CN202325542U - 弱胶结未成砂岩斜井挑顶与隧道初支转换结构 - Google Patents

弱胶结未成砂岩斜井挑顶与隧道初支转换结构 Download PDF

Info

Publication number
CN202325542U
CN202325542U CN2011204987194U CN201120498719U CN202325542U CN 202325542 U CN202325542 U CN 202325542U CN 2011204987194 U CN2011204987194 U CN 2011204987194U CN 201120498719 U CN201120498719 U CN 201120498719U CN 202325542 U CN202325542 U CN 202325542U
Authority
CN
China
Prior art keywords
tunnel
inclined shaft
arch
shaft
primary support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011204987194U
Other languages
English (en)
Inventor
董勤银
董洋
刘新英
刘明松
Original Assignee
董勤银
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 董勤银 filed Critical 董勤银
Priority to CN2011204987194U priority Critical patent/CN202325542U/zh
Application granted granted Critical
Publication of CN202325542U publication Critical patent/CN202325542U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

本实用新型属于岩土工程技术领域,具体为弱胶结未成砂岩斜井挑顶与隧道初支转换结构。其特征在于:将隧道斜井断面以折线分段挑起,使斜井拱墙角处沿着隧道正洞轮廓线开挖斜井初支(1),斜井的端头设置斜井端头大拱脚(2),在斜井井口与隧道边拱相交处设置井口钢门架(3),在斜井端头大拱脚(2)和井口钢门架(3)之上设隧道拱部初期支护(4),使隧道拱部初期支护(4)暂时不受顶部围岩压力,然后开挖隧道支护,当隧道仰拱完成后,采用混凝土将斜井与隧道初支的空间进行回填。本实用新型可安全平稳的完成斜井与隧道初支结构受力体系转换,可有效避免开挖过程中的涌、流砂,塌方和初支变形失稳的问题。

Description

弱胶结未成砂岩斜井挑顶与隧道初支转换结构
技术领域
本实用新型属于岩土工程技术领域,具体为弱胶结未成砂岩斜井挑顶与隧道初支转换结构。
背景技术
我国铁路的快速发展,基于铁路隧道和桥梁的施工技术创新。在隧道施工中由于软弱砂性地质斜井开挖支护存在围岩流变,拱顶围岩下沉和水平收敛值较大,斜井初支垮塌时有发生,影响施工。如兰渝铁路桃树坪隧道全长为3220m,设有5座斜井12个工作面,斜井由于塌方不能进入隧道正洞施工。其工程地质为弱胶结未成砂岩,主要地质特征为:人工开挖后成粉细砂,无强度,人踩上去即可陷入20cm左右,人工和手推车行走需要铺设木板,曾对开挖出的砂体进行多次注浆试验与施工,而注浆只是将管内注满,管外浆液不扩散,没有开挖的未成岩注浆效果更差。拱部开挖采用超前小导管密排,管与管之间稍有缝隙就流沙,若不采取人工插塞三合板的措施,会越流越大,拱部必然跨塌。有水地段降水困难,粉细砂不透水,一般降水措施不凑效,掌子面只有采取数十根轻型真空泵进行降水,否则,砂体从高至低塑变,无法控制。由于未成砂岩地质的特殊性,经过试验,不能进行帷幕注浆,所以斜井挑顶进入隧道正洞施工,采用以往挑顶的方法是不可能的。
发明内容
本实用新型的目的在于提供一种弱胶结未成砂岩斜井挑顶与隧道初支转换结构,以该结构实现斜井挑顶与隧道正洞初期支护结构转换,来解决弱胶结未成砂岩斜井挑顶进入隧道正洞施工时的未成砂岩的密实性,开挖后成粉细砂,无水开挖沙漠状、漏干沙,有水开挖胶结、塑变,且不透水等施工问题。
本实用新型的技术方案为:弱胶结未成砂岩斜井挑顶与隧道初支转换结构,它包括斜井和隧道初支,其特征在于:在斜井内设置斜井初支1,斜井的端头设置斜井端头大拱脚2,在斜井井口与隧道边拱相交处设置井口钢门架3,在斜井端头大拱脚2和井口钢门架3之上设隧道拱部初期支护4。所述的斜井端头大拱脚2,是以混凝土制,其将隧道支护的钢架包裹住,与隧道初支的钢架连接。所述的井口钢门架3,钢架的内外铺双层钢筋网片,喷混凝土,与斜井初支1连接牢固。
与现有技术比较,本实用新型的有益效果是:
以往斜井挑顶转入正洞施工结构,一般都是留足变形量,直接施作隧道初支结构,并将隧道初支结构加强,对于未成砂岩地质边挖边流边塌的隧道斜井,是很难转换为隧道初支结构的。本结构是利用斜井做出斜井初支,在初支空间做出斜井端头大拱脚和井口钢门架,后在井口钢门架和斜井端头大拱脚之上悬空施工隧道拱部初期支护,使隧道拱部初期支护暂时不受顶部围岩压力,然后开挖隧道支护,当隧道仰拱完成后,采用混凝土将斜井与隧道初支的空间进行回填。
本实用新型可安全平稳的完成斜井与隧道初支结构受力体系转换,可有效避免开挖过程中的涌(流)砂、塌方和初支变形失稳的问题。
附图说明
图1本实用新型弱胶结未成砂岩斜井挑顶与隧道初支转换结构的结构图。
图2为本实用新型A-A剖面图。
图3为本实用新型B-B剖面图。
图中:斜井初支1,斜井端头大拱脚2,井口钢门架3、隧道拱部初期支护4、斜井拱部与隧道拱部初期支护间空洞5、隧道拱部超前支护6,隧道拱部开挖支护7,大拱脚以下开挖支护8,仰拱开挖支护封闭9。
具体实施方式
实例1、
本实施例为兰渝铁路桃树坪隧道施工工程,以下结合该工程对本实用新型的结构及具体实施做方法做进一步解释,但是并不构成对本实用新型的限制。
工程概况:兰渝铁路桃树坪隧道全长3220m的桃树坪隧道,设有5座斜井12个工作面,工程地质为弱胶结未成砂岩,其主要地质特征:人工开挖后成粉细砂,无强度,人踩上去即可陷入20cm左右,人工和手推车行走需要铺设木板,我们对开挖出的砂体进行多次注浆试验与施工,注浆只是将管内注满,管外浆液不扩散,没有开挖的未成岩注浆效果更差。拱部开挖采用超前小导管密排,管与管之间稍有缝隙就流沙,若不采取人工插塞三合板的措施,会越流越大,直至拱部跨塌。有水地段降水困难,粉细砂不透水,一般降水措施不凑效,掌子面只有采取数十根轻型真空泵进行降水,才能进行开挖,否则,砂体从高至低塑变,无法控制。由于未成砂岩地质的特殊性,不能进行帷幕注浆,所以斜井挑顶进入隧道正洞施工,采用以往挑顶的方法是不可行,通过试验采用弱胶结未成砂岩斜井挑顶与隧道初支转换结构。
一、进行斜井初支1的施工,将隧道斜井断面以折线分段挑起,使斜井拱墙角处沿着隧道正洞轮廓线开挖斜井初支1,当斜井进入隧道中心后,断面以折线分段下降,斜井端头过隧道最大跨1.3m。
二、进行斜井端头大拱脚2的施工,在斜井端头以混凝土施做斜井端头大拱脚2,宽6.3m(与斜井同宽),高0.6m,大拱脚将隧道支护钢架I25包裹住,作为连接上、下隧道初支钢架的支撑连接点。
三、进行井口钢门架3的施工,在隧道斜井口与正洞边拱相交处架立双排井口钢门架3,钢架采用I25,内外铺双层
Figure BSA00000628233000041
钢筋网片,喷C30混凝土,与斜井初支连接牢固。
四、在斜井端头大拱脚2和井口钢门架3之上悬空架立I25拱部钢架,钢架内外铺双层
Figure BSA00000628233000042
钢筋网片,喷C30混凝土,做为隧道拱部初期支护4。
五、斜井拱部与隧道拱部初期支护间的空洞5采用混凝土回填。
六、斜井范围转换为隧道拱部开挖时,可以进行隧道拱部超前支护6的施工,支护采用
Figure BSA00000628233000043
小导管密排,导管长度3m。
七、隧道拱部开挖支护7按二台阶开挖至大拱脚高程。
八、大拱脚以下开挖支护8,每循环不得超过1榀。
九、仰拱初支开挖每次不得超过3m,使隧道初支尽快封闭成环,形成仰拱开挖支护封闭9,完成斜井初支转换为隧道开挖支护的正常施工工序。

Claims (3)

1.弱胶结未成砂岩斜井挑顶与隧道初支转换结构,它包括斜井和隧道初支,其特征在于:在斜井内设置斜井初支(1),斜井的端头设置斜井端头大拱脚(2),在斜井井口与隧道边拱相交处设置井口钢门架(3),在斜井端头大拱脚(2)和井口钢门架(3)之上设隧道拱部初期支护(4)。
2.如权利要求1所述的弱胶结未成砂岩斜井挑顶与隧道初支转换结构,其特征在于:所述的斜井端头大拱脚(2),是以混凝土制,其将隧道支护的钢架包裹住,与隧道初支的钢架连接。
3.如权利要求1所述的弱胶结未成砂岩斜井挑顶与隧道初支转换结构,其特征在于:所述的井口钢门架(3),其内外铺双层钢筋网片,喷混凝土,与斜井初支(1)连接。
CN2011204987194U 2011-03-09 2011-12-02 弱胶结未成砂岩斜井挑顶与隧道初支转换结构 Expired - Fee Related CN202325542U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011204987194U CN202325542U (zh) 2011-03-09 2011-12-02 弱胶结未成砂岩斜井挑顶与隧道初支转换结构

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN201120063917 2011-03-09
CN201120063917.8 2011-03-09
CN2011204987194U CN202325542U (zh) 2011-03-09 2011-12-02 弱胶结未成砂岩斜井挑顶与隧道初支转换结构

Publications (1)

Publication Number Publication Date
CN202325542U true CN202325542U (zh) 2012-07-11

Family

ID=46437524

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011204987194U Expired - Fee Related CN202325542U (zh) 2011-03-09 2011-12-02 弱胶结未成砂岩斜井挑顶与隧道初支转换结构

Country Status (1)

Country Link
CN (1) CN202325542U (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102979534A (zh) * 2012-12-11 2013-03-20 安徽恒源煤电股份有限公司 一种tu棚支护工艺
CN103061778A (zh) * 2013-02-05 2013-04-24 北京首尔工程技术有限公司 隧道拱脚环向高压喷射加固方法及施工设备
CN104481546A (zh) * 2014-11-25 2015-04-01 中铁十二局集团有限公司 一种软岩隧道斜井进入正洞的双曲拱的施工方法

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102979534A (zh) * 2012-12-11 2013-03-20 安徽恒源煤电股份有限公司 一种tu棚支护工艺
CN102979534B (zh) * 2012-12-11 2015-12-02 安徽恒源煤电股份有限公司 一种tu棚支护工艺
CN103061778A (zh) * 2013-02-05 2013-04-24 北京首尔工程技术有限公司 隧道拱脚环向高压喷射加固方法及施工设备
CN104481546A (zh) * 2014-11-25 2015-04-01 中铁十二局集团有限公司 一种软岩隧道斜井进入正洞的双曲拱的施工方法

Similar Documents

Publication Publication Date Title
CN104047623B (zh) 一种大跨洞室开挖施工方法
CN102996133B (zh) 适用于软弱围岩隧道斜井与正洞交汇处的施工方法
CN101994513B (zh) 上半断面完成全断面帷幕注浆隧道施工方法
CN110017144B (zh) 一种考虑基底加固处理的黄土隧道三台阶施工方法
CN105840207A (zh) 一种穿越浅埋偏压松散堆积体大跨度隧道综合进洞结构施工方法
CN205154174U (zh) 软弱围岩隧道管棚超前支护施工结构
CN103256053B (zh) 一种地下洞室球冠状穹顶的开挖施工方法
CN103089275A (zh) 富水极破碎围岩隧道塌方段围岩控制方法
CN103993892A (zh) 一种用于软弱破碎不均匀地层隧道施工的支护方法
WO2022122052A1 (zh) 一种市域铁路矿山法隧道浅埋段综合施工方法
CN106917627B (zh) 一种富水地层暗挖施工下导洞的超前支护方法
CN110454171A (zh) 洞内由台阶法施工向双侧壁导坑法施工的转换方法
CN205117357U (zh) 基于自钻式螺旋管棚的软弱围岩隧道超前支护结构
CN205117356U (zh) 自钻式螺旋管棚
CN105298514B (zh) 一种现浇连续混凝土支架及其安装方法
CN103410182A (zh) 桩基单侧卸荷水平顶拉纠偏及断桩补强加固施工方法
CN107023300A (zh) 一种采用棚护法建造地铁车站的施工方法
CN107448214A (zh) 大型地质构造裂隙煤岩体超深孔高压两巷预注浆方法
CN102913249B (zh) 斜井横向贯通正洞单喇叭挑高施工方法
CN202325542U (zh) 弱胶结未成砂岩斜井挑顶与隧道初支转换结构
CN202247899U (zh) 一种基坑支护气囊
CN205100989U (zh) 一种利用地铁出入口兼作施工斜通道结构
CN206668287U (zh) 一种用于支护的组合式钢管混凝土拱架
CN204646251U (zh) 一种卵石土地层超前大管棚的盾构端头加固体系
CN103775102A (zh) 潜孔钻跟管成孔回填砼稳定临空面处理塌方施工方法

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
DD01 Delivery of document by public notice

Addressee: Dong Qinyin

Document name: Notification to Pay the Fees

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120711

Termination date: 20141202

EXPY Termination of patent right or utility model