CN202324664U - Steel beam lifting and supporting device - Google Patents

Steel beam lifting and supporting device Download PDF

Info

Publication number
CN202324664U
CN202324664U CN 201120511747 CN201120511747U CN202324664U CN 202324664 U CN202324664 U CN 202324664U CN 201120511747 CN201120511747 CN 201120511747 CN 201120511747 U CN201120511747 U CN 201120511747U CN 202324664 U CN202324664 U CN 202324664U
Authority
CN
China
Prior art keywords
girder steel
shear wall
steel
vertical
bracket assembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201120511747
Other languages
Chinese (zh)
Inventor
许新琦
刘治国
朱立江
王蓉
石伟
顾友娥
方鹏
马花
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN 201120511747 priority Critical patent/CN202324664U/en
Application granted granted Critical
Publication of CN202324664U publication Critical patent/CN202324664U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a steel beam lifting and supporting device which consists of a shear wall embedded part supporting device and a steel beam supporting device, wherein the shear wall embedded part supporting device is a pair of vertical right-angled triangular plates welded and connected with a shear wall embedded part in a shear wall; one of the vertical edges of the vertical right-angled triangular plates is welded and connected with the shear wall embedded part, and inclined edges of the vertical right-angled triangular plates face to the inclined lower part; the steel beam supporting device is a pair of vertical square steel plates welded and connected with the upper surface of the connecting end of a to-be-installed steel beam connected with an installed steel beam or an installed bracket; and the vertical square steel plates protrude out of the connecting end of the to-be-installed steel beam connected with the installed steel beam or the installed bracket. The steel beam lifting and supporting device has the benefits that the lifting speed of the steel beam can be improved, the lifting time of a tower crane is saved, the construction period of super-high-rise steel structure engineering is shortened, and the social benefit and the economic benefit are remarkable.

Description

Girder steel lifting bracket assembly
Technical field
The utility model relates to a kind of girder steel bracket assembly.
Background technology
At present, superelevation layer structural steelwork is more and more, has produced the vertical lifting problem of vertical lifting problem, the especially girder steel of steel member thereupon.The vertical lifting of existing girder steel all is directly girder steel to be winched to the installation site, and is fixing then, but because the quantity of girder steel is more, so the lifting speed of girder steel is very slow, the time of girder steel lifting is oversize.
The utility model content
The purpose of the utility model provides a kind of girder steel lifting bracket assembly, solve the oversize technical problem of time that girder steel lifting speed is too slow, girder steel lifts.
For realizing above-mentioned purpose, the utility model adopts following technical scheme: a kind of girder steel lifting bracket assembly is characterized in that: be made up of shear wall built-in fitting bracket assembly and girder steel bracket assembly; Said shear wall built-in fitting bracket assembly is a pair of vertical right-angled triangle steel plate on the shear wall built-in fitting that is welded to connect in shear wall; One of them vertical edges and the shear wall built-in fitting of said vertical right-angled triangle steel plate are welded to connect, and the hypotenuse of vertical right-angled triangle steel plate is towards oblique below; Said girder steel bracket assembly is a pair of vertical square plate that is welded to connect on the connection end upper surface of the girder steel to be installed that is connected with mounted girder steel or bracket, and this protrudes in the connection end of the girder steel to be installed that is connected with mounted girder steel or bracket to vertical square plate.
Right-angle side * the right-angle side of said vertical right-angled triangle steel plate * thick is 200 mm * 200 mm * 16mm, 300mm * 300mm * 16mm or 400mm * 400mm * 20mm.
Distance between said two blocks of vertical right-angled triangle steel plates be the beam top flange plate of girder steel 5 to be installed wide-100mm.
The horizontal level allowable variation of said two blocks of vertical right-angled triangle steel plates is ± 10mm.
The length of said vertical square plate * wide * thick is 350mm * 150mm * 16mm, 450mm * 200mm * 20mm or 550mm * 250mm * 20mm.
Distance between said two vertical square plates be the beam top flange plate of girder steel 5 to be installed wide-100mm.
The horizontal level allowable variation of said two vertical square plates is ± 5mm.
Compared with prior art the utlity model has following characteristics and beneficial effect: the present invention is a kind of simple and easy bracket assembly, can improve the lifting speed of girder steel, practices thrift the tower crane lifting time, shortens the construction period of superelevation layer structural steelwork.The present invention guarantee construction quality, to shorten aspect the construction period effect remarkable, has obvious social and economic benefit.
Construction provides a kind of new thinking to structural steelwork in the present invention; That is exactly when carrying out the girder steel lifting construction; Control the absolute altitude of girder steel through the vertical right-angled triangle steel plate and the welding and assembling height of vertical square plate, adjust the horizontal level of girder steel with the gap between gap between the vertical right-angled triangle steel plate and the vertical square plate, tower crane only works to lift girder steel; Fine setting work is accomplished by manual work, thereby has accelerated the installation rate of girder steel.
Shear wall built-in fitting bracket assembly among the present invention is welded on the shear wall built-in fitting; The girder steel to be installed that is connected with shear wall and the interim installation question of shear wall have been solved; Girder steel bracket assembly among the present invention is welded on the girder steel to be installed that is connected with mounted girder steel or bracket, has solved the interim installation question of the girder steel to be installed that is connected with mounted girder steel or bracket and mounted girder steel or bracket.
Description of drawings
Below in conjunction with accompanying drawing the utility model is done further detailed explanation.
Fig. 1 is that the master of shear wall built-in fitting bracket assembly looks sketch map.
Fig. 2 is the schematic top plan view of Fig. 1.
Fig. 3 is that the master of girder steel bracket assembly looks sketch map.
Fig. 4 is the schematic top plan view of Fig. 3.
Reference numeral: the girder steel to be installed that the girder steel to be installed that 1-shear wall, 2-shear wall built-in fitting, 3-shear wall built-in fitting bracket assembly, the mounted girder steel of 4-or bracket, 5-are connected with shear wall, 6-girder steel bracket assembly, 7-are connected with mounted girder steel or bracket.
The specific embodiment
Embodiment is referring to shown in Fig. 1-4, and this girder steel lifting bracket assembly is made up of shear wall built-in fitting bracket assembly 3 and girder steel bracket assembly 6.
Referring to Fig. 1, Fig. 2; Said shear wall built-in fitting bracket assembly 3 is for being welded to connect a pair of vertical right-angled triangle steel plate on the shear wall built-in fitting 2 in shear wall 1; One of them vertical edges and the shear wall built-in fitting 2 of said vertical right-angled triangle steel plate are welded to connect, and the hypotenuse of vertical right-angled triangle steel plate is towards oblique below.
When the beam of the girder steel to be installed 5 that is connected with shear wall is heavy less than 50KN, vertical right-angled triangle steel plate is designed to 200 mm * 200 mm * 16mm (right-angle side * right-angle side * thick); When the beam of the girder steel to be installed 5 that is connected with shear wall is heavy less than 100KN, vertical right-angled triangle steel plate is designed to 300mm * 300mm * 16mm (right-angle side * right-angle side * thick); When the beam of the girder steel to be installed 5 that is connected with shear wall is heavy less than 150KN, vertical right-angled triangle steel plate is designed to 400mm * 400mm * 20mm (right-angle side * right-angle side * thick).
Utilize shear wall built-in fitting bracket assembly 3 to be fixedly connected the installation procedure of the girder steel to be installed 5 that is connected with shear wall: on shear wall built-in fitting 2, eject absolute altitude below the beam top flange plate → on shear wall built-in fitting 2, the eject beam mounting center girder steel to be installed 5 that line → makings shear wall built-in fitting bracket assembly 3 → installation shear wall built-in fitting bracket assembly 3 → lifting is connected with shear wall, the girder steel to be installed 5 that will be connected with shear wall is placed on the shear wall built-in fitting bracket assembly 3 → and girder steel to be installed 5 that manual work adjustment is connected with shear wall, installation high-strength bolt, the girder steel to be installed 5 that will be connected with shear wall be fixedly connected → remove shear wall built-in fitting bracket assembly 3 with shear wall built-in fitting 2.
End face absolute altitude on the vertical right-angled triangle steel plate of absolute altitude welding below the beam top flange plate that on shear wall built-in fitting 2, ejects; Be used to determine the final absolute altitude of the girder steel to be installed 5 that is connected with shear wall, the last end face absolute altitude allowable variation ± 2mm of two blocks of vertical right-angled triangle steel plates.
The beam mounting center line that on shear wall built-in fitting 2, ejects is the horizontal level (promptly being used to adjust the horizontal level of the girder steel to be installed 5 that is connected with shear wall) for definite vertical right-angled triangle steel plate, and vertical right-angled triangle steel plate requires to press beam mounting center line symmetric arrangement.Distance between two blocks of vertical right-angled triangle steel plates be the beam top flange plate of the girder steel to be installed 5 that is connected with shear wall wide-100mm, the horizontal level allowable variation ± 10mm of two blocks of vertical right-angled triangle steel plates.
Referring to Fig. 3, Fig. 4; Said girder steel bracket assembly 6 is for to be welded to connect a pair of vertical square plate on the connection end upper surface of the girder steel to be installed 7 that is connected with mounted girder steel or bracket, and this protrudes in the connection end of the girder steel to be installed 7 that is connected with mounted girder steel or bracket to vertical square plate.
When the beam of the girder steel to be installed 7 that is connected with mounted girder steel or bracket is heavy less than 50KN, vertical square plate is designed to 350mm * 150mm * 16mm (long * wide * thick); When the beam of the girder steel to be installed 7 that is connected with mounted girder steel or bracket is heavy less than 100KN, vertical square plate is designed to 450 mm * 200 mm * 20 mm (long * wide * thick); When the beam of the girder steel to be installed 7 that is connected with mounted girder steel or bracket is heavy less than 150KN, vertical square plate is designed to 550 mm * 250 mm * 20 mm (long * wide * thick).
Utilize girder steel bracket assembly 6 to be fixedly connected the installation procedure of the girder steel to be installed 7 that is connected with mounted girder steel or bracket: with girder steel to be installed 7 that mounted girder steel or bracket are connected on the girder steel to be installed 7 that is connected with mounted girder steel or bracket of welded steel beam bracket assembly 6 → lifting on mounted girder steel or bracket 4, girder steel bracket assembly 6 is ridden on mounted girder steel or the bracket 4 → girder steel to be installed 7 that manual work adjustment is connected with mounted girder steel or bracket; High-strength bolt is installed, and the girder steel to be installed 7 that will be connected with mounted girder steel or bracket is fixedly connected → removes girder steel bracket assembly 6 with mounted girder steel or bracket 4.
With girder steel to be installed 7 that mounted girder steel or bracket are connected on welded steel beam bracket assembly 6; Promptly at the top flange plate upper surface welded steel beam bracket assembly 6 of the girder steel to be installed 7 that is connected with mounted girder steel or bracket; The level altitude of the girder steel of confirming thus to be connected to be installed 7 with mounted girder steel or bracket; Distance between two vertical square plates be the beam top flange plate of the girder steel to be installed 7 that is connected with mounted girder steel or bracket wide-100mm, the horizontal level allowable error ± 5mm of two vertical square plates.

Claims (7)

1. a girder steel lifting bracket assembly is characterized in that: be made up of shear wall built-in fitting bracket assembly (3) and girder steel bracket assembly (6); Said shear wall built-in fitting bracket assembly (3) is for being welded to connect a pair of vertical right-angled triangle steel plate on the shear wall built-in fitting (2) in shear wall (1); One of them vertical edges of said vertical right-angled triangle steel plate and shear wall built-in fitting (2) are welded to connect, and the hypotenuse of vertical right-angled triangle steel plate is towards oblique below; Said girder steel bracket assembly (6) is for to be welded to connect a pair of vertical square plate on the connection end upper surface of the girder steel to be installed (7) that is connected with mounted girder steel or bracket, and this protrudes in the connection end of the girder steel to be installed (7) that is connected with mounted girder steel or bracket to vertical square plate.
2. girder steel according to claim 1 lifting bracket assembly is characterized in that: the right-angle side * right-angle side of said vertical right-angled triangle steel plate * thick is 200 mm * 200 mm * 16mm, 300mm * 300mm * 16mm or 400mm * 400mm * 20mm.
3. girder steel according to claim 2 lifting bracket assembly is characterized in that: the distance between said two blocks of vertical right-angled triangle steel plates for the beam top flange plate of the girder steel to be installed (5) that is connected with shear wall wide-100mm.
4. girder steel lifting bracket assembly according to claim 3, it is characterized in that: the horizontal level allowable variation of said two blocks of vertical right-angled triangle steel plates is ± 10mm.
5. girder steel according to claim 1 lifting bracket assembly is characterized in that: the length of said vertical square plate * wide * thick is 350mm * 150mm * 16mm, 450mm * 200mm * 20mm or 550mm * 250mm * 20mm.
6. girder steel according to claim 5 lifting bracket assembly is characterized in that: the distance between said two vertical square plates for the beam top flange plate of the girder steel to be installed (7) that is connected with mounted girder steel or bracket wide-100mm.
7. girder steel lifting bracket assembly according to claim 6, it is characterized in that: the horizontal level allowable variation of said two vertical square plates is ± 5mm.
CN 201120511747 2011-12-09 2011-12-09 Steel beam lifting and supporting device Expired - Fee Related CN202324664U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201120511747 CN202324664U (en) 2011-12-09 2011-12-09 Steel beam lifting and supporting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201120511747 CN202324664U (en) 2011-12-09 2011-12-09 Steel beam lifting and supporting device

Publications (1)

Publication Number Publication Date
CN202324664U true CN202324664U (en) 2012-07-11

Family

ID=46436645

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201120511747 Expired - Fee Related CN202324664U (en) 2011-12-09 2011-12-09 Steel beam lifting and supporting device

Country Status (1)

Country Link
CN (1) CN202324664U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107152078A (en) * 2017-06-29 2017-09-12 中国建筑第二工程局有限公司 Articulated mounting and the construction method that steel vestibule welding interior stress is discharged using it

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107152078A (en) * 2017-06-29 2017-09-12 中国建筑第二工程局有限公司 Articulated mounting and the construction method that steel vestibule welding interior stress is discharged using it

Similar Documents

Publication Publication Date Title
CN103757993B (en) High-speed railway subgrade sedimentation repair system and method
CN102733316A (en) Integral synchronous rotary jacking construction method for small radius horizontal curved bridge
CN103437300A (en) Construction method for erecting double cantilevers for pier top steel beam without pier-side bracket
CN204607405U (en) A kind of large deformation Rock Crane Rail Support orbital arrangement structure
CN204552050U (en) A kind of anchor ear bearing frame and scaffolding platform assembly
CN102518300B (en) Embedded conical bearing joint type steel structural support and construction method thereof
CN202324664U (en) Steel beam lifting and supporting device
CN202482772U (en) Collapse-proof stop block mounting system for railway bridge
CN104495614A (en) Large-deformation rock wall crane beam track arranging structure and mounting and debugging method thereof
CN204728217U (en) The assembled positioning plate device of steel box girder segment
CN101899815B (en) Device for preventing bridging machine from rolling-over in installation process of bridge transition cross T-shaped boundary beam of bridging machine
CN107653756B (en) A kind of city rail U-type groove plate-type ballastless railway roadbed track plates bearing adjuster and its application method
CN202298375U (en) Quick aligning devices for installing ground flatcar tracks
CN201915420U (en) Foundation of temporary gate building
CN205476528U (en) Precast pile device of taking one's place fast
CN104032680A (en) Position adjusting device of straddle-type monorail transportation simple-support-first rigid-framework-second system
CN204475085U (en) A kind of tune rail support for track switch construction
CN204530506U (en) End bay closing device
CN204038986U (en) For removing the fork truck of inner support steel pipe
CN203781657U (en) Ground track fixing device
CN203307837U (en) Foundation bolt pouring positioning device
CN202670986U (en) Safety lifting lug for lifting blast furnace downcomer
CN202658485U (en) Formwork device for double-block ballastless track transverse expansion joint construction
CN202429894U (en) Holder for mounting and assembling of bridge crane
CN205421021U (en) Integral hoisting roof beam sand box that falls

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120711

Termination date: 20121209