Effective date of abandoning: 20140813

AV01 Patent right actively abandoned

Granted publication date: 20120711

Effective date of abandoning: 20140813

RGAV Abandon patent right to avoid regrant